Loading...
R-1502 - 10/27/2015 - CONTRACTS - Resolutions Supporting Documents ITEM 6.C.6) , Of O q ff 49 v p 0 ff =WE a 00ut4jl'� AGENDAITEM Regular Board of Trustees Meeting of October 27, 2015 SUBJECT: Award of Contract—Information Technology Data Center Backup Electric Power System FROM: Jim Fox, Information Technology Director BUDGET SOURCEIBUDGET IMPACT: $33,140.70 from Information Technology Program -- Computer Hardware and Software (151-91 600) & $17,537.14 from Structural Improvements Program 421-90400 RECOMMENDED MOTION: I move that the Village Board waive further bidding since the State of Illinois already conducted the bid process and approve a Professional Service Agreement in the amount of $50,677.84 with SEPS, Inc. for the Information Technology Division Data Center Backup Electric Power System and approve Resolution R-1502, Background/History: An uninterruptible power supply or UPS is an electrical apparatus that provides emergency power to a load when the input power source, typically the main power supply fails. A UPS differs from an auxiliary or emergency power system or standby generator in that it will provide near-instantaneous protection from input power interruptions, by supplying energy stored in batteries. A UPS is typically used to protect hardware such as computers, data centers, telecommunication equipment or other electrical equipment where an unexpected power disruption could cause business disruption or data loss. In addition, UPS systems also provide extended run-time capabilities until an adjunct electrical supply can be brought on-line. The Information Technology Division currently uses rack mount UPS units that have an on- battery runtime of only a few minutes. In addition the current units do not have fail over capabilities. If one of the current UPS units fails, all devices powered by the UPS also fail. The current UPS units are at the end of their life expectancy and are scheduled for replacement. Information Technology Division staff has been researching replacement UPS systems that will provide for extended run-time capabilities and along with other advanced features. There are several reasons we recommend the Eaton BladeUPS data room operations: • The current UPSs are "break in power" which can cause switches to drop during a power disruption before the Generator kicks on. B1adeUPS is a"no break in power" system. The transition to UPS protection will be seamless. • This configuration will provide more runtime in the event of a generator failure—for graceful shutdown or to allow additional time to bring an adjunct emergency generator on-line. If needed, additional batteries can be added to extend the run-time of the system. • The system provides an A/B environment for dual and single corded devices (fault tolerance). If one segment of system fails, the other segment supports the load. • The BladeUPS is modular—provides flexibility as it can be moved or reconfigured based on future needs. Modularity also reduces the time required to do repairs, if needed. • Conserves valuable rack space with 12 kW of power in only 6U of rack height, including batteries. • Accommodates growth by enabling building-block upgrades from 12 kW to 60 kW in a single rack enclosure. • Reduces energy costs and cooling needs through best-in-class efficiency performance. • Delivers highest levels of reliability at the rack with patented Powerware® Hot Sync paralleling technology and intelligent bypass design, field proven in thousands of large data centers globally. • Simplifies installation and service with true plug-and-power connections and hot- swappable batteries and electronics modules. • Increases battery life through ABM®technology, resulting in more uptime and fewer battery replacements. • The Eaton Intelligent Power Software Suite allows a global view across the entire computer network from any PC. The system is extremely versatile, the software is compatible with power devices supporting a network interface, including other manufacturers' UPSs, environmental sensors, ePDUs, shutdown applications and more. Recommendation: That the Village Board waives further bidding since the State of Illinois already conducted the bid process and approve a Professional Service Agreement in the amount of$50,677.84 with SEPS, Inc. for the Information Technology Division Data Center Backup Electric Power System and approve Resolution R-1502. RESOLUTION 2015-ZO-ORD-CNSLT-R-1504 A RESOLUTION APPROVING AND AUTHORIZING THE AWARD OF A CONTRACT TO TESKA, INC. FOR ZONING ORDINANCE CONSULTING SERVICES WHEREAS, the Village desires to retain a planning firm to assist the Village in updating the Zoning Ordinance of the Village of Oak Brook, Illinois of 1966,"as amended ("Services'j; and WHEREAS, the Village issued a request for proposals to provide the Village with the Services ("RFP ); and WHEREAS, the Village received four proposals from firms desiring to provide the Village with the Services; and WHEREAS, after evaluating the proposals, the Village has determined that Teska Associates, Inc, of Evanston, Illinois ("Teska'j presented the best overall value to the Village based on factors including, without limitation, price, qualifications, and the understanding of the Village's needs; and WHEREAS, the Village desires to enter into an agreement with Teska to provide the Services for $78,200.00, which agreement is attached to this Resolution as Exhibit A("Agreement'j; and WHEREAS, the President and Board of Trustees have determined that it is in the best interests of the Village to enter into the Agreement with Teska; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of Agreement. The President and Board of Trustees hereby approve the Agreement with Teska in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Execution of Agreement. The Village Manager and Village Clerk shall be, and hereby are, authorized to execute the Agreement between the Village and Teska after receipt of the final Agreement fully executed by Teska. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2015-ZO-ORD-CNSLT-R-1504 Authorizing Award of Contract for Zoning Ordinance Consulting Srvcs. Page 2 of 3 APPROVED THIS 27th day of October, 2015 4- Gopal G. Lalmalani Village President PASSED THIS 27th day of October, 2015 Ayes: Trustees Adler, Baar, Manzo, Moy, Tiesenga, Yusuf Nays: None Absent: None ATTEST: q r Charlotte K. Pruss = Village Clerk