R-1644 - 05/23/2017 - ENGINEERING - Resolutions Exhibits i r
REVIEW OF CONTRACTS
Awardin Agency: e of Contract:
Department: Program/Accou Number:
arded ContracjPrice. r Budgeted Amount:
LYE 1 7. a
Under $20,000 $500,001 - $1,000,000
$20,000 - $500,000 0 Over $1,000,000
rt.�. ��• �('trS . 'mil Ate- �c�r�,} �� '=�'
Name: Date:
Name: Date: /
Name: Date: S.l�
Name: Date: �-
pC1 Three (3) Originals signed by other party Date/Initials W j
Original provided to staff member for other party Date/Initialsv� o�� 7 1"-
//�� 1
Original provided to Official Files Rate/Initials��#�7 zs
Village of Oak Brook I Approved by Board of Trustees- Date/Initials:
ENGINEERING SERVICES AGREEMENT
VILLAGE OF OAK BROOK
NORTH YORK ROAD/HARGER ROAD INTERSECTION
IMPROVEMENT PHASE I AND II
THIS AGREEMENT, made and entered into thisOL day of May 2017, by and between
Civiltech Engineering, Inc. (hereinafter referred to as "ENGINEER") and the Village of Oak
Brook, a municipal corporation (hereinafter referred to as 'VILLAGE") covers certain
professional engineering services in connection with the York Road/Harger Road Intersection
Improvement Phase I and II, (hereinafter referred to as "PROJECT").
The VILLAGE wishes to retain ENGINEER for these certain professional engineering
services and ENGINEER is willing to perform such services for the compensation and in
accordance with the terms and conditions described in this Agreement.
NOW, THEREFORE, in consideration of the mutual benefits, covenants and agreements
contained within this Agreement, the parties agree as follows:
1. SCOPE OF SERVICES
ENGINEER agrees to perform engineering consulting services as defined in the Scope of
Services attached as Appendix I and made a part of this Agreement.
2. COMPENSATION AND PAYMENT
ENGINEER shall be paid by VILLAGE for all services stipulated within this Agreement
according to the Compensation Schedule attached as Appendix 1I and made a part of this
Agreement.
Payment to ENGINEER shall be made by VILLAGE upon receipt of ENGINEER'S
monthly invoice. The invoice shall consist of a summary of direct labor hours by
ENGINEER'S standard job classification times the respective factors as depicted in
Appendix II plus listing of reimbursable costs incurred with copies of appropriate
invoices. The invoice will state the phase of work for which it applies, if a multi-phase
scope is used (e.g., design, construction, etc.). If VILLAGE identifies an item in the
invoice which appears to be in error, VILLAGE may withhold the amount in question,
pay the balance of the invoiced amount, and provide ENGINEER with a statement
concerning the questioned item. Alternatively, VILLAGE may pay the invoiced amount
in full, provide ENGINEER with a statement of the questioned item, and an-adjustment,
if appropriate, will be made in the next subsequent invoice submitted by ENGINEER.
Engineer will mark "Invoice number and final" on the invoice which closes
out this contract or a phase of the contract.
Page 1
If VILLAGE fails to make any payment due ENGINEER for services and expenses,
including amounts wrongly withheld, within thirty (30) days after submittal of
ENGINEER'S billing thereof, the amounts due ENGINEER shall include a charge at the
rate of one percent (1.0) per month from such thirtieth (30th) day; and, in addition, the
ENGINEER may, after giving seven (7) days written notice to VILLAGE, suspend
services under this Agreement until it has been paid in full the amounts due it for services
and expenses. During the period of any such suspension, the parties shall have the same
rights and obligations as are provided by Subsection 5(e) of this Agreement.
3. TIME SCHEDULE
The services required by this Agreement shall be completed in accordance with the Time
Schedule attached as Appendix III and made a part of this Agreement. It is recognized by
the parties that the Time Schedule may be contingent upon factors beyond the control of
either party. Both parties will take all reasonable steps to adhere to the Time Schedule.
4. TERM OF AGREEMENT
Unless extended by amendment, this Agreement shall terminate at the time of receipt of
final payment by the ENGINEER, provided that all warranties and representations shall
survive said final payment.
5. GENERAL TERMS AND CONDITIONS
a. Modification
The nature and the scope of services specified in this Agreement may only be
modified by written amendment to this Agreement approved by both parties.
b. Relationship between ENGINEER and VILLAGE
ENGINEER shall serve as VILLAGE'S professional engineering consultant in
those phases of the PROJECT to which this Agreement applies. The relationship
is that of a buyer and seller of professional services, and it is understood that the
parties have not entered into any joint venture or partnership with the other.
C. Responsibility of the ENGINEER
That all plans and other documents furnished by the ENGINEER pursuant to this
Agreement will be endorsed by him and will show his professional seal where
such is required by law.
Notwithstanding anything to the contrary which may be contained in this
Agreement or any other material incorporated herein by reference, or in any
agreement between VILLAGE and any other party concerning the PROJECT,
ENGINEER shall not have control or be in charge of and shall not be responsible
for the means, methods, techniques, sequences or procedures of construction, or
the safety, safety precautions or programs of VILLAGE, the construction
#11850987 vl
Page 2
contractor, other contractors or subcontractors performing any of the work or
providing any of the services on the PROJECT, nor shall ENGINEER be
responsible for the acts or omissions of VILLAGE provided that the ENGINEER
has properly executed his duties. ENGINEER shall not be responsible for the
failure of VILLAGE, any architect, engineer, consultant, contractor or
subcontractor to carry out their respective responsibilities in accordance with the
PROJECT documents, or any other agreement concerning the PROJECT. Any
provision which purports to amend this provision shall be without effect unless it
contains a reference that the content of this Subsection 5(c) is expressly amended
for the purposes described in such amendment and is signed by ENGINEER.
d. Corrections
In the event plans, surveys or construction staking is found to be in error and
revisions of the plans or survey or construction staking are necessary, the
ENGINEER agrees that he will perform such work without expense to the
VILLAGE, even though final payment has been received by him. He shall give
immediate attention to these changes so there will be a minimum delay to the
contractor.
e. Suspension of Services
VILLAGE may, at any time, by written order to ENGINEER (Suspension of
Services Order), require ENGINEER to stop all, or any part of, the services
required by this Agreement. Upon receipt of such an order, ENGINEER shall
immediately comply with its terms and take all reasonable steps to minimize the
occurrence of costs allocable to the services covered by the order.
ENGINEER will not be obligated to provide the same personnel employed prior
to suspension when the services are resumed, in the event the period of any
suspension exceeds thirty (30) days.
f. Termination
1) The VILLAGE shall have the right to terminate this Agreement with or
without cause upon serving thirty (30) days written notice upon the other
Ply•
2) Upon such termination, the liabilities of the parties to this Agreement shall
cease, but they shall not be relieved of the duty to perform their
obligations up to the date of termination. All warranties and the provisions
of Section 5, Paragraph I shall be in full force and effect after termination.
3) Upon such termination, ENGINEER shall cause to be delivered to the
VILLAGE all drawings, specifications, partial and completed estimates,
and any and all other data concerning the PROJECT which ENGINEER is
then accomplishing for the VILLAGE. ENGINEER shall be paid for any
Page 3
#11850987 vl
services completed and any services partially completed in accordance
with Sections 2 and 3.
g. Warranties
In addition to the covenants herein made, the ENGINEER represents and certifies
that its engineering services shall be performed in accordance with the standards
of professional practice, care, and diligence practiced by recognized engineering
firms in the industry in performing services of a similar nature in existence at the
time of performance. The representations and certifications expressed shall be in
addition to any other representations and certifications expressed in this
Agreement, or expressed or implied by law, which are hereby reserved unto the
VILLAGE.
h. Representations
In addition to the covenants herein made, the ENGINEER represents and agrees:
1) That all plans and special provisions to be furnished by the ENGINEER
pursuant to this Agreement will be in accordance with the current standard
specifications and policies of the VILLAGE, it being understood that all
such plans and drafts shall, before being finally accepted, be subject to
approval by the VILLAGE.
2) That he has not employed or retained any company or person, other than a
bona fide employee working solely for the ENGINEER, to solicit or
secure this Agreement, and that he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for
the ENGINEER, any fee, commission, percentage, brokerage fee, gifts, or
any other consideration, contingent upon or resulting from the award or
making of the Agreement. For breach or violation of this warranty, the
VILLAGE shall have the right to annul this Agreement without liability,
or in its discretion to deduct from the Agreement price or consideration, or
otherwise recover, the full amount of such fee, commission, percentage,
brokerage fee, gift, or contingent fee.
3) The ENGINEER represents and certifies that the ENGINEER is not barred
from contracting with a unit of state or local government as a result of: (1)
a delinquency in the payment of any tax administered by the Illinois
Department of Revenue, unless the ENGINEER is contesting, in
accordance with the procedures established by the appropriate revenue act,
its liability for the tax or the amount of the tax, as set forth in Section I I-
42.1-1 et seq. of the Illinois Municipal Code, 65 ILCS 5/11-42.1-1 et seq.;
or (2) a violation of either Section 33E-3 or Section 33E-4 of Article 33E
of the Criminal Code of 1961, 720 ILCS 5/33E-1 et seq. ENGINEER
represents that the only persons, firms, or corporations interested in this
Agreement as principals are those disclosed to the VILLAGE prior to the
Page 4
#11850987 vl
execution of this Agreement, and that this Agreement is made without
collusion with any other person, firm, or corporation. If at any time it
shall be found that the ENGINEER has, in procuring this Agreement,
colluded with any other person, firm, or corporation, then the ENGINEER
shall be liable to the Village for all loss or damage that the VILLAGE may
suffer, and this Agreement shall, at the VILLAGE's option, be null and
void.
4) That he is qualified technically and is conversant with the policies
applicable to the PROJECT; and that he has and will furnish sufficient,
properly trained and experienced personnel to perform the services
enumerated herein.
5) That he will not employ, for the duration of this Agreement, any person
presently employed by the VILLAGE without the written consent of the
VILLAGE.
6) ENGINEER represents and certifies that, to the best of its knowledge: (1)
no elected or appointed VILLAGE official, employee or agent has a
personal financial interest in the business of ENGINEER or in this
Agreement, or has personally received payment or other consideration for
this Agreement; (2) as of the date of this Agreement, neither ENGINEER
nor any person employed or associated with ENGINEER has any interest
that would conflict in any manner or degree with the performance of the
obligations under this Agreement; and (3) neither ENGINEER nor any
person employed by or associated with ENGINEER shall at any time
during the term of this Agreement obtain or acquire any interest that
would conflict in any manner or degree with the performance of the
obligations under this Agreement.
i. Documents Property of VILLAGE
Drawings, specifications, reports, and any other documents prepared by
ENGINEER in connection with any or all of the services furnished hereunder
shall be the property of VILLAGE and the VILLAGE shall obtain any and all
intellectual property rights in the drawings, specifications, reports, and documents
prepared by ENGINEER in connection with any and all of the services furnished
hereunder. ENGINEER shall have the right to retain copies of all documents and
drawings for its files. All construction drawings shall be prepared electronically
using MICROSTATION software. Paper copies will be provided to the
VILLAGE in full-size (24" x 36") or quarter-size (11" x 17") as requested.
Electronic design files will also be transferred to the VILLAGE.
If construction services are a part of the ENGINEER'S work, he will create
electronic "As-Built" conditions and will deliver them to the VILLAGE within
thirty (30) days after completion of construction and before final payment to the
ENGINEER. ENGINEER will title these files "Record Drawings".
Page 5
411850987 vl
If construction services are not part of the ENGINEER'S work, he will deliver
electronic MICROSTATION files to the VILLAGE upon request and before final
payment to the ENGINEER.
j. Access to Records
The ENGINEER shall maintain all books, documents, papers, accounting records
and other evidence pertaining to his costs incurred by reason of this Agreement
and agrees to make such material available, at his office at the address indicated
in Section 5, Paragraph u of this Agreement, at all reasonable times during the life
of this Agreement and for a period of three (3) years from the date of final
payment of the obligations of this Agreement by the VILLAGE or such longer
time as requested by the VILLAGE, for inspection by personnel of the
VILLAGE, or any authorized representative of the VILLAGE, and copies thereof
shall be furnished if requested. The cost of any copies shall be paid by the
VILLAGE.
k. Reuse of Documents
All documents, including drawings and specifications furnished by ENGINEER
pursuant to this Agreement, are intended for use on the PROJECT only. They
should not be used or modified by VILLAGE or others on extensions of the
PROJECT or any other project without specific written verification or adaptation
by ENGINEER. Any reuse or modification without written verification or
adaptation by ENGINEER shall be at VILLAGE'S sole risk.
1. Indemnification
ENGINEER agrees to indemnify, hold harmless, and defend (or pay the
VILLAGE for the costs of defense if the Village so desires in its sole discretion)
the VILLAGE and any of its officers, employees, or agents from and against all
liability, claims, demands, and causes of action arising out of or related to any
loss, damage, injury, death, or loss or damage to property resulting from any
negligence, errors or omissions by the ENGINEER in the performance of this
Agreement.
In the event of joint or concurrent negligence of ENGINEER and VILLAGE,
each shall bear that portion of the loss or expense that its share of the joint or
concurrent negligence bears to the total negligence (including that of third parties)
which caused the personal injury or property damage.
m. Entire Agreement
This Agreement sets forth all the covenants, conditions and promises between the
parties. There are no covenants, promises, agreements, conditions or
understandings between the parties, either oral or written, other than those
contained in this Agreement and the attached Rider No. 1.
Page 6
#11850987_vl
n. Governing Law
This Agreement shall be governed by the laws of the State of Illinois both as to
interpretation and performance.
o. Successors and Assigns
The terms of this Agreement shall be binding upon and inure to the benefit of the
parties and their respective successors and assigns; provided, however, that
neither party shall assign this Agreement in whole or in part without the proper
written approval of the other.
P. Waiver of Contract Breach
The waiver of one party of any breach of this Agreement or the failure of one
party to enforce at any time, or for any period of time, any of the provisions
hereof, shall be limited to the particular instance, shall not operate or be deemed
to waive any future breaches of this Agreement, and shall not be construed to be a
waiver of any provision, except for the particular instance.
q. Severability of Invalid Provisions
If any provisions of this Agreement shall be held to contravene or be invalid
under the laws of any particular State, County or jurisdiction where used, such
contravention shall not invalidate the entire Agreement, but it shall be construed
as if not containing the particular provision or provisions held to be invalid in the
particular State, County or jurisdiction and the rights or obligations of the parties
hereto shall be construed and enforced accordingly.
r. Force Majeure
Neither VILLAGE nor ENGINEER shall be liable for any fault or delay caused
by any contingency beyond their control, including, but not limited to, acts of
God, wars, strikes, walkouts, fires, or natural calamities.
S. Access and Permits
VILLAGE shall arrange for ENGINEER to enter upon public and private
property and shall obtain all necessary approvals and permits required from all
governmental authorities having jurisdiction over the PROJECT.
t. Designation of Authorized Representatives
Each party shall designate one or more persons to act with authority in its behalf
in respect to appropriate aspects of the PROJECT. The persons designated shall
review and respond promptly to all communications received from the other
party.
Page 7
411850987_vl
U. Address for Notices
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to ENGINEER, such notices or communications shall be
delivered or sent to:
Civiltech Engineering, Inc.
Two Pierce Place
Suite 1400
Itasca, Illinois 60143
Attn: James R. Woods, P.E., PTOE
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to the VILLAGE, such notices or communications shall be
delivered or sent to:
VILLAGE OF OAK BROOK
1200 Oak Brook Road
Oak Brook, Illinois 60523
Attn: Doug Patchin
Director of Public Works
Notices personally delivered or sent via U.S. Mail, postage prepaid, shall be
deemed, for all purposes, proper notice.
V. Insurance
ENGINEER agrees to obtain and maintain, for the term of this Agreement, and
for a period of twelve (12) months after the services contracted for hereunder
have been completed, insurance hereinafter provided, furnishing a certificate or
certificates of insurance to the VILLAGE prior to commencing work under this
Agreement. The certificate or certificates of insurance shall be in a form
satisfactory to the VILLAGE from companies authorized to do business in Illinois
and shall provide that the policies referred to shall not be canceled or changed
without first giving thirty (30) days written notice thereof to the VILLAGE. Said
insurance requirements are attached as Appendix IV and made a part of this
Agreement ("REQUIRED INSURANCE POLICIES").
The VILLAGE shall be named as an additional insured and a cancellation notice
recipient on all Required Insurance Policies.
W. Additional Services
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECT.
Separate proposals shall be submitted by ENGINEER for furnishing these
additional services. Compensation for such additional services shall be negotiated
by the parties and included in this Agreement by a written amendment.
Page 8
#11850987_vl
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECT.
Separate proposals shall be submitted by ENGINEER for furnishing these
additional services. Compensation for such additional services shall be negotiated
by the parties and included in this Agreement by a written amendment.
X. Time
Time is of the essence in the performance of all terms and provisions of this
Agreement.
Y. Third Party Beneficiary
No claim as a third party beneficiary under this Agreement by any person, firm, or
corporation shall be made or be valid against the Village.
Z. Conflicts
If any provisions of this Agreement conflict with any provisions of the attached
appendices I through IV, the provisions of this Agreement shall control. If any
provisions this Agreement conflict with any provisions of the attached Rider No.
1, the provisions of Rider No. 1 shall control. if any provisions of the attached
appendices I through IV conflict with any I conflict with any provisions of the
attached Rider No. 1, the provisions of Rider No. I shall control.
IN WITNESS WHEREOF, the parties set their hands and seals on the date first written
above.
4RiE OF BROOK ATTEST:
ipal orpo ton
F. Ginex, Village Vanager Charlotte Pruss, Village Clerk
Civiltech Engineering. Inc. ATTEST:
C
Duly A orize fficer �
Page 9
#11850987 %l
APPENDIX 1
SCOPE OF SERVICES
Per Proposal for Professional Engineering Services submitted by
Civiltech Engineering, Inc. dated April 28, 2017.
Page 10
#11850987_vl
APPENDIX II
COMPENSATION SCHEDULE
Per Proposal for Professional Engineering Services submitted by
Civiltech Engineering, Inc. dated April 28, 2017.
Page 11
#11850987 vi
APPENDIX III
TIME SCHEDULE
Per Proposal for Professional Engineering Services submitted by
Civiltech Engineering, Inc. dated April 28, 2017.
Page 12
#11850987 vi
APPENDIX IV
Insurance
Engineer shall maintain for the term of this Agreement, and for a period of twelve months
after the services is contracted for hereunder have been completed, insurance policies covering:
1. Workers Compensation: Statutory.
2. Employers Liability Insurance:
$1,000,000 injury-per occurrence
$500,000 disease-per employee
$1,000,000 disease-policy limit
Such insurance shall evidence that coverage applies in the State of Illinois.
3. Comprehensive General Liability Insurance:
$2,000,000 per occurrence combined single limit. Coverages shall include Broad
Form Property Damage Endorsements and Blanket Contractual Liability (must
expressly cover the indemnity provisions of the Agreement).
4. Comprehensive Automobile Liability Insurance:
$1,000,000 combined single limit, any auto.
5. Professional Liability Insurance (errors and omissions):
$1,000,000 per claim and $2,000,000 in aggregate.
6. Umbrella or excess liability:
The required coverages may be in any combination of primary, excess, and
umbrella policies. Any excess or umbrella policy must provide excess coverage
over underlying insurance on a following-form basis such that when any loss
covered by the primary policy exceeds the limits under the primary policy, the
excess or umbrella policy becomes effective to cover such loss.
7. Engineer will provide the Village with a certificate of insurance and additional
insured endorsement showing the Village added to the General Liability Insurance
as an additional insured.
8. Coverage shall not be suspended, voided, canceled, or reduced except after thirty
(30) days prior written notice by certified mail has been given to the Village. If a
standard Certificate of Insurance form is used with a cancellation clause, the
words "endeavor to" and "but failure to mail such notice shall impose no
obligation or liability of any kind upon the company, its agents or representatives"
will be stricken or crossed out.
Page 13
#11850987_vl
�- Proposal to Furnish Phase 1, Phase II
CIWLTECH and Phase 111 Engineering Services
APRIL 28,2017
fia
e :
R
m-
•
`.
d` ` „ t R, z,��� m • 'Ie tat .."` _'} .+ �( x� � �i xS,
„s
..�.. _-1_ .... � — ti
North York Road/Harger Road
Intersection Improvement �� ^{
Village of Oak Brook , -
Two Pier ite 1400
630.773.
t^;
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
TABLE OF CONTENTS
I. Project Understanding and Approach.....................................1
A. Phase I Engineering ...................................................................................4
B. Phase II Engineering ..................................................................................4
C. Phase III Engineering .................................................................................6
II. Anticipated Scope of Services.................................................9
A. Phase I Engineering ...................................................................................9
1. Data Collection and Early Coordination ......................................................9
2. Field Survey and Preparation of Base CAD File..........................................10
3. Crash Analyses..............................................................................................11
4. Traffic Analyses.............................................................................................11
5. Geometric Studies.........................................................................................12
6. Subsurface Soils and Pavement Investigations..........................................13
7. Preliminary Environmental Site Assessment..............................................13
8. Wetland Delineations and Impact Evaluations............................................14
9. Location Drainage Study...............................................................................15
10. Section 4(f) Evaluation and Documentation (if necessary).........................16
11.Traffic Noise Analysis (if necessary)............................................................17
12. Structural Studies (if necessary)..................................................................18
13. Draft Project Development Report................................................................18
14.Agency Coordination ....................................................................................19
15. Public Involvement........................................................................................19
16. Final Project Development Report................................................................20
17. Supervision, Administration and Project Coordination..............................21
Village of Oak Brook I April 28,2017
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
B. Phase II Engineering ..................................................................................21
1. Project Kick-Off Meeting...............................................................................21
2. Coordination with Phase I Project Development Report ............................21
3. Data Collection and Review..........................................................................21
4. Field Survey and Base Sheet Development.................................................22
5. Geometric Studies.........................................................................................22
6. Subsurface Soils and Pavement Investigation............................................22
7. Special Waste and CCDD Testing ................................................................23
8. Wetland Permitting and Coordination..........................................................23
9. Drainage, Storm Water Permitting, and Supporting Documentation.........23
10. NPDES Permitting and Documentation........................................................24
11. Review and Confirm Project Right-of-Way Requirements..........................24
12. Maintenance of Traffic Concept....................................................................25
13.Traffic Signal Installation Plan......................................................................26
14. Lighting Design (if necessary)......................................................................26
15. Structural Design (if necessary)...................................................................26
16. Preliminary Plans (65%)................................................................................28
17. Pre-Final (90%) Plans, Special Provisions and Estimates..........................29
18. Final (100%) Plans, Special Provisions and Estimates...............................32
19. Project Administration and Coordination....................................................33
20. Construction Assistance...............................................................................33
A. Phase III Engineering .................................................................................34
1. Pre-Construction ...........................................................................................34
2. Construction..................................................................................................35
3. Completion with Final Papers.......................................................................38
III. Qualifications............................................................................39
A. Civiltech Engineering's Unique Qualifications ........................................39
B. Representative Project Experience...........................................................40
C. Project Staff Qualifications........................................................................40
Village of Oak Brook I April 28,2017
N
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
1. Proposed Phase I Staffing ............................................................................41
2. Proposed Phase II Staffing ...........................................................................42
3. Proposed Phase III Staffing ..........................................................................43
B. Proposed Sub-Consultants .......................................................................44
1. Proposed Phase I Subconsultants...............................................................44
2. Proposed Phase II Subconsultants..............................................................44
3. Proposed Phase III Subconsultants.............................................................44
IV. Anticipated Project Schedule ..................................................45
V. Cost Estimate of Consultant Services ....................................45
Village of Oak Brook I April 28,2017
Civiltech Engineering,Inc.
