Loading...
S-1312 - 06/14/2011 - PREVAILING WAGE - Ordinances ExhibitsORDINANCE 201 1-PW-WPA-EX2-S-1 312 Prevailing Wages Page 4 of 20 EXHIBIT A Cook County Prevailing Wage for June 2011 Trade Name RG TYP C Base FRMAN *M -F >8 OSA OSH H/W Pensn Vac Trng ASBESTOS ABT -GEN ALL 35.200 35.700 1.5 1.5 2.0 10.63 8.570 0.000 0.450 ASBESTOS ABT -MEC BLD 32.290 0.000 1.5 1.5 2.0 10.82 10.66 0.000 0.620 BOILERMAKER BLD 43.020 46.890 2.0 2.0 2.0 6.720 9.890 0.000 0.350 BRICK MASON BLD 39.030 42.930 1.5 1.5 2.0 8.800 10.67 0.000 0.740 CARPENTER ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 CEMENT MASON ALL 41.850 43.850 2.0 1.5 2.0 9.850 10.06 0.000 0.220 CERAMIC TILE FNSHER BLD 33.600 0.000 2.0 1.5 2.0 6.950 8.020 0.000 0.540 COMM. ELECT. BLD 36.440 38.940 1.5 1.5 2.0 8.420 8.910 0.000 0.700 ELECTRIC PWR EQMT OF ALL 40.850 46.430 1.5 1.5 2.0 10.27 12.98 0.000 0.310 ELECTRIC PWR GRNDMAN ALL 31.860 46.430 1.5 1.5 2.0 8.010 10.13 0.000 0.240 ELECTRIC PWR LINEMAN ALL 40.850 46.430 1.5 1.5 2.0 10.27 12.98 0.000 0.310 ELECTRICIAN ALL 40.400 43.000 1.5 1.5 2.0 13.83 7.420 0.000 0.750 ELEVATOR CONSTRUCTOR BLD 47.410 53.340 2.0 2.0 2.0 10.53 10.71 2.840 0.000 FENCE ERECTOR ALL 32.660 34.660 1.5 1.5 2.0 10.67 10.00 0.000 0.500 GLAZIER BLD 38.000 39.500 1.5 2.0 2.0 10.19 13.64 0.000 0.790 HT /FROST INSULATOR BLD 43.050 45.550 1.5 1.5 2.0 10.82 11.86 0.000 0.620 IRON WORKER ALL 40.750 42.750 2.0 2.0 2.0 12.45 17.09 0.000 0.300 LABORER ALL 35.200 35.950 1.5 1.5 2.0 10.63 8.570 0.000 0.450 LATHER ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 MACHINIST BLD 43.160 45.160 1.5 1.5 2.0 7.640 8.700 0.000 0.000 MARBLE FINISHERS ALL 29.100 0.000 1.5 1.5 2.0 8.800 10.67 0.000 0.740 MARBLE MASON BLD 39.030 42.930 1.5 1.5 2.0 8.800 10.67 0.000 0.740 MATERIAL TESTER I ALL 25.200 0.000 1.5 1.5 2.0 10.63 8.570 0.000 0.450 MATERIALS TESTER II ALL 30.200 0.000 1.5 1.5 2.0 10.63 8.570 0.000 0.450 MILLWRIGHT ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 OPERATING ENGINEER 1.150 ORNAMNTL IRON WORKER 0.500 PAINTER 0.770 PAINTER SIGNS 0.000 PILEDRIVER 0.490 PIPEFITTER 1.820 . PLASTERER 0.550 PLUMBER 1.030 ROOFER 0.430 SHEETMETAL WORKER 0.630 SIGN HANGER 0.000 SPRINKLER FITTER 0.450 STEEL ERECTOR BLD 1 45.100 49.100 2.0 BLD 2 43.800 49.100 2.0 BLD 3 41.250 49.100 2.0 BLD 4 39.500 49.100 2.0 BLD 5 48.850 49.100 2.0 BLD 6 46.100 49.100 2.0 BLD 7 48.100 49.100 2.0 FLT 1 51.300 51.300 1.5 FLT 2 49.800 51.300 1.5 FLT 3 44.350 51.300 1.5 FLT 4 36.850 51.300 1.5 HWY 1 43.300 47.300 1.5 HWY 2 42.750 47.300 1.5 HWY 3 40.700 47.300 1.5 HWY 4 39.300 47.300 1.5 HWY 5 38.100 47.300 1.5 HWY 6 46.300 47.300 1.5 HWY 7 44.300 47.300 1.5 ALL 40.200 42.450 2.0 ALL 38.000 42.750 1.5 BLD 32.770 36.800 1.5 ALL 40.770 42.770 1.5 BLD 44.050 47.050 1.5 BLD 39.250 41.610 1.5 BLD 44.000 46.000 1.5 BLD 37.650 40.650 1.5 BLD 40.460 43.700 1.5 BLD 28.960 29.810 1.5 BLD 49.200 51.200 1.5 ALL 40.750 42.750 2.0 ORDINANCE 2011- PW- WPA- EX2- S-1312 Prevailing Wages Page 5 of 20 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 2.0 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 1.5 2.0 11.70 8.050 1.900 2.0 2.0 10.67 14.81 0.000 1.5 1.5 9.750 11.10 0.000 1.5 1.5 2.600 2.620 0.000 1.5 2.0 9.840 9.790 0.000 1.5 2.0 8.460 13.85 0.000 1.5 2.0 10.60 10.69 0.000 1.5 2.0 9.860 7.090 0.000 1.5 2.0 7.750 6.570 0.000 1.5 2.0 9.830 16.25 0.000 1.5 2.0 4.700 2.880 0.000 1.5 2.0 8.500 8.050 0.000 2.0 2.0 10.95 15.99 0.000 0.300 STONE MASON 0.740 TERRAZZO FINISHER 0.430 TERRAZZO MASON 0.510 TILE MASON 0.610 TRAFFIC SAFETY WRKR 0.000 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TRUCK DRIVER 0.000 TRUCK DRIVER 0.000 TRUCK DRIVER 0.000 TRUCK DRIVER 0.000 TUCKPOINTER 0.770 Legend BLD 39.030 42.930 1.5 BLD 35.150 0.000 1.5 BLD 39.010 42.010 1.5 BLD 40.490 44.490 2.0 HWY 28.250 29.850 1.5 E ALL 1 30.700 31.350 1.5 E ALL 2 30.950 31.350 1.5 E ALL 3 31.150 31.350 1.5 E ALL 4 31.350 31.350 1.5 W ALL 1 32.550 33.100 1.5 W ALL 2 32.700 33.100 1.5 W ALL 3 32.900 33.100 1.5 W ALL 4 33.100 33.100 1.5 BLD 39.200 40.200 1.5 ORDINANCE 2011- PW- WPA- EX2- S-1312 Prevailing Wages Page 6 of 20 1.5 2.0 8.800 10.67 0.000 1.5 2.0 6.950 10.57 0.000 1.5 2.0 6.950 11.91 0.000 1.5 2.0 6.950 9.730 0.000 1.5 2.0 4.896 4.175 0.000 1.5 2.0 6.750 5.450 0.000 1.5 2.0 6.750 5.450 0.000 1.5 2.0 6.750 5.450 0.000 1.5 2.0 6.750 5.450 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 7.830 10.25 0.000 M -F >8 (Overtime is required for any hour greater than 8 worked each day, Monday through Friday. OSA (Overtime is required for every hour worked