Loading...
R-1467 - 05/26/2015 - ENGINEERING - Resolutions Supporting Documents ITEM 6.D.6 PGA 0 ogK�9 .. �! p v p AGENDA ITEM Regular Board of Trustees Meeting of May 26, 2015 SUBJECT: Professional Services Agreement with Christopher B. Burke Engineering Ltd. (CBBEL) for the Luthin Road Outlet Study FROM: Mike Hullihan,P.E., Village Engineer BUDGET SOURCE/BUDGET IMPACT: $19,600 from the Infrastructure Fund (462-76200 and 462-90800) RECD I +NDED MOTION: I move that the Village Board approve the attached agreement with Christopher B. Burke Engineering Ltd. for the Luthin Road Outlet Study for an amount not-to-exceed $19,600. Background/History: The two acre pond adjacent to Luthin road was constructed approximately 65 years ago. It is the destination for water from most of the lots on Luthin Road. Over the years the pond has silted in. The very shallow depth of the pond has resulted in very low dissolved oxygen levels and infestations of aquatic vegetation. In order to perform maintenance of the pond and increase the turnover of the water, the owners have requested a lower outlet elevation., This would allow the . owners to lower the water level for bank stabilization and dredging activities. Our Engineering Department has formulated a plan by which the pond owners could be given a lower elevation storm sewer in which to discharge. The storm sewer would replace the existing road drainage system and could be installed as part of the paving of Luthin Road (currently scheduled for 2017). The planned storm sewer would have to discharge onto Forest Preserve District property. IN order to obtain perrnission for this discharge, a flowage easement, various stormwater and wetland studies must be performed. The professional services agreement with CBBEL would provide for these work products. CBBEL has been selected as an acceptable Architectural/Engineer consultant for the Village in a Quality Based Selection procedure. The scope of work and fee scheduled was negotiated with CBBEL by the Village Engineer and members of his staff. �L� Recommendation: I recommend that the Village Board approve the attached agreement with Christopher B. Burke Engineering Ltd. for the Luthin Road Outlet Study for an amount not-to-exceed $19,600. RESOLUTION 2015-ENG-STDY-AG-R-1467 A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND CHRISTOPHER B. BURKE ENGINEERING, LTD FOR THE PREPARATION OF A LUTHIN ROAD OUTLET STUDY WHEREAS, the pond located adjacent to Luthin Road was constructed approximately 65 years ago ("Pond'J; and WHEREAS, the Pond has filled with silt, resulting in an overgrowth of aquatic vegetation; and WHEREAS, to improve the Pond, the Village desires to obtain an engineering study evaluating the methods for lowering the Pond's outlet("Services'l; and WHEREAS, Christopher B. Burke Engineering, LTD ("Burke") has provided the Village satisfactory engineering services over the past several years; and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act'), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, the Village and Burke desire to enter into and execute an agreement for Burke to provide the Services to the Village for an amount not to exceed $19,600.00 ("Agreement'), which Agreement is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Burke in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Agreement after receipt of the final Agreement fully executed by Burke. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-ENG-STDY-AG-R-1467 Luthin Road Outlet Study 2 of 3 APPROVED THIS 26th day of May, 2015 Gopal G. Lalmalani Village President PASSED THIS 26th day of May, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk 435608870_vl Resolution 2015-ENG-STDY-AG-R-1467 Luthin Road Outlet Study 3 of 3 EXHIBIT A AGREEMENT Ec,J'1��ti�,`-' fit, �' i I � � �i • � � r Fs ? r4it — , E;lr4 iL1' {�d3G� ,vSl !° �;�Il,R511 F �EI(�gi�il ,,� +I1 sma FA • •. •• a •• • �• • :•. • • �•