GENERAL NOTES
PAVING NOTES
5. NITARY SEWERS ARE TO BE CONSTRUCTED USING A LASER INSTRUMENT TO MAINTAIN UNE AND
ALL SA29.
CO
ALL FRAMES AND UDS FOR STORM AND SANITARY SEWERS, VALVE VAULT COVERS, FIRE HYDRANTS, AND
GRADE.
16.1.2.1. LOCAL CONDITIONS PREVENT A LATERAL SEPARATION OF TEN (10) FEET;
c1. EXISTING SITE TOPOGRAPHY, UTILITIES, RIGHT-OF-WAY AND HORIZONTAL CONTROL SHOWN ON THE
B-BOXES ARE TO BE ADJUSTED TO MEET FINISHED GRADE. THE CONTRACTOR'S ADJUSTMENT IS TO BE
MADE BY THE SEWER AND WATER CONTRACTOR, AND THE COST IS TO BE CONSIDERED INCIDENTAL
1. GENERAL
6. CONNECTIONS TO EXISTING SANITARY SEWER SYSTEM SHALL NOT BE DONE UNTIL AUTHORIZED BY THE
16.1.2.2. THE WATERMAIN INVERT IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE CROWN OF THE
DRAWINGS WERE OBTAINED FROM A SURVEY PREPARED BY:
0
THESE ADJUSTMENTS TO FINISHED GRADE WILL NOT ALLEVIATE THE CONTRACTOR FROM ANY ADDITIONAL
1.1. PAVING WORK INCLUDES FINAL SUBGRADE SHAPING, PREPARATION, AND COMPACTION; PLACEMENT OF
VILLAGE.
SEWER;
o2COMPASS SURVEYING, LTD.
.
ADJUSTMENTS AS REQUIRED BY THE VILLAGE UPON FINAL INSPECTION OF THE PROJECT.
SUBBASE OR BASE COURSE MATERIALS; BITUMINOUS BINDER AND/OR SURFACE COURSES; FORMING,
FINISHING, AND CURING CONCRETE PAVEMENT, CURBS, AND WALKS; AND FINAL CLEAN-UP AND ALL
7. WATERMAINS SHALL BE SEPARATED FROM SANITARY SEWERS AND STORM SEWERS IN ACCORDANCE WITH
16.1.2.3. THE WATERMAIN IS EITHER IN A SEPARATE TRENCH OR IN THE SAME TRENCH ON AN
Ld
Q
26314 GINGER WOODS PARKWAY, SUITE 100
AURORA, IL 60502
30. HYDRANTS SHALL NOT BE FLUSHED DIRECTLY ONTO THE ROAD SUBGRADES. WHENEVER POSSIBLE, HOSES
RELATED WORK.
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (IEPA) REQUIREMENTS, AS SPECIFIED IN THE STANDARDS
UNDISTURBED EARTH SHELF LOCATED TO ONE SIDE OF THE SEWER.
p
m
a TEL: (630) 820-9100
SHALL BE USED TO DIRECT THE WATER INTO LOT AREAS OR THE STORM SEWER SYSTEM, IF AVAILABLE.
DAMAGE TO THE ROAD SUBGRADE OR LOT GRADING DUE TO EXCESSIVE WATER SATURATION AND/OR
1.2. COMPACTION REQUIREMENTS (REFERENCE ASTM D-1557 (MODIFIED PROCTOR)k SUBGRADE = 93X;
FOR WATER AND SEWER CONSTRUCTION IN IWNOIS.
16.1.3. WHEN IT IS IMPOSSIBLE TO MEET (1) OR (2) ABOVE, BOTH THE WATERMAIN AND DRAIN OR
a EMAIL SKREBSOCLSURVEYING.COM
KREBBS
EROSION FROM HYDRANT FLUSHING, OR FROM LEAKS IN THE WATER DISTRIBUTION SYSTEM, WILL BE
SUBBASE = 93X; AGGREGATE BASE COURSE = 95X; BITUMINOUS COURSES = 95% OF MAXIMUM
8. NO WATER UNE SHALL BE PLACED IN THE SAME TRENCH AS A SEWER LINE, EXCEPT UNDER SPECIAL
SEWER SHALL BE CONSTRUCTED OF SLIP-ON OR MECHANICAL JOINT CAST OR DUCTILE IRON
c CONTACT: SCOTT
a
REPAIRED BY THE CONTRACTOR FLUSHING OR USING THE HYDRANT AT THE CONTRACTOR'S OWN
DENSITY, PER ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT) HIGHWAY STANDARDS.
CIRCUMSTANCES AND THEN ONLY UNDER THE FOLLOWING RULES:
PIPE, PRESTRESSED CONCRETE PIPE, OR PVC PIPE EQUIVALENT TO WATERMAIN STANDARDS OF
E COPIES OF THE SURVEY ARE AVAILABLE FROM THE ENGINEER. SITE CONDITIONS MAY HAVE CHANGED
TO VISIT SITE TO FAMIUARIZE THEMSELVES WITH
EXPENSE. LEAKS IN THE WATER DISTRIBUTION SYSTEM SHALL BE THE RESPONSIBILITY OF THE WATER
MAIN CONTRACTOR AND SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
1.3. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBIUTY TO PROVIDE PROPER BARRICADING WARNING
A. IF NECESSARY PERMISSION SHALL BE OBTAINED FROM THE VILLAGE IN WRITING PRIOR TO BEGINNING
CONSTRUCTION AND IN CONFORMANCE WITH THE ILLINOIS STANDARDS FOR WATER AND SEWER
CONSTRUCTION IN ILLINOIS. THE DRAIN OR SEWER SHALL BE PRESSURE-TESTED TO THE
o SINCE THE SURVEY WAS PREPARED. CONTRACTORS
x
DEVICES, AND THE SAFE MANAGEMENT OF TRAFFIC WITHIN THE AREA OF CONSTRUCTION. ALL SUCH
CONSTRUCTION.
MAXIMUM EXPECTED SURCHARGE HEAD BEFORE BACKFlWNG.
THE CURRENT CONDITIONS.
31. TRENCH BACKFILL HALL BE REQUIRED TO THE FULL DEPTH ABOVE SEWERS AND WATERMAIN WITHIN
DEVICES AND THEIR INSTALLATION SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL
VERTICAL SEPARATION
2. COPIES OF SOILS INVESTIGATION REPORTS MAY BE OBTAINED FROM THE OWNER. ANY BRACING, SHEETING
TWO (2) FEET HORIZONTAL OF PROPOSED OR EXISTING PAVEMENT.
DEVICES (MUTCD), LATEST EDITION, AND IN ACCORDANCE HATH THE VILLAGE CODE.
B. THE
FROM THE EDGEF THEELF A MINIMUM OF 18 CHES SEWER. ABOVE
BOP OF THE SEWER AND OTTOM OF A WATER EB HNCHESALL EHORIZON INSTALON A LED
16.2.
E
Y OR SPECIAL CONSTRUCTION METHODS DEEMED NECESSARY BY THE CONTRACTOR IN ORDER TO INSTALL
IMPROVEMENTS SHALL BE CONSIDERED INCIDENTAL TO THE COST OF THE PROJECT. ANY
32. IF SOFT, SPONGY, OR OTHER UNSUITABLE SOILS WITH UNCONFINED COMPRESSIVE STRENGTH LESS THAN
2. SUBGRADE PREPARATION
16.2.1. A WATERMAIN SHALL BE LAID SO THAT ITS INVERT IS EIGHTEEN (18) INCHES ABOVE THE
THE PROPOSED
° ATA NEEDED TO CONFIRM THE CONTRACTORS OPINIONS OF THE SUBSOIL CONDITIONS
ADDITIONAL SOILS D
THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL OBTAIN THE OWNER'S
0.5 TSF ARE ENCOUNTERED AT THE BOTTOM OF THE TRENCH, ALL SUCH MATERIAL SHALL BE REMOVED
AND REPLACED WITH WELL-COMPACTED, CRUSHED LIMESTONE BEDDING MATERIAL IF ROCK IS
2.1. EARTHWORK FOR PROPOSED PAVEMENT SUBGRADE SHALL BE FINISHED TO WITHIN 0.1 FOOT, PLUS OR
9. ALL SANITARY MANHOLES (AND STORM MANHOLES IN COMBINED SEWER AREAS) SHALL HAVE A MINIMUM
INSIDE DIAMETER OF 48 INCHES AND SHALL BE CAST IN PLACE OR PRE-CAST REINFORCED CONCRETE. A
CROWN OF THE DRAIN OR SEWER WHENEVER WATERMAINS CROSS STORM SEWERS, SANITARY
SEWERS, OR SEWER SERVICE CONNECTIONS. THE VERTICAL SEPARATION SHALL BE MAINTAINED
>. SHALL BE DONE IZ
- WRITTEN AUTHORIZATION TO ACCESS THE SITE TO CONDUCT A SUPPLEMENTAL SOILS INVESTIGATION.
ENCOUNTERED, IT SHALL BE REMOVED TO AT LEAST SIX (6) INCHES BELOW THE BOTTOM OF THE PIPE
MINUS, OF PLAN ELEVATION. THE CONTRACTOR SHALL CONFIRM THAT THE SUBGRADE HAS BEEN
WATERTIGHT BOOT, CONFORMING TO ASTM C-923, SHALL BE USED AT THE PIPE-STRUCTURE CONNECTION.