on Samrda)y OSH (Overtime is required for every hour worked on Sunday and Holidays) H/W (Health & Welfare Insurance) Pensn(Pension) Vac (Vacation) Tmg (Training) Explanations COOK COUNTY The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and Veterans Day in some classifications /counties. Generally, any of these holidays which fall on a Sunday is celebrated on the following ORDINANCE 201 1-PW-WPA-EX2-S-1 312 Prevailing Wages Page 7 of 20 Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay. Common practice in a given local may alter certain days of celebration. If in doubt, please check with IDOL. TRUCK DRIVERS (WEST) - That part of the county West of Barrington Road. EXPLANATION OF CLASSES ASBESTOS - GENERAL - removal of asbestos material /mold and hazardous materials from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials /mold and hazardous materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS - MECHANICAL - removal of asbestos material from mechanical systems, such as pipes, ducts, and boilers, where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting, cleaning, and polishing of all classes of tile, whether for interior or exterior purposes, all burned, glazed or unglazed products; all composition materials, granite tiles, warning detectable tiles, cement tiles, epoxy composite materials, pavers, glass, mosaics, fiberglass, and all substitute materials, for tile made in tile -like units; all mixtures in tile like form of cement, metals, and other materials that are for and intended for use as a finished floor surface, stair treads, promenade roofs, walks, walls, ceilings, swimming pools, and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin -set mortars, epoxies, wall mud, and any other sand and cement mixtures or adhesives when used in the preparation, installation, repair, or maintenance of tile and /or similar materials. The handling and unloading of all sand, cement, lime, tile, fixtures, equipment, adhesives, or any other materials to be used in the preparation, installation, repair, or maintenance of tile and /or similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including, but not be limited to, all soap compounds, paper products, tapes, and all polyethylene coverings, plywood, masonite, cardboard, and any new type of products that may be used to protect tile installations, Blastrac equipment, and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re- tiled. ELECTRICIAN Installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data apparatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment, and residential purposes, including but not limited to, communication and ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page B of 20 telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and /or cable through conduit and the installation of any incidental conduit, such that the employees covered hereby can complete any job in full. MARBLE FINISHER Loading and unloading trucks, distribution of all materials (all stone, sand, etc.), stocking of floors with material, performing all rigging for heavy work, the handling of all material that may be needed for the installation of such materials, building of scaffolding, polishing if needed, patching, waxing of material if damaged, pointing up, caulking, grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting, use of tub saw or any other saw needed for preparation of material, drilling of holes for wires that anchor material set by setters, mixing up of molding plaster for installation of material, mixing up thin set for the installation of material, mixing up of sand to cement for the installation of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble, slate, travertine, art marble, serpentine, alberene stone, blue stone, granite and other stones (meaning as to stone any foreign or domestic materials as are specified and used in building interiors and exteriors and customarily known as stone in the trade), carrara, sanionyx, vitrolite and similar opaque glass and the laying of all marble tile, terrazzo tile, slate tile and precast tile, steps, risers treads, base, or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and exterior which are installed in a similar manner. MATERIAL TESTER I: Hand coring and drilling for testing of materials; field inspection of uncured concrete and asphalt. MATERIAL TESTER II: Field inspection of welds, structural steel, fireproofing, masonry, soil, facade, reinforcing steel, formwork, cured concrete, and concrete and asphalt