Loading...
G-939 - 12/14/2010 - BOND - Ordinances ORDINANCE 2010-CD-BC-G-939 AN ORDINANCE REVISING THE FEE AND BOND SCHEDULE BY AMENDING CHAPTER 4(FEES AND BONDS) OF TITLE 10 (BUILDING REGULATIONS) OF THE VILLAGE CODE OF THE VILLAGE OF OAK BROOK WHEREAS, the President and Board of Trustees have determined that it is necessary to increase the current building permit fee schedule in order to defray the Village's increased costs relative to the issuance of building permits and to protect the public health, safety and welfare. NOW, THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS, as follows: Section 1: The foregoing preamble is restated and incorporated herein by reference as though fully set forth herein. Section 2: Chapter 4 (Fees and Bonds) of Title 10 (Building Regulations) of the Village Code is hereby amended by deleting Chapter 4 in its entirety and substituting the following in lieu thereof: CHAPTER 4 FEES AND BONDS SECTION 10-4-1: FEE AND BOND SCHEDULE: Before a permit required by this Title is issued, the Director of Community Development shall collect a fee and bond calculated according to the following schedule: A. Volume Computation: Volume shall be computed on the exterior dimensions of the building and shall include all space above the lowest level of the foundation wall and to the highest point of the main roof and to include all projections. B. Unit of Volume Cost: Figure a fraction larger than one-half(1/2) as a full unit. C. Multi-Component Building Permit Fees: The majority of the permits issued by the Village are for new construction (new structures and additions/alterations to existing structures). The permit fee for these activities is calculated to cover the costs associated with the various permit components (i.e., pre-application meetings, application processing, plan review, base fee for the various construction elements, inspections, and issuance of final occupancy). These fee components are listed in the following: Fee($)*** 1. New Buildings: Commercial, Office and Industrial: Base permit fee $1285.00 Plus $10.50 per 1,000 cubic feet $10.50 Residential: Base Permit Fee $705.00 Ordinance 2010-CD-BC-G-939 Amending Section 10-4-1 Fees and Bonds Page 2 of 7 Fee($)*** Plus $4.00 per each additional 1,000 cubic feet $4.00 2. Residential Additions: Base permit fee $140.00 Plus $ 13.75 per 1,000 cubic foot $ 13.75 Residential Repairs and Alterations: $75.00 Plus$ 5.00 per$1000.00 construction cost $ 5.00 Residential Accessory Structure*(No engineering- No utilities): $62.00 Plus fee per square foot $ .25 Accessory Structures* (each): $ 105.00 Plus fee per square foot $ .25 *Applies to structures that are not listed in Section 10-4-1.D (Flat Fee Permits) 3. Commercial Additions: Base permit fee $ 350.00 Plus fee per$1000 est. cost of new construction $ 7.00 Commercial Alterations and Repairs: $200.00 Plus fee per$1000 est. cost of new construction $7.00 4. Plumbing Work: Per plumbing fixture or opening $ 14.00 Septic system installation $ 175.00 Septic system repair $ 175.00 5. Electrical Work: Electrical Permit(base fee) $ 75.00 Residential Panel: Per Amp $ .50 Commercial Panel: : Per Amp $ .50 Commercial Circuits (each) $ 14.00 Commercial openings, (each) $ 4.00 Commercial devices-alarms, strobes, detectors(each) $ 4.00 Commercial Motors (each): Up to 20 hp $ 36.00 Each additional hp over 20 hp $ 3.75 Commercial Appliances (each): Up to 20 kw $40.00 Each additional kw over 20 $ 7.50 Commercial-Temporary installations $ 105.00 Commercial Low Voltage-Repair/Relocation $ 300.00 Ordinance 2010-CD-BC-G-939 Amending Section 10-4-1 Fees and Bonds Page 3 of 7 Fee($)*** Fire Alarm-Commercial - Including Panels and Keltron: Relocate Only(each) $164.00 Plus Fee Per Opening $4.00 New or Added Devices $ 300.00 Plus Fee Per Opening $4.00 Fire Sprinkler-Commercial: Repair/Relocate Only (each) $164.00 Plus fee for Hydro if more than 10 $ 124.00 Plus fee per head $4.00 New or Added Devices $ 300.00 Plus fee per head $4.00 Commercial New Communication/Alarm (signal/low voltage) $ 65.00 Systems (each) 6. Driveway: Commercial $ 350.00 Residential $ 85.00 7. Certificates of Occupancy and Compliance (each) $ 40.00 8. Elevators, Escalators, Dumbwaiters: 5 floors or less, per device $ 125.00 Each additional floor over 5 $ 25.00 Hand-operated, 5 floors or less $ 48.00 Hand-operated, each floor over 5 $ 22.00 Inspection certificate, biannually, each $ 125.00 9. Mechanical Heating, Cooling, Ventilating including Chimneys: Each mechanical device/appliance $ 70.00 10. Storm Sewer/Sump Pump Connection (each) $ 105.00 11. Canopies, Marquees $ 70.00 12. Tanks, Flammable and Nonflammable: 500 gallons or less $ 105.00 Over 500 gallons, $5.25 ea. additional 100 gallons 13. Signs: Per square foot $4.25 Minimum $ 70.00 14. Moving Buildings $ 350.00 15. Wrecking Demolition, Shoring, Raisings, Underpinning: Base fee $ 325.00 Plus 3.75 Per 1,000 cubic foot $ 3.75 Ordinance 2010-CD-BC-G-939 Amending Section 10-4-1 Fees and Bonds Page 4 of 7 Fee($)*** 16. Plan and Application Examination and Review: Each, per hour(or portion thereof) $ 62.00 Minimum fee $ 62.00 In the event that any outside consulting plan review services are used, the applicant shall reimburse the Village for any fees associated with that service as a prerequisite to the issuance of any required permits. 