S-1343 - 07/24/2012 - PREVAILING WAGE - OrdinancesORDINANCE 201 ?- PW- WPA -EX2 -S -1343
AN ORDINANCE ADOPTING THE PREVAILING WAGE
STANDARDS FOR THE VILLAGE OF OAK BROOK, ILLINOIS
WHEREAS, the State of Illinois has enacted the "Prevailing Wage Act," 820 ILCS 130/1 et seq.
(the "Act "); and
WHEREAS, the Act requires that the Village of Oak Brook investigate and ascertain the
prevailing rate of wages as defined in the Act for laborers, mechanics and other workers in the locality of
the Village employed in performing construction of public works for the Village.
NOW, THEREFORE, be it ordained by the President and Board of Trustees of the Village of Oak
Brook, Cook County and DuPage County, Illinois, as follows:
SECTION 1: To the extent and as required by the Act, the general prevailing rates of wages in
this locality for laborers, mechanics and other workers engaged in construction of public works coming
under the jurisdiction of the Village and being performed in that part of the Village located within Cook
County is hereby ascertained to be the same as the prevailing rates of wages for construction work in the
Cook County area, as determined by the Department of Labor of the State of Illinois as of June of the
current year (See Exhibit "A ").
SECTION 2: To the extent and as required by the Act, the general prevailing rates of wages in
this locality for laborers, mechanics and other workers engaged in construction of public works coming
under the jurisdiction of the Village and being performed in that part of the Village located within DuPage
County is hereby ascertained to be the same as the prevailing rates of wages for construction work in the
DuPage County area, as determined by the Department of Labor of the State of Illinois as of June of the
current year (See Exhibit "B ").
SECTION 3: As required by the Act, any and all revisions of the prevailing rates of wages by the
Department of Labor of the State of Illinois shall supersede the Department's June construction
undertaken by the Village. The definition of any terms appearing in the ordinance which area also used in
the Act shall be the same as in the Act.
ORDINANCE 2012 -PW- WPA -EX2 -S -1343
Prevailing Wages
Page 2 of 22
SECTION 4: Nothing herein contained shall be construed to apply said general prevailing rates
of wages as herein ascertained to any work or employment except public works construction undertaken
by the Village to the extent required by the Act.
SECTION 6: The Village Clerk shall publicly post this determination or any revisions of such
prevailing rates of wages, and keep it available for inspection at the Village Hall by any interested party.
A copy of the determination or of the currently revised determination of the prevailing rates of wages then
in effect shall be attached to all contract specifications.
SECTION 6: The Village Clerk shall mail a copy of this determination to any employer and to any
association of employers and to any person or association of employees who have filed their names and
addresses and have requested copies of any determination stating the particular rates and the particular
class of workers whose wages will be affected by such rates.
SECTION 7: The Village Clerk shall promptly file a certified copy of this ordinance with the
Honorable Jesse White, Secretary of State of Illinois, Index Department, 111 East Monroe Street,
Springfield, IL 62706 and with the Illinois Department of Labor, Fair Labor Standards Division, One West
Old State Capitol Plaza, Room 300, Springfield, IL 62701.
SECTION 8: Within thirty (30) days after the filing with the Secretary of State, the Village Clerk
shall cause a notice to be published in a newspaper of general circulation within the Village stating:
THE VILLAGE OF OAK BROOK, ILLINOIS
PUBLIC NOTICE OF ADOPTION OF
PREVAILING WAGE STANDARDS
PLEASE TAKE NOTICE that on July 24, 2012, the President and Board of Trustees of
the Village of Oak Brook, Illinois, adopted Ordinance 2012 -PW- WPA -EX2 -S -1343
determining prevailing wages pursuant to 820 ILCS 13/1 et seq., which determination is
now effective.
(Date of Publication)
Published by Order of the President and Board of Trustees of the Village of Oak Brook.
Charlotte K. Pruss
Village Clerk
SECTION 9: If any section, paragraph, clause or provision of this ordinance shall be held invalid,
the invalidity thereof shall not affect any of the other provisions of this ordinance.
ORDINANCE 2012 -PW- WPA -EX2 -S -1343
Prevailing Wages
Page 3 of 22
SECTION 10: All ordinances in conflict herewith are repealed to the extent of such conflict.
SECTION 11: This ordinance shall be in full force and effect from and after its passage, approval
and publication as provided by law.
APPROVED THIS 24th day of July, 2012.
Go . Lalmalani
Village President
PASSED THIS 24th day of July, 2012.
Ayes: Trustees Aktipis, Manzo, Moy, Wolin, Yusuf and Zannis
STATE OF ILLINOIS
) SS
COUNTY OF DUPAGE
ATTEST:
I�
Charlotte K. Pruss
Village Clerk
CERTIFICATION
I, Charlotte Pruss, DO HEREBY CERTIFY that I am the duly qualified and elected Clerk of the
Village of Oak Brook, Illinois, and that as such Clerk I do have charge of and custody of the books and
records of the Village of Oak Brook, Illinois.
I DO HEREBY FURTHER CERTIFY that the foregoing is a full, true and correct copy of
Ordinance _2012 PW- WPA -EX2 -S -1343, "AN ORDINANCE ADOPTING THE PREVAILING WAGE
STANDARDS IN THE VILLAGE OF OAK BROOK, ILLINOIS," adopted and approved by the President
and Board of Trustees of the Village of Oak Brook, Illinois on July 24, 2012.