FOR THAT PORTION OF THE WATERMAIN LOCATED WITHIN TEN (10) FEET HORIZONTALLY OF
ANY SEWER OR DRAIN CROSSED. A LENGTH OF WATERMAIN PIPE SHALL BE CENTERED OVER
n
° THE CONTRACTOR SHALL PHOTOGRAPH THE WORK AREA PRIOR TO CONSTRUCTION FOR THE PURPOSE
TO ALLOW PROPER THICKNESS OF BEDDING. ANY UNDERCUTS OF TWO (2) FEET OR LESS SHALL BE
CONSIDERED INCIDENTAL TO THE CONTRACT. DEPTHS GREATER THAN TWO (2) FEET SHALL BE SUBMITTED
PROPERLY PREPARED AND THAT THE FINISHED TOP SUBGRADE ELEVATION HAS BEEN GRADED WITHIN
TOLERANCES ALLOWED IN THESE SPECIFICATIONS, UNLESS THE CONTRACTOR ADVISES THE ENGINEER IN
10.ALL PIPE CONNECTION OPENINGS SHALL BE PRECAST WITH RESILIENT RUBBER WATER-71GHT SLEEVES. THE
THE SEWER TO BE CROSSED WITH JOINTS EQUIDISTANT FROM THE SEWER OR DRAIN.
In
3.
OF DOCUMENTING EXISTING CONDITIONS.
TO THE ENGINEER FOR APPROVAL PRIOR TO PROCEEDING.
WRITING PRIOR TO FINE GRADING FOR BASE COURSE CONSTRUCTION. IT IS UNDERSTOOD THAT THE
CONTRACTOR HAS APPROVED AND ACCEPTS THE RESPONSIBILITY FOR THE SUBGRADE.
BOTTOM OF THE MANHOLE SHALL HAVE A CONCRETE BENCH POURED TO FACILITATE SMOOTH FLOWS.
16.2.1.1. IT IS IMPOSSIBLE TO OBTAIN THE PROPER VERTICAL SEPARATION, AS DESCRIBED ABOVE; OR
z
O
0
4. EXCEPT WHERE MODIFIED BY THE CONTRACT DOCUMENTS, ALL PROPOSED WORK SHALL BEE
33. THE TRENCHES FOR PIPE INSTALLATION SHALL BE KEPT DRY AT ALL TIMES DURING PIPE PLACEMENT.
APPROPRIATE FACILITIES TO MAINTAIN THE DRY TRENCH SHALL BE PROVIDED BY THE CONTRACTOR, AND
2.2. PRIOR TO THE PLACEMENT OF THE BASE COURSE, THE SUBGRADE MUST BE PROOF-ROLLED AND
A I A Y R MANHOLE FRAMES AND UDS. THE LIDS SHALL
11. FRAMES AND UDS: SEE DETAILS FOR ALL S N T R SEWS
HAVE RECESSED (CONCEALED) PICK HOLE AND BE SELF-SEALING WITH AN '0' RING GASKET. THE LIDS
16.2.1.2. THE WATERMAIN PASSES UNDER A SEWER OR DRAIN.
N
ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS WHICH ARE HEREBY MADE A PART HEREOF:
THE COST OF SUCH SHALL BE INCIDENTAL TO THE UNIT PRICE BID FOR THE ITEM. PLANS FOR THE SITE
INSPECTED FOR UNSUITABLE M ATERIALS AND/OR EXCESSIVE MOVEMENT. IF UNSUITABLE SUBGRADE IS
SHALL HAVE THE WORD 'SANITARY EMBOSSED ON THE SURFACE. THE JOINTS BETWEEN THE FRAME AND
W
°
a A. 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS.- AS PREPARED BY
DEWATERING, IF EMPLOYED, SHALL BE SUBMITTED TO AND APPROVED BY THE OWNER PRIOR TO
ENCOUNTERED, IT SHALL BE CORRECTED. THIS MAY INCLUDE ONE OR MORE OF THE FOLLOWING
CONCRETE SECTION SHALL BE SEALED WITH A BUTYL ROPE.
16.2.1.3. BOTH THE STORM SEWER AND SANITARY SEWER SHALL BE CONSTRUCTED WITH PIPE
EQUIVALENT TO WATERMAIN STANDARDS OF CONSTRUCTION OR THE STORM SEWER SHALL BE
x
IDOT, LATEST EDITION.
IMPLEMENTATION. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR DEWATERING DURING
CONSTRUCTION UNLESS APPROVED IN WRITING BY THE OWNER.
METHODS:
12.A MAXIMUM OF TWELVE (12) INCHES OF CONCRETE-ADJUSTING RINGS SHALL BE USED TO ADJUST FRAME
CONSTRUCTED USING '0' RING GASKET JOINTS, PER ASTM C-443, OR THE WATERMAIN MAY
N
B. 'STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN IWNOIS' AS PUBLISHED
2.2.1. SCARIFY, DISC, AND AERATE.
ELEVATIONS. RINGS SHALL BE SEALED TOGETHER WITH BUM ROPE.
BE IN ENCASED IN A WATERTIGHT CASING PIPE WHEN:
C BY THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (IEPA), LATEST EDITION.
34. AFTER THE STORM SEWER SYSTEM HAS BEEN CONSTRUCTED, THE CONTRACTOR SHALL PLACE PROPER
INLET PROTECTION EROSION CONTROL AT LOCATIONS INDICATED BY THE ENGINEER. THE PURPOSE OF THE
2.2.2. REMOVE AND REPLACE WITH STRUCTURAL CLAY FILL
13.CLEANING: ALL MANHOLES AND PIPES SHALL BE THOROUGHLY CLEANED OF DIRT AND DEBRIS, AND ALL
16.2.2. A VERTICAL SEPARATION OF EIGHTEEN (18) INCHES BETWEEN THE INVERT OF THE SEWER OR
dC. 'IWNOIS RECOMMENDED STANDARDS FOR SEWAGE WORKS,' AS PUBUSHED BY THE ILLINOIS
INLET PROTECTION WALL BE TO MINIMIZE THE AMOUNT OF SILTATION THAT NORMALLY WOULD ENTER THE
VISIBLE LEAKAGE ELIMINATED, BEFORE FINAL INSPECTION AND ACCEPTANCE.
DRAIN AND THE CROWN OF THE WATERMAIN SHALL BE MAINTAINED WHERE A WATERMAIN
CROSSES UNDER A SEWER. SUPPORT THE SEWER OR DRAIN LINES TO PREVENT SETTLING AND
ENVIRONMENTAL PROTECTION AGENCY (IEPA), LATEST EDITION.
0
STORM SEWER SYSTEM FROM ADJACENT AND/OR UPSTREAM DRAINAGE AREAS.
2.2.3. REMOVE AND REPLACE WITH GRANULAR MATERIAL
14.TESTING: DEFLECTION, AIR, AND LEAKAGE TESTING WILL BE REQUIRED. THE PROCEDURE AND ALLOWABLE
BREAKING OF THE WATERMAIN.
o D. REGULATIONS, STANDARDS AND GENERAL REQUIREMENTS SET FORTH BY THE VILLAGE, UNLESS
35. AT THE CLOSE OF EACH WORKING DAY AND AT THE CONCLUSION OF CONSTRUCTION OPERATIONS, ALL
2.2.4. USE OF GEOTEXTILE FABRIC.
TESTING OMITS SHALL BE IN ACCORDANCE WITH THE STANDARDS FOR SEWER AND WATER MAIN
CONSTRUCTION IN ILLINOIS.
16.2.3. CONSTRUCTION SHALL EXTEND ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL DISTANCE
OTHERWISE NOTED ON THE PLANS.
DRAINAGE STRUCTURES AND FLOW LINES SHALL BE FREE FROM DIRT AND DEBRIS.
MAXIMUM DEFLECTION ALLOWED IN ISOLATED AREAS MAY BE ONE-QUARTER (1/4) INCH TO ONE-HALF
FROM THE WATERMAIN TO THE SEWER OR DRAIN LINE IS AT LEAST TEN (10) FEET.
O
E. THE NATIONAL ELECTRIC CODE.
36. EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH IEPA REGULATIONS AND [DOT
(1/2) INCH IF NO DEFLECTION OCCURS OVER THE MAJORITY OF THE AREA.
