Loading...
Preliminary Engineering Plans Pg6c i I 0 0 s BLISS DRIVE _ - 12" STORM -CONNECT TO EXISTING STORM MANHOLE 18" STORM I 12" STORM 15" STORM — n IP RIM- 680 70 8" PVC ® 0.50% I INV= 675.33 O ' 12" STORM UNDERGROUND DETENTION SYSTEM TOP OF CHAMBER=678.50 BOT OF CHAMBER=675.83 BOT OF STONE=675.33 VOLUME PROVIDED=19,825 CF TO OUND ' M SYSTEM I ' I' I I I I I R (TYP•) CONNECT TO M UNDERGROUND DETENTION SYSTEM OO RM I Y I E 90 6" FIRE SERVICE CONNECTION II III I 2" DOMESTIC SERVICE CONNECTION STORM 1 123 UTILITY NOTES GRAPHIC SCALE IN FEET 0 15 30 60� GENERAL UTILITY NOTES 1. ALL WATER LINES i 3" SHALL BE DUCTILE IRON PIPE, CLASS 52. 2. ALL SANITARY SEWER LINES SHALL BE PVC MEETING, ASTM D-3034 SDR 26 EXCEPT FOR SANITARY SEWER THAT CROSSES ABOVE WATER MAIN, THIS PIPE SHALL BE AWWA C900 (UNLESS WATER MAIN CASING IS UTILIZED). PROVIDE 2 MINIMUM COVER. 3. CONTRACTOR SHALL COORDINATE ANY DISRUPTIONS TO EXISTING UTILITY SERVICES WITH ADJACENT PROPERTY OWNERS. 4. ALL ELECTRIC AND TELEPHONE EXTENSIONS INCLUDING SERVICE LINES SHALL BE CONSTRUCTED TO THE APPROPRIATE UTILITY COMPANY SPECIFICATIONS. ALL UTILITY DISCONNECTIONS SHALL BE COORDINATED WITH THE DESIGNATED UTILITY COMPANIES. 5. CONSTRUCTION SHALL NOT START ON ANY PUBLIC UTILITY SYSTEM UNTIL WRITTEN APPROVAL HAS BEEN RECEIVED BY THE ENGINEER FROM THE APPROPRIATE GOVERNING AUTHORITY AND CONTRACTOR HAS BEEN NOTIFIED BY THE ENGINEER. 6. CONTRACTOR TO CALL "JULIE" (1-800-892-0123) TO COORDINATE FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES BEFORE ORDERING MATERIALS OR COMMENCING CONSTRUCTION. NOTIFY ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 7. PRIOR TO THE CONSTRUCTION OF OR CONNECTION TO ANY STORM DRAIN, SANITARY SEWER, WATER MAIN OR ANY OTHER UTILITIES, THE CONTRACTOR SHALL EXCAVATE, VERIFY AND CALCULATE ALL POINTS OF CONNECTION AND ALL UTILITY CROSSINGS AND INFORM THE ENGINEER AND THE OWNER/ DEVELOPER OF ANY CONFLICT OR REQUIRED DEVIATIONS FROM THE PLAN. NOTIFICATION SHALL BE MADE A MINIMUM OF 72 HOURS PRIOR TO CONSTRUCTION. THE ENGINEER AND ITS CLIENTS SHALL BE HELD HARMLESS IN THE EVENT THAT THE CONTRACTOR FAILS TO MAKE SUCH NOTIFICATION. THE VILLAGE SHALL BE NOTIFIED OF ANY AND ALL CHANGES TO THE DESIGN PLANS. B. CONTRACTOR SHALL COMPLY COMPLETELY WITH THE LATEST STANDARDS OF OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING, BENCHING AND OTHER MEANS OF PROTECTION. THIS IS TO INCLUDE, BUT NOT LIMITED FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERFORMANCE CRITERIA AS REQUIRED BY OSHA. 9. CONTRACTOR TO AVOID DISRUPTION OF ANY ADJACENT TENANTS TRAFFIC OPERATIONS DURING INSTALLATION OF UTILITIES. 10. ALL DIMENSIONS ARE TO CENTERLINE OF PIPE OR CENTER OF MANHOLE UNLESS NOTED OTHERWISE. 11. SEE ARCHITECTURAL AND MEP PLANS FOR EXACT UTILITY CONNECTION LOCATIONS AT BUILDING. 12. LIGHT POLES SHOWN FOR COORDINATION PURPOSES ONLY AND DO NOT REPRESENT ACTUAL SIZE. SEE SITE LIGHTING PLANS BY OTHERS FOR MORE INFORMATION. 13. SEE DETAILS FOR LOCATING STORM STRUCTURES WITHIN THE CURB LINE. 14. STORMWATER FACILITIES MUST BE FUNCTIONAL BEFORE BUILDING CONSTRUCTION BEGINS. UTILITY LEGEND O PROPOSED STORM SEWER LINE PROPOSED OPEN LID STORM STRUCTURE (PAVEMENT USE NEENAH R-2540) (GRASS USE NEENAH R -4340-B BEEHIVE) PROPOSED CLOSED LID STORM STRUCTURE (PAVEMENT USE NEENAH R-1772) (GRASS USE NEENAH R-1786) PROPOSED OPEN LID CURB STRUCTURE (86.12 C&G USE NEENAH R -3281-A) PROPOSED SANITARY SEWER LINE PROPOSED SANITARY MANHOLE PROPOSED STORM/SANITARY CLEANOUT PROPOSED WATER LINE PROPOSED VALVE VAULT PROPOSED VALVE BOX PROPOSED FIRE HYDRANT PROPOSED LIGHT POLE PROPOSED TRANSFORMER PAD (BY OTHERS) 00 z L No w N Ow:Q a U i O N 0 0 0 s 0 < 0 no O no A� J nZ 0O -Mao _W O W m x�OJ .n 3—wy ■� oN o�Zo3 p N S m OO Jd� 00 CD Ow:Q i w o 0 3 0 ` O N z >'r O W m m } Lu m o 4 Z Y Q N¢ W U W X 2 N 0 0 U a OOF Ow:Q i 0 r ` O N O J rW OOF Ow:Q z� r ` O N O N O ORIGINAL ISSUE: 11/05/2015 KHA PROJECT NO. 168403000 SHEET NUMBER C3.0