IN WITNESS WHEREOF, I have hereunto affixed my hand and the Corporate Seal of the Village
of Oak Brook, Illinois this 24th day of July, 2012.
Charlotte K. Pruss
Village Clerk
Village of Oak Brook, Illinois
SEAL
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 4 of 20
EXHIBIT A
Cook County Prevailing Wage for August 2012
(See explanation of column headings at bottom of wages)
Trade Name RG TYP C Base FRMAN *M -F>8 OSA OSH H/W Pensn Vac
Trng
------------ ======= - - - - -- - - - - -- - - --- - - - -- - - -- ----
ASBESTOS ABT -GEN
ALL
36.200
36.700
1.5
1.5
2.0
12.78
9.020
0.000
0.500
ASBESTOS ABT -MEC
BLD
32.850
0.000
1.5
1.5
2.0
10.82
10.66
0.000
0.720
BOILERMAKER
BID
43.450
47.360
2.0
2.0
2.0
6.970
14.66
0.000
0.350
BRICK MASON
BID
40.680
44.750
1.5
1.5
2.0
9.550
12.00
0.000
0.970
CARPENTER
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
CEMENT MASON
ALL
42.350
44.350
2.0
1.5
2.0
11.21
11.40
0.000
0.320
CERAMIC TILE FNSHER
BLD
34.440
0.000
2.0
1.5
2.0
9.700
6.930
0.000
0.610
COMM. ELECT.
BID
37.500
40.150
1.5
1.5
2.0
8.420
9.980
1.100
0.700
ELECTRIC PWR EQMT OP
ALL
43.350
48.350
1.5
1.5
2.0
10.38
13.50
0.000
0.430
ELECTRIC PWR GRNDMAN
ALL
33.810
48.350
1.5
1.5
2.0
8.090
10.53
0.000
0.330
ELECTRIC PWR LINEMAN
ALL
43.350
48.350
1.5
1.5
2.0
10.38
13.50
0.000
0.430
ELECTRICIAN
ALL
42.000
44.800
1.5
1.5
2.0
12.83
13.07
0.000
0.750
ELEVATOR CONSTRUCTOR
BLD
48.560
54.630
2.0
2.0
2.0
11.03
11.96
2.910
0.000
FENCE ERECTOR
ALL
33.740
35.740
1.5
1.5
2.0
12.61
10.18
0.000
0.250
GLAZIER
BID
38.500
40.000
1.5
2.0
2.0
11.49
14.64
0.000
0.840
HT /FROST INSULATOR
BLD
43.800
46.300
1.5
1.5
2.0
10.82
11.86
0.000
0.720
IRON WORKER
ALL
40.750
42.750
2.0
2.0
2.0
13.20
19.09
0.000
0.350
LABORER
ALL
36.200
36.950
1.5
1.5
2.0
12.78
9.020
0.000
0.500
LATHER
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
MACHINIST
BLD
43.160
45.160
1.5
1.5
2.0
7.980
8.950
0.000
0.000
MARBLE FINISHERS
ALL
29.700
0.000
1.5
1.5
2.0
9.550
11.75
0.000
0.620
MARBLE MASON
BLD
39.880
43.870
1.5
1.5
2.0
9.550
11.75
0.000
0.730
MATERIAL TESTER I
ALL
26.200
0.000
1.5
1.5
2.0
12.78
9.020
0.000
0.500
MATERIALS TESTER II
ALL
31.200
0.000
1.5
1.5
2.0
12.78
9.020
0.000
0.500
MILLWRIGHT
0.530
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.150
OPERATING ENGINEER
1.150
OPERATING ENGINEER
1.150
OPERATING ENGINEER
1.150
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
OPERATING ENGINEER
1.250
ORNAMNTL IRON WORKER
0.500
PAINTER
0.770
PAINTER SIGNS
0.000
PILEDRIVER
0.530
PIPEFITTER
1.820
PLASTERER
0.550
PLUMBER
0.780
ROOFER
0.430
SHEETMETAL WORKER
0.630
SIGN HANGER
0.000
SPRINKLER FITTER
0.450
ALL 41.520 43.520 1.5
BLD 1 45.100 49.100 2.0
BLD 2 43.800 49.100 2.0
BLD 3 41.250 49.100 2.0
BLD 4 39.500 49.100 2.0
BLD 5 48.850 49.100 2.0
BLD 6 46.100 49.100 2.0
BLD 7 48.100 49.100 2.0
FLT 1 51.300 51.300 1.5
ELT 2 49.800 51.300 1.5
FLT 3 44.350 51.300 1.5
FLT 4 36.850 51.300 1.5
HWY 1 43.300 47.300 1.5
HWY 2 42.750 47.300 1.5
HWY 3 40.700 47.300 1.5
HWY 4 39.300 47.300 1.5
HWY 5 38.100 47.300 1.5
HWY 6 46.300 47.300 1.5
HWY 7 44.300 47.300 1.5
ALL 40.800 43.300 2.0
ALL 38.000 42.750 1.5
BLD 33.920 38.090 1.5
ALL 41.520 43.520 1.5
BLD 44.050 47.050 1.5
BLD 39.250 41.610 1.5
BLD 44.750 46.750 1.5
BLD 38.350 41.350 1.5
BLD 40.810 44.070 1.5
BLD 29.460 29.960 1.5
BLD 49.200 51.200 1.5
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 5 of 20
1.5
2.0
13.19
11.75
0.000
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
2.0
2.0
15.70
10.55
1.900
1.5
2.0
11.70
8.050
1.900
1.5
2.0
11.70
8.050
1.900
1.5
2.0
11.70
8.050
1.900
1.5
2.0
11.70
8.050
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
1.5
2.0
15.70
10.55
1.900
2.0
2.0
12.86
15.61
0.000
1.5
1.5
9.750
11.10
0.000
1.5
1.5
2.600
2.710
0.000
1.5
2.0
13.19
11.75
0.000
1.5
2.0
8.460
13.85
0.000
1.5
2.0
10.60
10.69
0.000
1.5
2.0
11.59
9.060
0.000
1.5
2.0
8.080
8.220
0.000
1.5
2.0
10.13
17.79
0.000
1.5
2.0
4.800
2.980
0.000
1.5
2.0
10.25
8.200
0.000
STEEL ERECTOR
0.350
STONE MASON
0.970
TERRAZZO FINISHER
0.400
TERRAZZO MASON
0.550
TILE MASON
0.710
TRAFFIC SAFETY WRKR
0.000
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TRUCK DRIVER
0.000
TRUCK DRIVER
0.000
TRUCK DRIVER
0.000
TRUCK DRIVER
0.000
TUCKPOINTER
0.940
Legend:
RG (Region)
ALL 40.750 42.750 2.0
BLD 40 -680 44.750 1.5
BLD 35.510 0.000 1.5
BLD 39.370 42.370 1.5
BLD 41.430 45.430 2.0
HWY 28.250 29.850 1.5
E ALL 1 33.850 34.500 1.5
E ALL 2 34.100 34.500 1.5