batch plants; adjusting proportions of bituminous mixtures. OPERATING ENGINEER - BUILDING Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with Caisson Attachment; Batch Plant; Benoto (requires Two Engineers); Boiler and Throttle Valve; Caisson Rigs; Central Redi -Mix Plant; Combination Back Hoe Front End - loader Machine; Compressor and Throttle Valve; Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concrete Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes, Hammerhead; Cranes, (GCI and similar Type); Creter Crane; Crusher, Stone, etc.; Derricks, All; Derricks, Traveling; Formless Curb and Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 -1/4 yd. and over; Hoists, Elevators, outside type rack and pinion and similar machines; Hoists, One, Two and Three ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 9 of 20 Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment); Locomotives, All; Motor Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid Rig; Post Hole Digger; Pre - Stress Machine; Pump Cretes Dual Ram; Pump Cretes: Squeeze Cretes -Screw Type Pumps; Gypsum Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor Drawn; Slip -Form Paver; Straddle Buggies; Tournapull; Tractor with Boom and Side Boom; Trenching Machines. Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks; Highlift Shovels or Front Endloaders under 2 -1/4 yd.; Hoists, Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Rock Drill (Self - Propelled); Rock Drill (Truck Mounted); Rollers, All; Steam Generators; Tractors, All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame. Class 3. Air Compressor; Combination Small Equipment Operator; Generators; Heaters, Mechanical; Hoists, Inside Elevators; Hydraulic Power Units (Pile Driving, Extracting, and Drilling); Pumps, over 3" (1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps, Well Points; Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcats (up to and including 'X cu yd.) . Class 4. Bobcats and /or other Skid Steer Loaders (other than bobcats up to and including 'X cu yd.); Oilers; and Brick Forklift. Class 5. Assistant Craft Foreman Class G. Gradall. Class 7. Mechanics. OPERATING ENGINEERS - HIGHWAY CONSTRUCTION Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt Heater Scarfire; Asphalt Spreader; Autograder /GOMACO or other similar type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi -Mix Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe Bucket or over or with attachments); Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower Cranes of all types: Creter Crane: Crusher, Stone, etc.; Derricks, All; Derrick Boats; Derricks, Traveling; Dowell Machine with Air Compressor; Dredges; Formless Curb and Gutter Machine; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with shear attachments; Lubrication Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig; Pre - Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid Rig; Rock Drill - Truck Mounted; Rock /Track Tamper; Roto Mill Grinder; Slip -Form Paver; Soil Test Drill Rig (Truck Mounted); Straddle Buggies; Hydraulic Telescoping Form (Tunnel); Tractor Drawn Belt Loader (with attached pusher - two engineers); Tractor with Boom; Tractaire with Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole Drills (Tunnel shaft); Underground Boring and /or ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 10 of 20 Mining Machines 5 ft. in diameter and over tunnel, etc; Underground Boring and /or Mining Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO). Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with attachments); Compressor and Throttle Valve; Compressor, Common Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine; Concrete Mixer or Paver 7S Series to and including 27 cu. ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or Similar Type); Drills, All; Finishing Machine - Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging Machine; Hydraulic Boom Trucks (All Attachments); Hydro - Blaster; All Locomotives, Dinky; Off -Road Hauling Units (including articulating) /2 ton capacity or more; Non Self- Loading Ejection Dump; Pump Cretes: Squeeze Cretes - Screw Type Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc., self - propelled; Scoops - Tractor Drawn; Self- Propelled Compactor; Spreader - Chip - Stone, etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of Size): Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc, Compactor, etc.; Tug Boats. Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over); Conveyor, Portable; Farm -Type Tractors Used for Mowing, Seeding, etc.; Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post -Hole Digger; Power Saw, Concrete Power Driven; Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats; Tamper -Form -Motor Driven. Class 4. Air Compressor; Combination - Small Equipment Operator; Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic Power Unit (Pile Driving, Extracting, or Drilling); Hydro- Blaster; Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed a total of 300 ft.); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches. Class 5. Bobcats (all); Brick Forklifts; Oilers. Class 6. Field Mechanics and Field Welders Class 7. Gradall and machines of like nature. OPERATING ENGINEER - FLOATING Class 1. Craft Foreman; Diver /Wet Tender; and Engineer (hydraulic dredge). Class 2. Crane / Backhoe Operator; 70 Ton or over Tug Operator; Mechanic /Welder; Assistant Engineer (Hydraulic Dredge); Leverman (Hydraulic Dredge); Diver Tender; Friction and Lattice Boom Cranes. Class 3. Deck Equipment Operator, Machineryman; Maintenance of Crane (over 50 ton capacity); Tug /Launch Operator; Loader /Dozer and like equipment on Barge; and Deck Machinery, etc. ORDINANCE 2011- PW- WPA -EX2S -1312 Prevailing Wages Page 11 of 20 Class 4. Deck Equipment Operator, Machineryman /Fireman (4 Equipment Units or More); Off Road Trucks (2 ton capacity or more); Deck Hand, Tug Engineer, Crane Maintenance 50 Ton Capacity and Under or Backhoe Weighing 115,000 pounds or less; and Assistant Tug Operator. TERRAZZO FINISHER The handling of sand, cement, marble chips, and all other materials that may be used by the Mosaic Terrazzo Mechanic, and the mixing, grinding, grouting, cleaning and sealing of all Marble, Mosaic, and Terrazzo work, floors, base, stairs, and wainscoting by hand or machine, and in addition, assisting and aiding Marble, Masonic, and Terrazzo Mechanics. �Y 7 \alaFS�Y:��JOl1 Work associated with barricades, horses and drums used to reduce lane usage on highway work, the installation and removal of temporary lane markings, and the installation and removal of temporary road signs. TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION - EAST & WEST Class 1. Two or three Axle Trucks. A -frame Truck when used for transportation purposes; Air Compressors and Welding Machines, including those pulled by cars, pick -up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry -alls; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers; Oil Distributors 2 -man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors; Self- propelled Chip Spreader; Skipman; Slurry Trucks, 2 -man operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters Unskilled dumpman; and Truck Drivers hauling warning lights, barricades, and portable toilets on the job site. Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self - loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready -mix Plant Hopper Operator, and Winch Trucks, 2 Axles. Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self - loading equipment or similar equipment over 16 cubic yards; Explosives and /or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, 1 -man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry trucks, 1 -man operation; Winch trucks, 3 axles or more; Mechanic - -Truck Welder and Truck Painter. Class 4. Six axle trucks; Dual- purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic; self- loading equipment like P.B. and trucks with scoops on the front. Other Classifications of Work: For definitions of classifications not otherwise set out, the Department generally has on file such definitions which are ORDINANCE 2011- PW- WPA -EX2S -1312 Prevailing Wages Page 12 of 20 available. If a task to be performed is not subject to one of the classifications of pay set out, the Department will upon being contacted state which neighboring county has such a classification and provide such rate, such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task, the Department shall undertake a special determination, such special determination being then deemed to have existed under this determination. If a project requires these, or any classification not listed, please contact IDOL at 217- 782 -1710 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer, operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators (regardless of equipment used or its size) is covered by the classifications of operating engineer. The work performed by landscape truck drivers (regardless of size of truck driven) is covered by the classifications of truck driver. ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 13 of 20 Du Page County Prevailing Wage for June 2011 Trade Name RG TYP C Base FRMAN *M -F>8 OSA OSH H/W Pensn Vac Trng ASBESTOS ABT -GEN ALL 35.200 35.700 1.5 1.5 2.0 10.63 8.570 0.000 0.450 ASBESTOS ABT -MEC BLD 32.290 0.000 1.5 1.5 2.0 10.82 10.66 0.000 0.620 BOILERMAKER BLD 43.020 46.890 2.0 2.0 2.0 6.720 9.890 0.000 0.350 BRICK MASON BLD 39.030 42.930 1.5 1.5 2.0 8.800 10.67 0.000 0.740 CARPENTER ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 CEMENT MASON ALL 38.000 40.000 2.0 1.5 2.0 8.700 14.95 0.000 0.380 CERAMIC TILE FNSHER BLD 33.600 0.000 2.0 1.5 2.0 6.950 8.020 0.000 0.540 COMMUNICATION TECH BLD 32.650 34.750 1.5 1.5 2.0 7.650 13.98 0.400 0.490 ELECTRIC PWR EQMT OP ALL 34.240 45.510 1.5 1.5 2.0 5.000 10..62 0.000 0.260 ELECTRIC PWR GRNDMAN ALL 26.480 45.510 1.5 1.5 2.0 5.000 8.200 0.000 0.200 ELECTRIC PWR LINEMAN ALL 41.000 45.510 1.5 1.5 2.0 5.000 12.71 0.000 0.310 ELECTRIC PWR TRK DRV ALL 27.420 45.510 1.5 1.5 2.0 5.000 8.500 0.000 0.210 ELECTRICIAN BLD 36.200 39.820 1.5 1.5 2.0 9.250 16.27 4.380 0.680 ELEVATOR CONSTRUCTOR BLD 47.410 53.340 2.0 2.0 2.0 10.53 10.71 2.840 0.000 FENCE ERECTOR NE ALL 32.660 34.660 1.5 1.5 2.0 10.67 10.00 0.000 0.500 FENCE ERECTOR W ALL 43.300 45.460 2.0 2.0 2.0 8.140 17.29 0.000 0.400 GLAZIER BLD 38.000 39.500 1.5 2.0 2.0 10.19 13.64 0.000 0.790 HT /FROST INSULATOR BLD 43.050 45.550 1.5 1.5 2.0 10.82 11.86 0.000 0.620 IRON WORKER E ALL 40.750 42.750 2.0 2.0 2.0 12.45 17.09 0.000 0.300 IRON WORKER W ALL 43.300 45.460 2.0 2.0 2.0 6.140 17.29 0.000 0.400 LABORER ALL 35.200 35.950 1.5 1.5 2.0 10.63 8.570 0.000 0.450 LATHER ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 MACHINIST BLD 43.160 45.160 1.5 1.5 2.0 7.640 8.700 0.000 0.000 MARBLE FINISHERS ALL 29.100 0.000 1.5 1.5 2.0 8.800 10.67 0.000 0.740 MARBLE MASON BLD 39.030 42.930 1.5 1.5 2.0 8.800 10.67 0.000 0.740 ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 14 of 20 MATERIAL TESTER I ALL 25.200 0.000 1.5 1.5 2.0 10.63 8.570 0.000 0.450 MATERIALS TESTER II ALL 30.200 0.000 1.5 1.5 2.0 10.63 8.570 0.000 0.450 MILLWRIGHT ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 OPERATING ENGINEER BLD 1 45.100 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER BLD 2 43.800 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER BLD 3 41.250 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER BLD 4 39.500 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER BLD 5 48.850 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER BLD 6 46.100 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1 -.150 OPERATING ENGINEER BLD 7 48.100 49.100 2.0 2.0 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 1 43.300 47.300 1.5 1.5 2.0 11.10 8.050 1.900 1.150 OPERATING ENGINEER HWY 2 42.750 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 3 40.700 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 4 39.300 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 5 38.100 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 6 46.300 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 OPERATING ENGINEER HWY 7 44.300 47.300 1.5 1.5 2.0 11.70 8.050 1.900 1.150 ORNAMNTL IRON WORKER E ALL 40.200 42.450 2.0 2.0 2.0 10.67 14.81 0.000 0.500 ORNAMNTL IRON WORKER W ALL 43.300 45.460 2.0 2.0 2.0 8.140 17.29 0.000 0.400 PAINTER ALL 40.180 42.180 1.5 1.5 1.5 8.950 8.200 0.000 1.250 PAINTER SIGNS BLD 32.770 36.800 1.5 1.5 1.5 2.600 2.620 0.000 0.000 PILEDRIVER ALL 40.770 42.770 1.5 1.5 2.0 9.840 9.790 0.000 0.490 PIPEFITTER BLD 40.250 42.250 1.5 1.5 2.0 10.15 13.49 0.000 1.360 PLASTERER BLD 39.360 41.720 1.5 1.5 2.0 8.800 12.12 0.000 0.510 PLUMBER BLD 40.250 42.250 1.5 1.5 2.0 10.15 13.49 0.000 1.360 ROOFER BLD 37.650 40.650 1.5 1.5 2.0 7.750 6.570 0.000 0.430 SHEETMETAL WORKER BLD 41.660 43.660 1.5 1.5 2.0 8.810 10.66 0.000 0.780 SPRINKLER FITTER BLD 49.200 51.200 1.5 1.5 2.0 8.500 8.050 0.000 0.450 STEEL ERECTOR E ALL 40.750 42.750 2.0 2.0 2.0 10.95 15.99 0.000 0.300 STEEL ERECTOR W ALL 43.300 45.460 2.0 2.0 2.0 8.140 17.29 0.000 0.400 STONE MASON 0.740 TERRAZZO FINISHER 0.430 TERRAZZO MASON 0.510 TILE MASON 0.610 TRAFFIC SAFETY WRKR 0.000 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TRUCK DRIVER 0.150 TUCKPOINTER 0.770 Legend: BLD 39.030 42.930 1.5 BLD 35.150 0.000 1.5 BLD 39.010 42.010 1.5 BLD 40.490 44.490 2.0 HWY 28.250 29.850 1.5 ALL 1 32.550 33.100 1.5 ALL 2 32.700 33.100 1.5 ALL 3 32.900 33.100 1.5 ALL 4 33.100 33.100 1.5 BLD 39.200 40.200 1.5 ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 15 of 20 1.5 2.0 8.800 10.67 0.000 1.5 2.0 6.950 10.57 0.000 1.5 2.0 6.950 11.91 0.000 1.5 2.0 6.950 9.730 0.000 1.5 2.0 4.896 4.175 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 6.500 4.350 0.000 1.5 2.0 7.830 10.25 0.000 M -F >8 (Overtime is required for any hour greater than 8 worked each day, Monday through Friday. OSA (Overtime is required for every hour worked on Saturday) OSH (Overtime is requied for every hour worked on Sunday and Holidays) HIW (Health & Welfare Insurance) Pensn (Pension) Vac (Vacation) Tmg (Training) Explanations DUPAGE COUNTY IRON WORKERS AND FENCE ERECTOR (WEST) - West of Route 53. The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and Veterans Day in some classifications /counties. Generally, any of these holidays which fall on a Sunday is celebrated on the following Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay. Common practice in a given local may alter certain days of celebration. If in doubt, please check with IDOL. EXPLANATION OF CLASSES ORDINANCE 2011- PW- WPA -EX2 -5 -1312 Prevailing Wages Page 16 of 20 ASBESTOS - GENERAL - removal of asbestos material /mold and hazardous materials from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials /mold and hazardous materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS - MECHANICAL - removal of asbestos material from mechanical systems, such as pipes, ducts, and boilers, where the mechanical systems are to remain. TRAFFIC SAFETY - work associated with barricades, horses and drums used to reduce lane usage on highway work, the installation and removal of temporary lane markings, and the installation and removal of temporary road signs. CERAMIC TILE FINISHER The grouting, cleaning, and polishing of all classes of tile, whether for interior or exterior purposes, all burned, glazed or unglazed products; all composition materials, granite tiles, warning detectable tiles, cement tiles, epoxy composite materials, pavers, glass, mosaics, fiberglass, and all substitute materials, for tile made in tile -like units; all mixtures in tile like form of cement, metals, and other materials that are for and intended for use as a finished floor surface, stair treads, promenade roofs, walks, walls, ceilings, swimming pools, and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin -set mortars, epoxies, wall mud, and any other sand and cement mixtures or adhesives when used in the preparation, installation, repair, or maintenance of tile and /or similar materials. The handling and unloading of all sand, cement, lime, tile, fixtures, equipment, adhesives, or any other materials to be used in the preparation, installation, repair, or maintenance of tile and /or similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work, particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including, but not be limited to, all soap compounds, paper products, tapes, and all polyethylene coverings, plywood, masonite, cardboard, and any new type of products that may be used to protect tile installations, Blastrac equipment, and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re- tiled. TECHNICIAN Low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V -SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated system digital network), pulling of wire in raceways, but not the installation of raceways. MARBLE FINISHER Loading and unloading trucks, distribution of all materials (all ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 17 of 20 stone, sand, etc.), stocking of floors with material, performing all rigging for heavy work, the handling of all material that may be needed for the installation of such materials, building of scaffolding, polishing if needed, patching, waxing of material if damaged, pointing up, caulking, grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting, use of tub saw or any other saw needed for preparation of material, drilling of holes for wires that anchor material set by setters, mixing up of molding plaster for installation of material, mixing up thin set for the installation of material, mixing up of sand to cement for the installation of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble, slate, travertine, art marble, serpentine, alberene stone, blue stone, granite and other stones (meaning as to stone any foreign or domestic materials as are specified and used in building interiors and exteriors and customarily known as stone in the trade), carrara, sanionyx, vitrolite and