Loading...
R-1465 - 05/26/2015 - WATER MAIN CONTRACT - Resolutions Supporting Documents ITEM 6.1).1 PGA OF Oqk�� o o G AGENDA ITEM Regular Board of Trustees Meeting of May 26,2015 SUBJECT: 2015 Water Main Replacement Project(parts of Brook Forest Subdivision) Engineering Services Agreement for Construction Engineering with Thomas Engineering Group —Mockingbird Lane —Camelot Drive FROM: Jim Bosma, P.E.,Project Engineer rob BUDGET SOURCE/BUDGET IMPACT: $133,252.50 within Water System Distribution Improvements Account 451-76200. RECOMMENDED MOTION: I move that the Village Board approve the attached Engineering Services Agreement with Thomas Engineering Group for the construction engineering of the 2415 Water Main Replacement Project in the not-to-exceed amount of $133,252.50 and approve Resolution R-1465. Background/History: Included within the 2015 Budget are funds for engineering services for the 2015 Water Main Replacement Project. This project, starting with Mockingbird Lane and.Camelot Drive, will ideally be the start of several future projects in Brook Forest Subdivision. Thomas Engineering completed the design and bidding documents for this project. Their construction engineering fee of$133,252.50 equals 10.8% of the recently awarded construction bid of $1,229,680. Construction should commence in late May and be completed by late September. The attached agreement will provide for construction engineering services including full-time inspection, contract administration, public relations and production of as-built drawings. Recommendation: I recommend approving the attached Engineering Services Agreement with Thomas Engineering Group for construction engineering for the 2015 Water Main Replacement Project. Last saved by B2015 WM(15-1202)12015-Water-Main-Replacement-construction-engineering-memo.docx /J Last printed 5/2=015 11:17 AM �j RESOLUTION 2015-WA-MAIN-AG-R-1465 A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND THOMAS ENGINEERING GROUP, LLC FOR CONSTRUCTION ENGINEERING SERVICES RELATED TO THE 2015 WATER MAIN PROJECT WHEREAS, the Village is replacing the water mains in parts of the Brook Forest Subdivision (collectively, the "Project'); and WHEREAS, the Village desires retain an engineer to provide construction engineering services for the Project ("Services") to insure that the Project is constructed in a safe manner and in accordance with the specifications contained on the construction contract for the Project; and WHEREAS, Thomas Engineering Group, LLC ("Thomas") has previously provided satisfactory engineering services to the Village on numerous projects, including, without limitation, providing the engineering design services for the Project; and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act'), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, the Village and Burke desire to enter into and execute an agreement for Thomas to provide the Services to the Village for an amount not to exceed $133,252.50 ("Agreement'), which Agreement is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Thomas in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Agreement after receipt of the final Agreement fully executed by Thomas. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-WA-MAIN-AG-R-1465 Engineering Services for the Inspection of the 2015 Water Main Project 2of3 APPROVED THIS 26th day of May, 2015 Gopal G. Lalmalani Village President PASSED THIS 26th day of May, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk #35598621_vl Resolution 2015-WA-MAIN-AG-R-1465 Engineering Services for the Inspection of the 2015 Water Main Project 3of3 EXHIBIT A AGREEMENT i - . - ', 1 111 '� 11 111 . • - 111 111 W m� „- F 0 �4��,�-''f�e r�1�l T`�3j,������-�r��F1^'LCC`��•1 u5 q�5t h�r'—�G F v�a�Fc,Tt�11��[,� P y ,w � ho-+-,v,.,�a++�l t ♦ r � t f 'tF E34,,�ti�, } u$�r�J V'C"n lriLi�rA-ter',li 11 yl �dv� lr' ,Grrrat �'. r t lv.urn BENIN u?\�r4 �� ?i, �Lr c� �Ii� �'I iii �.� I .