15.TESTING THE ALIGNMENT/STRAIGHTNESS SHALL BE IN ACCORDANCE WITH THE VILLAGE CODE.
z
c
STANDARDS FOR SOIL EROSION AND SEDIMENTATION CONTROL AND SHALL BE MAINTAINED BY THE
17. ALL WATERMAINS SHALL BE PRESSURE-TESTED FOR A MIN. OF 2 HOURS AT 200 PSI, FLUSHED, AND
a APPLICABLE PROVISIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT ARE HEREIN
F
CONTRACTOR AND REMAIN IN PLACE UNTIL A SUITABLE GROWTH OF GRASS, ACCEPTABLE TO THE
2.3. PRIOR TO THE CONSTRUCTION OF THE CURB AND GUTTER AND THE PLACEMENT OF THE BASE
MATERIAL, THE PAVEMENT AREA SHALL BE FINE-GRADED TO WITHIN 0.04 FEET (1/2 INCH) OF FINAL
16.TELEVISING: IF REQUIRED BY THE VILLAGE, ALL SANITARY SEWERS SHALL BE TELEVISED, AND A COPY OF
THE TAPE AND A WRITTEN REPORT SHALL BE SUBMITTED AND REVIEWED BY THE VILLAGE BEFORE FINAL
DISINFECTED IN ACCORDANCE WITH AWWA AND VILLAGE SPECIFICATIONS. EACH VALVE SECTION SHALL BE
PRESSURE-TESTED FOR A MINIMUM OF ONE (1) HOUR. ALLOWABLE LEAKAGE IS TO BE ONLY THAT WHICH
z
o INCORPORATED BY REFERENCE.
ENGINEER, HAS DEVELOPED.
SUBGRADE ELEVATION, TO A POINT TWO (2) FEET BEYOND THE BACK OF THE CURB, SO AS TO
ACCEPTANCE. THE REPORT SHALL INCLUDE STUB LOCATION AS WELL AS A DESCRIPTION OF ALL DEFECTS,
IS PREDETERMINED BY THE VILLAGE. AT NO TIME IS THERE TO BE ANY VISIBLE LEAKAGE FROM THE
x
i, 5. STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS, AND RECURRING SPECIAL PROVISIONS,
37. THE CONTRACTOR SHALL CONFORM TO ALL EROSION CONTROL REQUIREMENTS AS SET FORTH BY THE
ENSURE THE PROPER THICKNESS OF PAVEMENT COURSES. NO CLAIMS FOR EXCESS QUANTITY OF BASE
MATERIALS DUE TO IMPROPER SUBGRADE PREPARATION WILL BE HONORED.
WATER LEVEL, LEAKS, AND LENGTHS. IDENTIFY MANHOLE TO MANHOLE BOTH VERBALLY AND ON-SCREEN
USING MANHOLE NUMBERS FROM APPROVED PLANS. ORDER OF WRITTEN REPORT SHALL BE THE SAME AS
MAIN.
L , i O
� n
_T CONSTRUCTION PLANS, AND SUBSEQUENT DETAILS ARE ALL TO BE CONSIDERED AS PART OF THE
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY THROUGH THE NPDES PHASE II PERMIT PROGRAM
AND MAINTAIN ALL EROSION
THE VIDEOTAPES.
a
O
E CONTRACT. INCIDENTAL ITEMS OR ACCESSORIES NECESSARY TO COMPLETE THE CONTRACTOR'S WORK
Y CONSIDERED A PART OF THE CONTRACTOR'S CONTRACT.
REQUIREMENTS AND GOVERNING VILLAGE. THE CONTRACTOR SHALL INSTALL
CONTROL MEASURES AS INDICATED ON THE EROSION CONTROL DRAWINGS AND SPECIFICATIONS AS WELL
2.4. PRIOR TO PLACEMENT OF THE BASE COURSE, THE SUBGRADE SHALL BE APPROVED BY THE TESTING
0 D
MAY NOT BE SPECIFICALLY NOTED, BUT ARE
AS THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PREPARED BY KIMLEY-HORN AND
ENGINEER.
17.TEST RESULTS: IF THE SANITARY SEWER INSTALLATION FAILS TO MEET THE TEST REQUIREMENTS
= a N
>
a B. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL ITEMS REQUIRED FOR
ASSOCIATES, INC. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING THE PROVISIONS INDICATED IN
SPECIFIED, THE CONTRACTOR SHALL DETERMINE THE CAUSE OR CAUSES OF THE DEFECT AND REPAIR, OR
REPLACE ALL MATERIALS AND WORKMANSHIP, AS MAY BE NECESSARY TO COMPLY WITH THE TEST
^ o 0
`o CONSTRUCTION OF THE PROJECT, AS SHOWN ON THE PLANS, ARE INCLUDED IN THE CONTRACT. ANY
THE SWPPP AT A MINIMUM, INCLUDING EROSION CONTROL MEASURES AND INSPECTION FREQUENCY, AS
3. CONCRETE WORK
REQUIREMENTS.
z Q U) o
�\
ITEM NOT SPECIFICALLY INCLUDED IN THE CONTRACT, BUT SHOWN ON THE PLANS, SHALL BE
SHALL NOTIFY THE ENGINEER
REQUIRED BY THE IEPA NPDES PHASE II PERMIT PROGRAM REQUIREMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR KEEPING ALL SWPPP DOCUMENTATION CURRENT AND READILY AVAILABLE ON THE
3.1. ALL EXTERIOR CONCRETE SHALL BE PORTLAND CEMENT CONCRETE WITH AIR ENTRAINMENT OF NOT
z '� .
aCONSIDERED INCIDENTAL TO THE CONTRACT. THE CONTRACTOR
IMMEDIATELY IN THE EVENT OF A DISCREPANCY WITH THE PLANS AND QUANTITIES.
PROJECT SITE AT ALL TIMES FOR REVIEW BY THE OWNER, ENGINEER, AND REGULATORY AGENCIES.
LESS THAN FIVE (5X) OR MORE THAN EIGHT (8� PERCENT. CONCRETE SHALL BE A MINIMUM OF SIX
18.CERTIFlCATION: CONTRACTOR SHALL SUBMIT CERTIFIED COPIES OF ALL REPORTS OF TESTS CONDUCTED BY
ao
a
KIMLEY-HORN AND ASSOCIATES, INC. IS NOT RESPONSIBLE FOR THE ACTS OR OMISSIONS OF THE
((6) BAG MIX AND SHALL DEVELOP A MINIMUM OF 3,500 PSI COMPRESSIVE STRENGTH AT FOURTEEN
AN INDEPENDENT LABORATORY BEFORE INSTALLATION OF PVC PLASTIC PIPE. TESTS SHALL BE CONDUCTED
'EXTERNAL
//��� x > N � o
c
7. THE CONTRACTOR IS RESPONSIBLE FOR HAVING A SET OF 'APPROVED' ENGINEERING PLANS WITH THE
CONTRACTOR, SUBCONTRACTORS OR SUPPLIERS, WHICH CONTRIBUTE TO DEFICIENCIES IN THE SWPPP OR
(14) DAYS AND A MINIMUM OF 4,000 PSI COMPRESSIVE STRENGTH AT TWENTY-EIGHT (28) DAYS. ALL
OF TRAVEL
IN ACCORDANCE WITH STANDARD METHOD OF TEST FOR LOADING PROPERTIES OF PLASTIC
PIPE BY PARALLEL PLATE LOADING.' ASTM STANDARDS D-2241, AS APPROPRIATE FOR THE PIPE, TO BE
W y z n I 1
� woo
o LATEST REVISION DATE ON THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF THERE ARE ANY
ANY VIOLATIONS RESULTING FROM INADEQUATE EROSION CONTROL PROTECTION AND/OR DOCUMENTATION.
CONCRETE SHALL BE BROOM-FINISHED PERPENDICULAR TO THE DIRECTION
USED. TESTS SHALL ALSO BE CONDUCTED TO DEMONSTRATE JOINT PERFORMANCE AT FIVE (5) PERCENT
y
s w o � w
DISCREPANCIES WITH WHAT IS SHOWN ON THE CONSTRUCTION PLANS, HE MUST IMMEDIATELY REPORT
`c THEM TO THE SURVEYOR OR ENGINEER BEFORE DOING ANY WORK. OTHERWISE, THE CONTRACTOR
38. THE PAVEMENT SHALL BE KEPT FREE OF MUD AND DEBRIS AT ALL TIMES. IT MAY BE NECESSARY
3.2. CONCRETE CURB AND/OR COMBINATION CURB AND GUTTER SHALL BE OF THE TYPE SHOWN ON THE
MAXIMUM DIAMETRIC DEFLECTION OF THE SPIGOT.
Y a �_ 'a
"' 3 w Y
" ASSUMES FULL RESPONSIBILITY. IN THE EVENT OF DISAGREEMENT BETWEEN THE CONSTRUCTION PLANS,
TO KEEP A SWEEPER ON-SITE AT ALL TIMES.
PLANS. THE CONTRACTOR IS CAUTIONED TO REFER TO THE CONSTRUCTION STANDARDS AND THE
PAVEMENT CROSS SECTION TO DETERMINE THE GUTTER FLAG THICKNESS AND THE AGGREGATE BASE
19.CONTRACTOR SHALL VERIFY THAT THE TESTING METHODS DESIGNATED HEREIN ARE ACCEPTABLE TO THE
�� N o � o 3
H SPECIFICATIONS, AND/OR SPECIAL DETAILS, THE CONTRACTOR SHALL SECURE WRITTEN INSTRUCTION FROM
THE ENGINEER PRIOR TO PROCEEDING WITH ANY PART OF THE WORK AFFECTED BY OMISSIONS OR
39. ALL DISTURBED AREAS OF THE RIGHT-OF-WAY SHALL BE FULLY RESTORED TO PRE-CONSTRUCTION
COURSE THICKNESS BENEATH THE CURB AND GUTTER. PRE-MOLDED FIBER EXPANSION JOINTS, WITH
LOCAL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT.