E ALL 3 34.300 34.500 1.5
E ALL 4 34.500 34.500 1.5
W ALL 1 32.550 33.100 1.5
W ALL 2 32.700 33.100 1.5
W ALL 3 32.900 33.100 1.5
W ALL 4 33.100 33.100 1.5
BLD 40.950 41.950 1.5
TYP (Trade Type - All ,Highway,Building,Floating,Oi1 & Chip,Rivers)
C (Class)
Base (Base Wage Rate)
FRMAN (Foreman Rate)
M -F>8 (OT required for any hour greater than 8 worked each day, Mon through Fri.
OSA (Overtime (OT) is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 6 of 20
2.0
2.0
13.20
19.09
0.000
1.5
2.0
9.550
12.00
0.000
1.5
2.0
9.700
9.320
0.000
1.5
2.0
9.700
10.66
0.000
1.5
2.0
9.700
8.640
0.000
1.5
2.0
4.896
4.175
0.000
1.5
2.0
8.150
8.500
0.000
1.5
2.0
8.150
8.500
0.000
1.5
2.0
8.150
8.500
0.000
1.5
2.0
8.150
8.500
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
8.180
10.82
0.000
M -F>8 (OT required for any hour greater than 8 worked each day, Mon through Fri.
OSA (Overtime (OT) is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
ORDINANCE 2012- PW- WPA -E)(2-S -1343
Prevailing Wages
Page 7 of 20
Pensn(Pension)
Vac (Vacation)
Tong (Training)
Explanations
COOK COUNTY
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial Day,
Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and
Veterans Day in some classifications /counties. Generally, any of
these holidays which fall on a Sunday is celebrated on the following
Monday. This then makes work performed on that Monday payable at the
appropriate overtime rate for holiday pay. Common practice in a given
local may alter certain days of celebration. If in doubt, please
check with IDOL.
TRUCK DRIVERS (WEST) - That part of the county West of Barrington
Road.
EXPLANATION OF CLASSES
ASBESTOS - GENERAL - removal of asbestos material /mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials /mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to remain.
CERAMIC TILE FINISHER
The grouting, cleaning, and polishing of all classes of tile, whether
for interior or exterior purposes, all burned, glazed or unglazed
products; all composition materials, granite tiles, warning detectable
tiles, cement tiles, epoxy composite materials, pavers, glass,
mosaics, fiberglass, and all substitute materials, for tile made in
tile -like units; all mixtures in tile like form of cement, metals, and
other materials that are for and intended for use as a finished floor
surface, stair treads, promenade roofs, walks, walls, ceilings,
swimming pools, and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin -set mortars, epoxies, wall mud, and any other
sand and cement mixtures or adhesives when used in the preparation,
installation, repair, or maintenance of tile and /or similar materials.
The handling and unloading of all sand, cement, lime, tile,
fixtures, equipment, adhesives, or any other materials to be used in
the preparation, installation, repair, or maintenance of tile and /or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work, particularly and
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including, but not be limited to, all soap compounds, paper products,
ORDINANCE 2012- PW- WPA -EX2 -8-1343
Prevailing Wages
Page 8 of 20
tapes, and all polyethylene coverings, plywood, masonite, cardboard,
and any new type of products that may be used to protect tile
installations, Blastrac equipment, and all floor scarifying equipment
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re- tiled.
COMMUNICATIONS ELECTRICIAN
Installation, operation, inspection, maintenance, repair and service
of radio, television, recording, voice sound vision production and
reproduction, telephone and telephone interconnect, facsimile, data
apparatus, coaxial, fibre optic and wireless equipment, appliances and
systems used for the transmission and reception of signals of any
nature, business, domestic, commercial, education, entertainment, and
residential purposes, including but not limited to, communication and
telephone, electronic and sound equipment, fibre optic and data
communication systems, and the performance of any task directly
related to such installation or service whether at new or existing
sites, such tasks to include the placing of wire and cable and
electrical power conduit or other raceway work within the equipment
room and pulling wire and /or cable through conduit and the
installation of any incidental conduit, such that the employees
covered hereby can complete any job in full.
