Loading...
Parking Lot Modification Pg2WOOD OR STEEL POSTS AT 5' MAX. SPACING MIRAFl INC. OR ENVIROFENCE FILTER FABRIC, OR APPROVED EQUAL_ WOVEN WIRE FENCE (MIN) 14 1/2 • GAUGE) (MAX) 6• MESH SPACING) COMPACTED BACKFILL _ MIN. 6'X6* TRENCH EXTEND FABRIC INTO TRENCH A MINIMUM OF 6• VERTICALLY AND 6' HORIZONTALLY NATURAL SOIL NOTES: 1. FILTER BARRIERS SHALL BE PIACED AT THOSE LOCATIONS SHOWN ON THE PLANS. 2. ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, TO WOOD POSTS WITH NAILS. AND TO STEEL POSTS WITH TIE -WIRES AT TOP AND MID-SECTION. 3. OVERLAP FILTER FABRIC BY 6' AND FOLD WHERE 2 SECTIONS ADJOIN. 4. STRAW BALES MAY BE SUBSTITUTED FOR THE FILTER FABRIC, IF APPROVED BY THE VILLAGE ENGINEERING DIVISION 5. INSPECTION OF SILT FENCES SHALL BE AT LEAST ONCE PER WEEK AND AFTER RAIN EVENTS IN EXCESS OF 1/2 REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 6. SEDIMENT TRAPPED BY THE FENCE SHALL BE REMOVED AND PROMPTLY DISPOSED OF WHENEVER SIGNIFICANT ACCUMULATION OCCURS. 7. BARRIERS SHALL BE MAINTAINED IN PLACE UNTIL COMPLETION OF CONSTRUCTION AND THE UPSLOPE AREA HAS BEEN STABILIZED, AND BE REMOVED ONLY WHEN DIRECTED BY THE VILLAGE. NOT TO SCALE REVISED 5-10-04 EXISTING ^ GROWN ,. 20 MIN I' R 67}� e, z f EXISTING r PAVEMENT T. I= COPRSE AGGREGATE - z r o� PLAN SILT PENCE G 678.5 2D MIN EXISTING GROUN 1D� MIN SA SLOPE R ; ff vP) A' T/C 679.18 P 679.83 EXISTING r PAVEMENT z FI LT ER FABRIC f $ MOUNTABLEBERM m A n RIED INTO SILT FENCE) ELEVATION T/C 679.18 2D'MIN G 678.66 TO EXTEND FULL WIDTH OF ENTRANCE 1 r Y MIN lJ'JI 3' MIN �Il FILTER FABRIC %• / A / A / A' bA AQP EON PREPARED sUeGRADE GROUND SECTION A -A NOTES: O U) 1. GEOTEXTILE FILTER FABRIC SHALL BE PLACED OVER THE > w a CLEARED AREA PRIOR TO PLACING COARSE AGGREGATE 2. COARSE AGGREGATE (OR CRUSHED CONCRETE) SHALL MEET IDOT GRADATION FOR CA -1 CRUSHED AGGREGATE. NOT TO SCALE 3 STABIUZED TRCTION ENTRANE SHALL BEIANDASHALL STABILIZED PRIOR TO ONSETSOFUCONSTRUCTIONCOPERATIONS w N BE MAINTAINED THROUGHOUT THE PROJECT. CONSTRUCTION 4. CONSTRUCTION ENTRANCE SHALL BE REMOVED UPON COMPLETION OF CONSTRUCTION AND ONLY WHEN ENTRANCE DIRECTED BY MLLAGE ENGINEERING. DETAIL REMSE001-01A8 W LOCABCW OF UNDERG4IXMID UIKIRES WERE NOT SU6STANRAMD BY RNYSTCAL E1400Y i ARE TAKEN FRLM/ RECORDS NOWAALLY CLW9 IDD RELIABLE NO BEER WVMITY FCR ZURR ACCURACY IS ASSUMED BY WE SVRW£ .. FM LOCI TK.YI � BURIED CABLE CALL 1UU 1E. O 1-800-892-0123 BEFOW &GGINO LO Mws 0` EbSIINC UTHTTY SERNCEs AAE BASED ON WSUAL 075 14ATKAYS. IX MACTOR MUST COVNRM LOCI MW ANO COWKROY 0` AU URUTY.SYFHCES TO REMAIN. 6} °P` \ ut ?� BEGIN 347 LF `'^�, "`-� FACE OF WALL T/W 686.3 UP` RAIL ROAD TIE N \ RETAINING WALL s - 1 r NOTE TO THE CONTRACTOR: ALL THE EXISTING UTILITIES ALONG THE FRONTAGE OF THE SITE AS WELL AS ANY UNDERGROUND CONDUITS AND EQUIPMENT SHALL BE LOCATED BEFORE STARTING ANY WORK 1 BMP -001 \ (. RI = 676.10 I `-,T/W 684.5 T/W 685.0T/W 686.0 1, QQ GR 684.0 ``` GR 684.0 1 -6' OFF (L' GR 686.0 B/W 683�0, B/W 683.0 '\ B/W 683.0 685-.._.._ -� .._.._..... - ..........._ .- _..__ .............. .-- ._..... - .... _r _679- ............. ............ ............ ......._...- ............. ............. ......._._ ..........._- �.-_ - 678.__._ - _` T/C 678.55 T/C 680.3,,/ r' --- 677- �_........ - -.._ G 678.05 G 679.8 / BMP -0 - - ..- - - 676._._. - ( R = 675.0 \ T/C 678.4 �2 f 677.6 �E TtJG UE TEN I10� }j- R & G 677.9 6.76 POND - -._ ='`l \ 678.55 - 677-- G 6 .05 - 678- , T/C 678.91 e79 �6_�S.18' 78.41 T/C DIFFER BASIN -HIGH ,1 WATER ELEV.