Two Pierce Place,Suite 11
.t
630.773.3900
ht
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
Proposal to Furnish
Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois I April 28, 2017
I. Project Understanding and Approach
An improvement at the intersection of North York Road and Harger Road has been in the planning
stages at the Village of Oak Brook for a number of years. In 2016,the improvement was awarded
federal Surface Transportation Program (STP)funding for Construction and Construction Engineering
through the DuPage Mayors and Managers Conference (DMMC) process for the Fiscal Year 2017-2022
program.
This project will need to adhere to Federal-aid procedures. A Federal-aid highway project is completed
in three-phases. Phase I includes preliminary concept engineering,environmental analyses and public
involvement. Once these activities are complete and Design Approval is received,the project moves
into Phase 11,which is the preparation of contract plans and specifications for bidding. Phase III
commences once the project is awarded to a contractor, and involves construction layout, inspection
and documentation. Since there are no federal dollars in the Phase I and Phase II Engineering portions
of this project,these two phases can overlap schedule-wise, i.e., Phase II can commence prior to
receiving Phase I Design Approval. This typically results in a significant reduction in the overall project
schedule. Phase III is the construction phase,for which Civiltech would provide construction layout,
documentation and inspections services,and would serve as the liaison between the selected contractor
and the Village of Oak Brook. By agreement with the Federal Highway Administration (FHWA), Federal-
aid projects on routes under local agency jurisdiction are processed through IDOT's Bureau of Local
Roads and Streets.
A proposed intersection concept plan is shown on Exhibit A. The project will result in the following
improvements:
• Improved Access to Westbound 1-88:The proposed improvement will modify the existing right-
in/right-out configuration on the west leg of the North York Road/Harger Road intersection to
provide full-access and install a new traffic signal. The project will allow northbound North York
motorists to turn left onto Harger Road thus providing access to the westbound 1-88 entrance
ramp from the south on York Road. The Village predicts substantial corporate redevelopment in
Village of Oak Brook I April 28,2017 Page 1 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
the areas surrounding the intersection of North York Road and 22nd Street located to the south
of the study area. This improvement will provide a route to reach westbound 1-88 that is an
alternative to the westbound 1-88 access at the 22nd Street/Spring Road intersection,which is
highly congested during peak commuting hours.
• Removal of Adverse Travel Distance through Roosevelt Road Cloverleaf:Currently,some
motorists destined to westbound 1-88 from the south on North York Road continue north to
Illinois Route 38 to use the northbound to westbound and then westbound to southbound loop
ramps in order to travel south on North York Road and ultimately west on Harger Road to the I-
88 entrance ramp. This circuitous route amounts to an additional 1.1 miles of travel distance.
• Removal of Adverse Travel Distance through York Road Jug Handle:The proposed
improvement will also allow eastbound Harger Road motorists to turn left onto North York
Road. In order to accomplish this movement under current conditions, it is necessary for
motorists to turn right to head south on North York Road and use the jug handle at the Wood
Glen Lane intersection,and then turn left to head back north. Recent counts indicate that
approximately 120 southbound North York Road motorists use the jug handle at Wood Glen
Lane to head back north on North York Road during the P.M. peak hour. This circuitous route
amounts to an additional 0.4 miles of travel distance.
• Elimination of a Stop Sign for a Heavy Traffic Movement:The proposed improvement will also
realign the west leg of the Harger Road/Timber Edge Drive intersection so that Harger Road
becomes the east-west through movement. Timber Edge Drive would "tee" into realigned
Harger Road. In existing conditions, motorists heading west on Harger Road away from the
North York Road intersection must stop at the"tee" intersection with Timber Edge Drive. The
overwhelmingly predominant movements at this intersection are between the existing south
and the east legs. Most of the turn movements between the east and the north legs have less
than 5 vehicles,and no more than 20 vehicles. The proposed improvement will remove the
stop-sign induced delay for the 560 vehicles which currently make the westbound to
southbound left turn movement during the P.M. peak hour.
In addition to the Village of Oak Brook,who owns and maintains both Harger Road and North York Road
south of Harger Road,there are three other primary jurisdictional agencies that will play a part in this
project as follows.
Village of Oak Brook I April 28,2017 Page 2 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook,Illinois
• Illinois Department of Transportation. As stated above, IDOT's Bureau of Local Roads and
Streets(BLRS)will administer the project due the use of Federal-aid dollars in construction. in
addition,since the north leg of the North York Road/Harger Road is under Mors jurisdiction,
IDOT's Geometrics,Traffic,Environmental,and Drainage groups will also review the portion of
the project that affects the State highway system. On March 21, 2017,Civiltech and the Village
met with IDOT's BLRS and the above listed groups to scope the project. Meeting minutes are
available under separate cover.
• Illinois Tollway. North York Road passes over 1-88,an Illinois Tollway route,on a structure just
south of the Harger Road intersection. By agreement with the Village,the Tollway owns and
maintains the substructure of that bridge,while the Village owns and maintains the deck. The
deck currently provides two through lanes in each direction separated by a narrow 4-foot
median, and thus there is not enough width for a northbound North York Road to westbound
Harger Road left turn lane of desirable length. Coincidentally,the Tollway is currently in the
design stages for a widening project on 1-88. That project requires the reconstruction of the
North York Road structure to move piers out of the way. The Village and the Tollway have
recently coordinated to ensure that when the bridge is reconstructed,the deck is designed to
provide the needed northbound to westbound left turn lane. The Tollway anticipates that the I-
88 project including the bridge will occur in 2018. The Village currently anticipates the
construction of the intersection project in 2020. Based on the most recent status set of design
plans for the Tollway's bridge project,the pavement north of the structure up to the south
radius returns of the Harger Road intersection will be reconstructed in order to provide the
appropriate approach pavement structure and lane transitions back to the existing North York
Road pavement width. The Phase I geometric concept plans will therefore tie into the
Tollway's design plans. Follow-up survey to identify the as-built condition will be completed
during Phase II engineering for the intersection improvement.
• Forest Preserve District of DuPage County. The Salt Creek Greenway Trail is part of an
intergovernmental effort by the Forest Preserve District, DuPage County, and several park
districts and municipalities. It passes on a separate structure over 1-88 to the immediate west
of the North York Road structure,as can be seen on Exhibit A. It currently crosses Harger Road
on the east leg of the Tollway entrance ramp intersection. It then enters York Woods Forest
Preserve,a FPDDC facility, located to the north and west of the intersection project, before
continuing to the north. Preliminary concepts developed by Civiltech for the Village show the
at-grade crossing being moved to the west leg of the ramp intersection. As part of the
intersection improvement project,the Village is hopeful that a pedestrian tunnel under
relocated Harger Road can be feasibly constructed. The trail itself would then enter York
Village of Oak Brook I April 28,2017 Page 3 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
Woods along its eastern border after crossing the very-low volume Timber Edge Drive. It would
connect to the existing trail that borders the parking lot and require work within the forest
preserve. Preliminary investigations conducted by Civiltech,with Village staff,during the
funding application process,found that this may be challenging due to the necessary grades
and tunnel design. The Phase I portion of the intersection project will further investigate the
feasibility. If it is deemed feasible,this scope includes the following"as necessary"scope items:
• Preparation and submittal of an STP/TCM application for federal funding through the
DuPage Mayors and Managers Conference in the Summer of 2017.
• Additional geometric plan and profile work.
• Additional drainage/hydraulic analyses.
• A structure geotechnical report.
• A structure Type,Size and Location (TS&L) drawing.
• A tree type,size and condition survey.
• A Section 4(f) evaluation (for impacts to Forest Preserve).
• In Phase II, preparation of structural design plans.
A. Phase I Engineering
The Phase I Engineering Study for this project will include environmental and location-design studies
needed to develop and refine feasible alternatives for the intersection improvement,evaluate costs and
impacts,and undertake coordination with jurisdictional agencies and the public. The primary objective
of the Phase I Engineering Study is to develop a conceptual improvement plan which provides the
desired level of traffic safety and operation, minimizes impacts to adjacent properties and which fulfills
all of the requirements for processing and funding of this project by the Village of Oak Brook,the Illinois
Department of Transportation (IDOT) and the Federal Highway Administration (FHWA).
All of the reports and documents that are prepared as part of the Phase I study will follow IDOT criteria
and formats. The Scope of Services assumes that the improvement will be processed as a Federal-
Approved Categorical Exclusion, including the preparation of a Project Development Report(PDR).
B. Phase II Engineering
Following are some of the key elements of our proposed Phase II Engineering process.
Establish Preliminary Design Parameters
Civiltech has a successful history of identifying critical design elements up front during the Preliminary
design stage in order to produce accurate scope of work and budget information that carries through
the pre-final and final design stages of the project. We have extensive experience in completing these
Village of Oak Brook I April 28,2017 Page 4 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
types of combined Phase I and Phase II projects for our municipal clients. Our initial task will involve
working together between our teams to establish the base design parameters for the various elements
that will be included in the improvements.We will work with the Village to establish these design
parameters that will be documented and used as we proceed concurrently with the development of the
Phase I Engineering Study and the detailed Phase II Engineering Design documents:
• Documentation of Existing Conditions and Need for Improvement
• Documentation of Design Standards and Specifications
• Geotechnical Analysis and CCDD Compliance
• Pavement Design and Roadway Typical Section
• Preliminary Geometric Design
• Drainage Design and Best Management Practice(BMP)Approach
• Identification and Evaluation of Problematic Drainage Areas
• Condition and Capacity of Existing Storm Water Systems
• Public Utility Inventory Investigation, Rehabilitation,Replacement Strategies
• Private Utility Conflict Assessment
• Tree Protection, Preservation and Replacement
• Construction Staging and Maintenance of Traffic Access
• Project Right-of-Way and Easement Requirements
• Project Permitting Requirements and Documentation
• Preliminary Project Quantities and Cost Estimate
• Preliminary Estimate of Construction Time
• Public Involvement Plan (Residents and other Stakeholders)
• Specific Village and Public Project Concerns and Commitments
Maintenance of Traffic and Staging
A key design and construction issue that must be resolved will be the need to provide an efficient
construction work zone while minimizing tree impacts and maintaining traffic in a tightly constrained
area.The narrow roadway corridor combined with high traffic volumes will require thoughtful
consideration of options for staging and maintaining access to the Tollway and adjoining properties. If
the work zone is too constrained, safety problems,construction delays and increased construction costs
will result. Decisions regarding construction staging and maintenance of traffic will be made with a
complete understanding of the operational characteristics of the intersection and the adjacent
properties in efforts to minimize the impact to stakeholders which include the Tollway, Forest Preserve,
residents,commercial businesses,schools and churches, and local service providers. We will develop
Village of Oak Brook I April 28,2017 Page 5 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
alternative options for the construction staging, and seek Village input and concurrence as part of the
process.
Project Budget Controls
Our designers recognize the importance to design to our client's budgets,and we maintain a constant
awareness of the status of project costs from the beginning to end of every project.Agencies are tasked
with completing projects with limited funding,and scope changes that could potentially increase project
costs will always be recognized and immediately communicated with the Village.Although this is
important on every project we complete,a recent example is Civiltech's work for the Illinois Tollway.
The Tollway's$14 billion "Move Illinois" program is in the process of moving forward,and Civiltech was
selected for a key design role on the Elgin O'Hare expressway. Our directive was to complete our work in
a manner that"designed to budget". Our ability to successfully complete this task on projects of large
magnitude demonstrates our ability to successfully manage budgets on projects of all sizes.
We propose to complete quantity calculations and an engineer's estimate of cost at all project
milestones in order to develop accurate estimates throughout the project design development. All
estimating will be completed in accordance with our Quality Control/Quality Assurance Plan. Reviews
will include input from our construction engineering staff to ensure that pay item identification is
complete and comprehensive.This will result in high quality and accurate project budget management.
C. Phase III Engineering
The following explains how Civiltech approaches a construction project from beginning to end in order
to provide the quality service our clients have come to expect.This expanded scope clearly
demonstrates how our team consistently approaches each project to produce exceptional results.
As part of our Phase III Engineering services,Civiltech provides:
• A Resident Engineer
• A Project Manager
• Inspectors when needed
• A Surveyor when needed
Each of these employees are fully-experienced in the administration of the contract work.
Our Resident Engineer will act as a liaison between the Village of Oak Brook and the contractor,
residents,schools,and any other concerned party.The Project Manager will ensure the quality of our
services and facilitate the multiple levels of coordination that are required for complex projects with
Village of Oak Brook I April 28,2017 Page 6 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
IDOT involvement. Our Surveyor will be available for initial layout of control points and construction
staking verification,and our Resident Engineer is qualified to perform this layout verification as well.
Civiltech is capable of providing all of these services with our own forces. The only sub-consultant we
propose is needed to perform the Material Quality Assurance testing. We will use Midland Standard
Engineering&Testing(MSET)who we have worked with on nearly all of our Federally-funded projects.
MSET's qualifications are further detailed later in this proposal.
Coordination
Our project team excels as liaisons between our clients and the multiple stakeholders of a project. We
will coordinate all project issues with the involved parties and relate them back to the Village for your
information or approval.We understand that close communication with the Village, residents,schools,
Tollway, IDOT,and other involved agencies is of the utmost importance. Our goal will be to preempt any
calls to the Village regarding the project,since we would have already been in contact with the inquiring
party. We will update the Village on the status of any issues and forward recommendations when
needed. Our status updates to the Village will include any major project issues and their effect on the
progress schedule.
Civiltech will hold progress meetings every week or as often as needed,depending on the amount of
project activity.All concern parties will be invited.The contractors will be required to provide and
discuss a two week look-ahead schedule.The first portion of the meeting will be devoted to the
coordination of project work and schedule between:
• All of the concerned participants
• The contractor
• The IDOT Local Agency Engineer
• Village Departments including the Police and Fire Departments,and
• All the Village Public Works sections
This is an invaluable tool to keep all informed, preempt initial calls to the Village, and keep on track
towards a successful completion of the projects.
When concerns of the individual parties have been satisfied,they may leave,and we will continue with
more in depth project monitoring with the contractor regarding pay items, contract changes,staging,
status of submittals,overall schedule,etc.We will work with the contractor to resolve all issues and
keep the project moving forward.The actual progress of the project will be closely tracked as it
compares with the overall project schedule. If a contractor falls behind,we will investigate and
recommend possibilities to get back on schedule. Meeting minutes will be prepared, distributed to the
Village of Oak Brook I April 28,2017 Page 7 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
appropriate parties,and filed in the project records. Civiltech's experience with bringing projects to a
successful completion through our detailed construction inspection and administration services,as well
as thorough coordination, has been proven on many of our past projects.
Communication/Public Notification
Public notification and communication will be critical for this improvement. Civiltech is committed to
keeping all the involved parties fully informed so they know what is upcoming within the project work
zone. Proper notification will be accomplished with multiple forms of communication from changeable
message signs along the project to informational flyers to what we consider the best communication
which is face to face with the residents. It is this personal contact that brought success to our former
projects and will solve the coordination and information challenges of this improvement as well.When
people understand what needs to happen in front of their homes and how long each activity will last,
they can better accommodate the work and still get their business done. We have received many
compliments and"thank you's"from satisfied residents who were truly part of the process.The
inconvenience of a reconstruction is greatly reduced when the stakeholder is working with us to
determine the best solution.
Website
Civiltech has developed and supported dynamic websites for previous projects,and only if requested we
can create one for this project. Of course the most important aspects of the webpage are to:
• Announce construction alerts
• Announce road closures and detour information
• Share other news concerning the project,and
• Be able to accept and answer questions regarding the improvement
We would keep the site updated with pertinent information and photos. It is an excellent and efficient
tool for spreading project status and keeping the public fully informed.We will have a person dedicated
to maintaining the website with daily and sometimes more frequent updates regarding the construction
status.Visitors to the website will be able to contact our website administrator either over the internet
or the provided phone number. We are committed to having a person answer the phone or call back
within a very short time.A friendly voice on the end of the line is one of the most calming features of
good communications. If the question cannot be answered immediately,our administrator will have the
Resident Engineer contact the resident.The phone number of the RE will be given out regardless of
whether the question is answered immediately or not.The York/Harger website if requested by the
Village of Oak Brook I April 28,2017 Page 8 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase 111 Engineering Services
Village of Oak Brook,Illinois
Village will be attractive and informative. Most visitors will be satisfied and have their questions
answered on the spot through the ample amounts of project information that will be listed.
II. Anticipated Scope of Services
Following is our proposed scope of services for Phase I (Preliminary),Phase 11 (Design)and Phase III
(Construction)Engineering.
A. Phase I Engineering
1. Data Collection and Early Coordination
This work item will involve kick-off meetings and the collection and review of any available existing
information as follows. Data will be inventoried and summarized on maps,charts and the base CAD
file as necessary. This item includes the following tasks:
a. Attend project kick-off meeting with Village staff to ensure that all issues and concerns will
be addressed in the Phase I study.
b. Attend project kick-off meeting with IDOT/District 1 staff. Items for discussion at the
meeting include design standards, anticipated geometric/traffic reviews and jurisdictional
boundaries,data collection from IDOT,coordination with other ongoing studies, project
schedule,and anticipated level of environmental processing.
c. Attend a project kick-off meeting with Tollway staff to discuss their plans to reconstruct the
York Road structure over 1-88,and to discuss geometric modifications at the intersection of
Harger Road with the westbound 1-88 entrance ramp.
d. Obtain recent digital aerial photography for the study area from stock sources suitable for
plotting at a scale of 1"=50'.
e. Obtain and review land use,zoning,school district, park district,fire district,and other
similar maps and plans from the Village and County GIS departments.
f. Obtain right-of-way plans, plats and tax maps; record highway and geotechnical plans;
traffic signal timing plans;and historic traffic counts;among other items from the Village
and other sources.
g. Obtain any traffic studies for developments in the project area that may be in the proposal
stage.
h. Initiate a Design Stage Utility Locate request through J.U.L.I.E.,and contact all identified
public and private utilities to obtain atlases.
Village of Oak Brook I April 28,2017 Page 9 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
L Conduct at least two general field visits and prepare a comprehensive photo log of the
entire project area.
j. Prepare a Project Program Information(PPI) Form in accordance with [DOT requirements.
k. Prepare and process an Environmental Survey Request(ESR)through the IDOT Bureau of
local Roads and Streets (BLRS). This includes obtaining photographs of buildings 40 years
and older adjacent to the project area.
I. Prepare Initial Coordination Meeting Data Form(BLR 22410) in accordance with IDOT
requirements.
m. Preparation and submittal of an STP/TCM application for federal funding of the potential
pedestrian underpass through the DuPage Mayors and Managers Conference in the Summer
of 2017.
2. Field Survey and Preparation of Base CAD File
In order to develop accurate construction costs and limits of any necessary easements or right-of-
way,a complete design topographic survey will be conducted as part of the Phase I study. This
survey will include topographic information,cross sections on 50-foot stations,and a drainage and
utility survey. Cross sections will also be taken at all intersecting side streets and driveways to aid in
the final design.
The survey will extend south along the existing North York Road bridge over 1-88 to the approximate
centerline of 1-88. As noted above, it is anticipated that the Tollway will reconstruct this bridge in
2018. As part of the Phase Il engineering scope,supplemental survey will obtained to define the as-
built condition of the proposed bridge reconstruction.
This work item will also include inputting topographic information into a computer-aided design
(CAD)workstation. Civiltech will prepare base sheets which will include identification and plotting
of all existing utilities within the project limits. Existing cross section information would be
generated from the survey data and plotted on cross section sheets to aid in the review of the
existing roadway profile and completion of the drainage analysis.
We propose to use Jorgensen &Associates, Inc. (Jorgensen)as a subconsultant to perform the
topographic survey services. This item includes time for Civiltech coordination with the sub-
consultant. A scope of services and fee estimate for Jorgensen's services is contained in Attachment
E.
Village of Oak Brook I April 28,2017 Page 10 of 46
North York Road/Harper Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
3. Crash Analyses
In order to satisfy IDOT and FHWA requirements, it will be necessary to gather and review crash
data for the study area to determine the existence of any safety hazards. It is anticipated that the
analysis will need to be updated one time before design approval as new statistics are released.
This work item will include the following tasks:
a. Collect 5 years of vehicle crash data from the Village of Oak Brook and IDOT.
b. Tabulate data and prepare collision diagrams.
c. Evaluate safety improvement needs, identify countermeasures,and write crash analysis that
will be included in the PDR.
4. Traffic Analyses
As part of the FY 2017-2022 STP Application process through the DuPage Mayors and Managers
Conference (DMMC), Civiltech prepared a detailed traffic reassignment analysis to estimate the
volume of traffic that would be attracted to the new northbound to westbound and eastbound to
northbound left turn movements at the North York Road/Harger Road intersection. The
reassignment and projection analyses were coordinated with the Chicago Metropolitan Agency for
Planning(CMAP). In July of 2016,CMAP concurred with the resulting 2040 design year projections
under the proposed improvement scenario. As part of the Phase I Study,a weekday peak hour
turning movement count will be performed at the subject intersection in order to validate the
counts used as part of the 2016 STP application. It is assumed that the counts will be validated and
that the reassignment analysis will be satisfactory for use in the traffic analyses for the Phase I
study.
Per IDOT's latest comments on the proposed concept plan (dated June 16, 2014)and discussions at
the recent kick-off meeting, an Intersection Design Study(IDS) meeting IDOT standards will be
necessary at the intersection of North York Road and Harger Road. In addition, IDOT has requested
that the new traffic signal at York and Harger Roads be interconnected with the IDOT system north
of Roosevelt Road.
The traffic analyses work item will include:
a. Collect 24 hours'worth of turning movement videos using a Miovision Scout video camera
at the intersection of North York Road and Harger Road.
b. Process two morning and two evening peak hours to validate the counts performed in 2016.
Village of Oak Brook I April 28,2017 Page 11 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase 111 Engineering Services
Village of Oak Brook,Illinois
c. Perform weekday morning and evening peak hour capacity analyses at the following three
intersections using HCS 2010 software for existing conditions.
L North York Road and Harger Road
ii. Harger Road and Timber Edge Drive
iii. Harger Road and Westbound 1-88 Entrance Ramp
d. Perform weekday morning and evening peak hour capacity analyses at the following three
intersections using HCS 2010 software for 2040 design year conditions.
