R-1452 - 04/28/2015 - ENGINEERING - Resolutions Supporting Documents ITEM 7.13.2) PGA OF 0 A4- 69 v O O G f O GQUNjV AGENDAITEM' Regular Board of Trustees Meeting of April 28, 20015 SUBJECT: Award of Contract —2015 Bridge Improvements Project FROM: Rania Serences, Senior Purchasing Assistant BUDGET SOURCE/BUDGET IMPACT: $400,000 is included in the Infrastructure Fund for Roadway Improvements for this project (461- 90700) RECOMMENDED MOTION: I move that the Village Board award a contract to the lowest responsive and responsible bidder, Industria, Inc, Chicago, I1, for the 2015 Bridge Improvements Project based on the unit prices on the attached bid tabulation, for an estimated total project price of $336,404.95, and that the Village Board adopts Resolution R-1452 Background/History: A solicitation for bids for the 2015 Bridge Improvements Project was published in the Daily Herald and on the Village website on Tuesday, March 17, 2015. Bid packages were picked up by three (3) companies. Two (2) sealed bids were received and opened on Tuesday, April 7, 2015. Crawford, Murphy & Tilly, Inc. (our consulting engineer) recommends that we award the contract to the lowest responsive and responsible bidder, Industria, Inc. (see attached letter). The Consulting Engineer reviewed references and staff is satisfied. The Village has three bridges over Tollways that connect adjacent Village-owned streets. The bridges are at York Road over I-88, York Road over I-294, and Windsor Drive over I-294. It is the Village's responsibility to maintain/repair the surface of the decks of these bridges and everything else that is above the decks, like the side parapet walls and guard rails. Work will be completed on all three bridges. Additionally, the two bridges along York Road have significant potholes and damage to the side parapet walls. Work should begin in mid-May and be completed by late-July. Recommendation: That the Village Board award a contract to the lowest responsive and responsible bidder, Industria, Inc, Chicago, I1, for the 2015 Bridge Improvements Project based on the unit prices on the attached bid tabulation, for an estimated total project price of $336,404.95, and that the Village Board adopts Resolution R-1452. a CMT D 11 V�(q 2 E g %q April 8, 2015 V L5 �` Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523 � OF OM &4INUPJ40fiF NtTfAW Attention: Mr. Jim Bosma Re:Bid Recommendation of Award 2015 Oak Brook Bridge Improvements Windsor and York Road Bridges CMT Job#: 14251-01-00 Dear Mr. Bosma: This letter is in response to the 2015 Oak Brook Bridge Improvement project as advertised on March 17, 2015 with bids opened on April 7, 2014. There were two bids received which are summarized on the attached bid tabulation. The low bid of$336,404.95 from Industria, Inc. is less than the Engineer's Opinion of Probable Construction Cost of$343,873.50. The second bid from Vixen Construction, Inc. was for$349,061.60. It is our opinion that the two bids received are reasonable and within the range expected for a job of this type and size. At this time, we recommend the Village award the contract to Industria, Inc., presuming they have all the required insurances and information required by the contract. We are also developing our Phase 3 Construction Engineering Agreement and anticipate a draft submittal within the week for your initial review. Sincerely, CRAWFORD, MURPHY&TILLY, INC. Kevin D. Nelson, P.E. Vice President, Senior Manager cc: Rania Serences—Village of Oak Brook Fil V,�51-01-00 Crawford, Murphy Ti y Centered in Value 550 N Commons Drive Suite 116 Aurora,Illinois 60504 PHONE 630.820.1022 FAX 630.820.0350 cmtengr.com Engineers and Consultants 2015 OAK BROOK BRIDGE IMPROIVEMENTS AS BID ON 4/7/2015 BID TABULATION ENGINEERS'OPINION OF PROBABLE CONSTRUCTION COST BIDDER#1 BIDDER#2 Vixen Construction Co. INDUSTRIA,INC. AVG BID SP CODE N0. ITEM DESCRIPTION UNIT ESTIMATED TOTAL ESTIMATED PRICE UNIT COST QUANTITY ITEM COST ITEM COST TOTAL ITEM TOTAL ITEM DIFFERENTIAL UNIT COST COST UNIT COST COST UNIT COST FROM LOW BID TO EOPCC 40603315 HOT-MIX ASPHALT SURFACE COURSE,MIX"C",N 70 TON $300.00 62.8 $18,840.00 $400.00 $25,12(1.00 $385.00 $21;179.00 $392.50 $5,338.00 50157300 PROTECTIVE SHIELD SO YD $150.00 35.0 $5,250.00 $052.00 $15,820.00 $200.00 $7,000AD $328.00 $1,750.00 59200101 BRIDGE WASHING NO.1 EACH $10,000.00 1 $10,000.00 $3,500.00 $3,500.00 $10,000.00 $10,000.00 $8,750.00 $0.00 59200102 BRIDGE WASHING NO.2 EACH $10,000.00 1 $10,000.00 $3,500.00 $3,500.00 $10,000.00 $10,000.00 $6,750.00 $0.00 • 59200103 BRIDGE WASHING NO.3 EACH $10,000.00 1 $10,000.00 $8,500.00 $6,500.00 $10,000.00 $10,000.00. $8,250.00 $0:00 78001110 PAINT PAVEMENT MARKING-LINE 4" FOOT $1.25 3,809 $4,836.25 $3.10 $11,993.90 $1.05 $4,002.45 $2.08 -$773.80 • X0322194 POLYMER MODIFIED PORTLAND CEMENT MORTAR SO FT $150.00 50 $7,500.00 $155.00 $7,750.00 $200.00 $10,000.00 $177.50 $2,500.00 X0322215 CLEANING BRIDGE SCUPPERS AND DOWNSPOUTS EACH $250.00 35 $8,750.00 $575.00 $20,125.00 $200.00 $7,000.00 .