Loading...
R-1460 - 05/12/2015 - WATER MAIN CONTRACT - Resolutions Supporting Documents ITEM 6.13. 1) Of Oqk �o S d � G p CpbNZI, AGENDA ITEM Regular Board of Trustees Meeting of May 12, 2015 SUBJECT: Contract Award-2015 Water Main Replacement Project—(parts of Brook Forest Subdivision, Mocking Bird Lane, and Camelot Drive) FROM: Rania Serences, Senior Purchasing Assistant BUDGET SOURCE/BUDGET IMPACT: $1,079,680 for the 2015 Water Main Project from the Water System Distribution Improvements Account 451-91000 and $150,000 for drainage improvements within the 2015 Water Main Project from the Roadway Improvements Account 461-90700. RECOMMENDED MOTION: I move that the Village Board award a contract to the lowest responsive and responsible bidder, J. Congdon Sewer Service, Inc., Carol Stream, Illinois, subject to staff and attorney review,for the 2015 Water Main Replacement Project based on the unit prices listed on the attached bid tabulation, for an estimated total contract price of$1,229,680.00 and approve Resolution R-1460. Background/History: Seven (7) sealed bids were opened on Thursday, April 30, 2015. Bid Packages were picked up by eleven (11) companies. Thomas Engineering Group (our consulting engineer) recommends that we award the contract to the low bidder, J. Congdon Sewer Service, Inc. (see attached letter and bid tabulation). The bid submitted by J. Congdon Sewer Service, Inc. in the amount of $1,229,680.00 is approximately 2% lower than the Engineer's estimate of $1,256.905.00. J. Congdon Sewer Service, Inc. completed the Village's 2014 Water Main Project and has performed adequately. Also, they performed similar work, as to the Village's scope, for other municipalities. Thomas Enginering Group checked reference and staff is satisfied. This project will be the start of several future projects in the Brook Forest Subdivision, which has only had one (1) water main replacement project in 1997. Construction should begin in late May and be completed by late September. j:\worddoc\bid recommendations\2015 bid recommendations\2015 water main.doc Recommendation: That the Village Board award a contract to the lowest responsive and responsible bidder, J. Congdon Sewer Service, Inc., Carol Stream, Illinois, subject to staff and attorney review, for the 2015 Water Main Replacement Project based on the unit prices listed on the attached bid tabulation, for an estimated total contract price of $1,229,680.00 and approve Resolution R-1460. II j:\worddoc\bid recommendations\2015 bid recommendations\2015 water main.doc th� m s® engineering _group May 1,2015 service at the highest grade® 55 west 22nd street suite 300 Mr.James Bosma,P.E. lombard,illinois 60148 Village of Oak Brook 1200 Oak Brook Road Oak Brook, Illinois 60523 Re: 2015 Water Main Project Bid Proposals Evaluation Dear Mr.Bosma: Thomas Engineering Group, LLC(TEG) respectfully submits this letter to recommend a general contracting firm for performing contractual water main construction and restoration services for the 2015 Water Main Project. On Thursday,April 30,2015,the Village received and opened seven (7) bid proposals from interested firms. A Bid Tabulation worksheet (attached) was developed for evaluation of the lowest bidder based on the bid values submitted at the bid opening. Our evaluation of bids included consideration of the unit prices and past performance with other municipalities. Based on the attached tabulation, J. Congdon Sewer Service, Inc. (Congdon)submitted the lowest overall cost proposal Congdon submitted a bid proposal value of$1,229,680.00, approximately two (2) percent below the engineer's total estimated cost,which was$1,256,905.00. The second lowest bid proposal, submitted by Conley Excavating, Inc.,was approximately$86,700 higher than Congdon's bid