-678.48 G 6 EXISTING DETENI POND TO REMAIN EXISTING OFFICE BUILDING STABILIZED CONSTRUCTION ENTRANCE FF 682.83 ^ N b R 67}� e, r T/CONC 681.5 PP 678.68 p r T/C 679.0 r G 678.5 T r EXISTING ASPHALT PARKING 60T R r T/C 679.18 P 679.83 � r G 676.66 r Tfe-a"o-eg r G 679.18 T T/C 679.18 r G 678.66 1 r ILL! g EX. RIM = 675.8 O U) > w a LU EE w N W Z� i � V a a I Z W a w CL a tL U) N a `` '�-.,, ``-_� `"'•- �^ \ EX. RIM = 679.95..,E o M > d LCL M m U) (n 1 I-- 0 LU 00,`,\ % 0 O 2 0-W ¢ z ¢ U w Q w ZZ 0 w 0 Z 2 w E 0 U U ED p � M0 Z CD 00 N 0 LD 00 Z mac N S a LULU d < Z U) Z z LU 0> <:o = U � 0 O cD J ZLULU O CO CO C/) DO 1' 0 o ir13 NOTE TO THE CONTRACTOR: ALL THE EXISTING UTILITIES ALONG THE FRONTAGE OF THE SITE AS WELL AS ANY UNDERGROUND CONDUITS AND EQUIPMENT SHALL BE LOCATED BEFORE STARTING ANY WORK 1 BMP -001 \ (. RI = 676.10 I `-,T/W 684.5 T/W 685.0T/W 686.0 1, QQ GR 684.0 ``` GR 684.0 1 -6' OFF (L' GR 686.0 B/W 683�0, B/W 683.0 '\ B/W 683.0 685-.._.._ -� .._.._..... - ..........._ .- _..__ .............. .-- ._..... - .... _r _679- ............. ............ ............ ......._...- ............. ............. ......._._ ..........._- �.-_ - 678.__._ - _` T/C 678.55 T/C 680.3,,/ r' --- 677- �_........ - -.._ G 678.05 G 679.8 / BMP -0 - - ..- - - 676._._. - ( R = 675.0 \ T/C 678.4 �2 f 677.6 �E TtJG UE TEN I10� }j- R & G 677.9 6.76 POND - -._ ='`l \ 678.55 - 677-- G 6 .05 - 678- , T/C 678.91 e79 �6_�S.18' 78.41 T/C DIFFER BASIN -HIGH ,1 WATER ELEV.-678.48 G 6 EXISTING DETENI POND TO REMAIN EXISTING OFFICE BUILDING STABILIZED CONSTRUCTION ENTRANCE FF 682.83 II P 678.67 _�LOWE� BASIN -HIGH WATER ELEV. = 678.68 II T/C 679.0 -- ,-_ P 679..5 r G -67E -5- I r II P 678.83 r T/C 679.29 r T/, G 678.79 T/W 686.3 GR 683.0 B/W 682.0 I T/W 683.4 I4ik I GR 680.4 4 B/W 677.4 I I I I I I I I T/W 682.4 I! GR 679.5 I_( B/W 678.5 T 679,06 T/, 679.18 I I, T/C 677.90 G 678.68 R = 677.9 9. f G 78.56 __4 --( ._4 ___( --1 ---( ---( - 4 --( If G -67-7-40I -4 ---( --( --{ -( ---c --f --( -{ -( --� --( --( --( -%', R�8.68 G 678.5 it [ T/C 678.6 i RESTRICTOR MANHOLE G 678.1 11 l I I I I I I 1IPEXI A f l TEGIK 67-A56 /C 67 / I i 677.0) 677.9 I �I FULL DEPTH CLEAN t SAWCUT 8L REMOVE CURB 1 �4T T LOT G 67 7 818 T C 678 96 G 678.4 T/W 681.4 GR 679.7 B/W 678.7 T/W 680.4 GR 679.6 B/W 678.6 T/W 679.5 GR 679.5 B/W 678.5 DEMOLITION NOTES 1. Install temporary construction & silt fence for sediment erosion control around the proposed work area as shown on drawing C-1. 2. Install temporary 6' high chain link fence around the proposed work area as shown on the drawing. 3. Contractor to call julie at 1-800-892-0123. minimum of 48 hours prior to initiating any excavation or demolition. 4. Contractor shall verify the exact elevation and location of all existing utilities and appurtenances prior to construction, to avoid interferences. 5. Appropriate precautions shall be taken to avoid damage to and to protect existing utilities and appurtenances in the vicinity of work. Contractor shall be responsible for the protection of all underground or overhead utilities even though they may not be shown on the plans. any utility that is damaged during construction shall be repaired to the satisfaction of the Village and the owner, or replaced. 6. Any open excavations, or potentially dangerous areas shall be fenced or guarded in an acceptable manner at the end of each day for the protection of the contractor's employees and general public safety. 7. Bono Consulting Inc is not liable for any construction site safety. Contractor to take all OSHA regulated and applicable local safety precautions to safe gaurd all potentially hazard sites/work. 8. Contractor is responsible for keeping roads free of excessive debris at all times. 9. Any soil, mud or debris that is washed, tracked, or deposited onto the street shall be removed before the end of each day. 10. Topographic survey provided by owner, Bono Consulting Inc. is not liable for any errors or omissions in the survey. 