L North York Road and Harger Road
ii. Harger Road and Timber Edge Drive
iii. Harger Road and Westbound 1-88 Entrance Ramp
e. Evaluate vehicle storage needs as necessary.
f. Prepare a Draft Intersection Design Study(IDS)for the intersection of North York Road and
Harger Road and submit to the Village for review.
g. Revise the Draft IDS based on Village comments and submit to IDOT/District 1 for review.
h. Revise the Draft IDS based on two cycles of IDOT/District 1 comments and include in the
Draft Project Development Report(PDR).
5. Geometric Studies
This item will be the preparation of 50-scale plan and profile sheets showing detailed geometrics for
the proposed intersection improvement. The plan and profile sheets will be used for construction
cost estimating purposes, right-of-way/easement needs,and for evaluation of drainage patterns. As
noted above, it is anticipated that the Tollway will reconstruct this bridge in 2018. Based on a
review of the concept plans for the Tollway's bridge reconstruction, it is anticipated that the limits
of the bridge project will extend north of the bridge along North York Road up to the existing
southerly radius returns of the Harger Road intersection. The Phase I geometrics will tie into the
northern limits of the Tollway's bridge plans.
Also included in this item is an evaluation to determine if the construction of a tunnel beneath
Harger Road to bring the Salt Creek Greenway Trail directly into York Woods is feasible. This will
require vertical profile and horizontal alignment analyses on both the trail and the realigned Harger
Road leg of the intersection. If the underpass is determined to be feasible, it will be incorporated
into the geometric plan and profile sheets for the intersection project.
This item is comprised of the following tasks.
a. Prepare detailed horizontal geometrics on topographic base sheets.
b. Perform Autoturn analyses and prepare exhibits as necessary.
Village of Oak Brook I April 28,2017 Page 12 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook,Illinois
c. Define vertical roadway geometrics.
d. Develop proposed cross-sections for easement/right-of-way and drainage purposes.
e. Perform a roadside barrier warrant analysis.
f. Investigate the feasibility of tunneling the Salt Creek Greenway Trail beneath Harger Road.
g. If feasible, incorporate the tunnel plans into the geometric plan and profile sheets.
h. Prepare a disposition of the IDOT comments dated June 16,2014.
L Prepare a preliminary geometrics review package including traffic and crash data and submit
to the Village for review.
j. Refine horizontal and vertical geometrics based upon Village review and send review
package (with the disposition of previous comments)to IDOT for Geometric Studies Unit
(GSU) review.
k. Revise geometrics based on GSU review and include sheets in the PDR.
6. Subsurface Soils and Pavement Investigations
A factor which often contributes to project cost increases during the implementation of an
improvement is the inaccuracy of cost estimates for pavement rehabilitation and treatment of
unsuitable subgrade soils. We propose to use Midland Standard Engineering&Testing, Inc. (MSET)
as a subconsultant to perform pavement coring and highway/structure soils surveys for this
project. A copy of MSET's scope of services and fee estimate is included in Attachment E. Eight
soil borings and nine pavement cores are anticipated. MSET will prepare a Roadway Geotechnical
Report (RGR)which will summarize the analyses and will contain recommendations for areas which
may require additional subgrade treatment. Based on the findings, Civiltech will perform a
pavement design analysis which will determine the most effective pavement structure in the design
year(based upon a 20-year design life).
The improvement may require the reconstruction of one retaining wall on the northwest quadrant
of the intersection. MSET will also perform three structure soil borings and will prepare a Structure
Geotechnical Report (SGR)summarizing the analyses and findings. Based on the findings, Civiltech
will perform preliminary structural analyses as outlined in Item 12.
If necessary,two more structure borings will be performed in the location of the potential trail
underpass and another Structure Geotechnical Report(SGR)will be prepared.
7. Preliminary Environmental Site Assessment
We propose to use Stuedemann Environmental Consulting, LLC(SEC) as a sub-consultant to
perform the PESA for this project. A PESA is required to identify areas with Recognized
Village of Oak Brook I April 28,2017 Page 13 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
Environmental Conditions(REC's)and de minimis conditions that may exist from current or past
uses of properties within the project corridor. The PESA will be performed in accordance with the
specific methods presented in "A Manual for Conducting Preliminary Environmental Site
Assessments for Illinois Department of Transportation Highway Projects" (Erdmann et al., 1996,
and revisions in preparation). SEC will prepare a comprehensive PESA Report summarizing
information obtained. This item includes time for Civiltech coordination with the sub-consultant.
SEC's scope and fee estimate is provided in Attachment E.
8. Wetland Delineations and Impact Evaluations
We proposed to use Stuedemann Environmental Consulting, LLC(SEC)to perform these services.
SEC has performed a preliminary investigation and understands that regulated wetlands and/or
waters are located within the Project Corridor.
SEC proposes to conduct investigations of all potential wetlands and waters within the Project
Corridor.These investigations include an off-site records/document review followed by an on-site
investigation. SEC will flag all wetlands and "Waters of the U.S." (WOUS)within the project corridor
and will estimate the location of adjacent wetlands within 100 feet of the corridor per Village and
County requirements. SEC will coordinate with Civiltech and their surveyors to ensure that all
wetland and soil pit flags are surveyed.
SEC will prepare a Wetland Delineation Report for all areas within the Project Corridor in accordance
with U.S.Army Corps of Engineers, IDOT,IDNR,County and Village standards and will provide to
Civiltech in PDF format for review and distribution.
SEC will assist Civiltech in preparing,finalizing,and submitting NEPA related documentation with
regard to biological and wetland IDOT review and clearance. For areas within,adjoining, and
adjacent to the Project Corridor,SEC proposes to prepare the preliminary Section 7 consultation
memorandum to the U.S. Fish and Wildlife Service(USFWS)for identification of federally listed
endangered and threatened species habitats. As part of this task,SEC will also work closely with
Civiltech to obtain IDOT's TREC Report,complete IDOT's Wetland Impact Evaluation (WIE)submittal,
and complete the(DOT's Environmental Survey Request(ESR)submittal for IDOT clearance.
SEC will submit the Wetland Delineation Report to the Village for preliminary jurisdictional
determination (PJD)and boundary verification (BV)of Waters of DuPage and will also submit the
Wetland Delineation Report to the USACE for concurrence and jurisdictional determination of
WOUS, including wetlands. SEC will schedule and attend on-site pre-application meetings with the
USACE,the Village, and Civiltech as needed.
Village of Oak Brook I April 28,2017 Page 14 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
In addition,a tree type,size and condition survey will be completed for the areas in which tree
removals might be necessary.
This item includes time for Civiltech coordination with the sub-consultant. SEC's scope and fee
estimate is provided in Attachment E.
9. Location Drainage Study
Based on the scoping meeting with IDOT staff a full IDOT format Location Drainage Study(LDS)will
be prepared for the proposed improvement in accordance with IDOT,Village, and the DuPage
County Countywide Stormwater& Floodplain Ordinance design criteria. The LDS will include an
Existing Drainage Plan and Proposed Drainage Plan,as well as all the required exhibits and
evaluations to meet IDOT's requirements. The need for stormwater detention will also be
evaluated.
The Village of Oak Brook is a full waiver community within DuPage County,and thus we will hold
meetings with the Village to ensure the proposed drainage plan meets local stormwater
requirements for stormwater detention and best management practices set forth by the Village and
DuPage County.
The following tasks will be performed as part of this work item.
a. Existing Drainage Plan
i. Prepare General Location Drainage Map.
ii. Obtain contour mapping of study area.
iii. Develop watershed divides and identify drainage features.
iv. Identify outlets and determine interpreted divides.
V. Determine base floodplains (includes datum correlation).
vi. Perform field reconnaissance of existing drainage structures.
vii. Develop preliminary Existing Drainage Plan.
viii. Submit Existing Drainage Plan to Village and MOT for review.
ix. Meet with local officials to identify existing drainage problems.
X. Meet with IDOT to discuss comments on Existing Drainage Plan.
A. Prepare and submit Pre-Final Existing Drainage Plan to Village and IDOT for review.
xii. Prepare and submit Final Existing Drainage Plan and submit to Village and IDOT for
approval.
Village of Oak Brook I April 28,2017 Page 15 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
b. Proposed Drainage Plan
i. Determine existing and proposed runoff coefficients.
ii. Identify and quantify flood plain encroachments.
iii. Identify R.O.W. requirements for ditches,drainage outlets,and detention facilities.
iv. Prepare Draft Concept Proposed Drainage Plan and submit to Village and IDOT for
review.
V. Meet with Village and/or IDOT to discuss comments on the Concept Proposed
Drainage Plan.
Vi. Meet with local officials to discuss Concept Proposed Drainage Plan.
vii. Develop stormwater detention plan.
viii. Develop preliminary storm sewer sizing.
ix. Prepare and submit Proposed Drainage Plan to Village and IDOT for review.
X. Meet with IDOT to discuss comments on Proposed Drainage Plan.
xi. Prepare and submit Pre-Final Proposed Drainage Plan to Village and IDOT for review.
xii. Prepare and submit Final Proposed Drainage Plan to Village and IDOT for approval.
c. Location Drainage Study
I. Prepare text for Draft LDS.
ii. Develop exhibits for Draft LDS.
iii. Compile calculations for Draft LDS.
iv. Submit Draft LDS to Village and IDOT for review.
V. Revise Draft LDS and prepare Pre-Final LDS.
A. Revise Pre-Final LDS and prepare Final LDS for approval.
10. Section 4(f) Evaluation and Documentation (if necessary)
The proposed improvement may involve a temporary grading easement and/or a bicycle path access
enhancement at the driveway access to the York Woods Forest Preserve off of Harger Road. Since
the forest preserve is a publicly-owned recreational facility,Section 4(f)coordination will be
required. It is anticipated that the recreational facility impacts will be found to be minor or have a
positive impact,and that a de minimis finding would occur. Therefore, it is assumed that the Section
4(f) Evaluation will consist of preparing the necessary documentation to result in a de minimis
finding. Furthermore, if the trail underpass becomes feasible, a trail connection will enter forest
preserve property off of Timber Edge Drive. This,too,would require the preparation of a Section
4(f)evaluation,and would also likely be considered de minimis. This documentation would include
the following items:
Village of Oak Brook I April 28,2017 Page 16 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
a. Complete checklist and appendices.
b. Prepare 4(f) exhibits.
c. Address any public comments.
d. Prepare materials for Forest Preserve District of DuPage County(FPDDC) review.
e. One meeting with FPDCC.
f. Provide draft letter to FPDDC for their signature.
g. Submit documentation to IDOT/FHWA for approval.
11.Traffic Noise Analysis (if necessary)
There is the potential for the through lanes of travel to be moved closer to sensitive receptors,
therefore it is necessary to determine if highway noise impacts will be created by the proposed
improvement and, if so,to determine if it is feasible and reasonable to mitigate those impacts. In
order to make those determinations,this work item will include the following tasks:
a. Conduct field measurements to quantify the level of existing highway noise at sensitive
receptors.
b. Predict existing highway noise levels at sensitive receptors using the FHWA Traffic Noise
Model(TNM 2.5).
c. Perform highway noise analysis for 2040 No-Action Alternative.
d. Perform a full 2040 analysis using TNM for the preferred improvement.
e. Identify highway noise impacts and consider various abatement measures.
f. Evaluate the feasibility of noise barriers.
g. Evaluate the noise reduction design goal and cost reasonableness of the noise barrier. Noise
walls may be feasible and reasonable on a noise reduction basis for two common noise
environments within the project area, but from Civiltech Engineering's experience, we believe
the noise walls will not be reasonable on a cost-evaluation basis. Therefore, no noise
meetings have been included in the scope.
h. Prepare Traffic Noise Analysis Technical Memorandum including exhibits and tables for the
preferred alternative and submit for review and comment to IDOT and the Village of Oak
Brook.Submittals will include hard copies and well as electronic files.
L Revise Technical Memorandum up to two times, if necessary.
j. Incorporate results into Project Development Report.
k. Transmit noise analysis results to local officials.
Village of Oak Brook I April 28,2017 Page 17 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
12. Structural Studies (if necessary)
The following tasks are anticipated to be performed as part of this work item.
a. Due to the need to provide a shelf for a potential path along the west side of North York
Road north of Harger Road, in compliance with IDOT's Complete Streets policy,an existing
retaining wall may need to be removed and replaced in a location approximately 8 to 10
feet west of its existing location. Investigations discussed elsewhere in this scope will
determine if the retaining wall is necessary. At this time, it is assumed that the proposed
wall will measure 10-ft or more from the top of the retained surface to the bottom of the
foundation or fascia wall and therefore require the preparation of a Type Size&Location
(TSL)drawing per Mors BLRS Manual.A construction cost estimate will be prepared for
the proposed retaining wall. If the topographic survey and geometric design finds that the
wall will be less than this height,this item will not be necessary as part of Phase 1.
b. The Salt Creek Greenway Trail may cross under Harger Road through a pedestrian
underpass.The proposed pedestrian underpass is anticipated to be a cast-in-place (CIP)
concrete three-sided structure with cast-in-place wingwalls/retaining walls at each corner
of the underpass. Color stained formlined surface is anticipated for the exposed surfaces of
the wingwalls. Work will include the preparation of a Type Size&Location (TSL)plan as
part of the Phase I engineering study.The following tasks will be completed for this item:
• Preparation of TS&L drawings.
• Preparation of BLR form 10210(Preliminary Bridge Design and Hydraulic Report).
• Preparation of a construction cost estimate for the underpass.
• Attend TS&L review meeting with the Village and IDOT.
13. Draft Project Development Report
It is anticipated that the results of the environmental process will be a determination that the
proposed improvement will in fact cause no significant environmental impacts and thus would meet
Categorical Exclusion(CE) requirements. It is anticipated that this project will be a Federal Approved
CE, and therefore this work task will involve integration of project data and engineering studies into
a Draft Project Development Report that meets requirements as contained in BLR Form 22210.
Specifically this work item will include the following:
a. Prepare report exhibits, including a location map,a land use exhibit,a maintenance of traffic
(MOT)exhibit, and existing and proposed typical sections exhibits.
b. Prepare a detailed construction cost estimate for proposed improvements. Up to two
revisions are included in this item.
Village of Oak Brook I April 28,2017 Page 18 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
c. Write,proofread and edit the Draft PDR.
d. Print, bind and deliver Draft PDR to the Village for review.
e. Revise Draft PDR based on Village comments.
f. Print, bind and deliver Draft PDR to IDOT for review.
g. Attend review meeting with IDOT and Village if required. Write minutes.
14.Agency Coordination
The efficiency and timeliness of executing a project can hinge on the level and frequency of
coordination with applicable jurisdictional agencies. In order to avoid delays and costly multiple
design revisions,we believe it will be helpful to meet several times with the Village and/or[DOT to
review design issues,environmental impact findings and the project's overall progress. All meetings
will include preparation of an agenda, meeting attendance,and preparation of meeting minutes.
Kick-off meetings with the Village and IDOT are covered in Item 1. The following meetings are
anticipated:
a. One FHWA/IDOT/Local Agency meeting.
b. One meeting with the Forest Preserve District of DuPage County(included in Section 4(f)
item).
c. One meeting with the Illinois Tollway.
d. Two additional meetings with the Village. These may occur via phone.
15. Public Involvement
The purpose of the public involvement process is to promote a proactive and responsive approach
that seeks the input of all concerned stakeholders early and often,and that provides for appropriate
input at key points in the project decision making process. We propose that an open-house style
Public Information Meeting(PIM)should be held once all existing conditions data is collected and
analyzed to introduce the project to the public. Later in the project,once the Draft Project
Development report is reviewed by IDOT,we propose that a Public Hearing(PH)should be held to
present the proposed improvement. While we do not anticipate that there will be substantial
negative public interest, or substantial social,economic or environmental effects,the addition of
turn movements(changing the access) may represent a change in the function of the roadways. In
addition,there is the potential for Section 4(f) involvement. We believe it is in the Village's best
interest to reach out to the public when a proposed improvement is finalized.
Village of Oak Brook I April 28,2017 Page 19 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook,Illinois
Both the Public Information Meeting and the Public Hearing will be Open-House style,with exhibits
on display for the public to review and ask questions of Village and Consultant staff in a one-on-one
setting. Following are the specific public involvement tasks that are anticipated:
Public Information Meeting
a. Selection of and coordination with venue.
b. Preparation of public meeting newspaper advertisements.
c. Preparation of draft text for an invitation letter to be mailed by the Village to property
owners adjacent to or near the project.
d. Preparation of public meeting brochure,comment forms and sign-in sheets.
e. Preparation of public meeting exhibits.
f. Dry run with Village staff.
g. Revisions to presentation materials based on dry run.
h. Attendance at public meeting.
L Preparation of meeting summary and disposition of comments.
Public Hearing
a. Selection of and coordination with venue.
b. Preparation of public meeting newspaper advertisements.
c. Preparation of draft text for an invitation letter to be mailed by the Village to property
owners adjacent to or near the project.
d. Preparation of public meeting brochure,comment forms and sign-in sheets.
e. Preparation of public meeting exhibits.
f. Dry run with Village staff.
g. Revisions to presentation materials based on dry run.
h. Attendance at public meeting.
L Preparation of transcript(by court reporter)
j. Preparation of meeting summary and disposition of comments.
16. Final Project Development Report
Based on the outcome of the draft report review and agency input,the final Project Development
Report will be prepared and printed. Design Approval would be requested from IDOT.This work
item will include the following tasks:
a. Revise Draft PDR exhibits.
b. Revise construction cost estimate for proposed improvements.
Village of Oak Brook I April 28,2017 Page 20 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
C. Revise Draft PDR report, proofread and edit.
d. Print, bind and deliver Final PDR Report.
17. Supervision, Administration and Project Coordination
This item is comprised of project setup, monthly invoicing and preparation of status reports,
quarterly client coordination meetings as needed and in-house coordination meetings.This item
also includes implementation of Civiltech's quality control/quality assurance in-house review
process.
B. Phase 11 Engineering
1. Project Kick-Off Meeting
We will meet with the Village of Oak Brook to further discuss the Phase I work performed to date,
project requirements,schedule,and coordination with IDOT and any others involved with the
project.Since the project will use Federal funds,coordination with IDOT's Bureau of Local Roads and
Streets will be required.An initial kick-off meeting will be held with IDOT prior to starting Phase II
Design Engineering.This meeting will ensure that IDOT concurs with the scope of the improvements
and the proposed schedule. We will also confirm the revised IDOT PPI Form data to coordinate the
Target Letting Date; Revised Construction Cost;and assigned Project Number for construction.
2. Coordination with Phase I Project Development Report
The Project Manager and Design Engineers will review the approved Phase I project report in detail
to ensure that the design of the proposed improvements is in accordance with the report.
Furthermore,the report will be reviewed to ensure that any commitments made during the Phase I
stage of the project are followed through during Phase 11 Engineering.
3. Data Collection and Review
This work item will include obtaining and reviewing record information such as existing geotechnical
reports, aerial photography,contour mapping,and other available data such as existing plans and
utility atlases. This item will also include collecting non-municipal utility atlases and right-of-way
data. Much of this information was obtained during the Phase I stages of the project, however it
will need to be verified and/or updated during Phase II.
Village of Oak Brook I April 28,2017 Page 21 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase 111 Engineering Services
Village of Oak Brook,Illinois
4. Field Survey and Base Sheet Development
In order to develop accurate construction costs a complete design topographic survey will be
conducted during the Phase I portion of this project.
Follow-up survey is proposed during Phase II engineering to revise the previously-collected
topography to account for the new Tollway bridge work which will potentially be completed by this
point. We propose to use Jorgensen&Associates, Inc. (Jorgensen) as a subconsultant to perform the
follow-up topographic survey services. This item includes time for Civiltech coordination with the
sub-consultant. A scope of services and fee estimate for Jorgensen's services is contained in
Attachment E.
Once Phase II begins,we will perform a "plan-in-hand"field check of the project site to verify the
completeness and accuracy of the survey. We will also complete a more detailed photo-
documentation of the site and prepare a detailed inventory of existing signage and any other
topographic features which may impact or be impacted by the proposed design.
5. Geometric Studies
Concurrently and in coordination with the Phase I Engineering Study,a preliminary investigation of
the proposed intersection improvements and potential Salt Creek Greenway Trail tunnel crossing
will be completed to determine the appropriate location for the underpass and the associated
roadway improvements. Based upon the preliminary geometrics, horizontal geometrics will be
completed for the proposed alignment of the bike path. Geometrics will need to satisfy the DuPage
County Forest Preserve District,Oak Brook,Tollway,American Association of State Highway
Transportation Officials(AASHTO) and IDOT design criteria or,where not feasible,justifications for
design deviations will be developed.
6. Subsurface Soils and Pavement Investigation
Concurrently and in coordination with the Phase I Engineering Study, pavement cores and soil
borings for the project will be obtained to aid in the development of the appropriate pavement
design for both North York Road and Harger Road. Then the results of the geotechnical studies will
be incorporated into the construction documents.
We propose to use Midland Standard Engineering&Testing, Inc. (MSET)as a subconsultant to
perform pavement coring and highway/structure soils surveys for this project. A copy of MSET's
scope of services and fee estimate is included in the Phase I section of Attachment E.
Village of Oak Brook I April 28,2017 Page 22 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook, Illinois
7. Special Waste and CCDD Testing
Civiltech will coordinate and provide the required Clean Construction and Demolition Debris(CCDD)
evaluation and certification for any uncontaminated construction material that will need to be
disposed of off-site. Stuedemann Environmental Consulting, in accordance with current IEPA CCDD
regulations,will prepare a materials disposal plan, identify pre-approved CCDD facilities,and
complete the appropriate pre-construction permit application forms for material disposal.
We don't foresee the need to complete a Preliminary Site Investigation (PSI) because we anticipate
the North York Road and Harger Road project to only generate Clean Construction or Demolition
Debris (CCDD)materials.Therefore,to comply with Illinois Environmental Protection Agency(IEPA)
regulations for CCDD disposal,we will complete the LPC662/663 certification for inclusion in the
bidding documents.
This item includes time for Civiltech coordination with Stuedemann Environmental Consulting as a
subconsultant Civiltech to perform the complete the environmental services for this project.A copy
of their scope of services and fee estimate are included in Attachment E.
8. Wetland Permitting and Coordination
Wetland delineations will be performed within the North York Road and Harger Road project limits
as part of the Phase I study by our subconsultant,Stuedemann Environmental Consulting, Inc. A
copy of SEC's proposal is included in the Phase 1 section of Attachment E. It is anticipated that there
will be wetlands located within the project corridor limits.
The wetland delineation report will be prepared for concurrence and jurisdictional determination of
any Waters of the U.S.,including wetlands. Coordination will occur with IDOT for review of the
wetland delineation report and the submittal of the Wetland Impact Evaluation forms through the
Phase I Engineering Study. Through the Phase II Design Engineering and in accordance with
requirements associated with the Oak Brook Village Code, DuPage County, Illinois Department of
Transportation(IDOT),and the U.S. Army Corps of Engineers(USACE)Chicago District,we'll
complete and prepare the applicable wetland related documents for permit submittals to the Village
as a complete waiver community,and to the USACE.
