AGENDA ITEM
Regular Board of Trustees Meeting
of
December 14,2010
SUBJECT: Amendment to Title 10 of the Village Code—Building Regulations—Chapter 4 Fee
and Bond Schedule
FROM: Robert L.Kallien,Jr.,AICP, Community Development Director
BUDGET SOURCE/BUDGET IMPACT: Projected Fees Cover Expected Village Costs
RECOMMENDED MOTION: I move that the Village Board approve the recommended
changes to the Fee and Bond Schedule in Chapter 10 — Building Regulations and approve
attached ordinance G-939.
Backeroand/History:
Beginning in 2001, the Village Board has approved annual updates to the fee schedule in Chapter
10—Building Regulations relative to fees associated with new construction activities (e.g. permits,
plan review and inspections). At that time, the Board directed that Staff update the fee schedule
each year to ensure that a goal of cost recovery be met.
Proposed Update
Consistent with the Board's goal to cover Staff costs; the fee schedule applicable to our building
regulations has been updated. Because our Staff costs have not increased appreciably over the past
year, Staff is recommending no across the board increase to the fee schedule. Staff is however
recommending several minor changes to the fee schedule to improve clarity and fairness in how
fees are calculated for certain activities (residential tents, accessory structures, and residential
HVAC components).
As an example, a significant portion of our permits relate to new construction; either new buildings
or tenant alterations/additions to existing buildings. The permit fees are calculated by assigning a
fee for the various components of that permit(i.e., pre-application meetings, application processing,
plan review, building inspections, and issuance of final occupancy/complian ce). It is the Staff
recommendation that this process continue for these types of permits.
BO-Ree-Building Fees-2011.docJAI-FROM BOB\Bot-PC-ZBA\BO-Rec-Building Fees-201].doc
i
i
Staff is however recommending that the fees for a number of our permit types that involve smaller
structures, and improvements that are ancillary to the principal use of the property be simplified to
provide more clarity and fairness to our permit applicants.
Also,based on our experiences this past year in processing resident permits that resulted from storm
damage, Staff found that some of our permit costs were excessive(partial roof replacements/repairs
and residential generators)and have addressed those in the recommended fee update.
Attached for your consideration are the current 2010 fee and bond schedule and the proposed
schedule for 2011.
Recommendation
Approve the proposed fee and bond schedule(attached).
BO-Rec-Building Fees-201 i.dociAl-FROM BOB\Bot-PC-MAW-Rec-Building Fees-201 1.doc
....
ORDINANCE 2010-CD-BC-G-939
AN ORDINANCE REVISING THE FEE AND BOND SCHEDULE
i
BY AMENDING CHAPTER 4(FEES AND BONDS)
OF TITLE 10(BUILDING REGULATIONS)OF THE
VILLAGE CODE OF THE VILLAGE OF OAK BROOK
WHEREAS, the President and Board of Trustees have determined that it is necessary to increase
the current building permit fee schedule in order to defray the Village's increased costs relative to the
issuance of building permits and to protect the public health,safety and welfare.
NOW, THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS,as follows:
Section 1: The foregoing preamble is restated and incorporated herein by reference as though
fully set forth herein.
Section 2: Chapter 4 (Fees and Bonds)of Title 10 (Building Regulations) of the Village Code is
hereby amended by deleting Chapter 4 in its entirety and substituting the following in lieu thereof:
CHAPTER 4
FEES AND BONDS
SECTION 10-4-1: FEE AND BOND SCHEDULE: Before a permit required by this Title is issued, the
Director of Community Development shall collect a fee and bond calculated according to the following
schedule:
A. Volume Computation: Volume shall be computed on the exterior dimensions of the building and
shall include all space above the lowest level of the foundation wall and to the highest point of the
main roof and to include all projections.