� o rn x
^ J a
oDISCREPANCIES. FAIUNG TO SECURE SUCH INSTRUCTION, THE CONTRACTOR WILL BE CONSIDERED TO
CONDITIONS WITH A MINIMUM OF SIX (6) INCHES OF TOPSOIL, SEEDING, AND MULCH AS PER IDOT
TWO 3/4-INCH BY 18-INCH EPDXY-COATED STEEL DOWEL BARS, SHALL BE GREASED AND FITTED WITH
o HAVE PROCEEDED AT THE CONTRACTOR'S OWN RISK AND EXPENSE. IN THE EVENT OF ANY DOUBT OR
STANDARDS.
METAL EXPANSION TUBES
�
m
c7
3
QUESTIONS ARISING WITH RESPECT TO THE TRUE MEANING OF THE CONSTRUCTION PLANS OR
c SPECIFICATIONS, THE DECISION OF THE ENGINEER SHALL BE FINAL AND CONCLUSIVE.
40. ALL PROPOSED GRADES SHOWN ON PLANS ARE FINISHED SURFACE ELEVATIONS, UNLESS NOTED
3.3. CURBS SHALL BE DEPRESSED AND MEET THE SLOPE REQUIREMENTS OF THE IWNOIS ACCESSIBILITY
STORM SEWER NOTES
OTHERWISE.
CODE AT LOCATIONS WHERE PUBLIC WALKS INTERSECT CURB LINES AND OTHER LOCATIONS, AS
DIRECTED, FOR THE PURPOSE OF PROVIDING ACCESSIBILITY.
1. STORM SEWER PIPE: ALL STORM SEWER PIPE MATERIAL, SIZE AND TYPE SHALL BE INSTALLED AS
z
5
3
.3 B. THE CONTRACTOR SHALL SUBSCRIBE TO ALL GOVERNING REGULATIONS AND SHALL OBTAIN ALL
NECESSARY PUBLIC AGENCY PERMITS PRIOR TO STARTING WORK. THE CONTRACTOR, BY USING THESE
41. ALL TESTING SHALL BE THE RESPONSIBILITY AND EXPENSE OF THE CONTRACTOR. IF REQUESTED BY
INDICATED ON THE UTILITY PLAN. UNLESS OTHERWISE NOTED ON THE PLANS, ALL STORM SEWER PIPE
SHALL BE REINFORCED CONCRETE PIPE, IN ACCORDANCE WITH IDOT STANDARD SPECIFICATIONS FOR
m
m
3 PLANS FOR THEIR WORK, AGREE TO HOLD HARMLESS KIMLEY-HORN AND ASSOCIATES, INC, THE VILLAGE,
THE VILLAGE OR ENGINEER, COPIES OF ALL TEST RESULTS SHALL BE PROVIDED TO THE ENGINEER
3.4. THE CURBS SHALL BE BACKFILLED AFTER THEIR CONSTRUCTION AND PRIOR TO THE PLACEMENT OF
DETERMINING PIPE CLASS AND CONFORMING TO ASTM C76. ANY CHANGES TO THE PIPE MATERIAL, SIZE
<
m
s° THEIR EMPLOYEES AND AGENTS AND THE OWNER FROM AND AGAINST ANY AND ALL LIABILITY, CLAIMS,
FOR REVIEW AND APPROVAL.
THE BASE COURSE.
AND TYPE MUST BE APPROVED THE OWNER, ENGINEER AND VILLAGE PRIOR TO ORDERING MATERIALS
z
Y
a DAMAGES, AND THE COST OF DEFENSE ARISING OUT OF CONTRACTOR(S) PERFORMANCE OF THE WORK
42. PROVIDE SMOOTH VERTICAL CURVES THROUGH HIGH AND LOW POINTS INDICATED BY SPOT ELEVATIONS.
3.5. CONCRETE SIDEWALK SHALL BE IN ACCORDANCE WITH THE ABOVE AND THE PLANS. PROVIDE SCORED
ST
OR INSTAWNG THE PIPE. ALL STORM SEWER PIPE SHALL BE INSTALLED IN ACCORDANCE WITH THE
cn
DESCRIBED HEREIN.
PROVIDE UNIFORM SLOPES BETWEEN NEW AND EXISTING GRADES. AVOID RIDGES AND DEPRESSIONS.
JOINTS AT 5-FOOT INTERVALS AND 1/2-INCH PRE-MOLDED FIBER EXPANSION JOINTS AT 20-FOOT
FOLLOWING:
ai
o
o
v
v 9. THE ENGINEER AND OWNER ARE NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS,
INTERVALS AND ADJACENT TO CONCRETE CURBS, DRIVEWAYS, FOUNDATIONS, AND OTHER STRUCTURES.
PIPE SIZE CODE PIPE MATERIAL
So
TECHNIQUES, SEQUENCES OR PROCEDURES, TIME OF PERFORMANCE, PROGRAMS OR FOR ANY SAFETY
43. WHEN REQUIRED, THE CONTRACTOR SHALL NOTIFY THE OWNER WHEN RECORD DRAWINGS CAN BE
PREPARED. RECORD DRAWINGS SHALL INDICATE THE FINAL LOCATION AND LAYOUT OF ALL
3.6. CONCRETE CURING AND PROTECTION SHALL BE PER IDOT STANDARDS. TWO (2) COATS OF IDOT
12'-60' RCP REINFORCED CONCRETE PIPE (ASTM C76); SEE IDOT SPECS FOR PIPE CLASS
°o PRECAUTIONS USED BY THE CONTRACTOR. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXECUTION OF
IMPROVEMENTS, INCLUDING VERIFICATION OF ALL CONCRETE PADS, INVERT, RIM, AND SPOT GRADE
APPROVED CURING AGENT SHALL BE APPLIED TO ALL EXPOSED CONCRETE SURFACES.
3' - 12' PVC POLYVINYL CHLORIDE PLASTIC PIPE SDR-26 ASTM D3034 AND D2241
v THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS.
°
ELEVATIONS, AND INCORPORATE ALL FIELD DESIGN CHANGES APPROVED BY THE OWNER.
3'-48' HDPE HIGH DENSITY POLYETHYLENE PIPE
3'-48' DIP DUCTILE IRON PIPE, CLASS 52 (ANSI 21.51 AND AWWA C151)
z 10. CONSTRUCTION MATERIALS AND/OR EQUIPMENT MAY NOT BE STORED IN THE RIGHT-OF-WAY, AS
3.7. THE COST OF AGGREGATE BASE OR SUBBASE UNDER CONCRETE WORK SHALL BE INCLUDED IN THE
DIRECTED BY THE OWNER.
44. BEFORE ACCEPTANCE, ALL WORK SHALL BE INSPECTED BY THE VILLAGE, AS NECESSARY.
COST OF THE RESPECTIVE CONCRETE ITEM.
c
0
4. FLEXIBLE PAVEMENT
2. BAND OR SIMILAR COUPLING SHALL U WHEN JOINING PIPES OF DISSIMILAR
° 11 . EASEMENTS FOR THE EXISTING UTILITIES, BOTH PUBLIC AND PRIVATE, AND UTILITIES WITHIN PUBLIC
(SEAL
MATERIALS.
0 RIGHT-OF-WAYS ARE SHOWN ON THE PLANS ACCORDING TO AVAILABLE RECORDS. THE CONTRACTOR
c
4.1. THE PAVEMENT MATERIALS FOR BITUMINOUS STREETS, PARKING LOTS, AND DRIVE AISLES SHALL BE AS
SHALL RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF THESE UTILITY LINES AND THEIR
DETAILED ON THE PLANS. UNLESS OTHERWISE SHOWN ON THE PLANS, THE FLEXIBLE PAVEMENTS SHALL
3. ALL FOOTING DRAIN DISCHARGE PIPES AND DOWN SPOUTS SHALL DISCHARGE TO THE STORM SEWER
° PROTECTION FROM DAMAGE DUE TO CONSTRUCTION OPERATIONS. IF EXISTING UTILITY LINES OF ANY
ITI
EARTHWORK NOTES
CONSIST OF AGGREGATE BASE COURSE, TYPE B. BITUMINOUS CONCRETE BINDER COURSE, SUPERPAVE,
SYSTEM.
`NATURE ARE ENCOUNTERED WHICH CONFLICT WITH LOCATIONS OF THE NEW CONSTRUCTION, THE
IL-19, N50; AND BITUMINOUS CONCRETE SURFACE COURSE, SUPERPAVE, MIX N50, OF THE THICKNESS
u CONTRACTOR SHALL NOTIFY THE ENGINEER SO THAT THE CONFLICT MAY BE RESOLVED.
1. GENERAL
AND MATERIALS SPECIFIED ON THE PLANS. THICKNESSES SPECIFIED SHALL BE CONSIDERED TO BE THE
4. CONSTRUCTION: ALL STORM SEWERS ARE TO BE CONSTRUCTED USING A LASER INSTRUMENT TO MAINTAIN
0
a 12. OWNER SHALL OBTAIN EASEMENTS AND APPROVAL OF PERMITS NECESSARY TO FACILITATE
E FURNISH ALL REQUIRED
1.1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO UNDERSTAND THE SOIL AND GROUNDWATER CONDITIONS
MINIMUM COMPACTED THICKNESS.