proposal. Congdon, located in Carol Stream, IL, completed the Village's 2014 Water Main Project and has performed work similar to the Village's defined scope for other municipalities including the Village of Lisle and the Village of Downers Grove. Thomas Engineering staff worked directly with Congdon during the Village's 2014 Water Main Project and found the work completed by Congdon to be acceptable. Based on this information,TEG believes that Congdon adequately performed work similar to the project's scope and has the necessary equipment and qualified personnel to perform the required services. Therefore, TEG hereby recommends you consider awarding the contract for the 2015 Water Main Project to the lowest responsible bidder,J.Congdon Sewer Service, Inc.,for a contract amount not to exceed$1,229,680.00. If you have any questions or require additional information, please call me at (815)531-7868 or by e-mail at nicko thomas-engineering.com. Sincerely, thomas engineering group,Ilc Nicholas J.Ort,P.r,CFM,CPESC Attachments Cc: Rania Serences—Village of Oak Brook PROJECT Village of Oak Brook-2015 Water Main Project DATE: 30- r-15 1.CONGDON LOCATION Brook Forest Subdivision TIME: 1000 ENGINEER'S COST ESTIMATE SEWER SERVICE INC. Conio.Excavating,Inc. Gerardi Sewer&Water SECTION: 170 ALEXANDRA WAY 1555 Grammercy Place 4520 N.Osage Prepared by: Nick Orf CAROL STREAM,IL 60008 Morris.IL 60450 Norridge,IL 60706 Now 5%Bid Bonds included for all bids errors shown in BOLD 630-510-2434 815-942-1905 708.453.4715 ITEM DESCRIPTION UNIT QUANTITY ESTIMATE ESTIMATE BID BID BID BID BID BID NO. PAY CODE UNIT COST TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 20101000 TEMPORARY FENCE FOOT 1000 $4.00 $4,000.00 $2.50 $2,500.00 $5.00 $5,000.00 $2.00 52,000.00 2 20100110 TREE REMOVAL(6 TO 15 UNITS DIAMETER) UNIT 20 $24.00 5480,00 $15.00 $300.00 $38.00 $76000 $40.00 $80000 3 20100210 TREE REMOVAL(OVER 15 UNITS DIAMTER) UNIT 40 $28.00 $1,120.00 $15.00 $600.00 $44.00 $1,760.00 540.00 $1,600.00 4 NA TREE ROOT PRUNING FOOT 300 $20.00 $6,00000 $5.00 $1.50000 $15.00 $4,500.00 $4.00 $1,20000 5 20101300 TREE PRUNING(I TO 10 INCH DIAMETER) EACH 5 $80 00 5400.(10 $35.00 5175 00 S200,00 $1,000.00 545.00 $225.00 6 20101350 TREE PRUNING(OVER 10 INCH DIAMETER EACH 15 $110.00 $1.650.00 $35.00 $525.00 $450.00 $6,750.00 $75.00 $1.125.00 7 25100630 EROSION CONTROL BLANKET SQ YD 500 $3.50 $1,750.00 $3.00 $1,50000 $2.00 $1,000.00 $2.00 $1,000.00 8 25200200 SUPPLEMENTAL WATERING UNIT 40 550.00 $2,000.00 $10.00 5400.00 $90.00 $3,600.00 $25.00 $1000.00 9 28000400 PERIMETER EROSION BARRIER FOOT 500 $4.00 $2,(/00.00 $2.50 $1.250.00 $3.50 $1.750.00 $3.00 $1,5(1000 10 28000510 INLET FILTERS EACH 47 $125.00 $5,875.00 $25.00 $1,175.00 $14000 $658000 $110.00 $5,170.00 11 35300700 PORTLAND CEMENT CONCRETE BASE COURSE I2" SO YD 20 SI00.00 52.00000 $160.00 $3.200.00 $115.00 $2.300.00 $100.00 $2000.00 12 40201000 AGGREGATE FOR TEMPORARY ACCESS TON 225 $12.011 $2.700.00 $8.00 $1.800.00 $19.00 $4,275.00 $10.00 52,250.00 13 40603340 HOT-MIX ASPHALT SURFACE COURSE,MIX"D",N70 TON 25 $175.00 $4,375.00 $200.00 $5,00000 $160.00 $4,000.00 $200.00 55,000.00 14 40800010 BITUMINOUS MATERIALS PRIME COAT) GALLON 20 $25.00 $50000 $10.00 $200.00 SLOG $20.00 $10.00 $200.00 15 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT,6" SQ YD 200 $60000 $12,000.00 $75.00 $15,00000 $53.00 $10,600.00 $54.00 $10,800.00 16 44000200 DRIVEWAY PAVEMENT REMOVAL SQ YD 400 $8.00 $3.200.00 $5.00 $2.000.00 $14.00 $5,600.00 $9.00 $3600.00 17 44300200 STRIP REFLECTIVE CRACK CONTROL TREATMENT FOOT 80 $5.00 $400.00 $5.00 $400.00 $26.00 52,080.00 $5.00 $400.00 t8 56103300 DUCTILE IRON WATER MAIN 12" FOOT 25 $125.00 $3,12500 $150.00 $3,750.00 $150.00 53,750.00 $100.00 $2,500.00 19 56104900 WATER VALVES 6" EACH 4 $1.5(10.00 $6.000.00 $2,000.00 $8,00000 $1.40(1.00 $5,600.00 $1.275.00 55,100.00 20 56105000 WATER VALVES 8" EACH 4 52,000.00 $8,000.00 $2,500.00 $10,000.00 $1,630.00 56,520.00 $1,725.00 $6,900.00 2I 56400500 FIRE HYDRANTS TO BE REMOVED EACH 11 $500.00 $5.50000 $250.00 $2.750.00 $500.00 $5,500.00 $500.00 $5.500.00 22 56400820 FIRE HYDRANTS WITH AUXILARY VALVE AND VALVE BOX EACH 13 $5,00(1.00 $65,000.00 $6,000.00 $78,000.00 55,500 00 $71.500.00 $5,250.00 $68,250 00 23 59300100 CONTROLLED LOW-STRENGTH MATERIAL CLSM) CU YD 80 $120.00 $9.600.00 $85.00 $6.800.00 $120.00 $9.600.00 $90.00 $7.200.00 24 60100915 PIPE DRAINS 6" FOOT 30 $30.(10 $900,00 $30.00 $900.00 $3500 $1,050.00 $36.00 $1,080.00 25 60109520 PIPE UNDERDR.AINS,FABRIC LINED TRENCH 8" FOOT 850 560.00 $51000.00 $40.00 534000.00 $42.00 $35,700.00 $44.00 537,400.00 26 60248700 VALVE VAULTS.TYPE A,4'DIAMETER.TYPE 1 FRAME,CLOSED LID EACH 3 51.750000 $51250.00 $1,100.00 $3.300.00 $1,900.00 $5,700.00 $1,500.00 $4,500.00 27 60248900 VALVE VAULTS,TYPE A,5'DIAMETER,TYPE 1 FRAME,CLOSED LID EACH 5 $2,000.00 $10000.00 $1,300.00 86,500.00 $2,300.00 $11.500.00 $1,750.00 $8,75000 28 60255500 MANHOLES TO BE ADJUSTED EACH 1 $500600 $500.00 $500.00 $500.00 $800.00 $800.00 $475.00 $475.00 29 60500405 FILLING VALVE VAULTS EACH 4 $300.00 $120000 $150.00 560000 $500.00 $2,000.00 $275.00 $1,10000 30 66900200 NON-SPECIAL WASTE DISPOSAL CU YD 100 $50.00 $5.000.00 $25.00 $2,500.00 $50000 $5,000.00 $80.00 $8,000.00 31 66900450 SPECIAL WASTE PLANS AND REPORTS L SUM 1 $5,000.00 $5.000.00 $25.00 $25.00 $3 00000 $3,000.00 $1,500.00 $1,50000 32 66900530 SOIL DISPOSAL ANALYSIS EACH 2 $2,000.00 $4,000.00 $25.00 550.00 $2,500.00 $5,000.00 $975600 $1,9%00 33 78000650 THERMOPLASTIC PAVEMENT MARKING-LINE 24" FOOT 45 $50.00 $2.250.00 $25400 $1.125 00 $50.00 $2.250.00 $44600 $1.980.00 34 NA PVC C-900 WATER MAIN.6" FOOT 1300 560.00 $78,000.00 $100.00 $1307000.00 $5400 $70.200.00 $110.00 $143.000.00 35 NA PVC C-900 WATER MAIN,8" FOOT 2850 $70.00 $199,500.00 $105.00 $299,250.00 $68.00 $193,800.00 $120.00 $342,00000 36 NA PVC C-900 INTERNAL JOINT RESTRAINT WATER MAIN,8" FOOT 150 $100.00 $15,000.00 $115.00 $17,250.00 $6(1.00 $9,000.00 $90.00 $13,500.00 37 NA TEMPORARY HYDRANT EACH 1 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $1,000.00 $1,000.00 38 NA NON-PRESSURE WATER MAIN CONNECTION"A" L SUM I 57.500.00 $7.500400 $10,000.00 $1(1.000.00 $5.367.00 $5,367.00 $6.500.00 $6,50000 39 NA NON-PRESSURE WATER MAIN CONNECTION"B" LSUM 1 $4.000.00 $4.000.00 $10,000400 $10,000.00 $3,100.00 $3,100.00 $3,50000 $3,500.00 40 NA NON-PRESSURE WATER MAIN CONNECTION"C" L SUM 1 $4.000400 $4.000.00 $10,000.00 $10.000.00 $3.800.00 $3,800.00 $3,500.00 $3.500.00 41 NA NON-PRESSURE WATER MAIN CONNECTION"D" L SUM 1 $5,000.00 $5,000.00 $10,000.00 $10,()00.00 $4.100,00 $4,100.00 $3,500.00 $3,500400 42 NA NON-PRESSURE WATER MAIN CONNECTION"E" L SUM 1 $5 000.00 $5,000.00 $10,000.00 $10,000.00 $4 00000 $4,000.00 $3,500.00 $3,500.00 43 NA TRACER WIRE IN CONDUIT FOOT 4800 52.00 $9,60000 $5.00 $24.000.00 55.00 $24.000.00 $1.75 $8,4(10 00 44 NA TRACER WIRE ACCESS BOX EACH 13 $10000 $1,300.00 $250.00 $3,25000 $400.00 $5,20000 $50.00 $650.00 45 NA WATER SERVICE.NEAR SIDE.1 1/2" EACH 24 $14730.00 $41.520.00 $2,400.00 $57.600.00 $1.500.00 $36,000.00 $1,850.00 $444400.00 46 NA WATER SERVICE,NEAR SIDE,1 1/2" 5-FOOT BEYOND BACK-OF-CURB) EACH 5 $1,750.00 $8,750.00 $2,500.00 $12,500.00 $1,200.00 $6,000.00 $1.90000 $9,500.00 47 NA WATER SERVICE,FAR SIDE,1 1/2" EACH 15 $2,500.00 $37,500.00 $2,600.00 $39,000 00 $2,750.00 $41,250.00 $2,350.00 $35,250.00 48 NA WATER SERVICE.FAR SIDE,1 IR" 5-FOOT BEYOND BACK-OF-CURB) EACH 4 $2.5(10.00 $10,000.00 $2,500.00 $10,000.00 $2,480.00 $9,920.00 $2,400.00 $9,600.00 49 NA WATER SERVICE,FAR SIDE,1 I/2"(25-FOOT BEYOND RIGHT-OF-WAY) EACH 1 $3.200.00 53.200 00 $2,750.00 $2,750,00 $3,500.00 $3,500.00 $4,850.00 $4,850.00 50 NA WATER SERVICE.NEAR SIDE,(SPECIAL) EACH 1 $2.000.00 $2000.00 $2,450.00 $2.450.00 $14000.00 $1,000.00 $1,750.00 $1.750.00 51 NA WATER SERVICE,FAR SIDE.