MARBLE FINISHER
Loading and unloading trucks, distribution of all materials (all
stone, sand, etc.), stocking of floors with material, performing all
rigging for heavy work, the handling of all material that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching, waxing of material if
damaged, pointing up, caulking, grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material, drilling of holes for wires that anchor material set by
setters, mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material, mixing up of sand
to cement for the installation of material and such other work as may
be required in helping a Marble Setter in the handling of all
material in the erection or installation of interior marble, slate,
travertine, art marble, serpentine, alberene stone, blue stone,
granite and other stones (meaning as to stone any foreign or domestic
materials as are specified and used in building interiors and
exteriors and customarily known as stone in the trade), Carrara,
sanionyx, vitrolite and similar opaque glass and the laying of all
marble tile, terrazzo tile, slate tile and precast tile, steps, risers
treads, base, or any other materials that may be used as substitutes
for any of the aforementioned materials and which are used on interior
and exterior which are installed in a similar manner.
MATERIAL TESTER I: Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.
MATERIAL TESTER II: Field inspection of welds, structural steel,
fireproofing, masonry, soil, facade, reinforcing steel, formwork,
cured concrete, and concrete and asphalt batch plants; adjusting
proportions of bituminous mixtures.
OPERATING ENGINEER - BUILDING
ORDINANCE 2012- PW- WPA -E)(2-S -1343
Prevailing Wages
Page 9 of 20
Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with
Caisson Attachment; Batch Plant; Benoto (requires Two Engineers);
Boiler and Throttle Valve; Caisson Rigs; Central Redi -Mix Plant;
Combination Back Hoe Front End - loader Machine; Compressor and Throttle
Valve; Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete
Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concrete
Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom;
Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes,
Hammerhead; Cranes, (GCI and similar Type); Creter Crane; Crusher,
Stone, etc.; Derricks, All; Derricks, Traveling; Formless Curb and
Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels
or Front Endloader 2 -1/4 yd. and over; Hoists, Elevators, outside
type rack and pinion and similar machines; Hoists, One, Two and Three
Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom
Trucks; Hydro Vac (and similar equipment); Locomotives, All; Motor
Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid
Rig; Post Hole Digger; Pre - Stress Machine; Pump Cretes Dual Ram; Pump
Cretes: Squeeze Cretes -Screw Type Pumps; Gypsum Bulker and Pump;
Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor
Drawn; Slip -Form Paver; Straddle Buggies; Tournapull; Tractor with
Boom and Side Boom; Trenching Machines.
Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete
Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks;
Highlift Shovels or Front Endloaders under 2 -1/4 yd.; Hoists,
Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;
Hoists, Tugger Single Drum; Rock Drill (Self - Propelled); Rock Drill
(Truck Mounted); Rollers, All; Steam Generators; Tractors, All;
Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.
Class 3. Air Compressor; Combination Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators; Hydraulic
Power Units (Pile Driving, Extracting, and Drilling); Pumps, over 3"
(1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps, Well
Points; Welding Machines (2 through 5); Winches, 4 Small Electric
Drill Winches; Bobcats (up to and including . cu yd.) .
Class 4. Bobcats and /or other Skid Steer Loaders (other than bobcats
up to and including . cu yd.); Oilers; and Brick Forklift.
Class 5. Assistant Craft Foreman.
Class 6. Gradall.
Class 7. Mechanics.
OPERATING ENGINEERS - HIGHWAY CONSTRUCTION
Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt
Heater Scarfire; Asphalt Spreader; Autograder /GOMACO or other similar
type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast
Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi -Mix
Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe
Bucket or over or with attachments); Concrete Breaker (Truck
Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete
Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower
Cranes of all types: Creter Crane: Crusher, Stone, etc.; Derricks,
All; Derrick Boats; Derricks, Traveling; Dowell Machine with Air
Compressor; Dredges; Formless Curb and Gutter Machine; Grader,
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 10 of 20
Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form
Grader, Pull Grader, Subgrader; Guard Rail Post Driver Truck Mounted;
Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with
shear attachments; Lubrication Technician; Manipulators; Mucking
Machine; Pile Drivers and Skid Rig; Pre - Stress Machine; Pump Cretes
Dual Ram; Rock Drill - Crawler or Skid Rig; Rock Drill - Truck
Mounted; Rock /Track Tamper; Roto Mill Grinder; Slip -Form Paver; Soil
Test Drill Rig (Truck Mounted); Straddle Buggies; Hydraulic
Telescoping Form (Tunnel); Tractor Drawn Belt Loader (with attached
pusher - two engineers); Tractor with Boom; Tractaire with
Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom;
Raised or Blind Hole Drills (Tunnel Shaft); Underground Boring and /or
Mining Machines 5 £t. in diameter and over tunnel, etc; Underground
Boring and /or Mining Machines under 5 ft. in diameter; Wheel
Excavator; Widener (APSCO).
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with
attachments); Compressor and Throttle Valve; Compressor, Common
Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck
Cars (Haglund or Similar Type); Drills, All; Finishing Machine -
Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging
Machine; Hydraulic Boom Trucks (All Attachments); Hydro - Blaster; All
Locomotives, Dinky; Off -Road Hauling Units (including articulating) /2
ton capacity or more; Non Self- Loading Ejection Dump; Pump Cretes:
Squeeze Cretes - Screw Type Pumps, Gypsum Bulker and Pump; Roller,
Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc., self - propelled;
Scoops - Tractor Drawn; Self- Propelled Compactor; Spreader - Chip -
Stone, etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of
Size): Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc,
Compactor, etc.; Tug Boats.
Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over);
Conveyor, Portable; Farm -Type Tractors Used for Mowing, Seeding, etc.;
Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists,
Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep
Diggers; Low Boys; Pipe Jacking Machines; Post -Hole Digger; Power Saw,
Concrete Power Driven; Pug Mills; Rollers, other than Asphalt; Seed
and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with
"A" Frame; Work Boats; Tamper- Form -Motor Driven.
Class 4. Air Compressor; Combination - Small Equipment Operator;
Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or Drilling); Hydro- Blaster;
Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed
a total of 300 ft.); Pumps, Well Points; Tractaire; Welding Machines
(2 through 5); Winches, 4 Small Electric Drill Winches.
Class 5. Bobcats (all); Brick Forklifts; Oilers.
Class 6. Field Mechanics and Field Welders
Class 7. Gradall and machines of like nature.
OPERATING ENGINEER - FLOATING
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 11 of 20
Class 1. Craft Foreman; Diver /Wet Tender; and Engineer (hydraulic
dredge).
Class 2. Crane / Backhoe Operator; 70 Ton or over Tug Operator;
Mechanic /Welder; Assistant Engineer (Hydraulic Dredge); Leverman
(Hydraulic Dredge); Diver Tender; Friction and Lattice Boom Cranes.
Class 3. Deck Equipment Operator, Machineryman; Maintenance of Crane
(over 50 ton capacity); Tug /Launch Operator; Loader /Dozer and like
equipment on Barge; and Deck Machinery, etc.
Class 4. Deck Equipment Operator, Machineryman /Fireman (4 Equipment
Units or More); Off Road Trucks (2 ton capacity or more); Deck Hand,
Tug Engineer, Crane Maintenance 50 Ton Capacity and Under or Backhoe
Weighing 115,000 pounds or less; and Assistant Tug Operator.
i�7;7_VBdi)•i1��IbYNal;7
The handling of sand, cement, marble chips, and all other materials
that may be used by the Mosaic Terrazzo Mechanic, and the mixing,
grinding, grouting, cleaning and sealing of all Marble, Mosaic, and
Terrazzo work, floors, base, stairs, and wainscoting by hand or
machine, and in addition, assisting and aiding Marble, Masonic, and
Terrazzo Mechanics.
��cs�y�c.>Ry�a�rr•�
Work associated with barricades, horses and drums used to reduce lane
usage on highway work, the installation and removal of temporary lane
markings, and the installation and removal of temporary road signs.
TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION - EAST & WEST
Class 1. Two or three Axle Trucks. A -frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by cars, pick -up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry -alls; Fork Lifts and Hoisters; Helpers; Mechanics
Helpers and Greasers; Oil Distributors 2 -man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self- propelled Chip Spreader; Skipman; Slurry Trucks, 2 -man operation;
Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters; Unskilled
Dumpman; and Truck Drivers hauling warning lights, barricades, and
portable toilets on the job site.
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self - loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yards;
Ready -mix Plant Hopper Operator, and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self - loading equipment or similar
equipment over 16 cubic yards; Explosives and /or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1 -man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1 -man operation; Winch trucks, 3 axles or more;
Mechanic - -Truck Welder and Truck Painter.
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 12 of 20
Class 4. Six axle trucks; Dual- purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self- loading equipment like P.B. and trucks with scoops on the front.
Other Classifications of Work:
For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are
available. I£ a task to be performed is not subject to one of the
classifications of pay set out, the Department will upon being
contacted state which neighboring county has such a classification and
provide such rate, such rate being deemed to exist by reference in
this document. If no neighboring county rate applies to the task,
the Department shall undertake a special determination, such special
determination being then deemed to have existed under this
determination. If a project requires these, or any classification not
listed, please contact IDOL at 217 - 782 -1710 for wage rates or
clarifications.
LANDSCAPING
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by
landscape plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the classifications of truck driver.