17. Inspection Fee (each): $ 62.00 A fee based on the estimated number of inspections will be assessed prior to permit issuance. Additional inspections will require payment of an additional fee. 18. Annual Fire Inspection Fee— Non-Residential Occupancy(each): $62.00** A fee assessed for each inspection required to determine compliance with previously cited violations to the Building Codes of the Village. ** For annual Fire inspections, the fee will be assessed for continued non-compliance after the issuance of a 30-day correction notice. For violations that continue 90 days after the first correction notice will be assessed the reinspection plus an additional administrative fee of$100 for each subsequent inspection. 19. Cleanup and Street Bond: Commercial $ 750.00 Residential $ 375.00 20. Performance/Completion Bond: Each $ 725.00 21. Starting Work Without a Permit: Each $ 500.00 22. Occupancy of a Building or Structure Without Final Inspection and/or Issuance of Occupancy Permit: Each $ 500.00 23. Application Fee (required for each permit application) $ 40.00 24. Canceled Permits: $62.00/hour Once a permit application has been submitted to the Village for review and approval, any staff time devoted to plan review shall be billed to the applicant at a rate of$62.00/hour if the applicant makes a formal request to cancel the permit application or if applicant fails to obtain the permit within 90 days of approval. D. Flat Fee Permits: The following permit types are assessed a flat fee. The majority of these fee types involve smaller structures and improvements that are ancillary to the principal use of the property. Fee($)*** 25. Residential Permits: A. Burglar Alarm (Security System Installation) $ 217.00 B. Door Replacement: $62.00 Ordinance 2010-CD-BC-G-939 Amending Section 10-4-1 Fees and Bonds Page 5 of 7 Fee($)*** Plus Each Opening $ 5.00 C. Fences New and Alteration $ 125.00 D. Fire Sprinkler $250.00 E. Furnace Replacement $62.00 F. Garage Sale Signs No Fee G. Generator $ 325.00 H. Hot Water Heater Replacement $62.00 I. HVAC Replacement $62.00 J. Lawn Sprinkler(Includes a recording fee) $250.00 K. Low Voltage $217.00 L. Mailbox— Permanent Structure (Includes a recording fee) $130.00 G. Portable Storage Unit(POD) $ 50.00 H. Roof—Recoat/Recover: Primary Structure $250.00 Accessory Structure: Garage, Shed, Pool House $ 100.00 Repairs—plus$3.50 per$1000.00 construction cost $75.00 Repairs—under 25% of any roof No Fee 1. Sheds (Without Base), Decks, Patios, Outdoor Fireplace, $62.00 Outdoor Kitchen—Without Grade Changes, No Electric, and No Utilities J. Sheds (With Base), Decks, Patios, Outdoor Fireplace, $ 124.00 Outdoor Kitchen —Without Grade Changes—With Electric or a Utility Plus $ .25 per square foot K. Sheds(With Base), Decks, Patios, Outdoor Fireplace, $ 186.00 Outdoor Kitchen —Without Grade Changes—With Electric and Utilities L. Tents Less than 120 square feet and no utilities No Fee Less than 120 square feet and utilities $ 75.00 Larger than 120 square feet and no utilities $ 75.00 Larger than 120 square feet plus fee for utilities $ 75.00 M. Trailer(Construction)—Temporary $ 150.00 N. Window Replacement: $62.00 Plus Each Opening $ 5.00 26. Commercial Permits: A. Construction Crane $ 100.00 Ordinance 2010-CD-BC-G-939 Amending Section 10-4-1 Fees and Bonds Page 6 of 7 Fee($)*** Plus$ 50.00 Per Story $ 100.00 B. Office/Construction Trailer—Temporary and no utilities $ 150.00 Plus utilities $ 150.00 C. Roof—Recoat/Recover $ 710.00 Plus number of required inspections each $62.00 D. Tents (based on the cumulative area of all tents): Larger than 120 square feet and no utilities $ 100.00 Plus$ .25 per each square foot over 120 square feet $ 100.00 and utilities Under 120 Square feet and no utilities (utilities extra) No Fee Plus utilities $ 150.00 27. Temporary Signs(each) Per week or portion thereof $ 75.00 *** In addition to current fee, there is also included an application fee, inspection fees, plan review fee, and certificate fee. This does not apply to Flat Fee Permits, unless noted otherwise. Section 4: If any section, paragraph, clause or provision of this ordinance shall be held invalid, the invalidity thereof shall not effect any of the other provisions of this ordinance. Section 5: All ordinances in conflict herewith are hereby repealed to the extent of such conflict. Section 6. This ordinance shall be in full force and effect from and after its passage, approval and publication as required by law. APPROVED THIS 14th day of December, 2010. J Craig Village President PASSED THIS 14th day of December, 2010. Ayes: Trustees Aktipis, Carson, Moy, Saiyed, Wolin and Zannis Nays: None Absent: None Ordnance 2010-CD-BC-G-939 Amending Section 1E4q _ Fees ad mks m«7@7 »\ \ ATT yl ' Charlotte r P%s +Ibg Clerk