11. All excavation shall be tapered, or, shored and maintained pumped dry. 12. Do not create dust or other nuisance to neighboring properties during construction 13. "No trespassing" signs shall be mounted on the fencing in conspicuous locations until construction is completed and approved 14. Any gate in the perimeter fence shall be adequately hinged to prevent entry, except to allow ingress and egress to and from site, such gate must be looked at all times, other than permitted hours of construction. EROSION CONTROL NOTES A. Sediment and erosion control devices shall be functional before land is otherwise disturbed on the site. B. Vehicular access to the site shall be restricted to a gravel drive. Said gravel drive shall be installed before any construction begins above the top of the foundation. C. Any soil, mud or debris that is washed, tracked or deposited onto the street shall be removed before the end of each workday. D. The surface of stripped areas shall be permanently or temporarily protected from soil erosion within 15 days after final grade is reached. Stripped areas not at final grade that will remain undisturbed for more than 15 days after initial disturbance shall be protected from erosion. E. If a stockpile is to remain in place for more than three days, then sediment and erosion control shall be provided for such stockpile. F. Water pumped or otherwise discharged from the site during construction dewatering shall be filtered. G. Additional erosion and sediment control measure may be required at the discretion of the village engineer if site conditions warrant. H. Erosion control measures must be installed by contractor and inspected by the Village of Oak Brook prior to any excavation. I. Storm sewer inlets shall be protected with sediment trapping or filter control devices during construction. END RAILROAD TIE RETAINING WALL -585 SO. FACE FOOT EXPOSED ABOVE GRADE LEGEND FF FINISH FLOOR T/W TOP OF WALL GR GRADE AT WALL B/W BOTTOM OF WALL T/C TOP OF CURB P PAVEMENT R RIM T/CONC TOP OF CONCRETE G GUTTER SCALE, N,T,S, DURING CONSTRUCTION BILITY IGH :TIC I FENCE W Q ^ N b R 67}� e, r T/CONC 681.5 PP 678.68 p r T/C 679.0 r G 678.5 r r EXISTING ASPHALT PARKING 60T R r T/C 679.18 P 679.83 r G 676.66 r Tfe-a"o-eg r G 679.18 T T/C 679.18 r G 678.66 r II P 678.67 _�LOWE� BASIN -HIGH WATER ELEV. = 678.68 II T/C 679.0 -- ,-_ P 679..5 r G -67E -5- I r II P 678.83 r T/C 679.29 r T/, G 678.79 T/W 686.3 GR 683.0 B/W 682.0 I T/W 683.4 I4ik I GR 680.4 4 B/W 677.4 I I I I I I I I T/W 682.4 I! GR 679.5 I_( B/W 678.5 T 679,06 T/, 679.18 I I, T/C 677.90 G 678.68 R = 677.9 9. f G 78.56 __4 --( ._4 ___( --1 ---( ---( - 4 --( If G -67-7-40I -4 ---( --( --{ -( ---c --f --( -{ -( --� --( --( --( -%', R�8.68 G 678.5 it [ T/C 678.6 i RESTRICTOR MANHOLE G 678.1 11 l I I I I I I 1IPEXI A f l TEGIK 67-A56 /C 67 / I i 677.0) 677.9 I �I FULL DEPTH CLEAN t SAWCUT 8L REMOVE CURB 1 �4T T LOT G 67 7 818 T C 678 96 G 678.4 T/W 681.4 GR 679.7 B/W 678.7 T/W 680.4 GR 679.6 B/W 678.6 T/W 679.5 GR 679.5 B/W 678.5 DEMOLITION NOTES 1. Install temporary construction & silt fence for sediment erosion control around the proposed work area as shown on drawing C-1. 2. Install temporary 6' high chain link fence around the proposed work area as shown on the drawing. 3. Contractor to call julie at 1-800-892-0123. minimum of 48 hours prior to initiating any excavation or demolition. 4. Contractor shall verify the exact elevation and location of all existing utilities and appurtenances prior to construction, to avoid interferences. 