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 13 of 20
EXHIBIT B
Du Page County Prevailing Wage for August 2012
(See explanation of column headings at bottom of wages)
Trade Name RG TYP C Base FRMAN -M-F>8 OSA OSH H/W Pensn Vac
Trng
ASBESTOS ABT -GEN
ALL
36.200
36.700
1.5
1.5
2.0
12.78
9.020
0.000
0.500
ASBESTOS ABT -MEC
BID
32.850
0.000
1.5
1.5
2.0
10.82
10.66
0.000
0.720
BOILERMAKER
BID
43.450
47.360
2.0
2.0
2.0
6.970
14.66
0.000
0.350
BRICK MASON
BLD
40.680
44.750
1.5
1.5
2.0
9.550
12.00
0.000
0.970
CARPENTER
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
CEMENT MASON
ALL
38.000
40.000
2.0
1.5
2.0
8.950
16.35
0.000
0.380
CERAMIC TILE FNSHER
BLD
34.440
0.000
2.0
1.5
2.0
9.700
6.930
0.000
0.610
COMMUNICATION TECH
BLD
32.650
34.750
1.5
1.5
2.0
9.250
14.46
0.400
0.610
ELECTRIC PWR EQMT OF
ALL
35.400
48.110
1.5
1.5
2.0
5.000
10.97
0.000
0.270
ELECTRIC PWR GRNDMAN
ALL
27.380
48.110
1.5
1.5
2.0
5.000
8.490
0.000
0.210
ELECTRIC PWR LINEMAN
ALL
42.390
48.110
1.5
1.5
2.0
5.000
13.14
0.000
0.320
ELECTRIC PWR TRK DRV
ALL
28.350
48.110
1.5
1.5
2.0
5.000
8.790
0.000
0.220
ELECTRICIAN
BLD
36.200
39.820
1.5
1.5
2.0
9.250
16.27
4.380
0.680
ELEVATOR CONSTRUCTOR
BLD
48.560
54.630
2.0
2.0
2.0
11.03
11.96
2.910
0.000
FENCE ERECTOR
NE
ALL
33.740
35.740
1.5
1.5
2.0
12.61
10.18
0.000
0.250
FENCE ERECTOR
W
ALL
44.950
47.200
2.0
2.0
2.0
8.890
17.69
0.000
0.400
GLAZIER
BLD
38.500
40.000
1.5
2.0
2.0
11.49
14.64
0.000
0.840
HT /FROST INSULATOR
BLD
43.800
46.300
1.5
1.5
2.0
10.82
11.86
0.000
0.720
IRON WORKER
E
ALL
40.750
42.750
2.0
2.0
2.0
13.20
19.09
0.000
0.350
IRON WORKER
W
ALL
44.950
47.200
2.0
2.0
2.0
8.890
17.69
0.000
0.400
LABORER
ALL
36.200
36.950
1.5
1.5
2.0
12.78
9.020
0.000
0.500
LATHER
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
MACHINIST
BID
43.160
45.160
1.5
1.5
2.0
7.960
8.950
0.000
0.000
MARBLE FINISHERS
ALL
29.700
0.000
1.5
1.5
2.0
9.550
11.75
0.000
0.620
ORDINANCE 2012- PW- WPA -E)(2-S -1343
Prevailing Wages
Page 14 of 20
MARBLE MASON
BLD
39.880
43.870
1.5
1.5
2.0
9.550
11.75
0.000
0.730
MATERIAL TESTER I
ALL
26.200
0.000
1.5
1.5
2.0
12.78
9.020
0.000
0.500
MATERIALS TESTER II
ALL
31.200
0.000
1.5
1.5
2.0
12.78
9.020
0.000
0.500
MILLWRIGHT
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
OPERATING ENGINEER
BLD
1
45.100
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
2
43.800
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
3
41.250
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
4
39.500
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
5
48.850
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
6
46.100
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
BLD
7
48.100
49.100
2.0
2.0
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
1
43.300
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
2
42.750
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
3
40.700
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
4
39.300
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
5
38.100
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
6
46.300
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
OPERATING ENGINEER
HWY
7
44.300
47.300
1.5
1.5
2.0
15.70
10.55
1.900
1.250
ORNAMNTL IRON WORKER E
ALL
40.800
43.300
2.0
2.0
2.0
12.86
15.61
0.000
0.500
ORNAMNTL IRON WORKER W
ALL
44.950
47.200
2.0
2.0
2.0
8.890
17.69
0.000
0.400
PAINTER
ALL
40.880
42.880
1.5
1.5
1.5
9.650
8.200
0.000
1.250
PAINTER SIGNS
BLD
33.920
38.090
1.5
1.5
1.5
2.600
2.710
0.000
0.000
PILEDRIVER
ALL
41.520
43.520
1.5
1.5
2.0
13.19
11.75
0.000
0.530
PIPEFITTER
BLD
41.000
43.000
1.5
1.5
2.0
10.75
14.59
0.000
1.660
PLASTERER
BLD
40.080
42.480
1.5
1.5
2.0
9.550
12.30
0.000
0.990
PLUMBER
BLD
41.000
43.000
1.5
1.5
2.0
10.75
14.59
0.000
1.660
ROOFER
BLD
38.350
41.350
1.5
1.5
2.0
8.080
8.220
0.000
0.430
SHEETMETAL WORKER
BLD
41.660
43.660
1.5
1.5
2.0
9.540
11.57
0.000
0.780
SPRINKLER FITTER
BLD
49.200
51.200
1.5
1.5
2.0
10.25
8.200
0.000
0.450
STEEL ERECTOR E
ALL
40.750
42.750
2.0
2.0
2.0
13.20
19.09
0.000
0.350
STEEL ERECTOR
0.400
STONE MASON
0.970
TERRAZZO FINISHER
0.400
TERRAZZO MASON
0.550
TILE MASON
0.710
TRAFFIC SAFETY WRKR
0.000
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TRUCK DRIVER
0.150
TUCKPOINTER
0.940
Legend:
RG (Region)
W ALL 44.950
BLD 40.680
BLD 35.510
BLD 39.370
BLD 41.430
HWY 28.250
ALL 1 32.550
ALL 2 32.700
ALL 3 32.900
ALL 4 33.100
BLD 40.950
47.200 2.0
44.750 1.5
0.000 1.5
42.370 1.5
45.430 2,0
29.850 1.5
33.100 1.5
33.100 1.5
33.100 1.5
33.100 1.5
41.950 1.5
TYP (Trade Type - All ,Highway,Building,Floating,Oi1 & Chip,Rivers)
C (Class)
Base (Base Wage Rate)
FRMAN (Foreman Rate)
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 15 of 20
2.0
2.0
6.890
17.69
0.000
1.5
2.0
9.550
12.00
0.000
1.5
2.0
9.700
9.320
0.000
1.5
2.0
9.700
10.66
0.000
1.5
2.0
9.700
8.640
0.000
1.5
2.0
4.896
4.175
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
6.500
4.350
0.000
1.5
2.0
8.180
10.82
0.000
M -F>8 (OT required for any hour greater than 8 worked each day, Mon through Fri.
OSA (Overtime (OT) is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
Pensn(Pension)
Vac (Vacation)
Tmg (Training)
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 16 of 20
Explanations
DUPAGE COUNTY
IRON WORKERS AND FENCE ERECTOR (WEST) - West of Route 53.
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial Day,
Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and
Veterans Day in some classifications /counties. Generally, any of
these holidays which fall on a Sunday is celebrated on the following
Monday. This then makes work performed on that Monday payable at the
appropriate overtime rate for holiday pay. Common practice in a given
local may alter certain days of celebration. If in doubt, please
check with IDOL.
EXPLANATION OF CLASSES
ASBESTOS - GENERAL - removal of asbestos material /mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials /mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to remain.
TRAFFIC SAFETY - work associated with barricades, horses and drums
used to reduce lane usage on highway work, the installation and
removal of temporary lane markings, and the installation and removal
of temporary road signs.
CERAMIC TILE FINISHER
The grouting, cleaning, and polishing of all classes of tile, whether
for interior or exterior purposes, all burned, glazed or unglazed
products; all composition materials, granite tiles, warning detectable
tiles, cement tiles, epoxy composite materials, pavers, glass,
mosaics, fiberglass, and all substitute materials, for tile made in
tile -like units; all mixtures in tile like form of cement, metals, and
other materials that are for and intended for use as a finished floor
surface, stair treads, promenade roofs, walks, walls, ceilings,
swimming pools, and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin -set mortars, epoxies, wall mud, and any other
sand and cement mixtures or adhesives when used in the preparation,
installation, repair, or maintenance of tile and /or similar materials.
The handling and unloading of all sand, cement, lime, tile,
fixtures, equipment, adhesives, or any other materials to be used in
the preparation, installation, repair, or maintenance of tile and /or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work, particularly and
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including, but not be limited to, all soap compounds, paper products,
tapes, and all polyethylene coverings, plywood, masonite, cardboard,
and any new type of products that may be used to protect tile
installations, Blastrac equipment, and all floor scarifying equipment
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 17 of 20
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re- tiled.
COMMUNICATIONS TECHNICIAN
Low voltage installation, maintenance and removal of telecommunication
facilities (voice, sound, data and video) including telephone and
data inside wire, interconnect, terminal equipment, central offices,
PABX, fiber optic cable and equipment, micro waves, V -SAT, bypass,
CATV, WAN (wide area networks), LAN (local area networks), and ISDN
(integrated system digital network), pulling of wire in raceways, but
not the installation of raceways.
MARBLE FINISHER
Loading and unloading trucks, distribution of all materials (all
stone, sand, etc.), stocking of floors with material, performing all
rigging for heavy work, the handling of all material that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching, waxing of material if
damaged, pointing up, caulking, grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material, drilling of holes for wires that anchor material set by
setters, mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material, mixing up of sand
to cement for the installation of material and such other work as may
be required in helping a Marble Setter in the handling of all
material in the erection or installation of interior marble, slate,
travertine, art marble, serpentine, alberene stone, blue stone,
granite and other stones (meaning as to stone any foreign or domestic
materials as are specified and used in building interiors and
exteriors and customarily known as stone in the trade), carrara,
sanionyx, vitrolite and similar opaque glass and the laying of all
marble tile, terrazzo tile, slate tile and precast tile, steps, risers
treads, base, or any other materials that may be used as substitutes
for any of the aforementioned materials and which are used on interior
and exterior which are installed in a similar manner.
MATERIAL TESTER I: Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.
MATERIAL TESTER II: Field inspection of welds, structural steel,
fireproofing, masonry, soil, facade, reinforcing steel, formwork,
cured concrete, and concrete and asphalt batch plants; adjusting
proportions of bituminous mixtures.
[e1111 71:7_v FBI o [Male I"Ilk hl a l 1aapa10to
Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with
Caisson Attachment; Batch Plant; Benoto (requires Two Engineers);
Boiler and Throttle Valve; Caisson Rigs; Central Redi -Mix Plant;
Combination Back Hoe Front End - loader Machine; Compressor and Throttle
Valve; Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete
Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concrete
Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom;
Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes,
Hammerhead; Cranes, (GCI and similar Type); Creter Crane; Crusher,
Stone, etc.; Derricks, All; Derricks, Traveling; Formless Curb and
Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 18 of 20
or Front Endloader 2 -1/4 yd. and over; Hoists, Elevators, outside
type rack and pinion and similar machines; Hoists, One, Two and Three
Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom
Trucks; Hydro Vac (and similar equipment); Locomotives, All; Motor
Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid
Rig; Post Hole Digger; Pre - Stress Machine; Pump Cretes Dual Ram; Pump
Cretes: Squeeze Cretes -Screw Type Pumps; Gypsum Bulker and Pump;
Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor
Drawn; Slip -Form Paver; Straddle Buggies; Tournapull; Tractor with
Boom and Side Boom; Trenching Machines.
Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete
Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks;
Highlift Shovels or Front Endloaders under 2 -1/4 yd.; Hoists,
Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;
Hoists, Tugger Single Drum; Rock Drill (Self - Propelled); Rock Drill
(Truck Mounted); Rollers, All; Steam Generators; Tractors, All;
Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.
Class 3. Air Compressor; Combination Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators; Hydraulic
Power Units (Pile Driving, Extracting, and Drilling); Pumps, over 3"
(1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps, Well
Points; Welding Machines (2 through 5); Winches, 4 Small Electric
Drill Winches; Bobcats (up to and including a cu yd.) .
Class 4. Bobcats and /or other Skid Steer Loaders (other than bobcats
up to and including , cu yd.); Oilers; and Brick Forklift.
Class 5. Assistant Craft Foreman
Class 6. Gradall
Class 7. Mechanics.
OPERATING ENGINEERS - HIGHWAY CONSTRUCTION
Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt
Heater Scarfire; Asphalt Spreader; Autograder /GOMACO or other similar
type machines: AEG Paver; Backhoes with Caisson Attachment; Ballast
Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi -Mix
Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe
Bucket or over or with attachments); Concrete Breaker (Truck
Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete
Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower
Cranes of all types: Creter Crane: Crusher, Stone, etc.; Derricks,
All; Derrick Boats; Derricks, Traveling; Dowell Machine with Air
Compressor; Dredges; Formless Curb and Gutter Machine; Grader,
Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form
Grader, Pull Grader, Subgrader; Guard Rail Post Driver Truck Mounted;
Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with
shear attachments; Lubrication Technician; Manipulators; Mucking
Machine; Pile Drivers and Skid Rig; Pre - Stress Machine; Pump Cretes
Dual Ram; Rock Drill - Crawler or Skid Rig; Rock Drill - Truck
Mounted; Rock /Track Tamper; Roto Mill Grinder; Slip -Form Paver; Soil
Test Drill Rig (Truck Mounted); Straddle Buggies; Hydraulic
Telescoping Form (Tunnel); Tractor Drawn Belt Loader (with attached
pusher - two engineers); Tractor with Boom; Tractaire with
Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom;
Raised or Blind Hole Drills (Tunnel Shaft); Underground Boring and /or
ORDINANCE 2012- PW- WPA -EX2 -S -1343
Prevailing Wages
Page 19 of 20
Mining Machines 5 £t. in diameter and over tunnel, etc; Underground
Boring and /or Mining Machines under 5 ft. in diameter; Wheel
Excavator; Widener (APSCO).
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with
attachments); Compressor and Throttle Valve; Compressor, Common
Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck
Cars (Haglund or Similar Type); Drills, All; Finishing Machine -
Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging
Machine; Hydraulic Boom Trucks (All Attachments); Hydro - Blaster; All
Locomotives, Dinky; Off -Road Hauling Units (including articulating) /2
ton capacity or more; Non Self- Loading Ejection Dump; Pump Cretes:
Squeeze Cretes - Screw Type Pumps, Gypsum Bulker and Pump; Roller,
Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc., self - propelled;
Scoops - Tractor Drawn; Self- Propelled Compactor; Spreader - Chip -
Stone, etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of
Size): Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc,
Compactor, etc.; Tug Boats.
Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over);
Conveyor, Portable; Farm -Type Tractors Used for Mowing, Seeding, etc.;
Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists,
Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep
Diggers; Low Boys; Pipe Jacking Machines; Post -Hole Digger; Power Saw,
Concrete Power Driven; Pug Mills; Rollers, other than Asphalt; Seed
and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with
"A" Frame; Work Boats; Tamper- Form -Motor Driven.
Class 4. Air Compressor; Combination - Small Equipment Operator;
Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or Drilling); Hydro- Blaster;
Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed
a total of 300 ft.); Pumps, Well Points; Tractaire; Welding Machines
(2 through 5); Winches, 4 Small Electric Drill Winches.
Class 5. Bobcats (all); Brick Forklifts; Oilers.
Class 6. Field Mechanics and Field Welders
Class 7. Gradall and machines of like nature.
TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION
Class 1. Two or three Axle Trucks. A -frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by cars, pick -up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry -alls; Fork Lifts and Hoisters; Helpers; Mechanics
Helpers and Greasers; Oil Distributors 2 -man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self- propelled Chip Spreader; Skipman; Slurry Trucks, 2 -man
operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters;
Unskilled Dumpman; and Truck Drivers hauling warning lights,
barricades, and portable toilets on the job site.
ORDINANCE 2012- PW- WPA -E)(2-S -1343
Prevailing Wages
Page 20 of 20
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self - loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards;
Ready -mix Plant Hopper Operator, and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self - loading equipment or similar
equipment over 16 cubic yards; Explosives and /or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1 -man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1 -man operation; Winch trucks, 3 axles or more;
Mechanic - -Truck Welder and Truck Painter.
Class 4. Six axle trucks; Dual- purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self- loading equipment like P.B. and trucks with scoops on the front.
TERRAZZO FINISHER
The handling of sand, cement, marble chips, and all other materials
that may be used by the Mosaic Terrazzo Mechanic, and the mixing,
grinding, grouting, cleaning and sealing of all Marble, Mosaic, and
Terrazzo work, floors, base, stairs, and wainscoting by hand or
machine, and in addition, assisting and aiding Marble, Masonic, and
Terrazzo Mechanics.
Other Classifications of Work:
For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are available.
If a task to be performed is not subject to one of the
classifications of pay set out, the Department will upon being
contacted state which neighboring county has such a classification and
provide such rate, such rate being deemed to exist by reference in
this document. If no neighboring county rate applies to the task,
the Department shall undertake a special determination, such special
determination being then deemed to have existed under this
determination. If a project requires these, or any classification not
listed, please contact IDOL at 217 - 782 -1710 for wage rates or
clarifications.
i l/ d 1 I U 7.Y N G 1191015 0
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by landscape
plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the classifications of truck driver.