9. Drainage Design, Storm Water Permitting, and Supporting Documentation
A formal Location Drainage Study is anticipated as part of this project through the Phase I
Engineering Study with an analysis of the existing drainage patterns and proposed improvements.
The Location Drainage Study will be used as the starting point for the completion of the detailed
Village of Oak Brook I April 28,2017 Page 23 of 46
North York Road/Harper Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
drainage design. The Village of Oak Brook is a full waiver community within DuPage County, and
thus we will submit for storm water permitting to the Village to ensure the proposed drainage plan
meets local storm water requirements for storm water detention and best management practices
set forth by the Village and DuPage County Ordinance.
We anticipate the Village to require a full-tabbed (flow chart) permit submittal in accordance with
the DuPage County Ordinance. Our plan is to develop preliminary engineering plans for a pre-
application meeting with the Village to get their guidance on any special management areas,erosion
control,wetland impacts,storm water management, and drainage design elements.We'll need to
meet with the Village or their representatives on-site to review the wetland delineation and get
concurrence with the limits of any wetlands,that the wetland is a regulatory wetlands,and that
there are no other critical wetlands along the corridor.Subsequently,we'll need to request that the
USACE issue a Jurisdictional Determination confirming any wetland sites as jurisdictional"waters of
the United States".
When ready to submit the permit an intake meeting can be scheduled at the Village.The intake
meeting will not provide technical review but will make certain that the application is complete.
Two copies of the permit application will be provided for the submittal and the permit fees are
anticipated to be waived. The approximate permit fees typically include an initial$200 application
fee,$1,200 for a small site floodplain,$710 for wetlands,and$360 for riparian (buffer). Fees
associated with wetland banks are currently estimated at an amount of approximately$150,000-
$180,000 per acre of impact,and while any wetland impacts will likely include a wetland banking
fee,the limits of any potential impacts are unknown,and therefore fees have not been included.
10. NPDES Permitting and Documentation
The NPDES permit, along with a Storm Water Pollution Prevention Plan(SWPPP),will also be
prepared for inclusion in the contract documents for final execution by the successful bidder.
Separate permits will be required for each construction contract.All erosion control design will be in
accordance with the latest IEPA, IDOT,County,and Village requirements.
11. Review and Confirm Project Right-of-Way Requirements
We will review the proposed roadway and bike path alignment and horizontal and vertical
geometrics with respect to the existing right-of-way and potential underpass limits.Additionally,the
preliminary cross sections will be analyzed in detail by the Phase II design team in order to confirm
the proposed right-of-way required.This work will be performed early in the design phase so that
Village of Oak Brook I April 28,2017 Page 24 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
the right-of-way acquisition process can begin as soon as possible to ensure that the project remains
on schedule.
There is only a single parcel with potential right-of-way impacts, permanent easement,and/or a
temporary easements within the project limits. We anticipate plats, appraisals, review appraisals,
and negotiations to be necessary through the valuation and land acquisition process.All such
services shall be performed in accordance with the policies of the Village,and where applicable,the
Illinois Department of Transportation Land Acquisition Policies and Procedures Manual and the
Federal Uniform Relocation Assistance and Real Property Acquisition Policies Act.
The preparation of the Plat of Highways and Legal Descriptions will be performed by Jorgensen&
Associates, Inc. in accordance with the IDOT Plats of Highway Checklist(a copy of their proposal is
included in Attachment E).We will provide Jorgensen electronic copies of the proposed alignment
and right-of-way for use in preparing the Plat of Highways and tying down the roadway and path
centerline alignments.
Civiltech will provide the necessary valuation services.The fees included in the Direct Costs reflect
that there will be parcels with differing levels of work required.We propose to use T Engineering
Services Ltd.for our review appraisals, and to use Santacruz Associates Ltd. as the negotiator for the
land acquisitions. This item also includes work involved with coordination between the Phase II
design team and the appraisers and negotiators.This work typically includes providing the
appraisers and negotiators with exhibits for use during meetings with the property owner,and
providing information regarding the design and potential modifications to the same. However,the
design for the relocation of any private property items is NOT included within the scope of this
agreement.We will work with the appraisers and negotiators to ensure that all items within the
takes or easements that need to be relocated by the property owner are accounted for in the
compensation offered to them.
12. Maintenance of Traffic Concept
We envision the construction staging and maintenance of traffic as a critical component to be
addressed and resolved as part of the preliminary engineering.We will prepare a staging and
maintenance of traffic concept memorandum for review and approval by the Village. Construction
staging, maintenance of traffic concepts will be agreed to prior to the pre-final plan development
which will include work associated with maintaining bicycle and pedestrian access through the
corridor.The staging of work over the winter may also be required,and maintenance of the
roadways during this period will be coordinated with the Village and IDOT.
Village of Oak Brook I April 28,2017 Page 25 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
13. Traffic Signal Installation Plan
This project is at the intersection of York Road and Harger Road on the north end of the Village of
Oak Brook,just north of 1-88. Harger Road is the west leg of the intersection,while an access road is
the east leg. Harger Road also provides access to Timber Edge Drive,York Woods forest preserve,
and an entrance ramp onto 1-88. The intersection is currently unsignalized,with the east and west
legs operating as right-in/right-out.
The proposed improvement will include the installation of a new traffic signal at the intersection of
York Road and Harger Road. We will attempt to place the traffic signal poles so as not to interfere
with the future shared-use path that may cross the west leg of the intersection. Since there is
currently no existing traffic signal at the intersection,a temporary traffic signal will not be needed.
IDOT will require the new traffic signal at the intersection to be interconnected to the north,to the
existing traffic signal at the intersection of York Road and Brush Hill Road/westbound IL Route 38
ramps. We assume that interconnect to the south along York Road will not be included in this
project and plan sheets as follows:
• Traffic Signal Installation Plan (1 sheet)
• Cable Plan and Sequences (1 sheet)
• Schedule of Quantities and Mast Arm Mounted Street Name Signs (1 sheet)
• Interconnect Plan—York Road from Wood Glen Road to Harger Road (1 sheet)
• Interconnect Schematic—York Road(1 sheet)
• IDOT Details (8 sheets)
14. Lighting Design (if necessary)
Lighting of the roadway and intersection is not anticipated based on the location of the project.
However, based on recent experiences, lighting of the underpasses will be required.We will prepare
lighting calculations for the underpass that meet IES standards. We will also attend one meeting
with IDOT's Bureau of Electric if necessary. The following plans are anticipated:
• Pedestrian Underpass Lighting Plan (1 sheet)
• Pedestrian Underpass Lighting Details—Controller, Fixture, Service(3 sheets)
15. Structural Design (if necessary)
For the purposes of estimating the effort required to prepare contract plans and specifications for
the underpasses and retaining wall,the following assumptions have been made:
Village of Oak Brook I April 28,2017 Page 26 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase 111 Engineering Services
Village of Oak Brook,Illinois
• Retaining walls are anticipated to be either cast-in-place concrete cantilever T-walls or
soldier pile walls with cast-in-place concrete facing.
• The proposed underpasses and retaining walls will be designed and detailed in accordance
with the AASHTO Standard Specifications for Highway Bridge Design,the 2012 IDOT Bridge
Manual and the IDOT Standard Specifications for Road and Bridge Construction.
• The proposed underpasses will be designed for HL-93 design loading.
• Aesthetic treatments for the retaining walls and underpasses will be considered such as
form liner surfaces,staining/coloring, protective coating,formed road names,other
aesthetic concrete details,and ornamental railings.
For Underpass,the flowing assumptions were also made based on the current concept drawing:
• The underpasses will be cast-in-place concrete 3-sided structures founded on spread
footings and will provide 18-ft clear width and 10-ft min vertical clearance.
• Underpass length of approximately 60-ft.
• Invert of underpass will be located above water table and gravity drained.
• 4 wingwalls(one at each corner)are expected with maximum retained height of 25-ft and
lengths of approximately 40-ft.
The following plans are anticipated based on the current conceptual drawing:
a. Structural Bike Path and Pedestrian Underpass
• General Plan and Elevation (1 sheet)
• General Notes,Staging Details,and Total Bill of Material (1 sheet)
• Underpass Details(2 sheets)
• Wingwall&Headwall Details (4 sheets)
• Pedestrian Railing&Architectural Details (1 sheet)
• Bar Splicer Assembly Details (1 sheet)
• Temporary Concrete Barrier Details(1 sheet)
• Boring Logs(2 sheet)
b. Structural Retaining Wall
• General Plan and Elevation (1 sheet)
• General Notes and Total Bill of Material (1 sheet)
• Typical Wall Sections and Details (1 sheet)
• Boring Logs(2 sheets)
Village of Oak Brook I April 28,2017 Page 27 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
16. Preliminary Plans (65%)
a. Preliminary Plans will be prepared containing the following drawings:
• Cover Sheet and Index of Sheets (1 sheet)
• General Notes and List of State and Local Standards(2 sheets)
• Existing Typical Sections (1 sheet)
• Proposed Typical Sections (1 sheet)
• Erosion Control and Landscaping—3 stages 1"=50' (3 sheets)
• Roadway Plan and Profile 1"=20' (4 sheets)
• Bike Path Plan and Profile 1"=20' ( 1 sheet)
• Drainage and Utilities 1"=20' (4 sheets)
• Detention Basin Grading Plan and Details 1"=20' (1 sheet)
• Detention Basin Planting Plan 1"=50' (1 sheet)
• Traffic Signal Installation Plan (1 sheet)
• Traffic Signal Cable Plan and Sequences(1 sheet)
• Pavement Marking Plan 1"=50' (1 sheet)
• Signing Plan 1"=50' (1 sheet)
• York and Harger Intersection Grading Plan 1"=10' ( 1 sheet)
• York and Timber Edge Drive Intersection Grading Plan 1"=10' ( 1 sheet)
• York and 1-88 Entrance Ramp Intersection Grading Plan 1"=10' ( 1 sheet)
• Overall Project Grading Plan with Contours 1"=50' (1 sheet)
• Roadway Cross Sections(10 sheets)
The Preliminary Plan preparation and submittal will serve as a progress submittal for review by
the Village staff, in an effort to identify and address any significant design issues prior to
completing pre-final plans.We will communicate with the Village and Forest Preserve
throughout the design process to resolve any current design issues.
In an effort to alert the various utility companies of possible conflicts and to advise them of the
overall project schedule,we will submit a utility plan set for their review. It is our intention that
this submittal will allow the utility companies to review the plans to determine where additional
information is needed concerning the location of their facilities. Utility plan submittals will be
coordinated with Village's Utility Coordinator for their records.
b. Preliminary Design Review Meeting-We will coordinate a meeting in order to discuss the
status of the project with the County and Forest Preserve.The meeting will be scheduled
Village of Oak Brook I April 28,2017 Page 28 of 46
CIVILTECH
North York Road/Harper Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
such that all parties will have had an opportunity to review the preliminary plans and
provide comments.
c. DuPage County Forest Preserve Coordination—We will coordinate with the Forest Preserve
to ensure that the design is consistent with their vision or any master plans for the area.
d. Aesthetic Features Coordination Meeting and Conceptual Design-We will coordinate a
meeting to discuss the proposed aesthetic features for the proposed underpass and
retaining walls with the Village and Forest Preserve.
17. Pre-Final (90%) Plans, Special Provisions and Estimates
The development of Pre-Final Contract Plans and documents will proceed throughout the Village's
review of the Preliminary Plan Submittal. We will prepare pre-final contract plans based on
comments received on the preliminary plans and in accordance with the approved Phase I Report,
the applicable sections of the BLRS manual,applicable IDOT Standards and in accordance with
current Village standards and practices. We anticipate that the contract plans will contain the
following drawings:
a. Pre-final Plans
• Cover Sheet and Index of Sheets (1 sheet)
• General Notes and List of State and Local Standards (2 sheets)
• Existing Typical Sections (1 sheet)
• Proposed Typical Sections (1 sheet)
• Erosion Control and Landscaping-3 stages 1"=50' (3 sheets)
• Roadway Plan and Profile 1"=20' (4 sheets)
• Bike Path Plan and Profile 1"=20' ( 1 sheet)
• Drainage and Utilities 1"=20' (4 sheets)
• Detention Basin Grading Plan and Details 1"=20' (1 sheet)
• Detention Basin Planting Plan 1"=50' (1 sheet)
• Traffic Signal Installation Plan (1 sheet)
• Traffic Signal Cable Plan and Sequences (1 sheet)
• Traffic Signal Schedule of Quantities and Mast Arm Mounted Street Name Signs (1
sheet)
• Traffic Signal Interconnect Plan—York Road from Wood Glen Road to Harger Road (1
sheet)
• Traffic Signal Interconnect Schematic—York Road (1 sheet)
• Traffic Signal IDOT Standard Details (8 sheets)
• Lighting Plan Pedestrian Underpass (1 sheet)
Village of Oak Brook I April 28,2017 Page 29 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
• Lighting Details Pedestrian Underpass—Controller, Fixture, Service (3 sheets)
• Structural Bike Path and Pedestrian Underpass
• General Plan and Elevation (1 sheet)
• General Notes, Staging Details, and Total Bill of Material (1 sheet)
• Underpass Details (2 sheets)
• Wingwall& Headwall Details(8 sheets)
• Pedestrian Railing&Architectural Details (1 sheet)
• Bar Splicer Assembly Details (1 sheet)
• Temporary Concrete Barrier Details (1 sheet)
• Boring Logs (2 sheet)
• Structural Retaining Wall
o General Plan and Elevation (1 sheet)
o General Notes and Total Bill of Material (1 sheet)
o Typical Wall Sections and Details (1 sheet)
o Boring Logs (2 sheets)
• Pavement Marking Plan 1"=50' (1 sheet)
• Signing Plan 1"=50' (1 sheet)
• York and Harger Intersection Grading Plan 1"=10' ( 1 sheet)
• York and Timber Edge Drive Intersection Grading Plan 1"=10' ( 1 sheet)
• York and 1-88 Entrance Ramp Intersection Grading Plan 1"=10' ( 1 sheet)
• Overall Project Grading Plan with Contours 1"=50' (1 sheet)
• Roadway Cross Sections (10 sheets)
• Project Specific Construction Details (4 sheets)
• Architectural Details for Underpass and Retaining Walls (1 sheet)
• Village and IDOT Standard Construction Details (10 sheets)
We estimate that the contract plans will contain a total of 89 sheets.
The cross sections will be prepared at 50-foot intervals and will include full sections at intersections
of streets, high and low points along the roadway profile, beginning of project, and end of project
limits. Half width cross sections will be prepared at driveways and access points.This work will be in
accordance with Lake County Division of Transportation Plan Preparation Guidelines.
The goal with the design of the proposed detention will be to meet the needs of the roadway
improvement, conform to the requirements of the DuPage County Watershed Development
Ordinance and be, at a minimum,aesthetically neutral. We propose to utilize planting schemes
similar to what we've done for similar facilities to develop a planting scheme which is low
Village of Oak Brook I April 28,2017 Page 30 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase 111 Engineering Services
Village of Oak Brook,Illinois
maintenance and native in character. Inclusion of appropriate hydrophytic vegetation in the plan
will aid in addressing water quality issues.
The Forest Preserve or Village have not expressed their intent to plant trees along the Harger Road
intersection as part of a plan to reforest this area. However,should it be desired the Village or
Forest Preserve can provide marked-up plans showing the location,size, and species of trees to be
planted. Civiltech will draft the mark-ups for inclusion in the contract documents. Civiltech will work
with the Village or forest Preserve I regard to any specific special provisions for the trees covering
supplying, planting and maintenance requirements.
The pre-final contract documents will be submitted to the Village, Forest Preserve, Tollway,and
IDOT. We will also submit the contract plans to the various utility companies.This submittal will
sufficiently define the conflicts so that the utility companies can,at a minimum, perform the
necessary engineering for any required utility relocations.This allows relocations to be performed in
advance of the actual construction. Civiltech will perform the necessary coordination with the utility
companies and follow up as needed on each of our submittals.This will attempt to ensure that no
utility company is ignoring the project. Depending on the complexity of the utility involvement it
may be necessary to conduct periodic coordination meetings. Utility plan submittals will be
coordinated with Lake County's Utility Coordinator.
b. Pre-Final Special Provisions-We will prepare special provisions that supplement or amend
the special provisions contained in the latest edition of the Standard Specifications for Road
and Bridge Construction adopted by the Illinois Department of Transportation and the latest
edition of the Standard Specifications for Sewer and Watermain Construction in Illinois.
Applicable County special provisions will be utilized to supplement the Standard
Specifications. In addition,we will include the latest IDOT Recurring Special Provisions Check
Sheet.The most recent set of IDOT's Bureau of Design and Environment Special Provisions
and District 1 Special Provisions will be reviewed and included in the special provisions
where applicable.
c. Pre-Final Quantity Calculations-We will perform detailed quantity calculations at the pre-
final stage of the plan development.Two sets of calculations will be performed by separate
engineers in order to ensure the accuracy of the calculations.
d. Pre-Final Estimate of Cost and Construction Time-We will use the quantities of work in
order to calculate an Engineer's Estimate of Cost and Time. Estimates will be based on
recent bid tab information for projects of similar scope and magnitude.
e. Pre-Final QA/QC Review- Prior to submission of the pre-final plans for review,we will
perform an internal Quality Assurance/Quality Control review of the work completed.The
Village of Oak Brook I April 28,2017 Page 31 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
review will be performed by a professional engineer independent of the design team.The
review will consider constructability issues as well as identification of missing pay items,
quantities of work, and special provisions required.The design team will also perform a
"plan-in-hand"field check to confirm the existing conditions and design.
f. Pre-Final Project Review Meeting with Village-A project review meeting will be held with
the Village to address design issues and plan comments generated from the pre-final
contract document review.
g. Pre-Final Project Review Meeting with IDOT-A project review meeting will be held with the
Village,Tollway, Forest Preserve, and IDOT to address design issues and plan comments
generated from the pre-final contract document review.
18. Final (100°/x) Plans, Special Provisions and Estimates
a. Final Plans -After completion of all agency reviews and resolution of any other agency or
utility company concerns,the contract plans will be finalized. In order to assist the Resident
Engineer(RE) we will furnish the Village, as part of our deliverables, detailed information
including all design, quantity calculations, and microstation files in Village format. We will
also prepare a technical memorandum to the RE highlighting any key issues, commitments,
or special concerns that arose during the design stage of the project. IDOT will be
responsible for letting the project.Therefore, we will provide the Village with pdf's of the
plans and bid documents as assembled by IDOT for the Bid, as well as the number of full and
reduced size copies that they request. We will also submit the contract plans to the various
utility companies for their permitting of any necessary relocations.
b. Final Special Provisions-All comments received pertaining to the prefinal special provisions
and bid documents will be addressed and a disposition will be included in the final bid
documents. The status and schedule of all utility relocations, as of the date of the final
plans, will be included in the bid documents.
c. Final Quantity Calculations-The quantities will be updated based on changes made to the
plans after the pre-final stage.
d. Final Estimate of Cost and Construction Time-The estimates will be updated based on the
revised quantities.Cost breakdowns for different funding sources will be provided to the
County to assist in the completion of any joint agreements for construction.
e. Final QA/QC Review- Prior to the final submittal, a second QA/QC review of the plans and
special provisions will be performed.
Village of Oak Brook I April 28,2017 Page 32 of 46
North York Road/Harper Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
19. Project Administration and Coordination
a. Project Administration-This item includes project setup, monthly invoicing, preparation of
status reports, and internal project team coordination meetings.
b. Project Submittals-As noted above,we will make the necessary document submittals, and
follow through with each agency in regards to their review comments or arrange a review
meeting to discuss plan changes necessary to resolve conflicts if possible.
c. Status Meetings—if necessary,we will attend meetings with Village to discuss the status of
the project. Based on the enclosed design schedule,we have assumed 4 meetings will be
required.
d. Utility Company Coordination -As noted above,we will analyze the project for potential
impacts to existing utilities. We will provide the utility companies with a list of areas of
potential conflict so that additional information,such as horizontal locates or depth borings
can be obtained where necessary to further define the extent of conflicts.We will first
attempt to address utility conflicts through design modifications while considering the
impact those changes will have on the overall improvement. It is anticipated that utility
relocation work will be necessary to construct the proposed roadway improvements. Based
on the amount and complexity of the required utility relocation, it may be necessary to have
periodic coordination meetings with the utility companies.We have included hours to meet
four times with the utility companies. In addition,we will review the permit submittals from
the utility companies to ensure that all of the conflicts have been resolved and that the
plans are compatible with the proposed construction.
e. Bidding Assistance-We will review any questions received from contractors during the
bidding process and provide any necessary responses to clarify the documents.
f. Pre-Construction Meeting Attendance-We will attend the pre-construction meeting at
LCDOT to answer any questions regarding the design and contract documents.
20. Construction Assistance
a. Construction Shop Drawing Reviews-We will make the necessary construction shop
drawing reviews for the retaining walls and underpass structures,and follow through with
the Resident Engineer and Contractor in regard to review comments to ensure compliance
with the contract documents and the design engineer's intent. For the proposed
underpasses,shop drawing review will be performed for the metal pedestrian railings
located at the headwalls/wingwalls.
b. Construction Review and Meeting Attendance -When a problem occurs it is the
construction engineer who will utilize their critical thinking, listening, learning, problem
solving, monitoring and decision making skills to create and enact a solution. Civiltech will
Village of Oak Brook I April 28,2017 Page 33 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
be a resource to the construction engineer for them to seek further clarification to confirm
the interpretation of a detail, specification or note on the construction drawings or to secure
a documented directive or clarification that is needed to continue work.
B. Phase III Engineering
Civiltech's team will accomplish the goal of providing the excellent Resident Engineering Services we
are known for by using our typical project approach, which has brought us success on our past
projects. Our project scope will be divided into three parts:
1. Pre-Construction
2. Construction
3. Completion with Final Papers
1. Pre-Construction
a. Plan Review—Civiltech will perform a detailed constructability review of the plans and
special provisions to determine if there are any potential conflicts that could be addressed
and resolved before construction, and those changes will then be incorporated into the final
engineering documents. Plan quantities and the viability of the Maintenance of Traffic plans
are areas we thoroughly investigate to ensure a workable project.
b. Stakeholder Coordination—We will initiate and continue coordination with all stakeholders
in the project including businesses, developers and their contractors, utilities, other
agencies, and property owners. Pre-project field meetings will be held with any of the above
mentioned entities necessary to resolve potential issues and keep them fully informed.All
concerned parties would be encouraged to attend the Pre-construction Meeting which we
could chair if needed.
c. Contractors and Contacts—A list of names, addresses, and telephone numbers(especially
24 hour emergency contact numbers)will be compiled and maintained for all contractors,
subcontractors, material suppliers, and any others pertinent to the project.We will make
recommendations to the Village regarding the suitability of the proposed subcontractors.
d. Traffic Staging Review—The staging and maintenance of traffic drawings will be reviewed as
they relate to field conditions. We will forward our comments to the contractor highlighting
concerns that may limit traffic moving safely while the contractor has enough room to work.