UNE AND GRADE.
CONSTRUCTION OF THE PROPOSED UTIUTIES. THE CONTRACTOR, HOWEVER, SHALL
AT THE SITE.
4.2. ALL TRAFFIC SHALL BE KEPT OFF THE COMPLETED AGGREGATE BASE UNTIL THE BINDER COURSE IS
5. COVER: THE CONTRACTOR SHALL MAINTAIN AT LEAST TWO (2) FEET OF COVER OVER THE TOP OF
LLOy
=
BONDS AND EVIDENCE OF INSURANCE NECESSARY TO SECURE THESE PERMITS AND EASEMENTS.
LAID. THE AGGREGATE BASE SHALL BE UNIFORMLY PRIME COATED AT A RATE OF 0.4 TO 0.5 GALLONS
SHALLOW PIPES AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL MOUND OVER ANY PIPES
c
0
1.2. ANY QUANTITIES IN THE BID PROPOSAL ARE INTENDED AS A GUIDE FOR THE CONTRACTOR'S USE IN
PER SQUARE YARD PRIOR TO PLACING THE BINDER COURSE. PRIME COAT MATERIALS SHALL BE IDOT
THAT HAVE LESS THAN TWO (2) FEET OF COVER DURING CONSTRUCTION UNTIL THE AREA IS FINAL
13. THE CONTRACTOR SHALL PRESERVE ALL CONSTRUCTION STAKES UNTIL THEY ARE NO LONGER NEEDED.
0 ANY STAKES DESTROYED OR DISTURBED BY THE CONTRACTOR PRIOR TO THEIR USE SHALL BE RESET BY
DETERMINING THE SCOPE OF THE COMPLETED PROJECT. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO
APPROVED.
GRADED OR PAVED.
° THE SURVEYOR AT THE CONTRACTOR'S EXPENSE.
DETERMINE ALL MATERIAL QUANTITIES AND BE KNOWLEDGEABLE OF ALL SITE CONDITIONS."
4.3. PRIOR TO PLACEMENT OF THE SURFACE COURSE, THE BINDER COURSE SHALL BE CLEANED AND
6. STRUCTURES: MANHOLE, CATCH BASIN, AND INLET BOTTOMS SHALL BE PRECAST CONCRETE SECTIONAL
C
`w
1.3. THE CONTRACTOR WILL NOTE THAT THE ELEVATIONS SHOWN ON THE CONSTRUCTION PLANS ARE
TACK-COATED IF DUSTY OR DIRTY. ALL DAMAGED AREAS IN THE BINDER, BASE, OR CURB SHALL BE
UNITS OR MONOLITHIC CONCRETE. MANHOLES AND CATCH BASINS SHALL BE A MINIMUM OF FOUR (4)
I/
14. NOTIFICATION OF COMMENCING CONSTRUCTION:
FINISHED GRADE AND THAT PAVEMENT THICKNESS, TOPSOIL, ETC., MUST BE ACCOUNTED FOR.
REPAIRED TO THE SATISFACTION OF THE OWNER PRIOR TO LAYING THE SURFACE COURSE. THE
FEET IN DIAMETER UNLESS OTHERWISE SPECIFIED ON THE PLANS. STRUCTURE JOINTS SHALL BE SEALED
CONTRACTOR SHALL PROVIDE WHATEVER EQUIPMENT AND STAFF NECESSARY, INCLUDING THE USE OF
WITH 'O' RING OR BUM ROPE. A MAXIMUM OF TWELVE (12) INCHES OF ADJUSTING RINGS SHALL BE
�^- } ?
d 14.A. THE CONTRACTOR SHALL NOTIFY AFFECTED GOVERNMENTAL AGENCIES IN WRITING AT LEAST THREE
° IN ADDITION, THE CONTRACTOR
1.4. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE DURING CONSTRUCTION AND PREVENT
POWER BROOMS IF REQUIRED BY THE OWNER, TO PREPARE THE PAVEMENT FOR APPLICATION OF THE
USED.
V c
FULL WORKING DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
a SHALL NOTIFY, AS NECESSARY, ALL TESTING AGENCIES, THE VILLAGE, AND THE OWNER SUFFICIENTLY
STORMWATER FROM RUNNING INTO OR STANDING IN EXCAVATED AREAS. THE FAILURE TO PROVIDE
PROPER DRAINAGE WILL NEGATE ANY POSSIBLE ADDED COMPENSATION REQUESTED DUE TO DELAYS OR
SURFACE COURSE. THE TACK COAT SHALL BE UNIFORMLY APPLIED TO THE BINDER COURSE AT A RATE
OF 0.05 TO 0.10 GALLONS PER SQUARE YARD. TACK COAT SHALL BE AS PER IDOT STANDARDS.
7. A CONCRETE BENCH TO DIRECT FLOWS SHALL BE CONSTRUCTED IN THE BOTTOM OF ALL INLETS AND
., ®
°
IN ADVANCE
n CE OF CONSTRUCTION
UNSUITABLE MATERIALS CREATED AS A RESULT THEREOF. FINAL GRADES SHALL BE PROTECTED
MANHOLES.
3'`
0
° 14.B. FAILURE OF THE CONTRACTOR TO ALLOW PROPER NOTIFICATION TIME WHICH RESULTS IN THE
AGAINST DAMAGE FROM EROSION, SEDIMENTATION, AND TRAFFIC.
4.4. SEAMS IN BAM, BINDER, AND SURFACE COURSE SHALL BE STAGGERED A MINIMUM OF 6 INCHES.
B. THE FRAME, GATE, AND/OR CLOSED LID SHALL BE CAST IRON OF THE STYLE SHOWN ON THE PLANS.
c
a
TESTING COMPANIES TO BE UNABLE TO VISIT THE SITE AND PERFORM TESTING WILL CAUSE THE
1.5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF THE SOIL EROSION AND
5. TESTING AND FINAL ACCEPTANCE.
'�
°
.. CONTRACTOR TO SUSPEND THE OPERATION TO BE TESTED UNTIL THE TESTING AGENCY CAN
SEDIMENTATION CONTROL MEASURES. THE INITIAL ESTABLISHMENT OF EROSION CONTROL PROCEDURES
9. CLEANING: THE STORM SEWER SYSTEM SHALL BE THOROUGHLY CLEANED PRIOR TO FINAL INSPECTION
Q
o
SCHEDULE TESTING OPERATIONS. COST OF SUSPENSION OF WORK SHALL BE BORNE BY THE
AND THE PLACEMENT OF SILT AND FILTER FENCING, ETC., TO PROTECT ADJACENT PROPERTY,
5.1. THE CONTRACTOR SHALL FOLLOW THE QUAUTY CONTROL TESTING PROGRAM FOR CONCRETE AND
AND TESTING.
.
CONTRACTOR.
3
WETLANDS, ETC., SHALL OCCUR BEFORE GRADING BEGINS.
PAVEMENT MATERIALS ESTABLISHED BY THE ENGINEER.
10. THE STORM SEWER SHALL BE TELEVISED IF REQUIRED BY THE VILLAGE.
"'
c
4
15. ALL CONTRACTORS SHALL KEEP ACCESS AVAILABLE AT ALL TIMES FOR ALL EMERGENCY TRAFFIC, AS
1.6. PRIOR TO COMMENCEMENT OF GRADING ACTIVITIES, THE CONTRACTOR SHALL ERECT A CONSTRUCTION
5.2. PRIOR TO PLACEMENT OF THE BITUMINOUS CONCRETE SURFACE COURSE, THE CONTRACTOR, WHEN
w DIRECTED BY THE VILLAGE.
FENCE AROUND ANY TREE DESIGNATED TO BE PRESERVED. SAID FENCE SHALL BE PLACED IN A CIRCLE
REQUIRED BY THE VILLAGE, SHALL OBTAIN SPECIMENS OF THE BINDER COURSE WITH A CORE DRILL
11. MANHOLES, CATCH BASINS, INLETS, FRAMES, GRATES, AND OTHER STRUCTURES SHALL BE CONSTRUCTED
>.
n
..
c EXISTING SIGNS, LIGHT STANDARDS, AND UTUTY POLES THAT INTERFERE WITH CONSTRUCTION
CENTERED AROUND THE TREE, THE DIAMETER OF WHICH SHALL BE SUCH THAT THE ENTIRE DRIP ZONE
WHERE DIRECTED, FOR THE PURPOSE OF THICKNESS VERIFICATION.
OF THE TYPE, STYLE, AND SIZE AS SET FORTH WITH THE ORDINANCES AND STANDARDS OF THE
VILLAGE.
16. ANY
v OPERATIONS AND ARE NOT NOTED ON THE PLANS FOR DISPOSAL SHALL BE REMOVED AND RESET BY
°
EXTENT OF FURTHEST EXTENDING BRANCHES SHALL BE WITHIN THE FENCE LIMITS. THE EXISTING
( )
GRADE WITHIN THE FENCED AREA SHALL NOT BE DISTURBED.
