Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
2021 Prevent. Maint. Generators and Fire Pumps
2nd Amendment to the 2017 5 Year Maintenance for the BGC HVAC Equipment and BAS Controls
Actuarial Services
Advertising and Marketing Agreement
B&T Advertising Services
B&T Club and Golf Club Security Camera Sys. DVR Recorders Inst. Project
B&T Club Electrical Demolition and Various Repairs Project
B&T Club Fire Protection System Dry Valve Replacement Project
B&T Club New LED Lighting Installation and Repairs Project
B&T Club Outdoor Lighting Project
B&T Club Poolside Sidewalk and Stair Replacement Project
B&T Clubhouse Hot Water Storage Tank Install. Project
B&T High Dive Stand Repair Project
B&T Janitorial Services
B&T Power Panels Installation Project
BGC and PW Building Security Camera Installation Project
BGC Burner Repair and Installation Project
BGC HVAC Unit AC-5 Condenser Coil Replacement Project
Computer Network Consulting Services
Const. Mgmnt. Contract for Designer-Led Design-Build 35th Street and Midwest Path Imp.
Cross Connection Control Program Inspections for Non-residential Properties
Cross Connection Control Program Residential Survey
Designer-led Design-Build Contract for York Woods Water Main Abandonment
Designer-Led Design-Build Project for the 2021 Watermain Improvements Brook Forest Subdivision Phase 4
Electric Aggregation Program Consulting Services
Eng. Const. Services Agreement for S.C. OSLAD Improvements Project
Eng. Inspection Services Agreement T-Mobile Equipment Upgrade and Install
Eng. Srvs. Agreement for Water System Risk and Resilience Assessment
Eng. Srvs. Contract for Interim Water Operations Assistance
Eng. Srvs. Year 18 NPDES MS4 Phase II Compliance (2020-2021)
Engineering Design Services Agreement for Golf Club Parking Lot Lighting
Engineering Project Management Services Agreement for the East and West Elevated Water Tanks Painting Project
Engineering Services Agreement for Bridge Inspections
Engineering Srvs. Contract for Water System Master Meter Evaluation
Environ. Eng. Srvs. Agreement Pond/Wetland Review
FD 93 and 94 Aerapy Purifier Installation Project
Fertilization, Broadleaf Weed, Crabgrass and Pre-Emergent Weed Control
Fire Hydrant Flow/Watermain Capacity Testing
Fire Pumper and PUC Lease Agreement
Golf Clubhouse Restroom Floor Restoration Project
Golf Clubhouse RTU Replacement Project
HVAC Preventative Maintenance Agreement
IGA Between the IL State Tollway Authority and Village of Oak Brook for Windsor Drive Widening
Library Backflow Unit Internal Check Valves Replacement Project
Library HVAC Compressor Replacement Project
Low Voltage Light Fixtures Maintenance 2022-2025
Outdoor Warning Siren System Annual Monitoring Services
Outdoor Warning Sirens Annual Preven. Maint. Agrmnt.
PD Interview Room Security Camera Installation Project
Prev.Maint.Ins. Srvs.for Pumps located at Resvs. A and B and 31st. St. Well House
Prof. Srvs. for Water System Emergency Response Plan
Professional Engineering Design Services for the Golf Clubhouse Bathroom Renovation Project
PW Garage Lighting Replacement Project
Removal of Buckthorn Ash Trees and Other Dead Trees Along the Sports Core Property
RPZ Testing 2022-2026
Soccer Building Lease Agreement
Sorts Core Water Main Improvements Project
Third Ammendment to the Janitorial Services Agreement
Trane Tracer Ensemble Cloud Coverage
Tree Maintenance Services 2021-2024
Tree Purchase and Planting Project
UPS & Battery Prev. Maint. Agrmnt.
UST Annual Compliance Testing
Village-wide Sprinkler System Opening and Closing Services 2022-2024
Water Main Improvements-Brook Forest Subdivision-Phase 3 Project