B. Unit of Volume Cost: Figure a fraction larger than one-half(112)as a full unit.
C. Multi-Component Building Permit Fees: The majority of the permits issued by the Village are for
new construction (new structures and additions/alterations to existing structures). The permit fee
for these activities is calculated to cover the costs associated with the various permit components
(i.e., pre-application meetings, application processing, plan review, base fee for the various
construction elements, inspections, and issuance of final occupancy). These fee components are
listed in the following:
Fee($)**
1. New Buildings:
Commercial,Office and Industrial:
Base permit fee $1285.00
Plus$10.50 per 1,000 cubic feet $10.50
Residential:
Base Permit Fee $705.00
Ordinance 2010-CD-BC-G-939
Amending Section 10-4-1
Fees and Bonds
Page 2 of 7
i
Plus$4.00 per each additional 1,000 cubic feet $4.00
2. Residential Additions:
Base permit fee $140.00
Plus$ 13.75 per 1,000 cubic foot $ 13.75
Residential Repairs and Alterations: $75.00
Plus$5.00 per$1000.00 construction cost $5.00
Residential Accessory Structure"(No engineering-No utilities): $62.00
Plus fee per square foot $ .25
Accessory Structures'(each): $ 105.00
Plus fee per square foot $ .25
*Applies to structures that are not listed in Section 104-1.D (Flat Fee Permits)
3. Commercial Additions:
Base permit fee $ 350.00
Plus fee per$1000 est.cost of new construction $7.00
Commercial Alterations and Repairs: $200.00
Plus fee per$1000 est.cost of new construction $7.00
4. Plumbing Work:
Per plumbing fixture or opening $ 14.00
Septic system installation $175.00
Septic system repair $ 175.00
5. Electrical Work:
Electrical Permit(base fee) $ 75.00
Residential Panel: Per Amp $ .50
Commercial Panel: : Per Amp $ .50
Commercial Circuits(each) $ 14.00
Commercial openings, (each) $ 4.00
Commercial devices-alarms, strobes,detectors (each) $'4.00
Commercial Motors(each):
Up to 20 hp $36.00
Each additional hp over 20 hp $3.75
Commercial Appliances(each):
Up to 20 kw $40.00
Each additional kw over 20 $ 7.50
Commercial-Temporary installations $ 105.00
Commercial Low Voltage-RepairlRelocation $300.00
_._. .._
Ordinance 2010-CD-BC-G-939
Amending Section 10-41
Fees and Bonds
Page 3 of 7
Fire Alarm-Commercial -Including Panels and Keltron:
Relocate Only(each) $164.00
Plus Fee Per Opening $4.00
New or Added Devices $300.00
Plus Fee Per Opening $4.00
Fire Sprinkler-Commercial:
Repair/Relocate Only(each) $164.00
Plus fee for Hydro if more than 10 $124.00
Plus fee per head $4.00
New or Added Devices $300.00
Plus fee per head $4.00
Commercial New Communication/Alarm (signal/low voltage) $ 65.00
Systems(each)
6. Driveway:
Commercial $350.00
Residential $ 85.00
7. Certificates of Occupancy and Compliance(each) $ 40.00
8. Elevators, Escalators, Dumbwaiters:
5 floors or less, per device $ 125.00
Each additional floor over 5 $ 25.00
Hand-operated, 5 floors or less $ 48.00
Hand-operated, each floor over 5 $ 22.00
Inspection certificate, biannually,each $125.00
9. Mechanical Heating, Cooling,Ventilating including Chimneys:
Each mechanical device/appliance $ 70.00
10. Storm Sewer/Sump Pump Connection (each) $ 105.00
11. Canopies, Marquees $ 70.00
12. Tanks, Flammable and Nonflammable:
500 gallons or less $ 105.00
Over 500 gallons, $5.25 ea.additional 100 gallons
13. Signs:
Per square foot $4.25
Minimum $70.00
14. Moving Buildings $350.00
15. Wrecking Demolition, Shoring, Raisings, Underpinning:
Base fee $325.00
Plus 3.75 Per 1,000 cubic foot $3.75
Ordinance 2010-CD-BC-G-939
Amending Section 10-4-1
Fees and Bonds
Page 4 of 7
Fee "*
16. Plan and Application Examination and Review:
Each, per hour(or portion thereof) $ 62.00
Minimum fee $ 62.00
In the event that any outside consulting plan review services are used the applicant
shall reimburse the Village for any fees associated with that service as a prerequisite
to the issuance of any required permits.
17. Inspection Fee(each): $ 62.00
A fee based on the estimated number of inspections will be assessed prior to permit
issuance. Additional inspections will require payment of an additional fee.
18. Annual Fire Inspection Fee—Non-Residential Occupancy(each): $62.00"*
A fee assessed for each inspection required to determine compliance with previously
cited violations to the Building Codes of the Village. **For annual Fire inspections,
the fee will be assessed for continued non-compliance after the issuance of a 30-day
correction notice. For violations that continue 90 days after the first correction notice
will be assessed the reinspection plus an additional administrative fee of$100 for
each subsequent inspection.
19. Cleanup and Street Bond:
Commercial $750.00
Residential $375.00
20. Performance/Completion Bond,
Each $725.00
21. Starting Work Without a Permit:
Each $500.00
22. Occupancy of a Building or Structure Without Final Inspection and/or Issuance of
Occupancy Permit:
Each $500.00
23. Application Fee(required for each permit application) $ 40.00
24. Canceled Permits: $62.00/hour
Once a permit application has been submitted to the Village for review and
approval, any staff time devoted to plan review shall be billed to the applicant at a
rate of$62.00/hour if the applicant makes a formal request to cancel the permit
application or if applicant fails to obtain the permit within 90 days of approval.
D. Flat Fee Permits: The following permit types are assessed a flat fee. The majority of these fee
types involve smaller structures and improvements that are ancillary to the principal use of the
property.
Fee ***
25. Residential Permits:
A. Burglar Alarm (Security System Installation) $217.00
B. Door Replacement: $62.00
Ordinance 2010-CD-BC-G-939
Amending Section 10-4-1
Fees and Bonds
Page 5 of 7
I
i
Fee ***
Plus Each Opening $5.00
C. Fences New and Alteration $ 125.00
i
D. Fire Sprinkler $250.00
E. Furnace Replacement $62.00 j
F. Garage Sale Signs No Fee
G. Generator $325A0
H. Hot Water Heater Replacement $62.00
I. HVAC Replacement $62.00
J. Lawn Sprinkler(Includes a recording fee) $250.00
K. Low Voltage $217.00
L. Mailbox—Permanent Structure(Includes a recording fee) $130,00
G. Portable Storage Unit(POD) $50.00 j
H. Roof—Recoat/Recover:
Primary Structure $250.00
Accessory Structure: Garage, Shed, Pool House $ 100.00
Repairs—plus$3.50 per$1000.00 construction cost $75.00
Repairs—under 25%of any roof No Fee
I. Sheds (Without Base),Decks, Patios,Outdoor Fireplace, $62.00
Outdoor Kitchen—Without Grade Changes, No Electric,
and No Utilities
J. Sheds(With Base), Decks, Patios, Outdoor Fireplace, $ 124.00
Outdoor Kitchen—Without Grade Changes—With Electric
or a Utility
Plus$.25 per square foot
K. Sheds(With Base), Decks, Patios, Outdoor Fireplace, $ 186.00
Outdoor Kitchen—Without Grade Changes—With Electric
and Utilities
L. Tents
Less than 120 square feet and no utilities No Fee
Less than 120 square feet and utilities $75.00
Larger than 120 square feet and no utilities $75.00
Larger than 120 square feet plus fee for utilities $75.00
M. Trailer(Construction)—Temporary $ 150.00
N. Window Replacement: $62.00
Plus Each Opening $5.00
26. Commercial Permits:
A. Construction Crane $ 100.00
Ordinance 2010-CD-BC-G-939
Amending Section 10-4-1
Fees and Bonds
Page 6 of 7
I
Fee($)***
Plus$50.00 Per Story $ 100.00
i
B. Office/Construction Trailer—Temporary and no utilities $ 150.00
Plus utilities $ 150.00
C. Roof—Recoat/Recover $710.00
Plus number of required inspections each $62.00
I D. Tents(based on the cumulative area of all tents):
Larger than 120 square feet and no utilities $ 100.00
Plus$ .25 per each square foot over 120 square feet $ 100.00
and utilities
Under 120 Square feet and no utilities (utilities extra) No Fee
Pius utilities $ 150.00
27. Temporary Signs (each)
Per week or portion thereof $75.00
**" In addition to current fee,there is also included an application fee, inspection fees,
plan review fee,and certificate fee. This does not apply to Flat Fee Permits,unless
noted otherwise.
Section 4: If any section, paragraph, clause or provision of this ordinance shall be held invalid,
the invalidity thereof shall not effect any of the other provisions of this ordinance.
Section 5: All ordinances in conflict herewith are hereby repealed to the extent of such conflict.
Section 6. This ordinance shall be in full force and effect from and after its passage, approval
and publication as required by law.
APPROVED THIS 14th day of December,2010.
John W. Craig
Village President
PASSED THIS 14th day of December,2010.
Ayes:
Nays:
Absent:
Ordinance 2010-CD-BC-G-939
Amending Section 10-4-1
Fees and Bonds
Page 7 of 7
i
ATTEST:
I
i
Charlotte K. Pruss
Village Clerk
CHAPTER 4
FEES AND BONDS
SECTION 10-4-1: FEE AND BOND SCHEDULE: Before a permit required by this Title is
issued, the Director of Community Development shall collect a fee and bond calculated according
to the following schedule:
A. Volume Computation: Volume shall be computed on the exterior dimensions of the
building and shall include all space above the lowest level of the foundation wall and to
the highest point of the main roof and to include all projections.
B. Unit of Volume Cost: Figure a fraction larger than one-half(1/2)as a full unit.
C. Multi-Component Building Permit Fees: The majority of the permits issued by the Village
are for new construction (new structures and additions/alterations to existing structures).
The permit fee for these activities is calculated to cover the costs associated with the
various permit components (i.e., pre-application meetings, application processing, plan
review, base fee for the various construction elements, inspections, and issuance of final
occupancy). These fee components are listed in the following:
Proposed
Fee ***
1. New Buildings:
Commercial, Office and Industrial:
Base permit fee $1285.00
Plus $10.50 per 1,000 cubic feet $10.50
Residential:
Base Permit Fee $705.00
Plus$4.00 per each additional 1,000 cubic feet $4.00
2. Residential Additions:
Base permit fee $140.00
Plus$ 13.75 per 1,000 cubic foot $ 13.75
Residential Repairs and Alterations: $75.00
Plus$5.00 per$1000.00 construction cost $5.00
Residential Accessory Structure*(No engineering—No utilities): $62.00
Plus fee per square foot $ .25
Accessory Structures*(each): $ 105.00
Plus fee per square foot $ .25
*Applies to structures that are not listed in Section 10-4-1.13(Flat Fee Permits)
3. Commercial Additions:
Base permit fee $ 350.00
Plus fee per$1000 est. cost of new construction $7.00
PROPOSED 2011 Bond and Fee Schedule
I
i
I
Proposed
Fee ***
Commercial Alterations and Repairs: $200.00
Plus fee per$1.000 est.cost of new construction $7.00
4. Plumbing Work:
Per plumbing fixture or opening $ 14.00
Septic system installation $ 175.00
Septic system repair $ 175.00
5. Electrical Work:
Electrical Permit(base fee) $ 75.00
Residential Panel: Per Amp $ .50
Commercial Panel: : Per Amp $ .50
Commercial Circuits (each) $ 14.00
Commercial openings, (each) $ 4.00
Commercial devices—alarms, strobes, detectors(each) $ 4.00
Commercial Motors(each):
Up to 20 hp $36.00
Each additional hp over 20 hp $3.75
Commercial Appliances(each):
Up to 20 kw $40.00
Each additional kw over 20 $ 7.50
Commercial—Temporary installations $ 105.00
Commercial Low Voltage—Repair/Relocation $300.00
Fire Alarm—Commercial —Including Panels and Keltron:
Relocate Only(each) $164.00
Plus Fee Per Opening $4.00
New or Added Devices $300.00
Plus Fee Per Opening $4.00
Fire Sprinkler—Commercial:
Repair/Relocate Only(each) $164.00
Plus fee for Hydro if more than 10 $ 124.00
Plus fee per head $4.00
New or Added Devices $300.00
Plus fee per head $4.00
Commercial New Communication/Alarm (signal/low voltage) $ 65.00
Systems (each)
PROPOSED 2011 Bond and Fee Schedule
2.
i
Proposed
fee M***
6. Driveway:
Commercial $350.00
Residential $ 85.00
7. Certificates of Occupancy and Compliance(each) $ 40.00
8. Elevators, Escalators, Dumbwaiters:
5 floors or less,per device $ 125.00
Each additional floor over 5 $ 25.00
Hand-operated, 5 floors or less $ 48.00
Hand-operated,each floor over 5 $ 22.00
Inspection certificate, biannually, each $ 125.00
9. Mechanical Heating, Cooling,Ventilating including Chimneys:
Each mechanical device/appliance $ 70.00
10. Storm Sewer/Sump Pump Connection (each) $ 105.00
11. Canopies, Marquees $ 70.00
12. Tanks, Flammable and Nonflammable:
500 gallons or less $ 105.00
Over 500 gallons, $5.25 ea.additional 100 gallons
13. Signs:
Per square foot $4.25
Minimum $70.00
14. Moving Buildings $350.00
15. Wrecking Demolition, Shoring, Raisings, Underpinning:
Base fee $325.00
Plus 3.75 Per 1,000 cubic foot $3.75
16. Plan and Application Examination and Review:
Each, per hour(or portion thereof) $ 62.00
Minimum fee $ 62.00
In the event that any outside consulting plan review services are used, the applicant
shall reimburse the Village for any fees associated with that service as a prerequisite
to the issuance of any required permits.