$387.50 -$1,750.00 • X4401198 HOT-MIX ASPHALT SURFACE REMOVAL,VARIABLE DEPTH SO YD $28.00 558.0 $15,624.00 $32.00 $17,856.00 $29.00 $18,102.00 $30.50 $558.00 X4403700 MEDIAN REMOVAL AND REPLACEMENT(SPECIAL) SO FT $40.00 140.0 $500.00 $38.50 $5,390.00 $60.00 08,40000 $49.25 $2,800.00 X5870015 BRIDGE DECK CONCRETE SEALER SO FT 52.75 41,863 $115,123.25 $1.90 $79,539.70 $2.50 $100,857.50 $2.20 -$10,485.75 • X7010216 TRAFFIC CONTROL AND PROTECTION(SPECIAL) L SUM $25,000.00 1 $25,000.00 $58,000.00 $58,000.00 $80,050.00 $80,050.00 $69,025.00 $55,050.00 X7010237 CHANGEABLE MESSAGE SIGN,SPECIAL CA DAY $200.00 28 $5,650.00 $76.50 $2,142.00 $75.00 $2,100,0D $75.75 -$3,500.00 • Z0001800 APPROACH SLAB REPAIR(PARTIAL) SO YD $500.00 55.0 $27,500.00 $505.00 $27,775.00 $280.00 $16,100.00 $392.50 412,100.00 *GBSP 20016200 DECK SLAB REPAIR(PARTIAL) SO YD $750.00 75.0 $56,250.00 $700.00 $58,950.00 $325.00 $24,376.00 $555.50 -$31,875.00 • JT701016 MAINTENANCE OF TRAFFIC,DAILY SHOULDER CLOSURE,STANDARD E-3 L SUM $10,000.00 1 $10,000.00 $900.00 $900.00 $900.00 $600.00 $900.00 -$9,100.00 JT701021 MAINTENANCE OF TRAFFIC,DAILY LANE CLOSURE,STANDARD E-2 L SUM I $8,000.00 1 $8,000.00 $4,200.00 $4,200.00 $2,100.00 $2,100.00 $3,150.00 45,900.00 AS TABULATED TOTAL CONSTRUCTION COSTS: $343,873.50 $349,061.60 $336,40495 -$7,468.55 AS READ TOTAL CONSTRUCTION COSTS: $349,061.60 $336,404.95 RESOLUTION 2015-ENG-BRIDGE-CNTRCT-R-1452 A RESOLUTION APPROVING AND AUTHORIZING THE EXECUTION OF A CONSTRUCTION CONTRACT RELATING TO THE BRIDGE IMPROVEMENT PROJECT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND INDUSTRIA, INC. WHEREAS, the Village desires to make certain bridge and infrastructure improvements to the bridges that are located on (i) York Road that passes over 1-88; (ii) York Road that passes over 1-294; and (iii)Windsor Drive that passes over 1-294 (collectively, the "Project"); and WHEREAS, the Village solicited bids for the completion of the Project ("Construction Services"); and WHEREAS, the Village received two bids for the Construction Services; and WHEREAS, Industria, Inc., of Chicago, Illinois ("Industria"), was the lowest responsive and responsible bidder for the Construction Services; and WHEREAS, the Village and Industria desire to enter into and execute an agreement for Industria to provide the Construction Services, which agreement is attached hereto as Exhibit A ("Construction Contract'); and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to award the Project to Industria and enter into the Construction Contract; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Award of Contract. The purchase of Construction Services from Industria for a total amount not to exceed $336,404.95 shall be, and is hereby, approved. Section 3: Authorization and Execution of Construction Contract. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Construction Contract in substantially the same form as attached hereto as Exhibit A, after receipt of the final Construction Contract fully executed by Industria. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-ENG-BRIDGE-CNTRCT-R-1452 Construction Services for 2015 Bridge Improvement Project 2of3 APPROVED THIS 28th day of April, 2015 Gopal G. Lalmalani Village President PASSED THIS 28th day of April, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk Resolution 2015-ENG-BRIDGE-CNTRCT-R-1452 Construction Services for 2015 Bridge Improvement Project 3 of 3 EXHIBIT A REVIEW OF CONTRACTS Awardin Agency: T +1pe of Contract: ( i Department: Program/Account Number: Li')11116122110 Award Contract ice: Budgeted Amount: L2�(V Lk)L�, tzlob ob Mal [] Under $20,000 0 $500,001 —$1,000,000 $20,000 - $500,000 0 Over $1,000,000 MEMO* Date: Name: a Zo l 1�, Name: Date: Name: Date: tea_ Name: Date: b other arty Date/Initials Three (3) Originals signed y p � Original provided to staff member for other party Date/Initials 1 Original provided to Official Files Date/Initials le K 'i �1 Village of Oak Brook I Approved by Board of Trustees- Date/Initials: