Loading...
G-908 - 12/08/2009 - COMMUNITY DEVELOPMENT - OrdinancesORDINANCE 2009- CD -BC -G -908 AN ORDINANCE REVISING THE FEE AND BOND SCHEDULE BY AMENDING CHAPTER 4 (FEES AND BONDS) OF TITLE 10 (BUILDING REGULATIONS) OF THE VILLAGE CODE OF THE VILLAGE OF OAK BROOK WHEREAS, the President and Board of Trustees have determined that it is necessary to increase the current building permit fee schedule in order to defray the Village's increased costs relative to the issuance of building permits and to protect the public health, safety and welfare NOW, THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS, as follows Section 1 The foregoing preamble is restated and incorporated herein by reference as though fully set forth herein Section 2 Chapter 4 (Fees and Bonds) of Title 10 (Building Regulations) of the Village Code is hereby amended by deleting Chapter 4 in its entirety and substituting the following in lieu thereof CHAPTER 4 FEES AND BONDS SECTION - 10-4-1 Fee and Bond Schedule 10-4 -1 FEE AND BOND SCHEDULE: Before a permit required by this Title is issued, the Director of Community Development shall collect a fee and bond calculated according to the following schedule A Volume Computation Volume shall be computed on the exterior dimensions of the building and shall include all space above the lowest level of the foundation wall and to the highest point of the main roof and to include all projections B Unit of Volume Cost Figure a fraction larger than one -half (1/2) as a full unit Fee 1. New Buildings: Commercial, Office and Industrial Base permit fee $ 1285.00 Plus $10.50 per 1,000 cubic feet $10.50 Residential Base Permit Fee $ 705.00 Plus $4.00 per each additional 1,000 cubic feet $ 4.00 Ordinance 2009- CD -BC -G -908 Amending Section 10-4 -1 Page 2 of 5 2. Residential Additions and Alterations: Base permit fee $ 140.00 Plus $13.75 per 1,000 cubic feet $ 13.75 3. Commercial Additions and Alterations Base permit fee $ 350.00 Plus $7.00 per $1000 estimated cost of new $ 7.00 construction 4. Plumbing Work Per plumbing fixture or opening $ 14.00 Septic system installation $ 175.00 Septic system repair $ 175.00 5. Electrical Work: Electrical Permit (base fee) $ 75.00 Residential Panel: Per Amp $ .50 Commercial Panel: Per Amp $ .50 Commercial Circuits (each) $ 14.00 Commercial openings, (each) $ 4.00 Commercial devices - alarms, strobes, detectors (each) $ 4.00 Commercial Motors (each) Up to 20 hp $36.00 Each additional hp over 20 hp $ 3.75 Commercial Appliances (each) Up to 20 kw $ 40.00 Each additional kw over 20 $ 7.50 Commercial - Temporary installations $ 105.00 Commercial Communication /Alarm (signal /low voltage) Systems $ 65.00 6. Driveway: Commercial $ 350.00 Residential $ 85.00 7. Certificates of Occupancy and Compliance (each): $ 40.00 8. Accessory Buildings and Structures (each): Pools, hot -tubs, detached garages, commercial tents, $ 105.00 Decks, patios, fireplaces, flagpoles and Other similar structure Ordinance 2009- CD -BC -G -908 Amending Section 10-4 -1 Page 3 of 5 Residential Tents $ 35.00 Portable Storage Units (each) $ 50.00 9. Elevators, Escalators, Dumbwaiters: Elevator /escalator/Dumbwaiter 5 floors or less, per device $ 125.00 Each additional floor over 5 $ 25.00 Hand- operated, 5 floors or less $ 48.00 Hand- operated, each floor over 5 $ 22.00 Inspection certificate, biannually, each $ 125.00 10. Mechanical Heating, Cooling, Ventilating Systems including Chimneys: Each mechanical device /appliance $ 70.00 11. Storm Sewer /Sump Pump Connection (each): $ 105.00 12. Canopies, Marquees: $ 70.00 13. Tanks, Flammable and Nonflammable: 500 gallons or less $ 105.00 Over 500 gallons, $5.25 each additional 100 gallons 14. Recoat or Recover Roof: Residential $ 70.00 Commercial $ 710.00 15. Temporary Office or Construction Trailer (each): $ 150.00 16. Fences (each): $ 70.00 17. Signs Per square foot $ 4.25 Minimum $ 70.00 18. Moving Buildings: $ 350.00 19. Wrecking Demolition, Shoring, Raisings, Underpinning: Base fee $ 325.00 Plus 3.75 Per 1,000 cubic feet $ 3.75 20. Plan and Application Examination and Review: Each, per hour $ 62.00 Minimum fee $ 62.00 In the event that any outside consulting plan review services are used, the applicant shall reimburse the Village for any fees associated with that service as a prerequisite to the issuance of any required permits. Ordinance 2009- CD -BC -G -908 Amending Section 10-4 -1 Page 4 of 5 21. Inspection Fee (each): $ 62.00 A fee based on the estimated number of inspections will be assessed prior to permit issuance. Additional inspections will require payment of an additional fee. 22. Fire Suppression Systems Inspection Fee (each) (per inspector) $ 62.00 Hydrostatic Test Fee (each) $ 150.00 A fee based on the estimated number of inspections and personnel based on the above rate will be assessed prior to permit issuance. Additional inspections will require payment of an additional fee. 23. Annual Non - Residential Fire Inspection Fee (each): $ 62.00 ** A fee assessed for each inspection required to determine compliance with previously cited violations to the Building Codes of the Village. * *For annual Fire Inspections, the fee will be assessed for continued non - compliance after the issuance of a 30 day correction notice. For violations that continue 90 days after the first correction notice will be assessed an additional inspection fee plus an additional administrative fee of $100 for each subsequent inspection. 24. Cleanup and Street Bond: Commercial $ 750.00 Residential $ 375.00 25. Completion Bond: Each $ 725.00 26. Starting Work Without a Permit: Each $ 500.00 27. Occupancy of a Building or Structure Without Final Inspection and/or Issuance of Occupancy Permit: Each $ 500.00 28. Application Fee (required for each permit application) $ 40.00 29. Canceled Permits: Per Hour $ 62.00 Minimum $ 62.00 Once a permit application has been submitted to the Village for review and approval, any staff time devoted to plan review shall be billed to the applicant at a rate of $62 per hour if the applicant makes a formal request to cancel the permit application. 30. Phased Approval Minimum fee: $200.00 * ** Ordinance 2009- CD -BC -G -908 Amending Section 10-4 -1 Page 5 of 5 For permits issued with phased approval — as allowed in the adopted building code — there shall be an administrative fee in addition to any and all fees required by this code for each permit so issued. ** *This administrative fee shall be equal to one half (1/2) the sum of all fees otherwise required in Section 10 -4 -1, but not less than two hundred dollars ($200.00). All permit and administrative fees known at the time of the phased approval shall be paid prior to the issuance of such partial permit. These fees may be recalculated prior to approval of each phase, modification or at the time of completion. Section 4 If any section, paragraph, clause or provision of this ordinance shall be held invalid, the invalidity thereof shall not effect any of the other provisions of this ordinance Section 5 All ordinances in conflict herewith are hereby repealed to the extent of such conflict Section 6 This ordinance shall be in full force and effect from and after its passage, approval and publication as required by law Ayes _ Nays _ Absent APPROVED THIS 8th day of December, 2009 i W. Craig ge President PASSED THIS 8th day of December, 2009. Trustees Aktipis, Carson, Moy, Wolin and Zannis None Trustee Saiyed a rr C , y` k a� It e, ATTEST Charlotte K Pruss Village Clerk