Village of Oak Brook I April 28,2017 Page 34 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook,Illinois
e. Field Review—We will thoroughly investigate the field conditions of the project exposing
conflicts so that the proposed improvements can be constructed without them.The
geometric control points will be set at this time as well.The erosion and sediment control
plan will be reviewed to make certain that the proposed measures will be effective in the
field, and we will confirm that the Notice of Intent has been completed and submitted to
the Illinois Environmental Protection Agency.
f. Initial Documentation—Field books, quantity book, diary,and all other forms of proper
project documentation will be set up per IDOT Documentation Standards. Existing
conditions photos will be taken. Important submittals will be requested from the contractor,
and they will be required to show those submittals on their proposed schedule.
g. Progress Schedule Review—We will review the contractor's proposed schedule for
constructability,to verify that all controlling as well as major items, are shown within the
context of the staging,and whether it is reasonable as compared to our experience with
production rates.
2. Construction
a. On Site Inspection—Civiltech will perform all on-site inspection of the contractor's work and
operations enforcing compliance with the plans and specifications.Any variations found will
either be corrected or a sound solution will be formulated and forwarded to the Village for
approval.
b. Individual Item Inspection—Our project team has a vast amount of experience in bridge
reconstruction work.We will conduct a pre-pour meeting to establish the best practices
with the contractor reviewing the proper equipment needed,size of crew, rate of
installation, and all other requirements including curing.Among all the requirements,we
will focus on proper equipment especially the paver to ensure a smooth surface.The
underground work will be closely coordinated with the contractor and utilities,our abilities
in this type of work will be evident as unknown conflicts that arise are quickly resolved. We
are well versed in the installation of traffic signals, both permanent and temporary. Our
abilities are enhanced by the powerful backup team of designers who are available should
questions arise.
c. Layout Verification—Our resident engineer or surveyor will verify the contractor's layout
staking and their interpretation of the grades. Before any material is placed,a final review
Village of Oak Brook I April 28,2017 Page 35 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
will be made checking that the proposed lines and grades have been met, make sense,and
all transitions are smooth.
d. Material Testing and Quality Assurance—It is understood that the contractor will be
performing Quality Control for the materials incorporated into this project. We will provide
Quality Assurance for material inspection at HMA and PCC plants with our sub-consultant
Midland Standard Engineering&Testing, Inc. Reports will be completed daily. Our IDOT
Level II trained resident engineer and assistant or our sub-consultant will perform the on-
site QA material testing. We have the knowledge and capability to respond quickly to any
material problems that may arise. We will keep in constant communication so
recommendations for changes if needed can be submitted and approved without delaying
the project. Landscaping items will be coordinated with the Village's representative. As
always,any items lacking proper inspection from the contractor will be measured, but not
paid.We will deliver updated holdback reports to the contractor so they know what is
deficient and can re-familiarize themselves with what we have already instructed them is
required for payment.
e. Project Documentation—Civiltech will document all project activities daily in the diary,field
books, and inspectors' daily reports using IDOT Documentation Procedures. Weekly reports
of the project's progress will be forwarded to the Village of Oak Brook and the contractor.
These weekly reports will be one of the tools used to review the progress of the work with
the contractor and what should be done to stay on schedule. Measurements of work
completed will be documented daily, posted to the quantity book, and when possible,
agreed to with the contractor.
f. Contract Changes—No substantial changes in contract work or quantities will be done
without the prior approval of the Village of Oak Brook. We will investigate the reason for
any change and forward our recommendations to the Village for approval. As the Village's
representative and as part of our construction engineering services,our resident engineer
will make decisions and interpretations regarding the improvement that do not substantially
increase the cost or negatively affect its overall quality. We will keep the Village informed of
these decisions and, as mentioned above, seek their opinion on items that will impact the
overall projects. Actual authorizations for change orders will include all necessary items and
detailed reasons.We will maintain a record of the dollar total for all changes and provide
direction toward keeping the costs within the budget.
Village of Oak Brook I April 28,2017 Page 36 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
g. Pay Estimates—Pay estimates will be compiled regularly as a reasonable amount of work is
completed,typically on a monthly basis.Only items that have been measured and
thoroughly checked in the quantity book and IDR's will be placed on the estimates.The
contractor will have an opportunity to review them as well before processing, but as stated
before, no item will be paid without the proper material inspection.
h. Erosion Control Inspection—Correct installation for all erosion and sediment control
measures per the approved plan will be verified.The measures will be inspected weekly or
after rain events. Incidents of Non-compliance will be documented and forwarded to the
contractor for immediate repair and the IEPA. We will be adamant about the protection of
sensitive areas, and maintain close contacts with representatives from the US Army Corps of
Engineers and the Soil &Water Conservation District.
i. Submittal Review—Important submittals will be required from the contractor early on in the
project and repeatedly requested if they are not received in a timely fashion. We will review
them, return them to the contractor for any revisions,and forward them to the Village with
our recommendations for approval.A status file of submittals will be maintained for tracking
purposes, and we will verify that what is shown in the approved submittal is incorporated
into the project.Any contractor requests for information or changes will also be reviewed
and recommendations given to Village.
j. Traffic Control Inspection—Civiltech will review the traffic control for correct installation.
We will look for and enforce not only compliance with the traffic control standards, but
keep an eye towards how it appears to the everyday motorists. It should be clear where to
safely travel.The traffic control will be inspected at least twice a day and in actuality
whenever we travel through the project. Night inspections for verifying equipment
reflectivity, steady-burn light outages, striping, and after hours traffic safety will be
performed regularly. We will keep the Village of Oak Brook and the contractor informed of
the traffic control status daily,document any deficiencies,and forward them onto the
contractor for immediate action. Should the contractor fail to correct the deficiencies in a
timely manner,they will be charged damages per the contract.
k. Stakeholder Coordination/Progress Meetings—We specialize in coordination between
multiple entities, and we will conduct progress meetings during construction to help achieve
the common goal of a successful project. More details of how we accomplish this task are
described in the Project Coordination Section.
Village of Oak Brook I April 28,2017 Page 37 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase 11 and Phase III Engineering Services
Village of Oak Brook, Illinois
3. Completion with Final Papers
a. Final Phase—Civiltech will monitor the project throughout the punch-list period and forward
to the contractor for correction any safety concerns that may arise such as traffic control.
We will ready our forces and continue coordination much like it was described in the pre-
construction portion of this proposal.
b. Contractor's Punch-list—We will enlist items from all those involved with the project. Then,
after our detailed inspection and the Village of Oak Brook's full input, we will produce a final
punch-list for the contractor to finish before the project will be considered complete.
Constant communication and follow up with the contractor will be performed to ensure that
all items and stakeholders are satisfied with the completed work. Only when all punch-list
items are completed will we make recommendations to the Village concerning final
acceptance.
c. Final Inspection—The final inspection for the project will be held when all items of the
punch-list have been completed. We will conduct the final inspection with all interested
parties present, most importantly the Village's representatives. Separate final inspections
will be held when required by other agencies such as IDOT regarding the traffic signal turn
on or lighting. The project's Notice of Termination will be completed and forwarded to the
IEPA.
d. Final Documentation—All pay items will be final measured, calculated, and checked.They
will be marked and posted as final on the IDR's and in the quantity book. We will provide all
backup documentation as well as the necessary cross referencing so the final quantities are
clear and can be easily verified.
e. Record Drawings—The contractor's record drawings will be reviewed for accuracy and all
dimensions shown will be verified. We will also provide a detailed set of"As Built" drawings
for the Village's permanent records. All changes will be noted and the drawings will be
reproducible.
f. Material Certification—We will work closely with the contractor to resolve all the material
deficiencies that may still be present on the holdback reports. Any material inspection
required for quality assurance will be reviewed for accuracy and completeness. We are
committed to resolving all material deficiencies. However, if after we do all we possibly can
to help, and the contractor still cannot provide what is needed,those deficient items will
not be paid.
Village of Oak Brook I April 28,2017 Page 38 of 46
CIVILTECH
Mimi
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
g. Final Pay Estimate—Only after all final measurements have been verified and material
inspection assured will we create the final pay estimate and forward it to the Village for
approval.
h. Project Records—Civiltech will compile all the project records in an orderly fashion.They
will be labeled, arranged, and a table of contents provided for easy review.The completed
set of records will be promptly submitted to the Village of Oak Brook.
III. Qualifications
A. Civiltech Engineering's Unique Qualifications
Civiltech Engineering was formed in 1988 to provide civil consulting engineering services to
governmental agencies and private sector clients. We have two offices, one in Itasca and one located
within the City of Chicago. We specialize in the areas of transportation planning,traffic and
transportation engineering, highway design, water resources, structural engineering, construction
engineering, municipal engineering, and appraisal services.
In the 28 years since Civiltech was founded,we have grown to a staff of over 90 people,which includes
66 engineers (44 of which are registered Professional Engineers), 7 registered Professional Traffic
Operations Engineers, 1 registered Structural Engineers, and 3 LEED Green Associates.
Civiltech Engineering provides engineering services for Federal-aid projects ranging from Surface
Transportation Program (STP) and Congestion, Mitigation, and Air Quality(CMAQ) roadway, bridge,
bicycle and pedestrian improvements for municipalities to major arterial highway and interchange
improvements for county transportation departments,the Illinois Department of Transportation (IDOT),
and the Illinois Tollway. A copy of our prequalification statement is included in Attachment A and
Statement of Qualifications is provided in Attachment B.
Civiltech brings an excellent reputation for engineering services as well as a list of satisfied clients. We
have assembled a team that,with the support of our qualified subconsultants, will accomplish the
engineering services needed by the Village of Oak Brook.The proposed Civiltech team offers the
following:
• Our staff is taught to first ask how each project is different from the last assignment, rather than
how it is the same.
Village of Oak Brook I April 28,2017 Page 39 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase 11 and Phase 111 Engineering Services
Village of Oak Brook, Illinois
• Civiltech has an outstanding established relationship with the Illinois Department of
Transportation in District 1 through the completion of over 35 Federal-aid projects over the past
five years.
• We are fortunate to have a strong county and municipal client base,from which we constantly
learn and share innovative ideas and experiences with each new project.
• Our emphasis on creativity can often lead to innovative, yet practical and cost effective
solutions.
• We provide a team of professionals who are experts in every facet of the services we provide.
• Our staff has a "sense of urgency" in completing projects.
• We retain ownership of our submittals once they leave our office by staying in touch with
review agencies in order to move projects along.
• Civiltech has the ability to commit qualified teams of individuals whose goal is to successfully
complete projects and build long-term relationships with their clients.
B. Representative Project Experience
Examples of the vision and creativity that we bring to the Phase I Engineering process, as well as our
ability to find innovative solutions can be found in the project profiles contained in Attachment C. We
have chosen these projects because they involved challenges similar to those that may be encountered
on the York Road/Harger Road Intersection Improvement Project.The project profiles contain
descriptions of these projects as well as client contacts that are familiar with the services we provided
and our performance. We encourage the Village to contact these references in order to obtain an
assessment of our capability, adherence to project schedule and budget, and the quality of our work.
C. Project Staff Qualifications
Our ability to successfully complete projects on time and within budget lies in the experience and
capabilities of the staff assigned to a particular project. Our staff has direct relevant experience with
projects involving the same design elements that will be part of this project. Our experience is not only
relevant,it is also recent,which is important when implementing Federal-aid projects.
Following is a brief summary of the staff we have identified as playing key roles during the
implementation of these projects. All of the key staff members listed below maintains active
Village of Oak Brook I April 28,2017 Page 40 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
professional engineering licenses in the State of Illinois. Resumes of these individuals are also included
in Attachment D.
1. Proposed Phase I Staffing
Mary L.Young, P.E., PTOE will serve as the Senior Project Manager and provide
Quality Control/Quality Assurance for this project. She is Civiltech's Director of
Traffic, Environmental, and Design Studies. Mary brings 25 years of experience in
traffic and transportation engineering as well as environmental and location-
design studies for projects ranging from simple intersection improvements to
major roadway corridor projects. She has completed more than 50 Phase I
engineering studies funded as part of the Surface Transportation Program. She
also has had extensive training in the National Environmental Policy Act
procedures and methodologies and is prequalified by IDOT to perform
Environmental Impact Statements.
James R.Woods, P.E., PTOE will serve as a Project Manager and has 19 years of
Phase I engineering experience. His specialties include Phase I studies,
k
preliminary roadway alignment and geometric design,traffic data collection and
analysis, preparation and reviews of traffic impact studies, and traffic noise
analyses. He has been involved in the successful completion of over 25 Federal-
aid Phase I Studies, 10 Feasibility Studies, and over 40 Traffic and Traffic Impact
Studies. Currently,Jim is engaged in geometric,traffic and environmental
analyses on Civiltech's Phase I study for the reconstruction of North Lake Shore
Drive in the City of Chicago. Jim will be the primary contact with the Village, IDOT,and other agencies
throughout the Phase I process and will ensure that all disciplines adhere to the project schedule and
budget.
Jennifer M. Hyman, P.E. will serve as a Phase I Project Engineer.ten has been
employed at Civiltech for 6 years after receiving her Master's Degree in Civil
Engineering in 2011.Jen's work experience has included assistance in the
preparation of environmental and location-design studies. She has specialized in
crash analyses,geometric design, environmental analyses, public involvement,
and report preparation.
Village of Oak Brook I April 28,2017 Page 41 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
2. Proposed Phase II Staffing
Jonathan R.Vana, P.E.would serve as the Senior Project Manager, and is the
Director of Design Services at Civiltech. He has 20 years of experience in the
implementation of major highway and roadway improvements for IDOT,the
Illinois Tollway, and Counties and Municipalities in DuPage, Lake, Cook, Kane,
McHenry and Will Counties. His expertise includes projects utilizing federal
funding, and has overseen 20 Federal aid projects over the past three years for
various State, County and Municipal clients, and has developed an excellent
relationship with the IDOT Bureau of Local Roads and Streets and Bureau of
Land Acquisition. Although the Phase I and Phase II Project Managers will be the
primary contacts with the Village,Jon is highly engaged in all of Civiltech's design projects, and will
provide the foresight and guidance to navigate the complex Federal-aid project approval process,
oversee the work being performed and provide QC/QA reviews of the design team's work.
Reid T. Magner, P.E.will serve as the Phase II Project Manager, and has 17
years of experience. Mr. Magner has served as Project Manager and Engineer
f' for numerous State, County and Municipal projects utilizing Local, Federal and
MFT type funding. He has extensive experience with the design of local agency
Federal aid projects that involved functional overlay design, bicycle/pedestrian
facilities design, including alternatives analysis projects. He has served as
Project Manager on 7 Federal-aid projects in the last three years and has
gained substantial experience processing projects through the IDOT Bureau of
Local Roads and Streets. He recently completed the design of the$17 million
Quentin Road reconstruction project as well as several pedestrian over/underpasses for the Lake County
Forest Preserve District.
Petro Kravets,P.E. has 8 years of experience with the Phase II design of various municipal and county
projects in the Chicagoland region as a Project Engineer. He is a very detail oriented engineer, and has
demonstrated an exceptional ability to understand and coordinate the various project elements
including roadway,drainage,water main, structures,traffic signals, lighting and right-of-way. He is
experienced with geometric design as well as the preparation of the detailed P, S& E for roadway
rehabilitation and reconstruction improvements.
Village of Oak Brook I April 28,2017 Page 42 of 46
CIVILTECH
_J
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I,Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
3. Proposed Phase 111 Staffing
James D.Ewers, P.E.serves as the Construction Department Head for our firm
and would be the Project/Quality Assurance Manager for this project. He will
R}; make himself available to discuss questions with design plans and specifications,
sW attend progress meetings, make regular visits to the jobsite,oversee staffing
requirements, prepare monthly invoicing and project budgets,and ensure that
all project documentation is properly prepared and submitted to the Village for
final acceptance. He will remain available at any time for meetings with the
Village staff or construction personnel. Perhaps Jim's most valuable addition to
IDOT Let projects is his ability to ensure that our clients receive all the available
benefits using his knowledge of the internal IDOT system.
Donald J. Marek has been a Resident Engineer with Civiltech from the beginning,and employed in
consulting engineering for 30 years. He is well versed in all inspection and layout needs. His [DOT
certification includes: Documentation of Contract Quantities, ICORS, Bituminous and Concrete Level I.
Don has a vast knowledge in the field of construction and maintains meticulous documentation. He has
successfully completed IDOT documentation and final paperwork on several federally funded
improvements as well as a Will County project. Don has experience with projects of all sizes,and is
excellent at ensuring contractor coordination.These projects have most recently included the$7.5
million reconstruction of Caton Farm Road for Will County,the$2 million Federal Aid pedestrian/bike
bridges in the Village of Oakbrook,the reconstruction of the$6 million Federal Aid Calumet Station
Intersection in the Village of East Hazel Crest,the$7 million Federal Aid concrete reconstruction of
Deerfield Parkway in the Village of Buffalo Grove,the$4 million 107th Street bituminous reconstruction
project for Cook County,the$1 million 95th Street Parking Lot for the City of Naperville,the$2.7 million
intersection reconstruction of Essington/Hennepin Roads for Joliet, and the$1.0 million 1-290 @
Beisterfield Interchange improvement for Elk Grove Village. He has a friendly personality which helps
promote communication with the residents and business representatives of a project. Don knows the
value of advance notice for residents,and his system for notification whether by door hangers,
handouts, or personal contact has been proven again and again to keep residents happy.
If at certain times the amount of project activity dictates, Civiltech will provide an experienced inspector
to assist with field duties and the extensive documentation. The Resident Engineer and Project Manager
will be responsible for when and how long to bring in additional inspection personnel. It is with
thoughtful project staffing that we are able to provide the high quality construction engineering that the
Village has come to expect from Civiltech while still staying within the budget.
Village of Oak Brook I April 28,2017 Page 43 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
Samuel C. Moscatello will be responsible for providing construction layout verification. He has been
performing construction layout for many years. He has a great sense for construction staking which
results in his catching discrepancies in grades and alignment before they are built. Sam will be on site
only as needed to perform construction layout.
C. Proposed Sub-Consultants
Following is a listing of the proposed Subconsultants for each Phase of this project. Each subconsultant
is shown in the Team Organization Chart in Attachment D. Please see Attachment E for scopes of
services and fee estimates for each subconsultant.
1. Proposed Phase I Subconsultants
• Jorgensen and Associates, Inc.will perform topographic survey services as described in Item 2
of the Phase I Scope of Services.
• Midland Standard Engineering and Testing, Inc.will perform geotechnical investigations as
described in Item 6 of the Phase I Scope of Services.
• Stuedemann Environmental Consulting, LLC will perform wetland analyses and preliminary
environmental site assessment for this project as described in Items 7 and 8 of the Phase I Scope
of Services.
2. Proposed Phase 11 Subconsultants
• Jorgensen and Associates, Inc. will perform follow-up topographic survey services as described
in Item 4 of the Phase II Scope of Services.
• Stuedemann Environmental Consulting, LLC will perform Special Waste/CCDD analyses as well
as Wetlands Permitting services as described in Items 7 and 8 of the Phase II Scope of Services.
3. Proposed Phase III Subconsultants
• Midland Standard Engineering and Testing, Inc.will perform materials quality assurance testing
as part of the Phase III portion of this project.
Village of Oak Brook I April 28,2017 Page 44 of 46
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase I, Phase II and Phase III Engineering Services
Village of Oak Brook,Illinois
IV.Anticipated Project Schedule
We have prepared the project schedule included in Attachment F.The schedule is based on the
intersection improvement and the underpass construction.We have assumed that this engineering
proposal will be will be able to start at the beginning of June 2017. Because of the necessary approvals
(Village,Tollway, and IDOT)we believe it could be difficult to design and permit the project in time to
complete all of the construction in 2019. However, it is be possible to let the project in early to mid-
Summer of 2019.This will allow some advance work to be completed in 2019, including any potential
detention basin grading, bike path construction, underpass construction, and retaining wall
construction. Once these items are completed,temporary pavement could be constructed which would
allow the roadway work to begin in the early Spring of 2020. All of the roadway construction would then
be completed by the end of 2020.
V. Cost Estimate of Consultant Services
In order to calculate our"not-to-exceed"fee,we estimated workhours to complete the individual tasks
outlined in the Phase I and Phase II Scope of Services sections of this proposal. Our approved MOT
overhead rate for fiscal year ending December 31, 2016 is 117.34%. Using this approved IDOT overhead
rate and the IDOT profit formula results is an overall billing factor of 2.49.
Compensation for our work will be based upon actual labor dollars expended times a factor of 2.49 to
cover actual payroll, overhead and indirect costs, payroll burden and fringe benefit costs and profit.
Direct costs such as printing,vehicle expenses,and sub-consultant expenses will be billed at their actual
cost. Please reference the Cost Estimate of Consultant Services and workhour/direct expense
calculations in Attachment G.
Our proposed maximum "not-to exceed"fee is as follows:
• Phase I Engineering:$275,100.89
• Phase 11 Engineering:$351,278.41
Regarding a fee estimate for Phase III Engineering,an accurate Construction Engineering estimate of fee
is only possible when the plans and duration of the improvement are actually prepared. Without having
those items,the best estimate we can determine is by using some simple past experience percentages
of the estimated construction cost. Construction Engineering fees usually fall in around 10%to 12%of
the estimated construction cost for a project of this size. Once the plans and project duration are
available,we calculate our Construction Engineering fee using the following method.
Village of Oak Brook I April 28,2017 Page 45 of 46
CIVILTECH
North York Road/Harger Road Intersection Improvement
Proposal to Furnish Phase 1,Phase II and Phase III Engineering Services
Village of Oak Brook, Illinois
Based on our knowledge of the improvement and experience with similar projects,we will typically
prepare an Anticipated Schedule of Contractor's Construction Work. We have found that using an
anticipated contractor's schedule is an extremely valuable tool for viewing the project as it should
unfold and estimating the time required to provide the proper level of inspection and documentation.
We are able to more effectively estimate the amount of staff required to perform construction
engineering using this type of schedule. The quantities from the plans will be consolidated into major
items that are shown through the duration of the project. This schedule would then serve as the basis
for our construction staffing and calculation of the estimated hours needed. We will provide full time
inspection throughout the duration of the project. Project Manager hours will be estimated at two (2)
hours every week which will include attendance at progress meetings, assistance in plan interpretation,
and correspondence. Direct costs for Phase III will be billed at their actual cost. They include the cost of
a vehicle which will be billed at the rate of$55.00 per day, any required sub-consultants, printing, and
photography expenses.
