Boards & Commissions Supporting Documents - 02/17/1994 - Safety Pathway Committee (2)•
ORK BROOK
SAFETY PATHWAY COMMITTEE
PATHWAY PRIORITIES (for review at February 17, 1994 meeting)
A. Addition of pathway to York Road bridge over 1 -88.
B. Addition of pathway to Harger Road bridge over Salt Creek.
C. Along Timber Edge Drive from Twin Oaks to forest preserve
entrance.
D. Completion of Harger Road trail to York Road.
E. Along Frontage Road (Timber Edge) from north entrance to
south entrance of forest preserve.
F. Spring Road north from Hyatt Hotel, along Salt Creek (part may
be in Oakbrook Terrace).
G. Along Midwest Road from 1 -88 to 31 st Street.
H. Along south side of 1 -88 from Route 83 to 22nd Street.
1. Underpass under Route 88, connecting existing pathway on
22nd Street with Jorie pathway.
J. 35th Street across Midwest Road.
K. Along 31st Street from Concord to Jorie Blvd.
L. Correct new signage on York and 31 st for right turns while
pedestrians are present.
M. Trail connecting Woodside Estates to Forest Glen (Wood Glen
Lane).
0
N. Trail along 35th Street from Trinity Lane to St. Pascal's Drive.
0. Trail along St. Pascal Drive on forest preserve property from
35th Street to 31 st Street.
P. Safe crossing over Salt Creek bridge for existing 31 st Street
trail.
Q Completion of York Road pathway between 31 st and Salt Creek.
0
•