17. Inspection Fee(each): $ 62.00
A fee based on the estimated number of inspections will be assessed prior to permit
issuance. Additional inspections will require payment of an additional fee.
18. Annual Fire Inspection Fee-Non-Residential Occupancy(each): $62.00**
A fee assessed for each inspection required to determine compliance with previously
cited violations to the Building Codes of the Village. ** For annual Fire inspections,
the fee will be assessed for continued non-compliance after the issuance of a 30-day
correction notice. For violations that continue 90 days after the first correction notice
will be assessed the reinspection plus an additional administrative fee of$100 for
PROPOSED 2019 Bond and Fee Schedule
3.
Proposed
i
Fee($)
each subsequent inspection.
19. Cleanup and Street Bond:
Commercial $750.00
j Residential $375.00
j 20. Performance/Completion Bond:
Each $725.00
21. Starting Work Without a Permit:
Each $500.00
22. Occupancy of a Building or Structure Without Final Inspection and/or Issuance of
Occupancy Permit:
Each $500.00
23. Application Fee (required for each permit application) $ 40.00
24. Canceled Permits: $62.00/hour
Once a permit application has been submitted to the Village for review and
approval, any staff time devoted to plan review shall be billed to the applicant at a
rate of$62.00/hour if the applicant makes a formal request to cancel the permit
application or if applicant fails to obtain the permit within 90 days of approval.
D. Fiat Fee Permits: The following permit types are assessed a flat fee. The majority of
these fee types involve smaller structures and improvements that are ancillary to the
principal use of the property.
Proposed
Fee ***
25. Residential Permits:
A. Burglar Alarm (Security System Installation) $217.00
B. Door Replacement: $62.00
Plus Each Opening $5.00
C. Fences New and Alteration $125.00
D. Fire Sprinkler $250.00
E. Furnace Replacement $62.00
F. Garage Sale Signs No Fee
G. Generator $325.00
H. Hot Water Heater Replacement $62.00
I. HVAC Replacement $62.00
J. Lawn Sprinkler(Includes a recording fee) $250.00
K. Low Voltage $217.00
L. Mailbox—Permanent Structure(Includes a recording fee) $130.00
PROPOSED 2011 Bond and Fee Schedule
4.
i
Proposed
Fee ***
G. Portable Storage Unit(POD) $50.00
H. Roof—Recoat/Recover:
Primary Structure $250.00
Accessory Structure: Garage, Shed, Pool House $ 100.00
Repairs—plus$3.50 per$1000.00 construction cost $75.00
Repairs—under 25%of any roof No Fee
I. Sheds(Without Base),Decks,Patios, Outdoor Fireplace, $62.00
Outdoor Kitchen—Without Grade Changes, No Electric,
and No Utilities
J. Sheds (With Base), Decks, Patios,Outdoor Fireplace, $ 124.00
Outdoor Kitchen—Without Grade Changes—With Electric
or a Utility
Plus$ .25 per square foot
K. Sheds(With Base), Decks, Patios, Outdoor Fireplace, $ 186.00
Outdoor Kitchen—Without Grade Changes—With Electric
and Utilities
L. Tents
Less than 120 square feet and no utilities No Fee
Less than 120 square feet and utilities $75.00
Larger than 120 square feet and no utilities $75.00
Larger than 120 square feet plus fee for utilities $75.00
M. Trailer(Construction)—Temporary $ 150.00
N. Window Replacement: $62.00
Plus Each Opening $5.00
26. Commercial Permits:
A. Construction Crane $ 100.00
Plus$50.00 Per Story $ 100.00
B. Office/Construction Trailer—Temporary and no utilities $ 150.00
Plus utilities $ 150.00
C. Roof—Recoat/Recover $710.00
Plus number of required inspections each $62.00
D. Tents(based on the cumulative area of all tents):
Larger than 120 square feet and no utilities $ 100.00
Plus$ .25 per each square foot over 120 square feet $ 100.00
and utilities
Under 120 Square feet and no utilities(utilities extra) No Fee
Plus utilities $ 150.00
PROPOSED 2019 Bond and Fee Schedule
5.