Village of Oak Brook I April 28,2017 Page 46 of 46
CIVILTECH
Client
Municipalities
Village of Addison City of Elgin Village of Johnsburg Village of Palatine
Village of Arlington Heights Village of Elk Grove Village Village of Lake Barrington Village of Park Forest
City of Aurora City of Elmhurst City of Lake Forest City of Park Ridge
Village of Barrington City of Evanston Village of Lemont Village of Plainfield
City of Batavia Village of Evergreen Park Village of Libertyville Village of Richton Park
Village of Bensenville Village of Flossmoor Village of Lisle Village of Robbins
Village of Berkeley Village of Fox Lake City of Lockport Village of Romeoville
Village of Bloomingdale Village of Franklin Park Village of Lombard Village of Schaumburg
Village of Bridgeview Village of Glendale Heights City of McHenry Village of Shorewood
Village of Buffalo Grove Village of Glen Ellyn City of Marengo Village of South Holland
Village of Bull Valley Village of Glenview Village of Matteson Village of Sugar Grove
Village of Carol Stream Village of Grayslake Village of Monee Village of Vernon Hills
Village of Cary Village of Gurnee Village of Morton Grove Village of Villa Park
Cicero Township Village of Hanover Park Village of Mount Prospect City of West Chicago
City of Country Club Hills Village of Hazel Crest Village of Mundelein Village of Westmont
Village of Crete Village of Hinsdale City of Naperville City of Wheaton
City of Crystal Lake City of Highland Park Village of Niles Village of Wilmette
Village of Deer Park Village of Hoffman Estates Village of Northbrook Village of Winnetka
Village of Deerfield Village of Homewood Village of Oak Brook Village of Winfield
City of Des Plaines Village of Huntley City of Oak Forest Village of Woodridge
Village of Downers Grove Village of Itasca Village of Orland Park City of Woodstock
Village of East Hazel Crest City of Joliet Village of Oswego
State A County Agencies
Cook County Highway Department Lake County Division of Transportation
DuPage County Division of Transportation Lake County Forest Preserve District
Forest Preserve District of Cook County Lake County Public Works Department
IDOT,Districts 1,2,3,6&8 McHenry County Division of Transportation
IDOT,Division of Public Transportation Regional Transportation Authority
Illinois Tollway Will County Department of Highways
Kane County Division of Transportation
Other Public Agencies & Associations
Addison Fire Protection District Huntley Park District
Addison School District#4 Libertyville High School District#128
Arlington Heights School District 25 Palatine Public Library
Bloomingdale Fire Protection District Palatine Fire Protection District
Chicago Department of Transportation River Forest School District 90
Chicago Park District South Suburban Mayors&Managers Association
Chicago Zoological Society United States Postal Service
College of DuPage Vernon Township
Crystal Lake Park District Villa Park Fire Department
Private Sector Clients
Abbott Laboratories Chicago Academy of Sciences The Jenkins Group Pulte Home Corporation
Albin Carlson&Co. Edward Hospital Lakewood Homes St.Michael's United Church
Aldridge Electric Co. Fifth/Third Bank Lennar Communities of Chicago Staubauch Retail Services
Allstate Insurance Company Ford Motor Company The Levy Organization Town&Country Homes
Andrew Corporation Grand Investors Mission Hills United Land Development
Ashley Capital Great Lakes Principals Motorola,Inc. Van Vlissingen&Co.
The Cuneo Trust Hamilton Partners Oxford Bank&Trust Walsh Construction
Cypress Equities,Inc. Harding Partners Poag&McEwen Lifestyle Centers Western Industries
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
CWILTECH Village of Oak Brook I April 28,2017
Attachement C
IDOT Pr(-)qt ialificat6 i
St��1eny��rf! r)i G lalifi(;d io ns
Representative Project Experience
Team Organizational Chart and Resumes
Anticipated Project Schedule
Cost Estimate of Consultant Services
North York Road/Harger Road Intersection Improvement
CH CAqLTE
Village of Oak Brook I April 28,2017
Phase I
CIVILTECH
Rockland Road Phase I Study
Village of Libertyville I Libertyville Township Highway Department
Construction Cost Township Jurisdiction w ,
$5.9 million(est.)
Funding
Federal(STP),Local Match
Status
Phase I Completion Summer 2017
Project Manager
James R.Woods,P.E.,PTOE
Project Engineer
Jennifer M.Hyman,P.E. '
Design Engineer
Jenny J.Gantumur
Drainage Engineer The Village of Libertyville and the Libertyville Township Highway Department are
Thomas K.Liliensiek,P.E. planning the reconstruction of Rockland Road between IL Route 21 (Milwaukee
Avenue)and St.Mary's Road,a total distance of approximately 1.4 miles.The Des
Scope of Services
Traffic Analysis Plaines River lies at the approximate mid-point of the project,with the Village
jurisdiction to the west and the Township jurisdiction to the east.The bridge over the
Crash Analysis river is a project omission and will be studied as part of a future Phase I project.
Geometric Studies
The
Public&Stakeholder Involvement Des Plaines River Trail runs north-south along the east side of the river through
the Des Plaines River Greenway,a Lake County Forest Preserve facility,and crosses
Project Development Report Rockland Road at-grade via a mid-block marked crosswalk.
Interagency Coordination
Rockland Road is a two-lane major collector street that carries approximately 6,000
Client Contact vehicles per day,and it is signalized at the west and east terminus intersections.The
Fred Chung,P.E. Village jurisdiction is an urban cross-section with curb and gutter and an enclosed
Senior Project Engineer drainage system.Resurfacing projects over the past few decades have resulted in the
Village of Libertyville concrete gutter being overlaid resulting in only an inch or two of curb height remaining.
118 W.Cook Avenue
Libertyville,IL 60048 The roadway will be reconstructed in place as the pavement has reached the end of its
847.247.5435 design life.A new storm sewer trunk line will drain the roadway as well as provide relief
fchungpalibertyville.com for a residential stormwater Hooding problem toward the west end of the project.In
addition,the project will replace an aging water main trunk line.
Marty Neal
Highway Commissioner Within the Township jurisdiction,the existing roadway is a tree-lined 24-foot paved
Libertyville Twp.Highway Department rural cross-section drained by open ditches and swales.It has also reached the end of
343 Merrill Court its design life.Over the years,there have been resident requests for better pedestrian
L I
Libertyville, 60048
8L .3350 and cyclist access to the Des Plaines River Trail.Several alternatives were evaluated,
highwaydepartment@libertyvilletownship.us including a shared-use path,wider bicycle-friendly shoulders,and an urban cross-section
with curb and gutter and bike lanes.As a result of technical analyses and feedback
received at a neighborhood meeting facilitated by Civiltech,and due to the limited right-
of-way(66 to 80 feet),the Township has chosen to construct four-foot bike-friendly
shoulders as part of the proposed improvement.
A Public Involvement Meeting was held in March of 2017,and a Final Project
Development Report is being prepared for anticipated design approval in the summer
of 2017.
www.civiltechinc.com
'1
Mehit EkaliW \ yy
Ak
\\ /
PoWNN Tenp—y Ewe W /
xg
�A {N"" \ 2'111'Taper TIMBER--OEED PO
M"- < \ --.---—J— �-
Nelda Ex�xnp
., JAk,Emma
974 F�del�np RefelMre WeA
f>„
T�Re RemwM MReplecaC
Pmvge Shsxhx F tUFOV1 �
PNOeleeherlor 1 Sherodl)w PeIe BY,OIM�a
P ivas�C
=RgM Tum lane m L'.
710'Taper
218r ft" S 6�
----------- ..
....-. '-_.-
f
Aaetdi ExMlrg __
Q '
�n
e'McE1ngB Ip EAge) - —' �-- w _ .._ ^ ..
RAMPTOEB
ROOSEVELT ROAD
- Rmpoeed T e Signal
4qp Brldga reconstruction to be completed by the TW1�wwa�yy � \ /�P"""""axe0�°°°`
with l/lns0e paAicipation under a separate contract
The srmpe and=for this work is not Included 114
In this STP application.
��,�1 C1___"'�-�` \ q ••�_ NMA Y..Road .,,r Road
��, I `_ ""11��r � i 1%9-�`F \ mieraeaim imorosmem
PROPOSED INTERSECTION
C�/ \\ CONCEPT PLAN
— GgLYCVI _
Exhibit A
North York Road/Harger Road Intersection Improvement
CIWLTECH Village of Oak Brook I April 28,2017
Attachement A
MOT Prequalification Letter
1,( rfl (, (7)( 1'11ific l flit ;i
Representative Project Experience
Team Organizational Chart and Resumes
Anticipated Project Schedule
Cost Estimate of Consultant Services
Illinois Depadnvot of Tr�a WULM
2300 South Dirksen Parkway l Springfield, Illinois 162764
November 4, 2016
Subject: PRELIMINARY ENGINEERING
Consultant Unit
Prequalification File
Jonathan Vana
CIVILTECH ENGINEERING, INC.
450 E Devon Ave.
Suite 300
Itasca, IL 60143
Dear Jonathan Vana,
We have completed our review of your"Statement of Experience and Financial
Condition" (SEFC) which you submitted for the fiscal year ending Dec 31, 2015.
Your firm's total annual transportation fee capacity will be $33,600,000.
Your firm's payroll burden and fringe expense rate and general and administrative
expense rate totaling 117.34% are approved on a provisional basis. The rate used
in agreement negotiations may be verified by our Office of Quality Compliance and
Review in a pre-award audit.
Your firm is required to submit an amended SEFC through the Engineering
Prequalification & Agreement System (EPAS) to this office to show any additions or
deletions of your licensed professional staff or any other key personnel that would
affect your firm's prequalification in a particular category. Changes must be
submitted within 15 calendar days of the change and be submitted through the
Engineering Prequalification and Agreement System (EPAS).
Your firm is prequalified until December 31, 2016. You will be given an additional
six months from this date to submit the applicable portions of the "Statement of
Experience and Financial Condition" (SEFC) to remain prequalified.
Sincerely,
Maureen M. Addis
Acting Bureau Chief
Bureau of Design & Environment
SEFC PREQUALIFICATIONS FOR CIVILTECH ENGINEERING, INC.
CATEGORY STATUS
Hydraulic Reports-Waterways: Complex X
Hydraulic Reports- Pump Stations X
Location Design Studies - Reconstruction/Major Rehabilitation X
Location Design Studies- Rehabilitation X
Special Studies- Safety X
Environmental Reports -Environmental Assessment X
Special Studies -Traffic Signals X
Structures- Highway: Advanced Typical A
Special Services - Construction Inspection X
Special Studies- Location Drainage X
Location Design Studies- New Construction/Major Reconstruction X
Highways - Freeways X
Special Studies - Lighting: Typical X
Structures - Highway: Simple X
Structures - Highway: Typical X
Highways - Roads and Streets X
Special Studies- Feasibility X
Hydraulic Reports -Waterways: Typical X
Special Studies-Traffic Studies X
Environmental Reports -Environmental Impact Statement X
X PREQUALIFIED
A NOT PREQUALIFIED, REVIEW THE COMMENTS UNDER CATEGORY VIEW FOR
DETAILS IN EPAS.
S PREQUALIFIED, BUT WILL NOT ACCEPT STATEMENTS OF INTEREST
North York Road/karger Road Intersection Improvement
Village of Oak Brook I April 28,2017
Attachement B
11101- Pre.qupflificalion Lefler
Statement of Qualifications
Representative Project Experience
Team Organizational Chart and Resumes
Si ih(;onsultarii C t jAificatir)i is
Anticipated Project Schedule
Cost Estimate of Consultant Services
CIVILTECH
CIVILTECH ENGINEERING, INC.
Since 1988,Civiltech has been committed to providing top quality
consulting engineering services in Illinois.Through the years,we
have earned a reputation for professional excellence and integrity.
.�a.._•
Civiltech specializes in a full range of civil engineering services including:
• Transportation
• Civil ..
• Constructions'%
• Environmental
• Water Resources
• Structural `
• Appraisal
The growth of our company is a direct result of our employees,who are • f
dedicated to their job by implementing the latest technology and pursuing
professional development. We have over 85 employees devoted to t ;
transportation,which include: '
• 44 Licensed Professional Engineers ,,��:k, � - ;,; .
• 1 Licensed Structural Engineer
• 7 Certified PTOEs
• 3 LEED Green Associates
• 1 Licensed Appraiser Office locations
1 Certified Floodplain Manager ppy�
• iY a LaKe
We have offices in: ®bsca Michigan
• Itasca(Corporate Location) Chicago
• Chicago
We have established many relationships with clients in the Chicagoland ! r
area including:
Municipalities Itasca
• Munici
P Two Pierce Place,Suite 1400
• State and county agencies Itasca,IL 60143
• Other public agencies and associations
• Private sector Chicago
30 N LaSalle St,Suite 2624
Chicago,IL 60602
Civiltech Engineering,Inc.is licensed to do business in the State of Illinois and is a private corporation
CIVILTECH
Statement
of - -
Qualifications
a
CL
Civiltech Engineering is a civil and transportation engineering
t consultant partnering with public and private sector clients in the
✓� n
gChicagoland area since 1988.
l:
0
F- d
'c
a Through technical excellence,responsive service,close
communication,assured quality and local knowledge,Civiltech's
multi-disciplinary team develops innovative planning,design and
construction solutions.
Civiltech realizes that success lies in the individual service and
attention we provide to our clients.Civiltech contributes to this success
by completing projects in a timely manner and within budget.
www.civiltechinc.com
OWLTECH
■
Description
o •
services
Traffic Engineering Construction Engineering
Crash Analyses and Safety Studies Construction Inspection
Traffic Modeling and Simulation Documentation
Traffic Impact Studies Project Management
Feasibility Studies Scheduling
Intersection and Interchange Design Studies Materials Coordination
Neighborhood Traffic Management and Traffic Calming Utilities Coordination
Quality Control
Expressway and Highway Design Constructability Reviews
Freeway and Tollway Design Construction Layout
Arterial Highway Design Project Communication-Website Development&Hosting
Construction Staging and Traffic Management Plans
Drainage and Utility Design Environmental and Design Studies
Highway Lighting Environmental Impact Statements and Assessments
Location and Design Studies
Traffic Signals and Intelligent Project Development Reports
Transportation Systems Location Drainage Studies
Traffic Signal Design Highway Noise Analyses
Signal System Design Context Sensitive Solutions
Surveillance and Communication Systems Public Involvement Programs
Municipal Engineering Design Visualizations
Pavement Management Water Resources
Street Rehabilitation and Reconstruction Design Drainage and Utility Design
Grant Applications and Federal-Aid Project Implementation Storm Sewer and Detention Basin Design
Pedestrian and Bicycle Facilities Design Culvert and Bridge Hydraulic Structures Design
Storm Drainage Studies and Design Bridge Scour Evaluations
Water and Sewer Systems Bank Stabilization
Sewer System Rehabilitation and Replacement Floodplain Permitting and Analysis
Traffic Signals and Signal Systems Hydrologic and Hydraulic Modeling and Analysis
Street Lighting Stormwater and Environmental Permitting
Streetscape Design Best Management Practices
Park Design Pump Stations
Topographic and Route Surveys
Bridges and Structures
Civil Site Design Bridge Inspection and Rating
Site Evaluation,Planning and Engineering Highway Bridges
Parking Lot Design Commercial and Institutional Building Design
Traffic Impact Studies Pedestrian and Bicycle Bridges
Site Access and Off-Site Roadway Improvements Retaining Walls
Storm Drainage Design
Water and Sewer Systems Appraisal Services
Utility Coordination and Permitting Appraisals
Site Lighting Review Appraisals
State Agency Coordination
Right-Of-Way Consulting
Expert Testimony
Specialty Reports
www.civiltechinc.com
CIVILTECH
North Lake Shore Drive Phase I Study
Chicago Department of Transportation Illinois Department of Transportation
Construction Cost
$1.5 billion
Funding
State _ ♦d,
Status
Ongoing t -1 7ipr r
Project Manager �v
1•, _
Robert J.Andres,P.E.,PTOE
Project Coordinator
Michael J.Folkening,P.E.,PTOE
Environmental Lead
Mary L.Young,P.E.,PTOE
Scope of Services
Environmental Impact Statement
Alternatives Analysis The Chicago Department of Transportation in conjunction with the Illinois Department
Combined Design Report of Transportation,the Chicago Park District and Chicago Transit Authority have
Traffic Modeling and Simulation undertaken a Phase I Study for the seven mile stretch of North Lake Shore Drive
Safety Studies between Grand Avenue and Hollywood Avenue on the north side of the City of Chicago.
North Lake Shore Drive is an iconic boulevard that traverses historic Lincoln Park.Most
Intersection Design Studies
of the infrastructure was constructed 80 years ago and is in need of reconstruction.In
Highway Bridges those 80 years,travel demand has increased dramatically,but so has transit usage and
Highway Noise Analysis non-motorized travel.As many as 30,000 users per day utilize portions of the Lakefront
NEPA/404 Merger Process Trail.There is the need to strike a better balance between all users.
Interagency Coordination This project will correct design deficiencies at various locations along the corridor,
Section 4(f)/Section 106 Statement particularly at the Oak Street Curve where an average of 3 crashes occur per week.
Public Involvement Redesigning the curve will require extending the Drive into Lake Michigan.As such,
extensive coordination is occurring with IDNR,USFWS and USACE to determine
Context Sensitive Solutions Process
impacts and mitigation measures.
Client Contact
Mr.John Sadler,P.E. Because Lincoln Park is on the National Register of Historic Places and the roadway
Assistant Chief Highway Engineer right-of-way is located at the backs of curb,any changes to roadway facilities will result
Chicago Department of Transportation in an impact to the Park.The Park is not only a recreational facility protected under
Division of Engineering Section 4(f)of the U.S.Department of Transportation Act of 1969,but due to its
30 North LaSalle Street,Suite 400 historic nature is protected under Section 106 of the National Historic Preservation
Chicago,IL 60602 Act of 1966.As a result,this project requires substantial coordination with the Illinois
312.744.0488 Historic Preservation Agency and ultimately the National Park Service.
john.sadler@cityofchicago.org
Ms.Lori S.Brown,P.E. The project is being conducted utilizing IDOT's Context Sensitive Solutions(CSS)
Project Manager process.A number of Tasks Forces have been created to obtain input from residents,
Illinois Department of Transportation business owners and advocacy groups.An extensive public outreach program is being
201 W.Center Court undertaken with a project website,newsletters,and media campaigns.
Schaumburg,IL 60196
847.705.4477 A Combined Design Report and an Environmental Impact Statement will be prepared
Lori.S.Brown@aillinois.gov for this project.
www,civi Itec h i nc.com
OWLTECH
Weiland Road - Lake Cook Road to IL Route 22
Lake Cook Road - Buffalo Grove Road to Hastings Lane
Village of Buffalo Grove I Cook County Department of Transportation and Highways
Construction Cost L
$68.0 million
Funding •---—° —�— "''
CMAQ STP,MFT,Local
-s'
Status
Phase I completed in 2014 v.
Phase I Project Manager a
L
d
Mary L.Young,P.E.,PTOE
Phase I Project Engineer °
Sven D.Zimdahl,P.E.
�. LL
Drainage Engineer
Thomas K.Liliensiek,P.E. ' m
�
` r
Joel E.Christell,P.E.
I
Structural Engineer o
o
Gregory J.Hatlestad,P.E.,S.E.
Scope of Services
Roadway and Highway Design 'Ihis project consists of the widening and reconstruction of over three miles of Weiland
Environmental Assessment Road and over one mile of Lake Cook Road in the Villages of Buffalo Grove and
Combined Design Report Wheeling.The improvement will include two through lanes in each direction on
Intersection Design Studies Weiland Road and three through lanes in each direction on Lake Cook Road,separated
by a center median to allow for left turn channelization at intersections.This project
Highway Noise Analysis also includes the construction of a new roadway on a new alignment that will link up
Air Quality Analysis Weiland Road directly with Prairie Road.Short Aptakisic Road will also be realigned
Location Drainage Studies between Buffalo Grove Road and IL Route 83 to improve safety and operation and
provide a route that can better accommodate traffic movements between Buffalo Grove
Context Sensitive Solutions Process Road and both Weiland Road and Lake Cook Road.In addition,pedestrian and bicycle
Public Information Meetings accommodations will be provided.
Bridge Condition Report
The proposed improvements include the widening in-kind of the single span rolled beam
Type,Size and Location Plans bridge that carries Buffalo Grove Road over Buffalo Creek,and the replacement of the
triple cell box culvert that carries short Aptakisic Road over Buffalo Creek with a 3-span
Client Contacts Engineer slab bridge.Structural engineering tasks include the preparation of Bridge Condition
Village Eng
Mr.Darren Mo n P.E. Reports,Type,Size and Location plans,and detailed design plans for both structures.
Village of Buffalo Grove
51 Raupp Boulevard The proposed improvements include numerous drainage features within the project
Buffalo Grove,IL 60089 area including new storm sewers and new detention basins.Civiltech developed an
847.459.2543 Existing and Proposed Drainage Plan that satisfies the proposed improvement needs and
dmonico @vbg.org meets the requirements of the various agencies including the Lake County Stormwater
Mr.John Yonan,P.E. Management Commission,the Cook County Department of Transportation and
Superintendent of Highways Highways,and the Illinois Department of Transportation.
Cook County Department of
Transportation and Highways An Environmental Assessment and a Combined Design Report were prepared for
69 W.Washington Street,21st Floor this project.Due to highway noise impacts in the project corridor,an extensive public
Chicago,IL 60602 outreach program was conducted to educate and obtain input from affected property
312.603.1700 owners regarding implementation of noise walls.
john.yonan@cookcountyil.gov
Civiltech has also assisted the Village of Buffalo Grove and the Cook County
Department of Transportation and Highways in securing CMAQ and STP Federal
funding for construction.
www.civiltechinc.com
OWLTECH
Millennium Trail Underpass - Grand Avenue, Illinois Route 132
Lake County Forest Preserve District
Construction Cost
$2.7 million
Funding
Illinois Transportation Enhancement Program `
(ITEP)
Status
Phase I completed in 2011
Phase II completed in 2011
Phase III completed in 2013
Phase I Project Manager
Mary L.Young,P.E.,PTOE
Phase I Project Engineer
Joel E.Christell,P.E.
Phase II Project Manager
Jonathan R.Vana,P.E.
Phase II Project Engineer
Reid T.Magner,P.E.
Structural Engineers
Gregory J.Hatlestad,P.E.,S.E.
Jeffrey T.Schroeder,P.E.
Katelyn L.Kompare
Phase III Project Manager
James D.Ewers,P.E.
Resident Engineer
Phillip J.Hurst,P.E.
Assistant Resident Engineer Civiltech provided Phase I,II and III services for the construction of an underpass under
Eric D.Schmidt Grand Avenue,a four-lane,arterial under the jurisdiction of the Illinois Department
Surveyor of Transportation.The improvements were part of the Lake County Forest Preserve
Scope of Services District's Master Plan and the proposed Grand Illinois Trail which one day will link
Preparation of Contract Plans, multiple trails between Chicago and Galena.Together with the Des Plaines River and
Specifications and Estimates Fort Hill trails,this system includes over 90 miles of multi-use trails which will provide
Multiuse Underpass access to a large portion of the 28,000-acre Lake County Forest Preserves system.
