Loading...
R-211 - 09/14/1976 - STREETS - Resolutions-a l �Np'fJ4R1� RESOLUTION NO JVS9 0 A1�4RA CONTRACT AWARD - 22nd STREET /JORIE BOULEVARD WHEREAS, the Village of Oak Brook has entered into agreements with the Illinois Department of Transportation and the Federal Highway Administration for the improvement of 22nd Street from the East -West Tollway structure to Clearwater Drive, including major improvements to the intersection at Jorie Boulevard- Enterprise Drive and the structure over Salt Creek: and, WHEREAS, the Illinois Department of Transportation, received bids on September 2, 1976 for the construction of said improvements; and, WHEREAS, acceptable bids have been received from more than two construction companies; and, WHEREAS, said bids compare favorably with the engineer's estimate. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE OF OAK BROOK, COUNTY OF DU PAGE, STATE OF ILLINOIS: Section 1: That the contract be awarded to the low bidder, Brighton Building and.Malntenance Company and Krug Excavating Company in the amount of $1,247,576.21. Section 2: That the contractor's be notified of .the award at the earliest possible time'to-rexpddite execution of the cohtract and commencement of construction. Section 3: All ordinances, rules, and regulations of the Village of Oak Brook which are in conflict with the provisions of this Resolution are hereby repealed to the extent of the conflict. Section 4: If any section, sub - section, sentence, clause, or phrase of this Resolution is for any reason hold to be invalid, such determination shad not affect the validity of any remaining portion of this Resolution. Section 5: This Resolution shall be in full force and effect from and after its passage, approval, and publication in panphiet form as required by law. PASSED this, 10day of 1976 . Trustee Brown Trustee Giaves Trustee Cerne _ Trustee Philip Trustee Congrevo Trustee Rush APPROVED this'►;rday of esident) Attest: age arc Filed in the Office of the Village Clark and publigh d in pamphlet form by authority of a President pnd,B�o d of Trustees of he Vi lags of Oak Brook this day of /��u• . 197. APPROVED as to Form: % — 16 IS& % r g'� Wl y qt -jRer VILLAGE OF OAK BROOK 1200 OAK BROOK ROAD OAK BROOK, ILLINOIS September 3, 1976 14W TO: President 6 Board of Trustees SUBJSGT: Award of Bid - 22nd Street /Jorie Blvd. Gentlemen, 854 -2220 Attached is a "Resolution dealing with the contract award for the 22nd Street/ Jorie Blvd. project. Engineer's estimate for this project is $1,382,863,90. The four lowest bidders were as follows: Brighton Building 6 Maintenance Co. 8 Krug Excavating Co. - $1,2470576.21 Thomas Madden 1,334,293.07 Robert Addison 1,360,935.79 Swenson Company 1,404,894.14 The low bidder is Brightoe/Yrug who pas:- the contractor: on 22n1 Street from Route 83 west. .You will recall that the job was started long before our 22nd and Spring improvement and has dragged on so that even at the present time it IS not completed. It would be BY recommendation that in the letter of trans- mittal to the "State of Illinois with this attached resolution, that we advise the State of Illinois - 1. that we take this action based on the. State of Illinois making the contractor avnre that the Village of Oak Brook will not tolerate undue delays in the expedious.Implementation of these itprovea0uts. 2. that was will not tolerate excessive costs and overruns to the basic contract as was experienced on 22nd Street from Route 83 west.. 3. that we will not tolerate the uncooperative attitude expressed by the contractor An coordination with the various agencies and land owners involved along 22nd Street. I am sure that Brighton /Krug is aware of these problems and probably will have good reasons in mind why they occurred. However, in my judgment, we should make our position clear to the contractor in advance of any construction on our project.