5.3. WHEN REQUIRED BY THE VILLAGE, THE CONTRACTOR SHALL OBTAIN SPECIMENS OF THE FULL DEPTH
E
THE CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE, AS DIRECTED BY THE ENgNEFR. ANY DAMAGE
SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S OWN
BITUMINOUS CONCRETE PAVEMENT STRUCTURE WITH A CORE DRILL WHERE DIRECTED IN ORDER TO
12 ALL PVC PIPES CONNECTED TO REINFORCED CONCRETE PIPE SHALL BE CORED AND BOOTED PER THE
VILLAGE REQUIREMENTS.
N
a TO THESE ITEMS
EXPENSE TO THE SATISFACTION OF THE OWNER. ANY SIGNS NOT REQUIRED TO BE RESET SHALL BE
2. TOPSOIL EXCAVATION INCLUDES:
THE THICKNESS.DEFICIENCIES IN THICKNESS SHALL BE ADJUSTED FOR BY THE METHOD
ci
% DELIVERED TO THE RESPECTIVE OWNERS.
2.1. EXCAVATION OF TOPSOIL AND OTHER STRUCTURALLY UNSUITABLE MATERIALS WITHIN THOSE AREAS
RCONFIRM
EQUIRED BY IDOT STANDARDS.
WATERMAIN NOTES
�
,
o
a 17. ALL TREES TO BE SAVED SHALL BE IDENTIFIED PRIOR TO CONSTRUCTION BY THE LANDSCAPE ARCHITECT
THAT WILL REQUIRE EARTH EXCAVATION OR COMPACTED EARTH FILL MATERIAL EXISTING VEGETATION
5.4. FINAL ACCEPTANCE OF THE TOTAL PAVEMENT INSTALLATION SHALL BE SUBJECT TO THE TESTING AND
1. WATERMAIN PIPE: ALL WATERMAIN PIPE MATERIAL, SIZE AND TYPE SHALL BE INSTALLED AS INDICATED
m
a AND SHALL BE PROTECTED PER IDOT SECTION 201.05. THE RIGHT-OF-WAY LINE AND UMITS OF THE
SHALL BE REMOVED PRIOR TO STRIPPING TOPSOIL OR FILLING AREAS.
CHECKING REQUIREMENTS CITED ABOVE.
ON THE UTILITY PLAN. UNLESS OTHERWISE NOTED ON THE PLANS, ALL WATERMAIN PIPE SHALL BE
,o
o CONTRACTOR'S OPERATIONS SHALL BE CLEARLY DEFINED THROUGHOUT THE CONSTRUCTION PERIOD. NO
22 PLACEMENT OF EXCAVATED MATERIAL IN OWNER-DESIGNATED AREAS FOR FUTURE USE WITHIN AREAS
6. ALL MATERIAL AND CONSTRUCTION SHALL CONFORM TO THE VILLAGE CODE. WHEN CONFLICTS ARISE
CONSTRUCTED OF BITUMINOUS-COATED CEMENT-LINED DUCTILE IRON PIPE, CLASS 52, CONFORMING TO
o
c TREES NOTED TO REMAIN SHALL BE PROTECTED FROM DAMAGE TO TRUNKS, BRANCHES AND ROOTS
OR GRADING IS TO BE DONE INSIDE THE DRIP UNE OF TREES UNLESS OTHERWISE
TO BE LANDSCAPED AND THOSE AREAS NOT REQUIRING STRUCTURAL FILL MATERIAL PROVIDE
BETWEEN MUNICIPAL CODE, GENERAL NOTES AND SPECIFICATIONS, THE MORE STRINGENT SHALL TAKE
ANSI A21.51 (AWWA C151) CEMENT MORTAR LINING SHALL CONFORM TO ANSI A21.4 (AWWA C104). THE
O
o
v EXCAVATING, FIWNG
NECESSARY EROSION CONTROL MEASURES FOR STOCKPILE.
PRECEDENCE.
JOINTS SHALL BE PUSH-ON COMPRESSION GASKET JOINTS CONFORMING TO ANSI A21.11 (AWWA C111).
z
m INDICATED.
ANY CHANGES TO THE PIPE MATERIAL, SIZE AND TYPE MUST BE APPROVED BY THE OWNER, ENGINEER
°
18. LMB PRUNING SHALL BE PERFORMED UNDER THE SUPERVISION OF AN APPROVED LANDSCAPE ARCHITECT,
2.3. TOPSOIL STOCKPILED FOR RESPREAD SHALL BE FREE OF CLAY AND SHALL NOT CONTAIN ANY OF THE
SIGNAGE AND PAVEMENT MARKING NOTES
AND VILLAGE PRIOR TO ORDERING MATERIALS OR INSTALLING THE PIPE. ALL WATERMAIN PIPE SHALL BE
Z
z
-
o
«
FORESTER, OR ARBORIST AND SHALL BE UNDERTAKEN IN A TIMELY FASHION SO AS NOT TO INTERFERE
TRANSITIONAL MATERIAL BETWEEN THE TOPSOIL AND CLAY. THE TRANSITIONAL MATERIAL SHALL BE
INSTALLED IN ACCORDANCE WITH THE FOLLOWING:
c�
C
w WITH CONSTRUCTION. ALL LIMBS, BRANCHES, AND OTHER DEBRIS RESULTING FROM THE CONTRACTOR'S
USED IN NON-STRUCTURAL FILL AREAS OR DISPOSED OF OFF-SITE.
1. ALL SIGNING AND PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM
PIPE SIZE CODE PIPE MATERIAL
J
WORK SHALL DISPOSED OF OFF-SITE BY THE CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE.
TREE PAINT.
2.4. TOPSOIL RESPREAD SHALL INCLUDE HAULING AND SPREADING SIX (6) INCHES OF TOPSOIL DIRECTLY
TRAFFIC CONTROL DEVICES (MUTCD) AND THE ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT)
3'-48' DIP DUCTILE IRON PIPE, CLASS 52 (ANSI 21.51 AND AWWA C151)
o ALL CUTS OVER ONE (S INCH IN DIAMETER SHALL BE PAINTED WITH AN APPROVED
OVER AREAS TO BE LANDSCAPED WHERE SHOWN ON THE PLANS OR AS DIRECTED BY THE OWNER.
STANDARDS.
< 3' TYPE 'K' COPPER PIPE
0
a 19. ALL EXISTING PAVEMENT OR CONCRETE TO BE REMOVED SHALL BE SAWCUT ALONG OMITS OF PROPOSED
2.5. MODERATE COMPACTION IS REQUIRED IN NON-STRUCTURAL FILL AREAS.
2. SIGNS: SIGNS SHALL BE CONSTRUCTED OF 0.080-INCH THICK FLAT ALUMINUM PANELS WITH
2. FITTINGS: ALL FITTINGS SHALL BE OF DUCTILE IRON WITH CEMENT MORTAR LINING AND MECHANICAL
/'1/
0J
C,
REMOVAL BEFORE COMMENCEMENT OF PAVEMENT REMOVAL
REFLECTORIZED LEGEND ON THE FACE. LEGEND SHALL BE IN ACCORDANCE WITH THE MUTCD.
JOINTS CONFORMING TO ANSI AS21.10 (AWWA C110).
a
c
« 20. ALL EXISTING UTILITIES OR IMPROVEMENTS, INCLUDING WALKS, CURBS, PAVEMENT, AND PARKWAYS
c
3. EARTH EXCAVATION INCLUDES:
3. POSTS: SIGN POSTS SHALL BE A HEAVY-DUN STEEL 'U' SHAPED CHANNEL WEIGHING 3.0 POUNDS/FOOT,
3. VALVES: GATE VALVES SHALL BE USED ON ALL WATERMAINS. ALL VALVES SHALL TURN
ui
w
DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE PROMPTLY RESTORED TO THEIR RESPECTIVE
° WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT
3.1. EXCAVATION OF SUBSURFACE MATERIALS WHICH ARE SUITABLE FOR USE AS STRUCTURAL FILL THE
SUCH AS A TYPE B METAL POST, AS PER THE IDOT STANDARDS (OR 2-INCH PERFORATED STEEL TUBE).
COUNTER-CLOCKWISE TO OPEN. VALVES SHALL BE IRON BODY RESIUENT WEDGE GATE VALVES WITH
z
'- ORIGINAL CONDITION. THE CONTRACTOR'S
EXCAVATION SHALL BE TO %THIN A TOLERANCE OF 0.1 FEET OF THE PLAN SUBGRADE ELEVATIONS
BRONZE-MOUNTED SEATS AND NON-RISING STEMS CONFORMING TO AWWA C-509. THE VALVES SHALL
z
w
6UNLESS A PAY ITEM IS LISTED ON THE BID LIST.
WHILE MAINTAINING PROPER DRAINAGE. THE TOLERANCE WITHIN PAVEMENT AREAS SHALL BE SUCH
4. SIGNS AND POSTS SHALL BE INSTALLED IN ACCORDANCE WITH IDOT STANDARDS.
HAVE MECHANICAL JOINTS.
7
5 21. REMOVAL OF SPECIFIED ITEMS, INCLUDING BUT NOT LIMITED TO, PAVEMENT, SIDEWALK, CURB, CURB AND
THAT THE EARTH MATERIALS SHALL 'BALANCE' DURING THE FINE GRADING OPERATION.