i
Proposed
Fee($)***
27. Temporary Signs (each)
Per week or portion thereof $75.00
*** In addition to current fee,there is also included an application fee, inspection fees,
plan review fee, and certificate fee. This does not apply to Flat Fee Permits, unless
noted otherwise.
t
PROPOSED 2099 Bond and Fee Schedule
6.
AN ORDINANCE.REVISING THE FEE AND BOND SCHEDULE
BY AMENDING CHAPTER 4(FEES AND BOLDS)
OF TITLE 10(BUILDING REGULATIONS)OF THE
VILLAGE CODE OF THE VILLAGE OF OAK BROOK
WHEREAS,the President and Board of Trustees have determined that it is necessary to increase
the current building permit fee schedule in order to defray the Village's increased costs relative to the
issuance of building permits and to protect the public health, safety and welfare.
NOW,THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS, as follows:
Section 1: The foregoing preamble is restated and incorporated herein by reference as though
fully set forth herein.
Section 2: Chapter 4 (Fees and Bonds) of Title 10 (Building Regulations) of the Village Code is
hereby amended by deleting Chapter 4 in its entirety and substituting the following in lieu thereof:
CHAPTER 4
FEES AND BONDS
SECTION:
10-4-1: Fee and Bond Schedule
10-41: FEE AND BOND SCHEDULE: Before a permit required by this Title is issued, the Director of
Community Development shall collect a fee and bond calculated according to the
following schedule:
A. Volume Computation: Volume shall be computed on the exterior dimensions of the building and
shall include all space above the lowest level of the foundation wall and to the highest point of the
main roof and to include all projections.
B. Unit of Volume Cost: Figure a fraction larger than one-half(112)as a full unit.
Pee($1
1. New Buildings:
Commercial,Office and Industrial.
Base permit fee $ 1285.00
Plus$10.50 per 1,000 cubic feet $10.50
Residential
Base Permit Fee $705.00
Plus$4.00 per each additional 1,000 cubic feet $4.00
CURRENT 2010 Bond and Fee Schedule
i
l
ordinance 2009-CD-8C-G-908
Amending Section 104-1
Page 2 of 5
1
2. Residential Additions and Alterations:
Base permit fee $ 140.00
z Plus$13.75 per 1,000 cubic feet $ 13.75
3. Commercial Additions and Alterations
Base permit fee $350.00
Plus$7.00 per$1000 estimated cost of new $ 7.00
construction
4. Plumbing Work
Per plumbing fixture or opening $ 14'00
Septic system installation $ 175.00
Septic system repair $ 175.00
5. Electrical Work:
Electrical Permit(base fee) $ 75.00
Residential Panel: Per Amp $ .50
Commercial Panel: Per Amp $ .50
Commercial Circuits(each) $ 14.00
Commercial openings,(each) $ 4.00
Commercial devices--alarms,strobes,detectors(each) $ 4.00
Commercial Motors(each)
Up to 20 hp $36.00
Each additional hp over 20 hp $ 3.75
Commercial Appliances(each)
Up to 20 kw $ 40.00
Each additional kw over 20 $ 7'50
Commercial---Temporary installations $ 105.00
Commercial Communication/Alarm(signal/low voltage)Systems $ 65.00
6. Driveway: I
Commercial $350.00
Residential $ 85.00
7. Certificates of Occupancy and Compliance(each):
$ 40.00
g. Accessory Buildings and Structures(each):
Pools,hot-tubs,detached garages,commercial tents, $ 105.00
Decks,patios,fireplaces,flagpoles and
Other similar structure
CURRENT 2010 Bond and Fee Schedule
Ordinance 2009-CD-BC-G-908
Amending Section 10.4-1
Page 3 of 5
Residential Tents $ 35.00
Portable Storage Units(each) $ 50.00
9. Elevators,Escalators,Dumbwaiters:
Elevator/escalator/Dumbwaiter
5 floors or less,per device $ 125.00
Each additional floor over 5 $ 25.00
Hand-operated,5 floors or less $ 48.00
Hand-operated,each floor over 5 $ 22.00
Inspection certificate,biannually,each $ 125.00
,10. Mechanical Heating,Cooling,Ventilating Systems
including Chimneys:
Each mechanical device/appliance $ 70.00
11. Storm Sewer/Sump Pump Connection(each): $ 105.00
12. Canopies,Marquees: $ 70.00
13. Tanks,Flammable and Nonflammable:
500 gallons or less $ 105.00
Over 500 gallons,$5.25 each additional 100 gallons
14. Recoat or Recover Roof:
Residential $ 70.00
Commercial $710.00
15. Temporary Office or Construction Trailer(each): $ 150.00
16. Fences(each): $ 70.00
17. Signs
Per square foot $4.25
pr
Minimum $70.00
18. Moving Buildings: $350.00
19. Wrecking Demolition,Shoring,Raisings,Underpinning:
Base fee $325.00
Plus 3.75 Per 1,000 cubic feet $3.75
20. Plan and Application Examination and Review:
Each,per hour $ 62.00
Minimum fee $ 62.00
In the event that any outside consulting plan review services are used, the
applicant shall reimburse the Village for any fees associated with that service as a
prerequisite to the issuance of any required permits.