(SPECIAL) EACH 1 $2,00000 $27000.00 $2,800400 $2.80000 $1,000.00 $1,000.00 $1,875.00 $1,875.00 F57 NA COMPRESSION COUPLING AND EXTENSION OF WATER SERVICE EACH 2 $250.00 $500.00 $250.00 $50000 $85000 $1,700.00 $1,750.00 $3,500.00 NA REMOVE AND REPLACE COMBINATION CONCRETE CURB AND GUTTER,TYPE M-6.1 FOOT 400 $25.00 $10 000.00 $35.00 $14,000.00 $41.00 $16,400.00 $30.00 $12,000.00 NA REMOVE.AND REPLACE COMBINATION CONCRETE CURB AND GUTTER,TYPE B-6.l FOOT 30 $27.00 $81000 $35.00 51,050.00 $4700 $1,410.00 530.00 $900.110 NA STORM SEWER(SPECIAL)6" FOOT 35 $50.00 $1,750.00 $50.00 $1-750.00 $6300 $2,205.00 $55.00 $1,925.(10 NA STORM SEWER SPECIAL)8" FOOT 180 $55.0(1 $9.9(1000 $55.00 $9.900.00 $75.00 $13,500.00 $60.00 $108000(1 NA REMOVE AND REPLACE WITH STORM SEWER(SPECIAL)12" FOOT 400 $60.00 $24.000.00 $65.00 $26.00000 $79.00 $31,600.00 $65.00 $26.000 00 0 REMOVE AND REPLACE WITH STORM SEWER SPECIAL)21" FOOT 48 $150.00 $7,200.00 $95.00 $4,56000 $8. $4,224.00 $125.00 $6,00000 NA SANITARY SERVICE REPAIR FOOT 300 $45.00 $13,50000 $25.00 $7,500600 $70.00 $21,000.00 $3000 $y000.00 60 NA SUMP LINE REPAIR EACH i 5250.00 $1.25(1 00 $250.00 $1250.0(1 $50000 $2,500.00 $100.00 $500.00 Page 1 of 4 PROJECT Village of Oak Brook-2015 Water Main Project DATE: 30-A,15 J.CONGDON LOCATION Brook Forest Subdivision TIME: 10:00 ENGINEER'S COST ESTIMATE SEWER SERVICE INC. Conley Excavating,Inc. Gerardi Server M Water SECTION: 170.ALEXANDRA WAY 1555 Gr---y Place 4520 N.Osage Prepared by: Nick Orf CAROL STREAM,IL 60008 Morris,IL 61450 Norridge,IL 60706 Note:5%Bid Bonds included for all bids,errors shown in BOLD 630-510-2434 815-942-1905 708453.4715 ITEM DESCRIPTION UNIT QUANTITY ESTIMATE ESTIMATE BID BID BID BID BID BID NO. PAY CODE UNIT COST TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 61 NA REMOVE AND REPLACE PEDESTRIAN PATH SQ YD 30 $80 00 $2,400.00 $55.00 $1,650o() 542.00 $1 260.00 $55.00 $1,650.00 62 NA REMOVE AND REPLACE BRICK PAVER DRIVEWAY SQ YD 110 $50.00 $5.500.00 $55.00 $6,050.00 $28.00 $3,080.00 $9.00 $99000 63 NA TEMPORARY PAVEMENT,1.5" SQ YD 3600 $18.00 $64,800.00 $12.00 543,200000 $29.00 $104,400.00 $12.50 $45,000.00 64 X0323677 STREET SWEEPING HOUR 350 $140.00 $49.000.00 $5.00 $1,750.00 $100.00 $35,000.00 $135.00 $47,250.00 65 X0324636 WATER VALVE BOXES TO BE ABANDONED EACH 6 $200.00 $1.20000 $100.Do $600.00 $300.00 51,8(1000 $100.00 $600.00 66 X0327024 FIRE HYDRANTS TO BE REMOVED AND SALVAGED EACH 1 $600.00 $60000 $500.00 $500.00 $600.00 $600.00 $750.00 $750.00 67 X2080250 TRENCH BACKFILL.SPECIAL CU YD 4150 $32.00 $132,80000 $5.00 $20,75000 $35.00 $145,250.00 $32.00 $132.800.00 68 X2130010 EXPLORATION TRENCH,SPECIAL FOOT 120 $30.00 $3,60000 $5.00 $600.00 $30.00 $3,600.00 $10.00 $1,200.00 69 X2520700 SODDING,SPECIAL SQ YD 7000 $1000 $70,000.00 $0.01 $70000 $12.50 $87,500.00 $9.00 $63,000.00 70 X4404400 PAVEMENT REMOVAL(SPECIAL) SQ YD 3300 $10.00 $33,000.00 $5.00 $16,500.00 $900 $29,700.00 $5.00 $16,500.00 71 X5610651 ABANDON EXISTING WATER MAIN.FILL WITH CLSM FOOT 100 $50.00 $5.00000 $85.00 $8.500.00 $23.00 $2.300.00 $10.00 $1,000.00 72 X6020084 MANHOLE.SPECIAL. EACH 1 $5000.00 $5.000000 $8,000.D0 $8.000.00 $Q900.00 58,900.00 $10,000.00 $10,000.00 73 X6023508 INLETS,TYPE A,WITH SPECIAL FRAME AND GRATE EACH IS $1,500.00 $22,500.00 - $1,350.00 $20,250.00 $1,300.00 $19,50000 $1,250.00 $18,750.00 74 X6024502 INLETS,TYPE B,WITH SPECIAL FRAME AND GRATE EACH 4 $2,000.00 $8,000.00 $1,650.00 $6.600.00 $1,450.00 $5,800.00 $1,750.00 $7,000.00 75 X6026622 VALVE VAULTS TO BE REMOVED EACH 1 $1,000.00 $1000.00 $150.00 $15000 $850.00 $850.00 $275.00 $27500 76 NA TRAFFIC CONTROL AND PROTECTION. SPECIAL).MIDWEST ROAD L SUM 1 $5.000.00 $5.000.00 $15,000.00 $15.000.00 $30,000.00 $30,000.00 $10.000.00 $10.000.00 77 NA TRAFFIC CONTROL AND PROTECTION, SPECIAL).BROOK FOREST SUBDIVISION L SUM 1 $40,000.00 $40,000.00 $50,000.00 $50.000.00 518,000.00 $18,000.00 $64,000.00 $64,000.00 78 Z0004518 HOT-MIX ASPHALT DRIVEWAY PAVEMENT,4" SQ YD 200 $50.00 $10,000.00 $50.00 $10,000.00 $46.00 $9,200.00 $40.00 $8,000.00 79 Z00137 9 TCONSTRUCTION LAYOUT L SUM 1 $10,000.00 $10,0000(1 $80,000.00 580,000.00 54,000.00 $4,000.00 $12,50000 $12,500.00 80 Z0018700 DRAINAGE STRUCTURE TO BE REMOVED EACH 3 V$4..00 $1,200.00 $250.00 $750.00 5400.00 $1200.00 $175.00 $525.00 81 20019600 DUST CONTROL WATERING UNIT �70 .00 $6,00000 $10.00 $L50D.00 $60.00 $9.000.00 $25.00 $3,750.00 82 Z0067600 STEEL CASING 18" FOOT 000 $8,250.00 $65.00 $3,575011 5180.00 $9,900.00 $10000 $5,500.00 83 NA STEEL CASING PIPE.BORED,18" FOOT 0 $250.00 $17.50000 $425.00 $29.75000 $500.00 $35,000.00 AL 51256905011 As Tabulated 51,229,6811.00 As Correctcd $1,316,411.00 As Tabulated 51,394,995.00 %Lower Than Engineers Estimate: 2.2% Difference -$250.00 %Lower Than 2nd Bidder: 7.1% As Read $1,229,680.00 As Read $1 316,661.00 As Read $1,394,995 00 Page 2 of 4 PROJECT Village of Oak Brook-2015 Water Main Project DATE: 30-A,15 VIAN A.Lamp Concrete LOCATION Brook Forest Subdivision TIME: 10:00 Swallow Construction Corp CONSTRUCTION,INC. Martam Construction Inc Contractors,Inc. SECTION: 4250 Laccy Road 1041 MARTHA 1200 Gasket Dr. 1900 Wright Boulevard Prepared by: Nick Orf Downers Grove,IL 60515 ELK GROVE VILLAGE.IL 60(107 Elgin,IL 60120 Schaumburg,IL 60193 Note 5%Bid Bonds included for all bids,errors shown in BOLD 630.512-9902 847-364-5369 847-608-4800 ITEM DESCRIPTION UNIT QUANTITY BID BID BID BID BID BID BID BID NO. PAY CODE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 20101000 TEMPORARY FENCE FOOT 1000 $7.00 $7,000.00 $300 53,000.00 $500 $5,000.00 $4.00 $4,000.00 2 20100110 TREE REMOVAL 6 TO 15 UNITS DIAMETER) UNIT 20 $30.00 $600.00 $48.(10 $960.00 $46.00 $920.00 $50.00 $1,0(1(1.(10 3 20100210 TREE REMOVAL OVER 15 UNITS DIAMTER) UNIT 40 531.00 $1,240,00 $57.00 $2,28000 $51,00 $2,040.00 $6000 $2,400.00 4 NA TREE ROOT PRUNING FOOT 300 $3.00 $900.00 $14.00 $4.200.00 $6.00 $1,800.00 $5.00 $1.50(1.00 5 20101300 TREE PRUNING(I TO 10 INCH DIAMETER) EACH 5 $42.00 $210.00 $30(100 $1.500.0(1 $125.00 $625.00 $125.00 $625.00 6 20101350 TREE PRUNING(OVER 10 INCH DIAMETER) EACH 15 562.00 $93000 $600.00 $9.00000 $135.00 $2.02500 $150.00 $2.250.00 7 25100630 1 EROSION CONTROL BLANKET SO YD 500 $5.00 $2,500.00 $6.001 1 $3,000.00 $300 51,500.00 $3.00 S1.500.00 8 25200200 I SUPPLEMENTAL WATERING UNIT 40 $10.00 $4/10.00 $200.00 $8,000.00 $1.00 $40.00 $1.00 540.00 9 28000400 PERIMETER EROSION BARRIER FOOT 500 $6.50 $3150.00 54.00 $2.000.00 $3000 $1.500000 $5000 $2,500.00 10 28000510 INLET FILTERS EACH 47 $165.00 $7,755.00 $220,00 $10,34000 $236.00 $11,092.00 $125.00 $5875.00 11 35300700 PORTLAND CEMENT CONCRETE BASE COURSE 12" SQ YD 20 $325.00 $6.500.00 $340.00 $6.800.00 $188.00 $3,760.00 $125.00 $2.500.00 12 40201000 AGGREGATE FOR TEMPORARY ACCESS TON 225 $1.00 $225.00 518.00 84.050.00 546.00 $10,350.00 $30.00 $6,750.00 13 40603340 HOT-MIX ASPHALT SURFACE COURSE,MIX"D",N70 TON 25 $250.00 $6,250.00 $230.00 $5,750.00 $216.00 $5,400.00 $150.00 $3,750.00 14 40800010 BITUMINOUS MATERIALS PRIME COAT) GALLON 20 $10.00 $200.00 $20.00 $400.0(1 $10.00 5200.00 $5.00 $100.00 15 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT,6" SO YD 200 $85000 $17,000.00 $91.00 $18,20000 $61.00 $12,200.00 $75.00 $15,000.00 16 44000200 DRIVEWAY PAVEMENT REMOVAL S YD 400 $1500 $6.000.00 $20.00 $8.000.00 $1800 $7.200.00 $15.00 $6.000.00 17 44300200 STRIP REFLECTIVE CRACK CONTROL TREATMENT FOOT 80 $4.50 $360.00 $20.00 $1,600.00 $6.00 $480.00 $25.00 $2,000,00 IS 56103300 DUCTILE IRON WATER MAIN 12" FOOT 25 $250.00 56,250.00 $640.00 $16,000.00 $267.00 $6,675.00 $200.00 55,000.00 19 56104900 WATER VALVES 6" EACH 4 $5,500.00 $22.000.00 $1.8(1!100 $7,200.00 $1.410.00 $5,640.00 $2,000.00 $8,000.00 20 56105000 WATER VALVES 8" EACH 4 $7,500.00 $30,000.00 $2,200.00 $8,800.00 $1,940.00 $7,760.00 $3,50000 $14,000.00 21 56400500 FIRE HYDRANTS TO BE REMOVED EACH 11 $225.00 $2,475.00 $500.00 $5.500.00 $1,120.00 $122320000 5850.00 52350.00 22 56400820 FIRE HYDRANTS WITH AUXILARY VALVE AND VALVE BOX EACH 13 $9.500.00 $123500 00 $5.5(1000 $71,500.00 $4,980.00 $64,740.00 $5,500.(10 $71.500.00 23 59300100 CONTROLLED LOW-STRENGTH MATERIAL CLSM) CU YD 80 $180.00 $14,400.00 $160.00 112.800.00 $166.00 $13,280.00 $150.00 $12.000.00 24 60100915 PIPE DRAINS 6" FOOT 30 $33.50 $1,005.00 14&00 $1,440.00 K$3,910.00 00 $1,650.00 $60000 $L800600 25 60109520 PIPE UNDERDRAINS,FABRIC LINED TRENCH 8" FOOT 850 $45.00 $38,250.00 $53.00 $4"5.050.00 00 $39,950.00 $50.00 $42,500.00 26 - 60248700 VALVE VAULTS,TYPE A-4'DIAMETER TYPE I FRAME.CLOSED LID EACH 3 $1,500.00 54,500.00 $3.200.00 $9:60000 0.00 $11,010.00 52.850.00 $8.550.00 27 60248900 VALVE VAULTS,TYPE A,5'DIAMETER,TYPE 1 FRAME,CLOSED LID EACH 5 $1,950,00 $9,750.00 $3,300.00 $16,500.00 519,550.00 $3,750.00 $18,750.00 28 60255500 MANHOLES TO BE ADJUSTED EACH 1 $270.00 $270.00 $650.00 $650.00 .00 5450,00 $500.00 $500.00 29 60500405 FILLING VALVE VAULTS EACH 4 $300.00 $1,200.00 $60(1.00 $2,400.00 .00 51,800,00 $500.00 $2.00000 30 66900200 NON-SPECIAL WASTE DISPOSAL CU YD 100 $25.00 $2,500.00 $8000 $8,000.00 .00 $11,200.00 $140.00 $14,000.0(1 31 66900450 SPECIAL WASTE PLANS AND REPORTS L SUM 1 $2,500.00 $2,500.00 $3,000.00 $3,000,00 0.00 $7,500.00 $5,000.00 $5000.00 32 66900530 SOIL DISPOSAL ANALYSIS EACH 2 $500.00 $1,000.00 $1.400.00 $2,800600 $2,610.00 $5.220.00 $1,500.00 $3.000600 33 78000650 THERMOPLASTIC PAVEMENT MARKING-LINE 24" FOOT 45 $50.00 $2,250.00 $55m 52.475600 $52.00 1 52340.00 $100.00 $4,500,00 34 NA PVC C-900 WATER MAIN,6" FOOT 1300 590.00 $117,000.00 $84600 $10920000 $8100 $107,900.00 $80.00 $104,000,00 35 NA PVC C-900 WATER MAIN,8" FOOT 2850 $100.00 $285,000,00 $80.00 $228,000.00 $88.00 $250,800.00 $90600 $256,500.00 36 NA PVC C-900 INTERNAL JOINT RESTRAINT WATER MAIN,8" FOOT 150 $150.00 $22.500.00 $88.00 513,200.00 $11100 $16,950.00 $185.00 $27750400 37 NA TEMPORARY HYDRANT EACH 1 $1,000.00 $100000 $3000.00 $3,000.00 $4,500600 54,500.00 $1,50000 $1,50400 38 NA NON-PRESSURE WATER MAIN CONNECTION"A" L SUM 1 $9,500.00 $9,500.00 $16,20000 $16.200.00 54,600.00 54.600.00 $2,000.00 $2,000.00 39 NA NON-PRESSURE WATER MAIN CONNECTION"B" L SUM 1 $9.500.00 $9,500.00 $6,80(100 $6,800600 $3,400600 $3,400.00 52,500()0 $2,50000 40 NA I NON-PRESSURE WATER MAIN CONNECTION"C" L SUM 1 $9,500.00 $9,500.00 $6.800.00 $6.800.00 $3.660.00 $3.660.00 $1000.00 $3.000.00 41 NA NON-PRESSURE WATER MAIN CONNECTION"D" L SUM 1 $9,500.00 $9500.00 $8.800.00 $8,8()400 $4,110.00 $4,110.00 $3,000.00 $3,000.00 42 NA NON-PRESSURE WATER MAIN CONNECTION"E" L SUM 1 $9,500.00 $9,50000 $8,800,00 $8,80000 $4,6(10.00 $4,600.00 $3,500.00 $3,500100 43 NA TRACER WIRE IN CONDUIT FOOT 4800 $1.50 $7,200.00 $3.50 $16,800600 $5.00 $24,0(10.00 $1.00 $4.800.00 44 NA TRACER WIRE ACCESS BOX EACH 13 $30.00 $390.00 $170.00 $2,210.00 $260.00 53,380.00 $500.00 $6,500.00 45 NA WATER SERVICE,NEAR SIDE,1 1/2" EACH 24 $2,350.00 $56.400.00 $3.100.00 $74.400.00 $2.980.00 $71,52400 $2.500.00 $60.000.00 46 NA WATER SERVICE,NEAR SIDE,1 1/2"(5-FOOT BEYOND BACK-OF-CURB) EACH 5 $2,925.00 $14,625.00 $3.10000 $15.500.00 $2,900.00 $14,500.00 $2,800.00 $14,00400 47 NA WATER SERVICE,FAR SIDE,l 1/T' EACH 15 $3,600.00 $54,000.00 $4,300.00 $64,500.00 $3,910.00 $58,650.00 $3,500600 $52,500 00 48 NA WATER SERVICE,FAR SIDE,1 1/2"(5-FOOT BEYOND BACK-OF-CURB EACH 4 $3,850.00 $15,400.00 54,30400 $17.200.00 $3,610.00 814,440.00 $3,85000 S15,400.00 49 NA WATER SERVICE,FAR SIDE,11/2" 25-FOOT BEYOND RIGHT-OF-WAY) EACH 1 84,50000 54,50000 $5,811000 $5,800.00 $5,12000 $5,120.00 $5,000.00 $5,000.00 50 NA WATER SERVICE,NEAR SIDE.