5. PAVEMENT MARKINGS: ALL PAVEMENT MARKINGS IN THE PUBLIC RIGHT-OF-WAY, SUCH AS STOP LINES,
4. THE MECHANICAL JOINTS AND ALL FASTENERS ON THE VALVE BODY SHALL HAVE STAINLESS STEEL NUTS
w
a
m GUTTER, CULVERTS, ETC., SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR AT THE
CONTRACTOR'S OWN EXPENSE. THE CONTRACTOR IS RESPONSIBLE FOR ANY PERMITS REQUIRED FOR SUCH
3.2. PLACEMENT OF SUITABLE MATERIALS SHALL BE %THIN THOSE AREAS REQUIRING STRUCTURAL FILL IN
CENTERLINES, CROSSWALKS, AND DIRECTIONAL ARROWS, SHALL BE REFLECTORIZED THERMOPLASTIC HOT
AND BOLTS.
f n
ORDER TO ACHIEVE THE PLAN SUBGRADE ELEVATIONS TO WITHIN A TOLERANCE OF 0.1 FEET. THE FILL
ROLLED INTO PAVEMENT.
v
°
° DISPOSAL
MATERIALS SHALL BE PLACED IN LOOSE UFTS THAT SHALL NOT EXCEED EIGHT (8) INCHES IN
5. VALVE VAULTS: VALVE VAULTS SHALL BE PRECAST CONCRETE STRUCTURES FIVE (5) FEET IN DIAMETER,
°
N
o THE CONTRACTOR SHALL COLLECT AND REMOVE ALL CONSTRUCTION DEBRIS, EXCESS MATERIALS, TRASH,
THICKNESS, AND THE WATER CONTENT SHALL BE ADJUSTED IN ORDER TO ACHIEVE REQUIRED
6. PAVEMENT MARKINGS ON BIKE PATHS, PARKING LOT STALLS, AND SIMILAR 'LOW-WEAR' APPLICATIONS,
AS NOTED ON THE PLANS. THE FRAME AND LID SHALL BE ACCORDING TO THE DETAIL ON THE PLANS,
'WATER'
co
E 22.
OIL AND GREASE RESIDUE, MACHINERY, TOOLS, AND OTHER MISCELLANEOUS ITEMS WHICH WERE NOT
COMPACTION.
SHALL BE PAINT IN ACCORDANCE WITH IDOT STANDARDS.
WITH EMBOSSED ON THE LID.
a
/
o
2 PRESENT PRIOR TO PROJECT COMMENCEMENT AT NO ADDITIONAL EXPENSE TO THE OWNER. THE
n SHALL RESPONSI BLE FOR ACQUIRING ANY AND ALL PERMITS NECESS ARY FOR THE
3.3. STRUCTURAL FILL MATERIAL MAY BE PLACED WITHIN THOSE PORTIONS OF THE SITE NOT REWIRING
7. COLOR, WIDTH, STYLE, AND SIZE OF ALL MARKINGS SHALL BE IN ACCORDANCE WITH THE MUTCD AND
6. FIRE HYDRANTS: SEE PLANS FOR APPROVED FIRE HYDRANT DETAIL FIRE HYDRANTS SHALL BE INSTALLED
c CONTRACTOR
AND DISPOSAL REQUIRED FOR CLEANUP, AS DIRECTED BY THE ENGINEER OR OWNER. BURNING
A
STRUCTURAL FILL, WITHIN SIX 6 INCHES OF THE PLAN FINISHED GRADE ELEVATION. IN AREAS
( )
LOCAL CODE. STANDARD PARKING SPACES SHALL BE PAINTED WHITE.
WITH AN AUXILIARY VALVE AND CAST IRON VALVE BOX. FIRE HYDRANTS SHALL HAVE AUXILIARY VALVES
i
c HAULING
REQUIRING STRUCTURAL FILL, HOWEVER, THIS MATERIAL SHALL NOT BE PLACED OVER TOPSOIL OR
WITH A HYDRANT BARREL TO VALVE BOX RESTRAINING DEVICE. THE PUMPER CONNECTION SHALL FACE
cn
c
a ON THE SITE IS NOT PERMITTED.
OTHER UNSUITABLE MATERIALS UNLESS SPECIFICALLY DIRECTED BY A SOILS ENGINEER WITH THE
8. THERMOPLASTIC MARKINGS SHALL BE INSTALLED MEN THE PAVEMENT TEMPERATURE IS 55 DEGREES
THE ROADWAY.
0-4
0
0 23. NO UNDERGROUND WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE COVERED UNTIL IT HAS BEEN
CONCURRENCE OF THE OWNER.
FAHRENHEIT AND RISING. PAINT MARKINGS MAY BE INSTALLED WIZEN THE AIR TEMPERATURE IS 50
DEGREES FAHRENHEIT AND RISING.
7. PROVIDE AND INSTALL FOUR MEGALUG JOINT RESTRAINTS AT EACH JOINT FROM THE MAINUNE TEE TO
0
o
c APPROVED BY THE VILLAGE. APPROVAL TO PROCEED MUST BE OBTAINED FROM THE VILLAGE PRIOR TO
SURFACE, AND PRIOR TO POURING ANY CONCRETE AFTER
3.4. COMPACTION OF SUITABLE MATERIALS SHALL BE TO AT LEAST 93% OF THE MODIFIED PROCTOR DRY
THE AUXILIARY VALVE AND BETWEEN THE AUXILIARY VALVE AND THE HYDRANT BARREL
�-I
j
.o INSTALLING PAVEMENT BASE, BINDER, AND
0 FORMS HAVE BEEN SET, AS NECESSARY.
DENSITY WITHIN PROPOSED PAVEMENT AREAS, SIDEWALK, ETC. COMPACTION SHALL BE AT LEAST 95X
OF THE MODIFIED PROCTOR WITHIN PROPOSED BUILDING PAD AREAS.
SANITARY SEWER NOTES
8. THE BREAK FLANGE AND ALL BELOW-GRADE FITTING SHALL HAVE STAINLESS STEEL NUTS AND BOLTS.
O 1 a Ln
o
'u 24. WHERE SHOWN ON THE PLANS OR DIRECTED BY THE ENGINEER, EXISTING DRAINAGE STRUCTURTME AND
PIPE SHALL BE CLEANED OF DEBRIS AND PATCHED AS NECESSARY TO ASSURE INTEGRITY OF
4. UNSUITABLE MATERIAL: UNSUITABLE MATERIALS SHALL BE CONSIDERED MATERIAL THAT IS NOT SUITABLE
1, SANITARY SEWER PIPE: ALL SANITARY SEWER PIPE MATERIAL SIZE AND TYPE SHALL BE INSTALLED AS
9. CORPORATION STOPS: CORPORATION STOPS SHALL BE BRONZE BODY KEY STOPS CONFORMING TO AWWA
'J' FITTINGS. SIZE AS
�1
rw� o--a yQ
^
M
o STRUCTURE. THE CONTRACTOR'S WORK SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE MERGED
FOR THE SUPPORT OF PAVEMENT AND BUILDING CONSTRUCTION, AND IS ENCOUNTERED BELOW NORMAL
TOPSOIL DEPTHS AND THE PROPOSED SUBGRADE ELEVATION. THE DECISION TO REMOVE SAID MATERIAL
INDICATED ON THE UTILITY PLAN. UNLESS OTHERWISE NOTED ON THE PLANS, ALL SANITARY SEWER PIPE
SHALL BE POLYVINYL CHLORIDE PLASTIC PIPE PVC SDR-26). CONFORMING TO ASTM D3034 AND D2241
( )
C-800 AND SHALL INCLUDE BEND, TAILPIECE, AND COMPRESSION AND LOCATION
SHOWN ON THE PLANS.
/�
!FF""�i ` x N
a
°
° INTO THE CONTRACT UNIT PRICE EACH FOR STRUCTURES AND CONTRACT UNIT PRICE PER LINEAL FOOT
L '
o
I
n FOR STORM SEWERS, WIHICH SHALL BE PAYMENT IN FULL FOR CLEANING, PATCHING, REMOVAL, AND
AND TO WHAT EXTENT SHALL BE MADE BY THE ENGINEER WITH THE CONCURRENCE OF THE OWNER.
WITH ELASTOMERIC GASKET JOINTS CONFORMING TO ASTM D3139 AND D3212. ANY CHANGES TO THE
PIPE MATERIAL, SIZE AND TYPE MUST BE APPROVED BY THE OWNER, ENGINEER AND VILLAGE PRIOR TO
10. SERVICE BOX: PROVIDE CURB VALVE AND CURB BOX, AS INDICATED ON THE PLANS. BOX SHALL BE
P-4 O
0
° DISPOSAL OF DEBRIS AND DIRT. DRAINAGE STRUCTURES AND STORM SEWERS CONSTRUCTED AS PART OF
THE CONTRACTOR'S PROJECT SHALL BE MAINTAINED BY THE CONTRACTOR AT THE CONTRACTOR'S
5. MISCELLANEOUS. THE CONTRACTOR SHAW
ORDERING MATERIALS OR INSTAWNG THE PIPE. ALL SANITARY SEWER PIPE SHALL BE INSTALLED IN
EXTENSION TYPE WITH FOOT PIECE AND STATIONARY RODS FOR SIX (6) FEET OF BURY.