5. Appropriate precautions shall be taken to avoid damage to and to protect existing utilities and appurtenances in the vicinity of work. Contractor shall be responsible for the protection of all underground or overhead utilities even though they may not be shown on the plans. any utility that is damaged during construction shall be repaired to the satisfaction of the Village and the owner, or replaced. 6. Any open excavations, or potentially dangerous areas shall be fenced or guarded in an acceptable manner at the end of each day for the protection of the contractor's employees and general public safety. 7. Bono Consulting Inc is not liable for any construction site safety. Contractor to take all OSHA regulated and applicable local safety precautions to safe gaurd all potentially hazard sites/work. 8. Contractor is responsible for keeping roads free of excessive debris at all times. 9. Any soil, mud or debris that is washed, tracked, or deposited onto the street shall be removed before the end of each day. 10. Topographic survey provided by owner, Bono Consulting Inc. is not liable for any errors or omissions in the survey. 11. All excavation shall be tapered, or, shored and maintained pumped dry. 12. Do not create dust or other nuisance to neighboring properties during construction 13. "No trespassing" signs shall be mounted on the fencing in conspicuous locations until construction is completed and approved 14. Any gate in the perimeter fence shall be adequately hinged to prevent entry, except to allow ingress and egress to and from site, such gate must be looked at all times, other than permitted hours of construction. EROSION CONTROL NOTES A. Sediment and erosion control devices shall be functional before land is otherwise disturbed on the site. B. Vehicular access to the site shall be restricted to a gravel drive. Said gravel drive shall be installed before any construction begins above the top of the foundation. C. Any soil, mud or debris that is washed, tracked or deposited onto the street shall be removed before the end of each workday. D. The surface of stripped areas shall be permanently or temporarily protected from soil erosion within 15 days after final grade is reached. Stripped areas not at final grade that will remain undisturbed for more than 15 days after initial disturbance shall be protected from erosion. E. If a stockpile is to remain in place for more than three days, then sediment and erosion control shall be provided for such stockpile. F. Water pumped or otherwise discharged from the site during construction dewatering shall be filtered. G. Additional erosion and sediment control measure may be required at the discretion of the village engineer if site conditions warrant. H. Erosion control measures must be installed by contractor and inspected by the Village of Oak Brook prior to any excavation. I. Storm sewer inlets shall be protected with sediment trapping or filter control devices during construction. END RAILROAD TIE RETAINING WALL -585 SO. FACE FOOT EXPOSED ABOVE GRADE LEGEND FF FINISH FLOOR T/W TOP OF WALL GR GRADE AT WALL B/W BOTTOM OF WALL T/C TOP OF CURB P PAVEMENT R RIM T/CONC TOP OF CONCRETE G GUTTER SCALE, N,T,S, DURING CONSTRUCTION BILITY IGH :TIC I FENCE W Q ^ N b p n r DO ILL! g O U) > w a LU EE w N W Z� a a Z W a w CL a tL U) N a w o M > d LCL M m U) (n I-- 0 LU 0 O 2 0-W ¢ z ¢ U w Q w ZZ 0 w 0 Z 2 w E 0 U U ED p � M0 Z CD 00 N 0 LD 00 Z mac N S a LULU d < Z U) Z z LU 0> <:o = U � 0 O cD J ZLULU O CO CO C/) DO 1' 0 o ir13 Q O J i__ a- Q Z O O LL o U) o Z O Oo U J - _J Cl- O z o Y � = Q Q m w o a rQ V G J LU CL C) O ALU V) _U z F� Z (� U Z z O � C/)� Fn W N cn O Z N X Cc LU LLI J J_ < 0 fO V J COPYRIGHT: THIS DRAWING SHALL NOT BE USED. REPRODUCED, MODIFIED OR SOLD EITHER WHOLLY OR IN PART, EXCEPT WHEN AUTHORIZED IN WRITING BY THE ENGINEER, PROJECT NO.: 12138 BASE FILE: SHEET FILE: ISSUE DATE: MAY 16, 2012 SCALE: 1 "=30'-0 SHEET NUMBER C-1