Bikeway and Pedestrian Facility Design Due to rapid urbanization and increased traffic congestion,trail planning and construction
Resident Engineering has become increasingly more difficult.The primary concern is the safe crossing of roads
Construction Inspection that have higher speed limits and lack any controlled crosswalk location.The Millennium
Construction Management Trail Underpass is a reinforced concrete tunnel that will allow trail users to safely pass
Construction Layout under Grand Avenue from its current terminus near Rollins Road to connect to an existing
Interagency Coordination LCFPD trail north of the their Operations and Public Safety Facility.The tunnel is 18 feet
QC/QA Material Testing wide and 11 feet in height and has concrete wing walls with a simulated stone finish.The
Client Contact surrounding slopes were planted with native trees and grasses.
Mr.Randall Seebach The structure is long enough to accommodate a future five lane cross-section with
Director of Planning,Conservation curb and gutter and a bikeway/pedestrian facilities behind the back of curb.Due to a
and Development
Lake County Forest Preserve District constrained right-of--way near an adjacent utility tower along the southern approach,the
underpass incorporates a soldier pile wall design on either side of the trail.This design
1899 County
West Winchester Road
Libertyville,IL 60048 necessitated close coordination with the local agency staff and the Forest Preserve to
847.968.3262 ensure the aesthetic treatment for the wall surfaces and curved alignment blends into the
rseebach@lcfpd.org surroundings without an enclosed or narrowing corridor effect for the users.
www.civiltechinc.com
CIVILTECH
Traffic Engineering Services
Village of Vernon Hills
Construction Cost it
NA
Funding
Local
Status _r
Ongoing
Senior Project Manager
Mary L.Young,P.E.,PTOE
Project Manager _ s
James R.Woods,P.E.,PTOE 1 y
Traffic Engineer
Brian R.DeSalle,P.E.,PTOE
Design Engineer
Jennifer M.Hyman,P.E. Civiltech Engineering currently provides on-call Traffic Engineering Services to the
Traffic Signal Engineer Village of Vernon Hills.These services include:
Joseph J.Emry,P.E.
■ Preparing Traffic Impact Studies for potential developments in the Village.
Scope of Services
Reviewing Traffic Impact Studies prepared by others for potential developments.
Traffic Engineering
Traffic Impact Study ■ Quantifying cut-through traffic in residential neighborhoods and making
recommendations to address problems.
Traffic Calming
Intersection Design Studies ' Coordinating with the Illinois Department of Transportation(IDOT)to make
modifications to IDOT controlled intersections to improve overall operation.
Traffic Signal Design
■ Evaluating sight distance issues as a result of sign placement.
Client Contact
' Preparing contract documents for Traffic Signals.
Mr.David H.Brown,P.E.,ASCE
Director of Public Works Following is a list of traffic engineering projects that Civiltech has completed or is in the
Village of Vernon Hills
rocess of completing For the Village of Vernon Hills:
490 Greenleaf Drive p
Vernon Hills,IL 60061
847.918.3544 ' International Corporate Center TIS Review(2007)
daveb @vhills.org ■ Phillip Road Extension Study(2008)
■ Deerpath Subdivision Cut-Through Study(2008)
■ Oaks of Vernon Hills Residential Development TIS Review(2008&2013)
■ Learning Experience Day Care Center TIS Review(2013)
■ Menards Retail Development TIS Review(2014)
Three Traffic Signal Warrant Studies(2014)
■ Mellody Farms Traffic Study and Engineering Plan Review(2016)
■ Greggs Parkway/Huntington Drive Intersection Concepts(2017)
www.civiltechinc.com
OWLTECH
Pennsylvania Avenue One-Way/Two-Way Study
Village of Glen Ellyn
Construction Cost
n/a
Study Funding
Local . -
Status
Completed fall of 2015
Project Manager ?
James R.Woods,P.E.,PTOE +...-
Traffic Engineer
Brian R.DeSalle,P.E.,PTOE
DesignEngineer t x
Jennifer M.Hyman,P.E.
Scope of Services
Traffic Analyses Civiltech completed a study to analyze the feasibility of converting Pennsylvania Avenue
Conceptual Geometric Plans between Main Street and Forest Avenue from a one-way westbound street to a two-way
street in the Village of Glen Ellyn's Central Business District.
Client Contact
Mr.Robert Minix,P.E. A Village of Glen Ellyn Central Business District Traffic Study(CBDTS)was previously
Professional Engineer prepared by the Village in 2012.One of the primary considerations in the CBTDS
Glen Ellyn Public Works Department was the conversion of the entire Main Street/Crescent Boulevard/Forest Avenue/
30 South Lambert Road Pennsylvania Avenue block from one-way to two-way operation.The objectives of the
Glen Ellyn,IL 60137 CBDTS were to improve traffic flow,minimize loss of on-street parking,and evaluate
630.547.5514
bobm @glenellyn.org impacts to pedestrian and bicyclist access and safety.
The CBDTS first found that the existing one-way roadway system is generally operating
well with minimal delay and queuing,with some congestion caused by Metra and
freight trains on the Union Pacific(UP)railroad.It also found that a two-way roadway
system can be designed to operate well.The CBDTS listed a range of advantages and
disadvantages of converting the CBD Commercial Block to two way operation for
Village consideration.The Village subsequently determined that the conversion of the
entire CBD Commercial Block to two-way option should not be pursued at this time.
Civiltech's follow-up study satisfied a curiosity on the part of Village staff regarding
the feasibility of converting only Pennsylvania Avenue to two-way operation,versus
converting all four streets on the CBD Commercial Block.The study involved traffic
data collection,capacity analyses using Synchro,network simulations using SimTraffic,
development of a conceptual improvement concept,and preparation of a technical
-� memorandum.
www.civiltechinc.com
CIVILTECH
Traffic Engineering Services
Village of Libertyville
Construction Cost
NA
Funding _
Local&Private Developer
Status
goin -
Ongoing �z
Project Manager ' e ��F
James R.Woods,P.E.,PTOE � � o° in(epemd —
--1
Traffic Engineer M,= lnt orrau dI ri] !.:, i2 -
Brian R.DeSalle,P.E.,PTOE ts
ark - - -
Design Engineer
Jennifer M.Hyman,P.E. Over the past several years,Civiltech has served the Village of Libertyville by performing
reviews of Traffic Impact Studies and Parking Studies associated with new developments
Scope of Services being processed through the Village's review and approval process.
Traffic Impact Studies
A typical traffic impact study review begins with a meeting with Village staff to review
Traffic Engineering details of the proposed development and to obtain copies of relevant documents such
Client Contact as site plans,traffic counts,minutes of past meetings,and the traffic impact study itself,
Mr.Fred Chung Which is typically prepared by another traffic engineering consultant.Civiltech will also
discuss any parking or traffic-related concerns of the Village related to the development.
Senior Project Engineer In order to fully understand the issues at hand,we also perform a field visit to the subject
Village of Libertyville
site to observe existing traffic operations and site conditions.In some cases,we perform
118 Cook Avenue our own traffic counts.Civiltech then performs a detailed review of the traffic impact
Libertyville,IL 60048 study text,tables,exhibits and analyses.Our review is based on Village ordinances and
847.2475435 codes as well as industry-standard resources such as the ITE Trip Generation Manual,
fchungp libertyville.com the Manual on Uniform Traffic Control Devices,the TRB Highway Capacity Manual,
and the AASHTO Green Book.Our review is summarized in a technical memorandum
which contains a numbered listing of comments to be addressed by the developer's
traffic engineering consultant.After comments are addressed by the developer,there are
typically one two more subsequent reviews required until final concurrence with the
traffic impact study is achieved.
Civiltech also attends staff meetings with development representatives as necessary,as
well as public meetings held before applicable Village Commissions and the Village
Board to answer any traffic-related questions from elected and appointed officials.
Following is the listing of traffic and parking study reviews that Civiltech has performed
for the Village of Libertyville:
• Parkside of Libertyville Townhomes TIS Review(2014)
• Manchester Square Condominiums Parking Study Review(2014)
• Lakeside Bus Company Parking Study Review(2014)
• Liberty Townhomes TIS Review(2013)
• Bridge Development Partners Industrial Park TIS Review(2013)
• Condell Hospital TIS Review(2015)
• IL 21/IL 137 Mobil Station Site Plan Review(2015)
• Oak Trails/Roanoke Residential Development TIS Review(2016)
• Auto Expo Car Wash Circulation Review(2016)
• Stewart Avenue Townhomes Review(2016)
• Station Square TIS Review(2016)
• North Pointe Residential TIS Review(2017)
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
Village of Oak Brook I April 28,2017
Phase II
OWLTECH
South Street Trail Randall Road Underpass Improvement -
Keslinger Road to North of the UP Railroad
Kane County Division of Transportation
Construction Cost
$1.9 million
Mra ie�"sit ash!®IC �1€
Funding
Federal,KCDOT,IDOT
Status 't 1
Completed in 2013
Project Manager
James D.Ewers,P.E.
Resident Engineer °?
Joseph C.Kozial,P.E.
Surveyor
Scope of Services
Resident Engineering One of the most notable aspects of this improvement's area was the heavy amounts
Construction Inspection of traffic constantly travelling along Randall Road.Some of the traffic is to and from
Construction Management the Delnor Community Hospital in the northwest quadrant of the intersection.It was
very clear why the best design alternative chosen was the tunneling/jacking method to
Construction Layout connect the trail under Randall.This large amount of traffic,and especially emergency
Construction Documentation vehicles for the hospital,cannot be impeded.
Coordination and Public Involvement Civiltech provided Phase III Construction Engineering Services for the South Street
Interagency Coordination Underpass ensuring the plans and specifications were closely followed.This improvement
provided an underpass connection under Randall Road for the South Street Trail.The
QC/QA Material Testing underpass had temporary lighting during the installation procedure,and permanent
Client Contact lighting when completed.Decorative cast-in-place wing-walls were placed at either end
Mr.Dave Boesch of the tunnel which required demonstration and approval of the form liner and coloring
Chief of Construction process.The existing path in the northeast quadrant of the Randall and Keslinger
Kane County Division of Transportation intersection was realigned for an at grade crossing of Keslinger with proper pavement
41WO1 I Burlington Road markings and signal modifications.New embankment was used to bring the trail down
St.Charles,IL 60175 using the proper slope to the grade of the proposed underpass.A 12-foot inside diameter
630.584.1170 concrete jacking pipe was installed as the structure of the underpass under the existing
embankment that carries Randall Road up to the bridge over the UP Railroad.The
method to install the underpass was proposed by the contractor and approved by the
engineering team.A very thorough and comprehensive specification for the submittal
process and allowable tolerances to install the underpass was included in the Special
Provision.
{ It was the actual tunneling/jacking of the concrete pipe that was the greatest challenge
t ' of the improvement.Our RE was there to ensure that all the procedures,which
were approved in the submittal process made sense and were carried out correctly.
Civiltech's senior Structural Engineer reviewed all the tunneling/jacking/soil retention
submittals,and made certain that the proposed methods were reasonable and capable of
accomplishing this complex task.
! Through the efforts of the County,contractor and Civiltech,this challenging
improvement was a complete success;so much that it was recognized by the APWA
' Chicago Chapter as the best improvement under$5 million in 2013.The many patrons
-a+ who frequent the trail and underpass certainly agree.
www.civiltechinc.com
CIVILTECH
Millennium Trail Underpass - Grand Avenue, Illinois Route 132
Lake County Forest Preserve District
Construction Cost 1 -
$2.7 million
{
Funding
Illinois Transportation Enhancement Program -. -- -- -
(ITEP)
Status
Phase I completed in 2011
Phase II completed in 2011
Phase III completed in 2013
Phase I Project Manager
Mary L.Young,P.E.,PTOE
Phase I Project Engineer
Joel E.Christell,P.E.
Phase II Project Manager
Jonathan R.Vana,P.E.
Phase II Project Engineer
Reid T.Magner,P.E.
i
Structural Engineers '
Gregory J.Hatlestad,P.E.,S.E.
Jeffrey T.Schroeder,P.E.
Katelyn L.Kompare
Phase III Project Manager
James D.Ewers,P.E.
Resident Engineer
Phillip J.Hurst,P.E.
Assistant Resident Engineer Civiltech provided Phase I,II and III services for the construction of an underpass under
Eric D.Schmidt Grand Avenue,a four-lane,arterial under the jurisdiction of the Illinois Department
Surveyor of Transportation.The improvements were part of the Lake County Forest Preserve
Scope of Services District's Master Plan and the proposed Grand Illinois Trail which one day will link
Preparation of Contract Plans, multiple trails between Chicago and Galena.Together with the Des Plaines River and
Specifications and Estimates Fort Hill trails,this system includes over 90 miles of multi-use trails which will provide
Multiuse Underpass access to a large portion of the 28,000-acre Lake County Forest Preserves system.
Bikeway and Pedestrian Facility Design Due to rapid urbanization and increased traffic congestion,trail planning and construction
Resident Engineering has become increasingly more difficult.The primary concern is the safe crossing of roads
Construction Inspection that have higher speed limits and lack any controlled crosswalk location.The Millennium
Construction Management Trail Underpass is a reinforced concrete tunnel that will allow trail users to safely pass
Construction Layout under Grand Avenue from its current terminus near Rollins Road to connect to an existing
Interagency Coordination LCFPD trail north of the their Operations and Public Safety Facility.The tunnel is 18 feet
QC/QA Material Testing wide and 11 feet in height and has concrete wing walls with a simulated stone finish.The
Client Contact surrounding slopes were planted with native trees and grasses.
Mr.Randall Seebach The structure is long enough to accommodate a future five lane cross-section with
Director of Planning,Conservation curb and gutter and a bikeway/pedestrian facilities behind the back of curb.Due to a
and Development
constrained right-of-way near an adjacent utility tower along the southern approach,the
Lake County Forest Preserve District
1899 West Winchester Road underpass incorporates a soldier pile wall design on either side of the trail.This design
Libertyville,IL 60048 necessitated close coordination with the local agency staff and the Forest Preserve to
847.968.3262 ensure the aesthetic treatment for the wall surfaces and curved alignment blends into the
rseebach@lcfpd.org surroundings without an enclosed or narrowing corridor effect for the users.
www.civiltechinc.com
OWLTECH
Lake Carina Parking Area, Trail and Bridge Improvements
Lake County Forest Preserve District
Construction Cost °
$1.4 million c'
Funding
Local,IDNR
Status
Anticipated Construction in 2016
Phase II Project Manager t
Reid T.Magner,RE
Phase II Project Engineer
John R.Rosak
+
Structural Engineers
Gregory J.Hatlestad,P.E.,S.E.
Melissa F.Lange,P.E.,S.E.
Katelyn L.Kompare
Water Resource Engineers
Thomas K.Liliensiek,P.E.
Elliot S.Anderson
Scope of Services
Preparation of Contract Plans, The existing Lake Carina site consists of a parking area with an aggregate trail providing
Specifications,and Estimates access to a fishing pier and a mowed grass trail encircling the lake to the south.
Multiuse Bridge The proposed improvements will include expansion of the existing parking area to
Bikeway and Pedestrian Facility Design accommodate additional equestrian parking and hot-mix asphalt trails leading from the
parking area to the fishing pier and around the north side of Lake Carina with a new
Parking Lot Design
bridge crossing of the Des Plaines River.This will provide a critical link in the Lake
Client Contact County trail system by connecting to the existing Des Plaines River Trail.
Randall Seebach
Director of Planning,Conservation, The proposed parking lot will be able to accommodate 12 horse trailers and will allow
and Development direct loading and unloading onto the proposed trail.The proposed trails will be 12 feet
Lake County Forest Preserve District wide and will connect to a 12 foot wide pedestrian bridge over the Des Plaines River
1899 West Winchester Road with boardwalk approaches on the east and west sides.The project will also include the
Libertyville,Illinois 60048 construction of six culvert crossings to accommodate stormwater management in the
847.968.3262 area;two in the parking lot area and four along the proposed trail.An alternate bid
rseebach@lcfpd.org
component to the project may include the aggregate resurfacing of the mowed grass trail
encircling the south side of the lake.
Once complete,Lake Carina will become a trailhead for the 31-mile Des Plaines River
Trail,allowing people to further enjoy hiking,biking,fishing,and cross-country skiing
in the winter.
www.civiltechinc.com
CIVILTECH
Golfview Road - 31st Street to 1st Avenue
Chicago Zoological Society
Construction Cost - -
$3.4 million
Status '
PhaseIapproved-January 2012
Phase II complete-October 2013
Phase III complete-November 2014
Phase I Project Manager and Phase 11 QC
Michael J.Folkening,P.E.,PTOE, ;
LEED Green Associate
i1 .
Phase I QC/QA -
Mary L.Young,P.E.,PTOE
Phase II Project Manager
Gary Blazek,P.E. i F ;
Phase III Project Manager
James D.Ewers,P.E.
Project Engineers
Christopher S.Wolff,P.E., t t t
LEED Green Associate
Brandon J.Bogenschutz,P.E.,
LEED Green Associate
Daniel T.Echols - -
�KKNIK&DE ELEVATION TYPICAL �KK>81t BKfE ELEVATION TYPICAL �NNDCP.KI08K FROM EL NATION Christopher T.Braband,P.E.
Resident Engineer
The main objectives of this project are to reduce traffic delays for vehicles entering and
John P.Vogelman,P.E.
exiting the north parking lot of the Brookfield Zoo and to reduce queuing vehicles along
Scope of Services 1st Avenue during the Zoo's peak hours of major events.The project limits for Golfview
Roadway and Highway Design Road are from 31st Street to 1st Avenue.The proposed roadway improvements include
Traffic Engineering and Impact Studies providing better lane channelization at the north parking lot entrance/exit,reconfiguring
Project Development Report the intersection of Golfview Road and 1st Avenue,and providing a bus turnout/
drop-off zone to enhance pedestrian access along 31st Street.Within the Brookfield Zoo
Location Drainage Study parking lot,the proposed improvements included extending the storage lanes of the 6
Stormwater Management kiosks,modifying the parking lot vehicular circulation,adding parking lot lighting,and
Interagency Coordination updating communication lines.
Plan and Specification Preparation The project funding consisted of an Illinois Department of Commerce and Economic
Kiosk Design Opportunity(DCEO)grant,a Federal High Priority Project(HPP)Funds and
Lighting Design additional local money from the Chicago Zoological Society.Civiltech provided Phase
Resident Engineering I,II and III engineering services and lead the CZS through the IDOT approval process
during all three phases.Phase I work included geometric studies,Intersection Design
Client Contact Studies,crash analysis,preparation of a Location Drainage Study,and finally the
Mr.John Kramer
Vice President-Plant and Facilities Management preparation of a Project Development Report.Phase I1 services included preparation
Chicago Zoological Society of detailed design plans for the roadway improvement,entrance and parking lot
3300 Golf Road improvements,lighting and kiosk design.Phase III services included providing
Brookfield,IL 60513 construction inspection and all project documentation required by IDOT.This project
708.688.8315 was closely coordinated with the Forest Preserve District of Cook County,the Village of
ken neth.kaduk@czs.org Brookfield,IDOT and the Cook County Building and Zoning Department.
www.civiltechinc.com
CIVILTECH
Fairfield Road/IL Route 176 Junction Improvement
Lake County Division of Transportation
Construction Cost
$15.0 million
Funding
Local
Status
Phase I completed in 2012
Phase 11 completed in 2013 n
Phase III completed in 2014 0
Phase I Project Manager °
Mary L.Young,P.E.,PTOE .,
Phase I Design Engineer t. A
m
Sven D.Zimdahl,P.E.
Phase II Director of Design Services
Jonathan R.Vana,P.E. $
0
Phase II Project Manager •, a
A
David J.Kreeger,P.E. a
a
Phase II Project Engineer
Kristin R.Kalitowski,P.E. When a concept other than a typical improvement is being considered,it is a challenge for
Lighting Engineer stakeholders to imagine what the end result may look like.More and more,it is necessary to
Derek N.Mall,P.E.
use sophisticated visualization tools to communicate the future operation as well as the look
Traffic Signal Engineer and feel of alternatives.We employed such tools on a project for the Lake County Division
Joseph J.Emry,P.E.
of Transportation at the intersection of Fairfield Road/IL Route 176.The severely congested
Structural Engineer
Gregory J.Hatlestad,P.E.,S.E. intersection needed an increase in capacity.Because the intersection was completely
Phase III Project Manager surrounded by the Lakewood Forest Preserve,great consideration was given to the overall
James D.Ewers,P.E. impacts of an improvement as well as the aesthetics.Three alternates were investigated:
Resident Engineer standard intersection widening,a roundabout,and a grade separation with a connector
Brian J.Carroll,P.E. roadway to accommodate turning movements.Because two of these alternates were not
Assistant Resident Engineer/ "typical"intersection improvements,3D digital terrain models were developed for each
Materials Coordinator alternate,illustrating what they could look like upon completion.In addition,traffic models
Hugh Gilgunn,P.E.,DECI
Andy E Garb,P.E. were simulated for each alternate to show the operation of the improvements.After extensive
Surveyor public involvement and coordination with the Lake County Forest Preserve District,the
Scope of Services At-Grade Intersection Improvement was selected as the preferred alternative.
Roadway and Highway Design
Alternate Analysis Civiltech began detailed plan preparation in Spring of 2011.It was decided to split the project
Intersection Design Studies into two construction contracts.The first contract included all of the required trail and
Project Report underpass construction.This allowed the trail users to bypass the future roadway construction.
Traffic Modeling and Simulation The second contract included the roadway reconstruction.We closely coordinated with the
Pedestrian Bicycle Underpass Forest Preserve staff to design three detention ponds that would have a natural look and to
Context Sensitive Solutions Process limit impacts to the Forest Preserve.Deep areas of unsuitable soils also presented a design
Community Advisory Group challenge.To maintain two-way traffic during construction,vibro concrete columns were
Public Information Meetings designed for ground improvement,disturbing a smaller footprint than traditional undercuts.
Construction Engineering
Construction Inspection Civiltech was selected to perform construction engineering on the roadway contract,
Client Contact which began in Spring of 2013.Our Resident Engineer continued close coordination with
Ms.Paula Trigg,P.E. the Forest Preserve to maintain access to their facilities,as well as with the Lake County
Director of Transportation/County Engineer
Lake County Division of Transportation Stormwater Management Commission and Army Corps of Engineers regarding minimizing
600 West Winchester Road the impact of construction on the adjacent wetlands.Civiltech maintains an informative
Libertyville,IL 60048 website tracking construction progress and providing updates and photos for the public.
847.377.7400
Construction was completed in Fall 2014.
www.civiltechinc.com
CMLTECH
Quentin Road - South of Long Grove Road to North
of U.S. Route 12
Lake County Division of Transportation
Construction Cost
$17.8 million
Funding
County
Status
Phase I completed in 2006
Phase II completed in 2011
Principal in Charge v
Robert J.Andres,P.E.,PTOE -
Phase I Project Manager
Mary L.Young,P.E.,PTOE
Director of Design Services o
Jonathan R.Vana,P.E.
a
Phase II Project Manager
Reid T.Magner,P.E.