CURRENT 2010 Bond and Fee Schedule
Ordinance 2009-CD-BC-G-908
Amending Section 704-1
Page 4 of 5
21. Inspection Fee(each): $ 62.00
A fee based on the estimated number of inspections will be assessed prior to permit
issuance. Additional inspections will require payment of an additional fee.
22. Fire Suppression Systems
Inspection Fee(each) (per inspector) $ 62.00
Hydrostatic Test Fee(each) $ 150.00
A fee based on the estimated number of inspections and personnel based on the
above rate will be assessed prior to permit issuance. Additional inspections will
require payment of an additional fee.
23. Annual Non-Residential Eire Inspection Fee(each): $ 62,00**
A fee assessed for each inspection required to determine compliance with
previously cited violations to the Building Codes of the Village. **For annual
Fire Inspections, the fee will be assessed for continued non-compliance after the
issuance of a 30 day correction notice. For violations that continue 90 days after
the first correction notice will be assessed an additional inspection fee plus an
additional administrative fee of$100 for each subsequent inspection.
24. Cleanup.and Street Bond:
Commercial $ 750.00
Residential $375A0
25. Completion Bond:
Each $725.00
26. Starting Work Without a Permit:
Each $ 500.00
27. Occupancy of a Building or Structure Without Final Inspection and/or Issuance of
Occupancy Permit:
Each $500.00
28: Application Fee(required for each permit application) $40.00
29. Canceled Permits:
Per Hour $62.00
Minimum $62.00
Once° a permit application has been submitted to the Village for review and
approval,any staff time devoted to plan review shall be billed to the applicant at a
rate of$62 per hour if the applicant makes a formal request to cancel the permit
application.
30. Phased Approval Minimum fee: $200.00***
CURRENT 2010 Bond and Fee Schedule
Ordinance 2009-CD-BC-G-908
Amending Section 104-1
Page 5of5
For permits issued with phased approval — as allowed an the adopted building
code--there shall be an administrative fee in addition to any and all fees required
by this code for each permit so issued. ***This administrative fee shall be equal
to one half(1/2)the sum of all fees otherwise required in Section 10-4-1, but not
less than two hundred dollars ($200.00). All permit and administrative fees
known at the time of the phased approval shall be paid prior to the issuance of
such partial permit. These fees may be recalculated prior to approval of each
phase,modification or at the time of completion.
Section 4: If any section, paragraph, clause or provision of this ordinance shall be held invalid,
the invalidity thereof shall not effect any of the other provisions of this ordinance.
Section 5: All ordinances in conflict herewith are hereby repealed to the extent of such conflict.
Section 6. This ordinance shall be in full force and effect from and after its passage, approval
and publication as required by law.
APPROVED THIS 8ih day of December,2009.
L
,John W.Craig
`Vifiage President
PASSED THIS 8th day of December, 2009.
Ayes: Trustees A,ktipis, Carson, Moy, Wolin and Zannis
Nays: None
Absent: Trustee Saiyed
ATTEST:
e
I'm
�':-A 4 •-'try -ci
` :.. � Charlotte K. Pruss
Village Clerk
CURRENT 2010 Bond and Fee Schedule