similar opaque glass and the laying of all marble tile, terrazzo tile, slate tile and precast tile, steps, risers treads, base, or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and exterior which are installed in a similar manner. MATERIAL TESTER I: Hand coring and drilling for testing of materials; field inspection of uncured concrete and asphalt. MATERIAL TESTER II: Field inspection of welds, structural steel, fireproofing, masonry, soil, facade, reinforcing steel, formwork, cured concrete, and concrete and asphalt batch plants; adjusting proportions of bituminous mixtures. OPERATING ENGINEER - BUILDING Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with Caisson Attachment; Batch Plant; Benoto (requires Two Engineers); Boiler and Throttle Valve; Caisson Rigs; Central Redi -Mix Plant; Combination Back Hoe Front End - loader Machine; Compressor and Throttle Valve; Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete Conveyor (Truck Mounted); Concrete Paver Over 27E cu. ft; Concrete Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes, All; Cranes, Hammerhead; Cranes, (GCI and similar Type); Creter Crane; Crusher, Stone, etc.; Derricks, All; Derricks, Traveling; Formless Curb and Gutter Machine; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 -1/4 yd. and over; Hoists, Elevators, outside type rack and pinion and similar machines; Hoists, One, Two and Three Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment); Locomotives, All; Motor Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid Rig; Post Hole Digger; Pre - Stress Machine; Pump Cretes Dual Ram; Pump Cretes: Squeeze Cretes -Screw Type Pumps; Gypsum Sulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder; Scoops - Tractor Drawn; Slip -Form Paver; Straddle Buggies; Tournapull; Tractor with Boom and Side Boom; Trenching Machines. Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete Mixer (Two Bag and Over); Conveyor, Portable; Forklift Trucks; Highlift Shovels or Front Endloaders under 2 -1/4 yd.; Hoists, Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 18 of 20 Hoists, Tugger Single Drum; Rock Drill (Self - Propelled); Rock Drill (Truck Mounted); Rollers, All; Steam Generators; Tractors, All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame. Class 3. Air Compressor; Combination Small Equipment Operator; Generators; Heaters, Mechanical; Hoists, Inside Elevators; Hydraulic Power Units (Pile Driving, Extracting, and Drilling); Pumps, over 3" (1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps, Well Points; Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcats (up to and including 'X cu yd.) . Class 4. Bobcats and /or other Skid Steer Loaders (other than bobcats up to and including 'X cu yd.); Oilers; and Brick Forklift. Class S. Assistant Craft Foreman Class 6. Gradall Class 7. Mechanics. OPERATING ENGINEERS - HIGHWAY CONSTRUCTION Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt Heater Scarfire; Asphalt Spreader; Autograder /GOMACO or other similar type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi -Mix Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe Bucket or over or with attachments); Concrete Breaker (Truck Mounted); Concrete Conveyor; Concrete Paver over 27E cu. ft.; Concrete Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower Cranes of all types: Creter Crane: Crusher, Stone, etc.; Derricks, All; Derrick Boats; Derricks, Traveling; Dowell Machine with Air Compressor; Dredges; Formless Curb and Gutter Machine; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Hydraulic Backhoes; Backhoes with shear attachments; Lubrication Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig; Pre- Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid Rig; Rock Drill - Truck Mounted; Rock /Track Tamper; Roto Mill Grinder; Slip -Form Paver; Soil Test Drill Rig (Truck Mounted); Straddle Buggies; Hydraulic Telescoping Form (Tunnel); Tractor Drawn Belt Loader (with attached pusher - two engineers); Tractor with Boom; Tractaire with Attachments; Trenching Machine; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole Drills (Tunnel Shaft); Underground Boring and /or Mining Machines 5 ft. in diameter and over tunnel, etc; Underground Boring and /or Mining Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO). Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with attachments); Compressor and Throttle Valve; Compressor, Common Receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine; Concrete Mixer or Paver 7S Series to and including 27 cu. ft.; Concrete Spreader; Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or Similar Type); Drills, All; Finishing Machine - ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 19 of 20 Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging Machine; Hydraulic Boom Trucks (All Attachments); Hydro - Blaster; All Locomotives, Dinky; Off -Road Hauling Units (including articulating) /2 ton capacity or more; Non Self- Loading Ejection Dump; Pump Cretes: Squeeze Cretes - Screw Type Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc., self - propelled; Scoops - Tractor Drawn; Self- Propelled Compactor; Spreader - Chip - Stone, etc.; Scraper; Scraper - Prime Mover in Tandem (Regardless of Size): Tank Car Heater; Tractors, Push, Pulling Sheeps Foot, Disc, Compactor, etc.; Tug Boats. Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer (Two Bag and Over); Conveyor, Portable; Farm -Type Tractors Used for Mowing, Seeding, etc.; Fireman on Boilers; Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post -Hole Digger; Power Saw, Concrete Power Driven; Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats; Tamper -Form -Motor Driven. Class 4. Air Compressor; Combination - Small Equipment Operator; Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic Power Unit (Pile Driving, Extracting, or Drilling); Hydro- Blaster; Light Plants, All (1 through 5); Pumps, over 3" (1 to 3 not to exceed a total of 300 ft.); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches. Class 5. Bobcats (all); Brick Forklifts; Oilers. Class 6. Field Mechanics and Field Welders Class 7. Gradall and machines of like nature. TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Class 1. Two or three Axle Trucks. A -frame Truck when used for transportation purposes; Air Compressors and Welding Machines, including those pulled by cars, pick -up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry -alls; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers; oil Distributors 2 -man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors; Self- propelled Chip Spreader; Skipman; Slurry Trucks, 2 -man operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters Unskilled dumpman; and Truck Drivers hauling warning lights, barricades, and portable toilets on the job site. Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self - loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards; Ready -mix Plant Hopper Operator, and Winch Trucks, 2 Axles. Class 3. Five axle trucks; Dump Crete and Adgetors 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self - loading equipment or similar equipment over 16 cubic yards; Explosives and /or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; ORDINANCE 2011- PW- WPA -EX2 -S -1312 Prevailing Wages Page 20 of 20 Oil Distributors, 1 -man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry trucks, 1 -man operation; Winch trucks, 3 axles or more; Mechanic - -Truck Welder and Truck Painter. Class 4. Six axle trucks; Dual- purpose vehicles, such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic; Self- loading equipment like P.B. and trucks with scoops on the front. TERRAZZO FINISHER The handling of sand, cement, marble chips, and all other materials that may be used by the Mosaic Terrazzo Mechanic, and the mixing, grinding, grouting, cleaning and sealing of all Marble, Mosaic, and Terrazzo work, floors, base, stairs, and wainscoting by hand or machine, and in addition, assisting and aiding Marble, Masonic, and Terrazzo Mechanics. Other Classifications of Work For definitions of classifications not otherwise set out, the Department generally has on file such definitions which are available. If a task to be performed is not subject to one of the classifications of pay set out, the Department will upon being contacted state which neighboring county has such a classification and provide such rate, such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task, the Department shall undertake a special determination, such special determination being then deemed to have existed under this determination. If a project requires these, or any classification not listed, please contact IDOL at 217 - 762 -1710 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer, operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators (regardless of equipment used or its size) is covered by the classifications of operating engineer. The work performed by landscape truck drivers (regardless of size of truck driven) is covered by the classifications of truck driver.