Loading...
R-1494 - 09/22/2015 - ENGINEERING - Resolutions Supporting Documents ITEM 6.C.2) Of 0AIr V p ' l ` c CbUN14`�v AGENDA ITEM Regular Board of Trustees Meeting of September 22, 2015 SUBJECT: 2016 Street Improvement Project — 16t" Street —Acorn Hill Lane, Glendale Avenue, Washington Street and Wood Road —Avenue Loire —Bath & Tennis Drive —Camden Court&Tower Drive Water Reservoir Area —Camelot Drive and Mockingbird Lane — Clearwater Drive —Harger Road — St. Stephens Green —York Road (southernmost Tollway bridge to north Village limits) Engineering Services Agreement for Design Engineering with Christopher B. Burke Engineering, Ltd. FROM: Jim Bosma, P.E., Project Engineer BUDGET SOURCE/BUDGET IMPACT: $193,875 from Infrastructure Funds for Roadway Improvements Account 461-76200 RECOMMENDED MOTION: I move that the Village Board approve the attached Engineering Services Agreement with Christopher B. Burke Engineering, Ltd. for the design of the 2016 Street Improvement Project in the not-to-exceed amount of $193,875 and approve Resolution R-1494. Background/History: Included within the 2015 Budget are funds for the design of the 2016 Street Improvement Project (please also see attached map). The attached proposal for design engineering by Christopher B. Burke Engineering, CBBEL, is 6.5% of the estimated cost of approximately $3,000,000 (mostly Village's opinion) which is a reasonable percentage for this paving project. Brief descriptions of the project locations are below. Last saved by JA\2016 Street improvement Project(16-1106) 016-Street-Improvement-design-engineering-memo.docx Last printed 9/1712015 9.32 AM , The portland cement concrete (PCC) area of 16`n Street (thirty years old next year) will be cost- evaluated for significant maintenance work either by PCC patching or by replacing the top of the PCC with asphalt. Acorn Hill Lane, Glendale Avenue, Washington Street and Wood Road will have a standard resurfacing which was last done in 1997 (all nineteen years old next year). Some of these lengths might receive significant shoulder treatment and Glendale Avenue may require significant coordination with Hinsdale's ownership of part of this road. Avenue Loire, along west side of the Village, will have a standard resurfacing which was last done in 1999 (seventeen years old next year). This is further necessitated by the maintenance burden towards the developing potholes. Bath & Tennis Drive may have a combination of standard resurfacing and significant reconstruction depending on the existing asphalt thickness. Some drainage improvements could occur. The last paving projects here were in 1997 and 2002 (fourteen to nineteen years old). Camden Court will have a standard resurfacing which was last done in 1996 (twenty years old). A nearby water reservoir area on Tower Drive will also have significant asphalt reconstruction. Camelot Drive and Mockingbird Lane will have a combination of standard resurfacing and significant reconstruction based on observations during this year's water main project. The last paving project here was 1997 (nineteen years old next year). Clearwater Drive will have a standard resurfacing which was last done in 1999 (seventeen years old next year). This will include removing the large adjacent turnaround area used by the trucks from the former industrial building complex. Harger Road will have a standard resurfacing which was mostly last done in 2000 (sixteen years old next year). This includes the part of Harger Road near Spring Road (done in 2005)that had a water main replacement within it last year. St. Stephens Green will have a standard resurfacing which was last done in 1999 (seventeen years old next year). York Road will have some pavement maintenance work from the southernmost Tollway bridge to the north Village limits which was last done in 1998 (eighteen years old next year). This work, along with a nearby part of Harger Road, may be significantly lessened if a related grant application for major work at the end of this decade is found successful in a couple months. This project also includes various minor patching areas within the north part of the Village and some old culvert replacements under Adams Road. We anticipate completing the design by February, followed by bidding in March and then construction occurring from May to September. Recommendation: I recommend approving the attached Engineering Services Agreement with Christopher B. Burke Engineering, Ltd. for design engineering for the 2016 Street Improvement Project. Last saved by JA2016 Street Improvement Project(16-1106)\2016-Street-Improvement-design-engineering-memo.docx Last printed 9/17/2015 9:32 AM e e , s 16th St Ei�-I i York Rd I j I C i I s Camden Ct —' I m° Clearwater Dr ---------------------- — • nx. .b x ' c c e , Camelot Dr �„,„,x .•�w„� ' Bath and Tennis Dr � L a @ ' + Ave Loire ° ° u�b °N a Mockingbird Lnxw., '1 - ss+ g , St Stephens Green Washington St ° : SC' 5 CMS a S xi 9 + s s a` .3 I Acorn Hill Ln ".a y , n Wood Rd •„ — a j '� Glendale Ave , �conaoNium #2016 Village of Oak Brook LIMITATION OF LIABILITY: Tl,a lwaraemployeesaknn aM F!e,7C4rdany Ba, amsaptam aryaso=on1'a:>bn 0 Cn„ tion TheCky makes no tlakn p m me aourary o/1NIng e,tl I an Cly Data tals ano bon toes no fl pm 0y 7ortta:k Street Improvement Project wslon . In p,oritlipaacha itles edgy an oasss tlm ase nlhaalewpmla�«mrmemm�eoranyapprcn�maaeMear amiarwe. c�yassl,mea,aom:ponsin�aane accam�r or am auhalaaerc capiea or mla anitll. 0 430 860 1,720 2,580 3,440 Feet RESOLUTION 2015-ENG-ST-PRJT-R-1494 A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND CHRISTOPHER B. BURKE ENGINEERING, LTD FOR DESIGN SERVICES RELATED TO THE 2016 STREET IMPROVEMENT PROJECT WHEREAS, the Village has budgeted funds for the design and bidding of the 2016 Street Improvement Project("Project') in its budget for Fiscal Year 2015; and WHEREAS, the Village desires to retain an engineer to provide engineering design and bidding services for the Project("Services"); and WHEREAS, Christopher B. Burke Engineering, LTD ("Burke") previously provided satisfactory engineering services to the Village during the design and bidding phases of the 2011, 2012, 2013, 2015 and 2016 Paving Projects; and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act'), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, the Village and Burke desire to enter into and execute an agreement for Burke to provide the Services to the Village for an amount not to exceed $193,875.00 ("Agreement'), which Agreement is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Burke in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village President and Village Clerk shall be, and hereby are, authorized to execute the Agreement after receipt of the final Agreement fully executed by Burke. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-ENG-ST-PRJT-R-1494 Engineering Design Services for 2015 Street Improvement Project 2 of 3 APPROVED THIS 22nd day of September, 2015 Gopal G. Lalmalani Village President PASSED THIS 22nd day of September, 2015 Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk Resolution 2015-ENG-ST-PRJT-R-1494 Engineering Design Services for 2015 Street Improvement Project 3of3 EXHIBIT A AGREEMENT Y�0 Qfi!R�k� Fp C UtlY:iA� I at �(s ,rj t�r l� �14sVyts � q rn,,.t, �uY .alb`>.rr�W.h�,i,,,.+4i,�a,...,...id .-•. � � I i ��''�``J� � ` �3,� 11s P) (q f, f 8 ��! 77 s 1.1 :k A., "Ztr�--,t��I��7`� l `�h � •13 �t� �.,a.?. /' r T01 fl!I ` t7i6���j `?11311 - �r ;;er