Loading...
R-1466 - 05/26/2015 - ENGINEERING - Resolutions Supporting Documents ITEM 6.D.2 vGE.OF 0qK0 o IV i ,r 0 � o COUN-0,`� AGENDA ITEM Regular Board of Trustees Meeting of May 26, 2015 SUBJECT: 2015 Bridge Improvements Project Engineering Services Agreement for Construction Engineering with Crawford,Murphy and Tilly, Inc. —York Road (over I-88) —York Road(aver I-294 ramp) —Windsor Drive (over I-294 ramp) FROM: Jim Bosma, P.E.,Project Engineer Q4 3, BUDGET SOURCE/BUDGET IMPACT: $45,0984.57 from Infrastructure Funds for Roadway Improvements Account 461-76200 RECOMMENDED MOTION: I move that the Village Board approve the attached Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. for the construction engineering of the 2015 Bridge Improvements Project in the not-to-exceed amount of$45,984.57 and approve Resolution R-1466. Background/History: Included within the 2015 Budget are funds for engineering services for this project. The attached proposal describes the specifics involved for this project. Basically, the Village has three bridges over Tollways that connect adjacent Village-owned streets. It is the Village's responsibility to maintain/repair the surface of the decks of these bridges and everything else that is above the decks like the side parapet walls and guard rails. Two of these bridges, along York Road, have significant potholes along with damage to the side parapet walls. Crawford, Murphy and Tilly, Inc. (CMT) completed the design and bidding documents for this project. Their construction engineering fee of$45,984.57 equals 13.7% of the recently awarded construction bid of$336,404.95. Construction should occur throughout June and July. Recommendation: I recommend approving the attached Engineering Services Agreement with Crawford, Murphy and Tilly, Inc. for construction engineering for the 2015 Bridge Improvements Project. Last saved by i;\o Tollway Bridge Deck Surfaces Repair(14-1112)12015-Bridge-Improvements-Project-construction-engineering-memo.docx Last printed 51202015 2:40 PM RESOLUTION 2015-ENG-BRIDGE-AG-R-1466 A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND CRAWFORD, MURPHY AND TILLY, INC. FOR ENGINEERING SERVICES RELATED TO THE 2015 BRIDGE IMPROVEMENT PROJECT WHEREAS, the Village is making certain bridge and infrastructure improvements to: (i) the bridge located at York Road that passes over 1-88; (ii) the bridge located at York Road that passes over 1-294; and (iii)the bridge on Windsor Drive that passes over the 1-294 ramp (collectively, the "Project"); and WHEREAS, the Village desires retain an engineer to provide construction engineering services for the Project ("Services") to insure that the Project is constructed in a safe manner and in accordance with the specifications contained on the construction contract for the Project; and WHEREAS, Crawford, Murphy and Tilly, Inc. ("Crawford') previously provided the design and bidding documents for the Project; and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act"), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, the Village and Crawford desire to enter into and execute an agreement for Crawford to provide the Services to the Village for an amount not to exceed $45,984.57 ("Agreement'), which Agreement is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Crawford in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Agreement after receipt of the final Agreement fully executed by Crawford. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-ENG-BRIDGE-AG-R-1466 Engineering Services for the Inspection of the 2015 Bridge Project 2of3 APPROVED THIS 26th day of May, 2015 Gopal G. Lalmalani Village President PASSED THIS 26th day of May, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk #35598614_vl Resolution 2015-ENG-BRIDGE-AG-R-1466 Engineering Services for the Inspection of the 2015 Bridge Project 3 of 3 EXHIBIT A AGREEMENT c * All a .Ta• _4 ,�.��..>:���A�' -. rya�� _- .� � ,��,?�4 ��'.s,'2n��,�.co!�1�(���ir�;`���i.:��'f.3�''r��:%�.�+r+#�F,���i rr r � r - _