Q
�j
=
n EXPENSE. NO EXTRA PAYMENT WILL BE MADE FOR CLEANING STRUCTURES OR STORM SEWERS
° PROJECT.
5.1. SPREAD AND COMPACT UNIFORMLY TO THE DEGREE SPECIFIED ALL EXCESS TRENCH SPOIL AFTER
ACCORDANCE WITH THE FOLLOWING:
11. MAXIMUM DEFLECTION AT PIPE JOINTS SHALL BE IN ACCORDANCE WITH PIPE MANUFACTURER'S CURRENT
0�4/
` W
�
W
�
X
CONSTRUCTED AS PART OF THE CONTRACTOR'S
v
ca 25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING THE UTILITY COMPANIES LOCATE THEIR FACIUTES
COMPLETION OF THE UNDERGROUND IMPROVEMENTS.
PIPE SIZE CODE PIPE MATERIAL
4' - 12' PVC POLYVINYL CHLORIDE PLASTIC PIPE SDR-26 ASTM D3034 AND D2241
( )
RECOMMENDATIONS AND AWWA SPECIFICATIONS.
SHALL BE BEDDED ON FIRM GROUND, WITH BELLHOLES EXCAVATED SO THAT
CLIA !!,,��!! CIA
N
ALSO BE RESPONSIBLE FOR THE MAINTENANCE AND
5.2. SCARIFY, DISC, AERATE, AND COMPACT, TO THE DEGREE SPECIFIED, THE UPPER TWELVE 12 INCHES
( )
4'-48' DIP DUCTILE IRON PIPE, CLASS 52 (ANSI 21.51 AND AWWA C151)
12. BEDDING: ALL WATERMAINS
o
IN THE FIELD PRIOR TO CONSTRUCTION AND SHALL
OF THE SUITABLE SUBGRADE MATERIAL IN ALL AREAS THAT MAY BE SOFT DUE TO EXCESS MOISTURE
THE PIPE HAS AN EVEN BEDDING FOR ITS ENTIRE LENGTH.
x
C
0
, PRESERVATION OF THESE FACILITIES. THE ENGINEER DOES NOT WARRANT THE LOCATION OF ANY EXISTING
UTIU71ES SHOWN ON THE PLANS. THE CONTRACTOR SHALL CALL J.U.LI.E. (1-800-892-0123) AND THE
CONTENT. THIS APPLIES TO CUT AREAS AS WELL AS FILL AREAS.
2. BAND-SEAL OR SIMILAR FLEXIBLE-TYPE COUPUNGS SHALL BE USED WHEN CONNECTING SEWER PIPES OF
O
o
DISSIMILAR MATERIALS. ALL SANITARY SEWER CONSTRUCTION (AND STORM SEWER CONSTRUCTION IN
13. GRANULAR BEDDING MATERIAL OR GRANULAR BACKFILL MATERIAL SHALL BE CAREFULLY PLACED TO
o
`o VILLAGE FOR UTILITY LOCATIONS.
5.3. PROVIDE WATER TO ADD TO DRY MATERIAL IN ORDER TO ADJUST THE MOISTURE CONTENT FOR THE
IRES STONEMINIMUM
COMBINED SEWER REQUALR
LVE (12) INCHES OVER THE TOP OF THE PIPE BEFORE FINAL BACKFILLING AND COMPACTION.
o
n
u
26. THE GENERAL CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES TO PROVIDE CABLE TV, PHONE,
PURPOSE OF ACHIEVING THE SPECIFIED COMPACTION.
BEDDING THICKNESS OUJ4 THE OUTSIDE DIAMETER OF THE SEWER PIPE, BUT 0 LESS THAN FOUR
(4) INCHES NOR MORE THAN EIGHT (8) INCHES. AS A MINIMUM, THE MATERIAL SHALL CONFORM TO THE
14. A MINIMUM DEPTH OF COVER OF 5-FEET, 6-INCHES SHALL BE MAINTAINED OVER THE WATER LINES. THE
m
t ELECTRIC, GAS AND IRRIGATION SERVICES. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
SECURING SITE LAYOUTS FOR THESE UTILITIES AND SHALL COORDINATE AND PROVIDE CONDUIT
5.4. BACKFILL THE CURB AND GUTTER AFTER ITS CONSTRUCTION AND PRIOR TO THE PLACEMENT OF THE
REQUIREMENTS OF ARTICLE 704.01 OF THE 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
MAXIMUM COVER SHALL BE EIGHT (8) FEET, EXCEPT AT SPECIAL CROSSINGS AND ONLY AS DESIGNATED
7
z CROSSINGS AS REQUIRED. THIS COORDINATION SHALL BE CONSIDERED INCIDENTAL TO GENERAL
BASE COURSE MATERIAL
CONSTRUCTION' OF THE STATE OF ILLINOIS OR ASTM C-33. THE GRADATION SHALL CONFORM TO
ON THE PLANS..
>
3 CONTRACTOR AGREEMENT WITH THE OWNER. ANY CONFLICTS IN UTILITIES SHALL BE CORRECTED BY THE
6. TESTING AND FINAL ACCEPTANCE
GRADATION CA-11 OR CA-13 OF THE ILLINOIS STANDARD SPECIFICATIONS AND SHALL BE EXTENDED AT
LEAST 12' ABOVE THE TOP OF THE PIPE WHEN USING PVC.
15. 'MEGA-LUG' RETAINER GLANDS AND THRUST BLOCKING SHALL BE INSTALLED ON WATERMAINS AT ALL
ORIGINAL ISSUE:
w
GENERAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
BENDS, FITTINGS, TEES, ELBOWS, ETC. 'MEGA-LUG' RESTRAINED JOINTS ARE REQUIRED ON ALL VALVES
11 /05/2015
1
N
w
u
$ 27. CONTRACTOR IS TO VERIFY ALL EXISTING STRUCTURES AND FACILITIES AT ALL PROPOSED UTILITY
6.1. THE CONTRACTOR SHALL PROVIDE AS A MINIMUM A FULLY LOADED SIX-WHEEL TANDEM AXLE TRUCK
3. ALL UNSUITABLE MATERIALS SHALL BE REMOVED BELOW THE PROPOSED SANITARY SEWER AND REPLACED
AND ALL FITTINGS. THE COST FOR THIS WORK SHALL BE INCIDENTAL TO THE UNIT PRICE FOR THE PIPE
°
o CONNECTION LOCATIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO ORDERING MATERIAL
FOR PROOF ROLLING THE PAVEMENT SUBGRADE PRIOR TO THE PLACEMENT OF THE CURB AND GUTTER
FOR
AND THE OWNER. (SEE
WITH COMPACTED CRUSHED GRAVEL OR STONE, AS PER IDOT STANDARDS.
INSTALLED.
KHA PROJECT NO.
AND STARTING WORK.
THE BASE MATERIAL THIS SHALL BE WITNESSED BY THE ENGINEER
PAVING SPECIFICATION.)
4. ALL TRENCHES BENEATH PROPOSED OR EXISTING UTIUTES, PAVEMENTS, ROADWAYS, SIDEWALKS, AND FOR
16, ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (IEPA) AND VILLAGE WATERMAIN PROTECTION:
16H4O3000
u
o 28. ANY FIELD TILES ENCOUNTERED SHALL BE INSPECTED BY THE ENGINEER. THE DRAIN TLE SHALL BE
6.2. ANY UNSUITABLE AREA ENCOUNTERED AS A RESULT OF PROOF ROWING SHALL BE REMOVED AND
A DISTANCE OF TWO SE FEET ON EITHER SIDE OF SAME, AND/OR WHERE SHOWN ON THE PLANS, SHALL
BE BACKFILLED WITH SELECT GRANULAR BACKFILL PER IDOT STANDARDS AND THOROUGHLY
16.1. HORIZONTAL SEPARATION
SHEET NUMBER
E
°c
E CONNECTED TO THE STORM SEWER SYSTEM AND A RECORD KEPT BY THE CONTRACTOR OF THE
AND TURNED OVER TO THE ENGINEER UPON COMPLETION OF THE PROJECT. THE COST OF
REPLACED WITH SUITABLE MATERIAL OR OTHERWISE CORRECTED AND APPROVED BY THE ENGINEER.
MECHANICALLY COMPACTED IN 9-INCH THICK (LOOSE MEASUREMENT) LAYERS. JETTING WITH WATER IS
, LOCATIONS
THE CONTRACTOR'S WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT, AND NO ADDITIONAL
NOT PERMITTED.
16.1.1. WATERMAINS SHALL BE LAID AT LEAST TEN (10) FEET HORIZONTALLY FROM ANY EXISTING OR
a,
c
PROPOSED DRAIN, STORM SEWER, SANITARY SEWER, OR SEWER SERVICES CONNECTION.
5
COMPENSATION SHALL BE ALLOWED.
o
16.1.2. WATERMAINS MAY BE LAID CLOSER THAN TEN (10) FEET TO A SEWER UNE MEN::
r 0
C
o
.