(SPECIAL) EACH 1 $2.350.00 $2,350.00 $4.800.00 $4,800.00 $2,980.00 $2.980.00 $4.500.00 $4.500.00 51 NA WATER SERVICE,FAR SIDE,(SPECIAL) EACH 1 $3.650.00 $3,65400 $5800.00 $5.800600 $3.910.00 $3,910.00 $6,500.00 $6,500 00 52 NA COMPRESSION COUPLING AND EXTENSION OF WATER SERVICE EACH 2 $200.00 $400600 $2,600.00 55,200.00 $460.00 $920.00 $1,250000 $2,500.00 53 NA REMOVE AND REPLACE COMBINATION CONCRETE CURB AND GUTTER,TYPE M-6.1 FOOT 400 $50.00 $20,000.00 $36.00 $14.400.(1(1 $37.00 $14,800.00 $65.00 $26,000.00 54 NA REMOVE AND REPLACE COMBINATION CONCRETE CURB AND GUTTER,TYPE B-612 FOOT 30 565.00 $1,950.00 $36.00 $1,080.00 $37.00 $1,110.00 $65.00 $1,95000 55 NA STORM SEWER(SPECIAL)6" FOOT 35 $45.00 $1,575.00 $53.00 51,855.00 $55.00 $1925.00 $100.00 $3,50400 56 NA STORM SEWER(SPECIAL)8" FOOT 180 $52.00 $9.36000 $6000 $10.800.00 $60.00 $10,800.00 $12500 $22,500.00 57 NA REMOVE AND REPLACE WITH STORM SEWER(SPECIAL)1Y' FOOT 400 $69.00 $27,600000 $80600 $32.000.00 $81,00 $32.400.00 $135.00 $54.000,00 56 U REMOVE AND REPLACE WITH STORM SEWER(SPECIAL)2t" FOOT 48 8155.00 $7444(10 823(100 $11040.00 $221.00 $10,608.00 $165.00 $7,920.00 59 NA SANITARY SERVICE REPAIR FOOT 300 $40.00 $12,000.00 $56.00 $16,800.00 545 00 $1350000 5200.00 $60,000.00 GO NA SUMP LINE REPAIR EACH 5 $350000 $1,750.00 $4110.00 $2,00000 $31000 $1,550.00 $650.00 $3,250.00 Page 3 of 4 PROJECT Village of Oak Brook-2015 Water Main Project DATE: 30-A,15 VIAN A.Lamp Concrete LOCATION Brook Forest Subdivision TIME: 10.00 Swallo v Construction Corp CONSTRUCTION.INC. Martam Construction Inc Contractors,Inc. 4250 Lacey Road 1041 MARTHA 1200 Gasket Dr. 1900 Wright Boulevard SECTION: Prcpared by: Nick Orf Downers Grove,IL 60515 ELK GROVE VILLAGE.IL 6000 Elgin,IL 60120 Schaumburg,IL 60193 Note:5%Bid Bonds included for all bids,errors shown in BOLD 630-512-9902 847-364-5369 847-60"800 ITEM DESCRIPTION UNIT QUANTITY BID BID BID BID BID BID BID BID NO. PAY CODE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 61 NA REMOVE AND REPLACE PEDESTRIAN PATH SO YD 30 $70.00 $2,100.00 $90.00 $2,700.00 $87.00 $2,610.00 $60.00 $1,800.00 62 NA REMOVE AND REPLACE BRICK PAVER DRIVEWAY SO YD 110 $35.00 $3,850.00 $90.00 $9.9(1(1(1(1 $13700 $15070.00 $150.00 $16,500.00 G3 NA TEMPORARY PAVEMENT,1.5" S YD 36110 $I5.00 $54,000.00 $16.00 $57,W(1.011 $23000 $82,800.00 $3000 $100,000.00 64 X0323677 STREET SWEEPING HOUR 350 $10(1.00 $35.000.00 $172.011 $60,20000 $130.00 $45,500.00 $135.(01 $40250.00 65 X0324636 WATER VALVE BOXES TO BE ABANDONED EACH 6 S15000 $900.00 $300.00 $1.800,00 5450.00 52,700.00 $500.00 $3.000.00 66 X0327024 FIRE HYDRANTS TO BE REMOVED AND SALVAGED EACH 1 $150.00 $150.00 $5.000.00 $5.000.00 $1.160,00 $1160.00 $600.00 $600.00 67 X208(1250 TRENCH BACKFILL.SPECIAL CU YD 4150 SI.00 54,150.00 $3100 $128.650,00 $48.00 $199,200.00 545 00 $186,754(10 68 X2130010 EXPLORATION TRENCH,SPECIAL FOOT 120 825.011 $3,000.00 $65.00 $7,800.00 $41000 54,920.00 $50.00 $6,000 00 69 X2520700 SODDING,SPECIAL S YD 7000 512.00 $84,000.00 $9.00 $53.000,00 $14.00 $98,000.00 $15.00 $105 0(10.00 70 X4404400 PAVEMENT REMOVAL SPECIAL S YD 3300 $375 $12,375.00 $17.00 $86,100.00 $IX.00 $59,40400 $15.00 $49,500.00 71 X5610651 ABANDON EXISTING WATER MAIN.FILL WITH CLSM FOOT 100 $63.00 $6.300.00 $48.00 $,I 800.00 $11.00 $1.10000 550.00 $5.000.00 72 X5020084 MANHOLE,SPECIAL EACH 1 S25,000.00 $25,00400 58,000.00 $8,0011.(10 S8.800.00 $8,800.00 $5,00400 55,000.00 73 X6023508 INLETS,TYPE A,WITH SPECIAL FRAME AND GRATE EACH l5 $1,650 00 $24,750.00 $975.00 $14,621.00 81,320 00 $19,800.00 $1,350.00 $20,250.00 74 X6024502 INLETS,TYPE B,WITH SPECIAL FRAME AND GRATE EACH 4 $2,050.00 $8,200.00 $1,'700.00 $7,600.00 $1.8140(1 $7,240.00 52,000.00 $8,000.00 75 X6026622 VALVE VAULTS TO BE REMOVED EACH 1 $750.00 5750.00 5600.00 $60400 S45000 5450.00 $500.00 $500.00 76 NA TRAFFIC CONTROL AND PROTECTION. SPECIAL),MIDWEST ROAD L SUM 1 $1400.00 $1.400.00 $33,800 00 $33.800.00 $36.000.00 $36,000.00 5125,00400 $125.000.00 77 NA TRAFFIC CONTROL AND PROTECTION. SPECIAL),BROOK FOREST SUBDIVISION L SUM 1 $6,000.00 $6,000.00 $30,000.00 $30,600.00 $I($000 $165 000.00 $IG 60.0.00 $160,000.00 12,0 , 78 Z0004518 HOT-MIX ASPHALT DRIVEWAY PAVEMENT,4" SQ YD 200 540.00 $8,000400 $58.00 $11 600.00 $67.00 $13,300.00 $60.00 $12,000.00 79 Z0013798 CONSTRUCTION LAYOUT L SUM 1 $10,0(10.0(1 WS10,000-00S26.000.00$26.000.00 %26000.00 $11.(10(1.00 $11,000.00 $65,000.00 $65 00400 80 Z0018700 DRAINAGE STRUCTURE TO BE REMOVED EACH 3 5300.00 $600.00 $1800.00 $45000 $1,350.00 $500.00 51,500.00 81 Z0019600 DUST CONTROL WATERING UNIT 150 $1100 $180.00 $27.000.(10 SL00 $150.00 SL00 $150.00 82 Z0067600 $TEELCASINGI8" FOOT 55 $15000 $750.00 &11.25000 $136.011 $7,48400 $150.00 $8,250.00 83 NA STEEL CASING PIPE,BORED,18" FOOT 0 0 5750.00 $52.500 00 $392.00 $27,440.00 5400.00 $28,000.00 As Tabulated 0 As Tabulated $1,658,105.00 As Tabulated 81,774,420.00 As Tabulatd SI,995,860.00 Lower Than Engineers Estimate: 2Lower Than 2nd Bidder: 7.1% As Read $1,442, .0 As Read $1,658,105.00 As Read 81,774,420.00 As Read $1,995,860.0 0 Page 4 of 4 RESOLUTION 2015-WA-MAIN-CNTRCT-R-1460 A RESOLUTION APPROVING AND AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT RELATING TO THE 2015 WATER MAIN REPLACEMENT PROJECT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND J. CONGDON SEWER SERVICE, INC. WHEREAS, the Village has budgeted funds for the replacement of certain water mains in parts of the Brook Forest subdivision as part of the 2015 Water Main Replacement Project ("Work"); and WHEREAS, on April 10, 2015, the Village solicited bids for the completion of the Work; and WHEREAS, the Village received 7 bids for the completion of the Work; and WHEREAS, J. Congdon Sewer Service, Inc. ("Congdon"), is the lowest responsible bidder for the completion of the Work; and WHEREAS, the Village and Congdon desire to enter into and execute a contract for the completion of the Work in an amount not to exceed $1,229,680.00 ("Contract'), which Contract is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Contract with Congdon; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Contract. The President and Board of Trustees hereby approve the Contract by and between the Village and Congdon in substantially the same form attached to this Resolution as Exhibit A, and in a final form acceptable to the Village Attorney. Section 3: Authorization and Execution of the Contract. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Contract on behalf of the Village after receipt of the final Contract fully executed by Congdon. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-WA-MAIN-CNTRCT-R-1460 Water Main Construction Contract—Congdon Brook Forest Page 2 of 2 APPROVED THIS 12th day of May, 2015 Gopal G. Lalmalani Village President PASSED THIS 12th day of May, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk EXHIBIT A CONTRACT #35477250 vl �F W . AT #-r. • •s i • • - •' • ? $ cb .n,.stvn,axrn 1:15 r F�iE rc fi ter' �t ��5 r t p..�' Mt�;1n`,�"!ln�t�c�4:.im q4i� 'r'i,2� If, I v�k �t>I ,t ��i:t , t�h nl t�Y"ifcl� —t-, ♦'' + tD t ,�. t y f>• , tiny n. @ i$ j E �.y,�` ,i t ,E , '.n id !- t3 •. as 1 0 a a • :1. s 6 ..