Phase II Project Engineer
Petro Kravets,P.E.
fr .
Scope of Services
Regional Detention Basin Design This project is centered around the intersection of Quentin Road and U.S.Route 12
Roadway and Highway Design (Rand Road)in the Villages of Kildeer and Deer Park in Lake County,Illinois.Quentin
Road is an important north-south arterial in the southern portion of the County and
Environmental Class of Action U.S.Route 12 is part of the Illinois Department of Transportation's Strategic Regional
Determination Document
Arterial System,which is intended to accommodate regional travel demand.Both of
Project Development Report these roadways are heavily traveled and the intersection of Quentin Road/U.S.Route 12
Intersection Design Studies is severely congested for many hours of the day.
Crash Analysis
The project consists of widening and reconstructing one mile of Quentin Road from two
Highway Noise Analysis lanes to four lanes and widening approximately one mile of U.S.Route 12 from four
Air Quality Analysis lanes to six lanes.At the Quentin Road/U.S.Route 12 intersection,30-foot medians will
Wetland Delineation be provided to accommodate dual left turn channelization.Right turn channelization
Location Drainage Studies will also be provided.The proposed improvement results in substantial right-of-way
acquisition and it is necessary to acquire one residence and one business.
Interagency Coordination
Coordination and Public Involvement A regional detention basin was designed as part of the proposed improvement in order
to comply with the Lake County Watershed Ordinance.The basin was designed with a
Client Contact meandering low flow channel as well as native wetland plantings and landscaping.
Mr.Chuck Gleason
Senior Civil Engineer Although engineering is funded locally,Civiltech and the Lake County Division of
Lake County Division of Transportation Transportation are working with the Illinois Department of Transportation to follow
600 Winchester Road Federal-aid guidelines in order to remain eligible for future federal funds.A Project
Libertyville,IL 60048
847.377.7400 Development Report was prepared for this project.This project also includes extensive
cgleason @LakeCountylL.gov Wetland,flood plain,hydraulic and drainage studies,as well as air quality and highway
noise analyses.
www,civi[tech inc.com
CIVILTECH
Weiland Road - Lake Cook Road to IL Route 22
Lake County Division of Transportation
Construction Cost
$48.0 million 1 � 3
l e
Funding LL"'
CMAQ STP,MFT,Local
Status '
Phase I completed in 2014 "
ent Railroad „ , ,
Phase II ongoing
Director of Design Services
Jonathan R.Vana,P.E. ` `-
Phase II Project Manager
Reid T.Magner,P.E. Ilk
Phase II Project Engineer
Petro Kravets,P.E.
Phase II Design Engineers
Steven E.Warner `
Tracy F.Scurlock f s
t
Trenton G.Bruns `
a
Drainage Engineer z,
Thomas K.Liliensiek,P.E.
Structural Engineers This project consists of the widening and reconstruction of over three miles of
Gregory J.Hatlestad,P.E.,S.E. Weiland Road and over one mile of Aptakisic Road in the Village of Buffalo Grove.
Land Acquisition The improvement will include two through lanes in each direction on Aptakisic Road
David W.White and three through lanes in each direction on Lake Cook Road,separated by a center
median to allow for left turn channelization at intersections.This project also includes
Scope of Services the construction of a new roadway on a new alignment that will link up Weiland Road
Roadway and Highway Design directly with IL Route 22 to improve safety and operation and provide a route that can
better accommodate traffic movements between Lake Cook Road and IL Route 22.In
Traffic Signal Design addition,pedestrian and bicycle accommodations will be provided.
Lighting Design The proposed improvements include the reconstruction of a 12ft x 7ft culvert that carries
Watermain Design Aptakisic Creek.Structural engineering tasks include the preparation of Condition
Sanitary Sewer Design Reports,Type,Size and Location plans,and detailed design plans for the structure.
Stormwater and Environmental Permitting The proposed improvements include numerous drainage features within the project area
Drainage Structures including new storm sewers and new detention basins.Civiltech utilized StormCAD and
PondPak to develop an Existing and Proposed Drainage Plan that satisfies the proposed
Client Contacts improvement needs and meets the requirements of the various agencies including the
Mr.Darren Monico,P.E. Lake County Stormwater Management Commission,the Cook County Department of
Village Engineer Transportation and Highway,and the Illinois Department of Transportation.
Village of Buffalo Grove Due to impacts in the project corridor,an extensive public outreach program was
51 Raupp Boulevard conducted to educate and obtain input from affected property owners regarding
Buffalo Grove,IL 60089 implementation of property relocation benefits.
847.459.2543
dmonico @vbg.org Civiltech has assisted the Village of Buffalo Grove,Lake County and the Cook County
Department of Transportation and Highways in securing CMAQ and STP Federal
funding for construction.
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Phase III
CIVILTECH
31st Street Bike/Pedestrian Path
Village of Oak Brook
Construction Cost
$1.1 million
Funding _
STE,Local a
Status
Phase I completed in 2000
Phase II completed in 2003
Phase III completed in 2005
Phase II Project Manager
Jonathan R.Vana,P.E.
Phase II Project Engineer
David J.Kreeger,P.E.
Structural Engineer
Otto J.Hatlestad,S.E.,P.E. Civiltech provided Phase I,Phase II,and Phase III Engineering Services for this project.
Phase III Project Manager The project included the construction of a 10 foot wide multi use path with two foot
James D.Ewers,P.E. grassed shoulders from Trinity Lane to Jorie Boulevard.The project included segmental
Resident Engineer retaining walls and a twelve foot wide, 120 foot long pedestrian/bicycle bridge over
Donald J.Marek Illinois Route 83.The project also included the modification of two existing signal
installations to include pedestrian signal indications.
Surveyor
Scope of Services The project was funded with Surface Transportation Enhancement(STE)Funds.The
project included multi agency coordination between the Village of Oak Brook,the
Project Development Report
Illinois Department of Transportation,and the DuPage County Highway Department.
Bikeway and Pedestrian Facility Design The design services were completed in 2003.
Pedestrian/Bicycle Bridges
Retaining Walls The successful completion of Phase I and II engineering for this project has led Civiltech
to proceed with Phase III engineering services for the Village.The project was let and
Type,Size&location Drawings awarded by IDOT and Civiltech provided our full range of Construction Engineering
Traffic Signal Design Services.The project was completed in 2005.
Preparation of Contract Plans,
Specifications and Estimates
Resident Engineering
Construction Layout
Construction Inspection
Topographic Surveys
Client Contact
Mr.Dale L.Durfey,Jr.,P.E.
Village Engineer
Village of Oak Brook
1200 Oak Brook Road
Oak Brook,IL 60521
630.990.3010
ddurfey@oak-brook.org
www.civiltechinc.com
OWLTECH
Caton Farm Road from Drauden to County Line Road
Will County Division of Transportation
Construction Cost
$7.5 million
Funding
County,Local
Status
Completed in 2014
Project Manager
James D.Ewers,P.E.
Resident Engineer
Donald J.Marek
Assistant Resident Engineer
John M.Kerivan
Scope of Services
Resident Engineering
Construction Inspection
s
Construction Managements.
Construction Layout y
Construction Documentation i o
Y 4 1
a'� `�' • I' L
Coordination and Public Involvement a
LL
Interagency Coordination
m
QC/QA Material Testing t
a
m
Client Contact o
6
Mr.Jeffrey L.Ronaldson,P.E. a
Assistant County Engineer
Will County Division of Transportation a
16841 West Laraway Road
This$7.5 million roadway reconstruction continued an improvement corridor for
Joliet,IL 60433
815.727.8476 Will County to connect Joliet and Plainfield to the west.The improvement included
a substantial amount of Right of Way acquisition.During construction,the parties
involved with some of the acquired areas were kept especially well informed about
project activities and what would occur adjacent to their property.
The improvement fully reconstructed the road from a rural two lane cross section into
a two lane in each direction urban cross section with turn lanes and medians.Sidewalk
and a bike path were included to connect the surrounding neighborhoods.Miles of new
storm sewer was installed to properly drain the wider road which now included curb and
gutter.An ample amount of coordination was needed to facilitate the installation of a
widen Rail Road crossing with new gates and signal equipment.A new traffic signal was
also installed at the intersection with County Line Road.
Civiltech made certain to include the City of Joliet and all involved stakeholders keeping
them up to date so that they could make informed decisions regarding the road which
would be jurisdictionally transferred.The final improvement increased capacity to the
growing subdivisions,and made a safer road for all travelers.
File Name:2533
www.civiltechinc.com
OWLTECH
Essington Road/Hennepin Drive
City of Joliet
Construction Cost
$3.4 million
Funding
STP,Local '
Status
Phase I completed in 2008
Phase II completed in 2009
Phase III completed in 2010
Phase I Project Manager
Mary L.Young,P.E.,PTOE �.
a
Director of Design Services
Jonathan R.Vana,P.E. r o
8 o
Phase II Project Manager a
David J.Kreeger,P.E.
LL
Phase II Project Engineer
Kristin R.Kalitowski,P.E. m
Structural Engineer
Gregory J.Hatlestad,P.E.,S.E. 4q m
Lighting Engineer
Shirley J.Choi,P.E.
Phase III Project Manager a
James D.Ewers,P.E. -Ihe intersection of Essington Road and Hennepin Drive serves as one of the south
Resident Engineer entrances to Westfield Louis Joliet Shopping Center.It also accommodates a large
Donald J.Marek
Surveyor volume of commuter traffic destined to and from I-55,which is located approximately
one mile to the north.The intersection faces extreme congestion for many hours
Scope of Services of the day,oftentimes resulting in commuter traffic cutting through the mall.This
Roadway and Highway Design project included the widening and resurfacing of Essington Road and Hennepin Drive
Intersection Design Studies to provide additional turn lanes at the intersection.The existing traffic signal was
Location Drainage Studies modernized and pedestrian indications were provided.The intersection of Essington
Crash Analysis Road and Mall Loop Drive was also resurfaced and a new traffic signal was installed as
Computerized Traffic Simulation
part of this improvement.Because the two traffic signals are located within 200 feet of
Coordination and Public Involvement
one another,detailed traffic analyses were performed to ensure adequate levels of service
Project Development Report
Interagency Coordination could be provided.This included computer simulations using SYNCHRO to evaluate
the interdependent operation of the two traffic signals.
Traffic Signal and Signal System Design
Lighting Design
Sunnyland Drain crosses beneath Essington Road south of Hennepin Drive through
Preparation of Contract Plans,
Specifications and Estimates three 87"x 63"arch-shaped corrugated metal pipes.Inspection of the pipes during
Plat and Legal Description Preparation preparation of the Culvert Condition Report revealed that the pipes were deteriorating.
Appraisals It was determined that extension of the pipes to accommodate the road widening
Land Acquisition would not be possible.As part of the Phase II engineering,detailed plans for the
Resident Engineering construction of replacement triple 6'x 5'box culverts were prepared.Since Sunnyland
Construction Layout Drain is a Waters of the U.S.,a section 404 permit was obtained from the Army
Construction Documentation Corps of Engineers.
Client Contact
Mr.Russell A.Lubash,P.E. The City of Joliet selected Civiltech to perform the Construction Engineering for this
Traffic Engineer project due to our proven qualifications and experience. Our Resident Engineer brought
City of Joliet the involved stakeholders together by coordinating with Joliet,the contractor,multiple
921 East Washington Street
Joliet,IL 60433 utilities,and the Westfield Mall to make the installation of the triple box culvert under a
815.405.5493 full road closure as easy as possible.
rlubash@jolietcity.org
www.civiltechinc.com
CIVILTECH
Dundee Road Street Lighting
Village of Wheeling
Construction Cost
Phase 1-$1.2 million
Phase 2-$1.5 million
Funding
Federal STP
Status
Phase 1—Constructed in 2015
Phase 2—Anticipated Construction in 2017
Director of Design Services
Jonathan R.Vana,P.E.
Project Manager
Derek N.Mall,P.E. t
Project Engineer
Shirley J.Choi,P.E.
Director of Construction
Engineering Services
James D.Ewers,P.E.
Resident Engineer
,.r o
Donald J.Marek
Scope of Services
Lighting Design This project involved designing roadway lighting for about 2 miles on Dundee Road
Preparation of Contract Plans, (IL Route 68)in the Village of Wheeling.The work was split into two phases.The first
Specifications and Estimates phase was from Northgate Parkway to Milwaukee Avenue(IL Route2l).The second
Resident Engineering phase was from Cambridge Drive to Northgate Avenue.In the first phase,the standard
village poles and standard high pressure sodium luminaires were used.As the availability
Construction Documentation of high pressure sodium luminaire options dwindled and the rise of LED options,the
Client Contact second phase of the project was changed to utilize LED luminaires.Civiltech analyzed
Mr.Jon Tack,P.E. various LED options and provided the Village with these options for selection.Both
Village Engineer phases include festoon outlets and banner arms on the poles.
Village of Wheeling
2 Community Boulevard Since the roadway is under IDOT jurisdiction and the Village had secured federal
Wheeling,IL 60090 STP funding,the project was processed through the District 1 Bureau of Local Roads
847.459.2620 and Streets with the review of the lighting completed by the Electrical Section of
jtack@wheelingil.gov the Bureau of Traffic.the lighting design met the requirements of IDOT District I
General Guidelines for Lighting Design.Photometrics for the roadways,sidewalks and
intersections lighting met all guidelines of the ANSI/IESNA Roadway Lighting(RP-B-
00).
There was significant coordinate with ComEd and other overhead utilities companies
to address their overhead utility conflicts with proposed poles.Offset and wall mounted
foundations were used to avoid utilities and contend with narrow right of way.Phase I of
the project includes 77 poles and 2 controllers.The design of phase 1 was completed in
early 2015 with construction completed by the end of 2015.The construction cost for the
project was$1.2 million.The design of the phase 2 will be complete in 2017.
www.civiltechinc.com
CIVILTECH
U.S. Route 14/Davis Street/Arthur Avenue Intersection
Improvement - Stage 3
Village of Arlington Heights
Construction Cost
$3.5 million
Funding
STP
Status
Phase II completed in 2012 F, ,t►erp111111}�� L
Construction completed in 2013 pl
Phase I Project Manager
Mary L.Young,P.E.,PTOE '
Phase II Project Manager
Jonathan R.Vana,P.E.
Phase II Project Engineer
Reid T.Magner,P.E.
Traffic Signal Engineer The purpose and need of the improvement is to reduce traffic congestion and delays
Joseph J.Emry,P.E. while improving the safety along the U.S.Route 14/Davis Street/Arthur Avenue
Phase III Project Manager roadways and the corresponding Arthur Avenue railroad crossing and the Prindle
James D.Ewers,P.E. Avenue underpass.
Resident Engineer The roadway geometry at the Arthur Avenue railroad crossing is inadequate to properly
John P.Vogelman,RE
accommodate the vehicles that use the railroad crossing.There is the need to provide
Scope of Services additional capacity at this intersection.Due to the large number of turning movements
Preparation of Contract Plans, at the intersection,an exclusive right turn lane on the northwest leg of U.S.Route 14
Specifications and Estimates at the intersection with Arthur Avenue and a left turn lane on the southeast leg of U.S.
Traffic Signal and Signal System Design Route 14 will be extended at the intersection with Arthur Avenue.In addition,a barrier
Street Rehabilitation and Reconstruction median will be constructed on the approaches to the railroad tracks to prevent vehicles
from maneuvering around protective gates when they are in a down position.
Lighting Design
Interagency Coordination Since the Prindle Avenue underpass is a high accident location with a majority of the
Appraisals accidents occurring when vehicles turn left from U.S.Route 14 to Prindle Avenue,
there is a need to provide left turn channelization.In order to prevent conflicting left
Land Acquisition turns from southeastbound U.S.Route 14 to Gregory Street,a barrier median will be
Resident Engineering constructed.This would allow only right-in/right-out access to Gregory Street.
Contract Documentation
The project entails geometric improvements,railroad coordination,p.c.c.pavement
QC/QA Material Testing widening and rehabilitation,traffic signal design,highway lighting,utility
Client Contact improvements,and sidewalk improvements.
Mr.Michael L.Pagones
Village of Arlington Heights Civiltech saw this project through implementation and completion by providing
33 S.Arlington Heights Road construction engineering for the Village.Intense coordination was required and
Arlington Heights,IL 60005 accomplished by our Phase III Team between the contractors,railroad,businesses and
847.368.5250 Arlington Heights.
mpagones@vah.com
www.civiltechinc.com
OWLTECH
IL Route 31 at Virginia Road & Klasen Road
McHenry County Division of Transportation
Construction Cost
$8.5 million
Funding
Federal,State,County
Status
Design completed in 2011
Construction completed in 2012
Phase 11 Project Manager I
Gary A.Blazek,P.E.
Senior Project Engineer
Kenneth W Hodgen,P.E.
Project Coordinator
Peter M.Layer
Project Engineer - r
Daniel T.Echols \
Christopher T.Braband,P.E. a
Traffic Signals ' _
Joseph J.Emry,P.E.
Brian R.DeSalle,P.E.,PTOE This$9.0 million intersection improvement included the reconstruction of the roadway
Phase III Project Manager/Construction QC/QA with full depth concrete pavement.There was well over a mile of pavement to be
James D.Ewers,P.E. reconstructed into a cross section of multiple through and turn lanes that helped to
Resident Engineer alleviate the heavy congestion that this intersection had experienced.The Virginia Road
Martin F.Ebert
Assistant Resident Engineers intersection was realigned to the north to increase the distance from the Klasen Road
John P.Vogelman,P.E. intersection and to intersect IL Route 31 at a 90 degree angle which improved safety
Andy F.Garb,P.E. and traffic flow.This section of roadway was part of the Phase I study for the Western
Documentation Engineer Algonquin Bypass that included traffic studies,alignment alternatives,capacity analysis,
Michael R.Lubicky intersection design studies and a location drainage study.The improvement completes
Surveyor MCDOT's street network improvements in the area.The project also included a new
Scope of Services drainage system,two new traffic signals and a bike path.Additional right-of-way
Roadway and Highway Design requirements were established by Civiltech.The project was designed on a fast track in
Environmental Assessment
and Design Studies order for MCDOT to obtain Federal Funding.
Traffic Engineering and Impact Studies
Intersection/Interchange Design Studies Civiltech's Construction Engineering Team,using our experienced full time inspection
Drainage Design procedures,successfully continued the extensive coordination between all stakeholders
Traffic Signal and Signal System Design of the improvement.Our team was instrumental in conjunction with the contractor
Capacity Analysis in proposing and accomplishing an adjustment to the traffic staging on Virginia Road
Coordination and Public Involvement
which resulted in two months of time saving on that portion of the project.
Interagency Coordination
Intersection Design Studies
Pavement Design
Preparation of Contract Plans,
Specifications and Estimates
Client Contact
Mr.Joseph R.Korpalski,Jr.,P.E.
County Engineer
McHenry County Division of Transportation
16111 Nelson Road
Woodstock,IL 60098
815.334.4960
jrkorpalski@co.mchenry.il.us
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
OWLTECH
Village of Oak Brook I April 28,2017
Attachement D
IDOT Preq ialifi(-;ati(.)i-i i_(,1tt�►
F---;latel1 ler!t oll QI aalific alirq )
Representative Project Experience
Team Organizational Chart
and Resumes
"t ()I )stilt"Ill t��a li(i�.�t 1i� ;i I
Anticipated Project Schedule
Cost Estimate of Consultant Services
North York Road/Harger Road Intersection Improvement
Village of Oak Brook
Team Organizational Chart
Village Public Works&
Engineering Staff
Phase 1 Engineering Phase 11 Engineering t Phase 111 Engineering j
I Director ofTraffio Director of Construction
Diroctor of Design Services
Environmental&Design _.,__.._,,...� Engineering Services and
Studies and QUQA and QC/CIA QCJQA
Jonathan R.Yana,P.E.
Mary L.Young,P.E.,PTOE n lames D.Ewers,P.E.
Project Manager Project Mana�er Resident Engineer
James R.Woods,P.E,PTOE Reid T.Magner, Donald J.Marek
Project Engineer Project Engineer
Jennifer M.Hyman,PE. Petro Kravets,P.E.
Design Engineer Traffic Engineer Design Engineer Traffic Signal Engineer Lighting Engineer Surveyor
Jennifer M.Hyman,P.E. Brian R.DeSalle,P.E_PTOE Trenton G.Bruns Joseph J.Emry,P.E. Derek N.Mall,P.E. Samuel C Moscatello
Geotechnlcal Services Environmental Studies -� Environmental Permitting Geotechnical Serv7ce
Topographic Survey Topographic Survey
Midland Standard 9 I Stuedemann Environmental Stuedeman En uonmental c Midland Standard
ill Jorgensen&Associates,Inc g
Engineering&Testing,Inc. _onsuhing,LLC Consulnng,LLC i Jorgensen&ASSOCIates,l i Engineering&Testing
North York Road/Harger Road Intersection Improvement
CIVILTECH Pillage of Oak Brook I April 28.2017
Phase I
CIVILTECH
Brian R . DeSalle , P. E . , PTOE
Engineer V
Education Mr.DeSalle has been employed in the field of transportation engineering consulting
M.S.Civil Engineering,2002 for 15 years.He serves as a Senior Project Engineer with specialization in traffic signal
Purdue University design,signal coordination and timing(SCAT),traffic simulation and modeling,and
B.S.Civil Engineering, 1999 traffic engineering and impact studies.He has expertise in advanced transportation
University of Missouri-Rolla software and modeling packages such as Synchro and VISSIM.
Traffic Signal Seminar,October 2009 Representative Projects
CECI/Illinois Department of
Transportation Traffic Signal and Signal System Design
Traffic Signal Workshop,April 2008 ■ Various Traffic Signal Designs,Illinois Department of Transportation—
Northwestern University Center District One
for Public Safety ■ Weiland Road Improvements(Lake Cook Road to IL Route 22);Lake County
VISSIM Intro Training,May 2006 Division of Transportation
PTV America ■Lake Cook Road Phase II;Village of Buffalo Grove;$43.5 million
VISSIM Advanced Training,July 2011 ■Quentin Road, U.S.Route 12 to IL Route 22;Lake County Division of
PTV America Transportation;$22.8 million
Synchro/SimTraffic Level II Training ■Elgin-O Hare Western Access(EOWA)IL Route 390,Lively Boulevard to Supreme
August 2011 Trafficware Drive;Illinois Tollway;$88.9 million
■ Traffic Signal Interconnect—Broadway/Sheridan Road,Hollywood Avenue to
Professional Registrations Devon Avenue;EJM Engineering,Inc.
Professional Engineer—Illinois; ■Brookfield Zoo—Phase II Design;Chicago Zoological Society;$3.4 million
062-058689 ■Fairfield Road/IL Route 176Phase II;Lake County Division of Transportation;
Professional Traffic Operations $15.0 million
Engineer—National Certification;2550 ■Kreutzer Road Phase II,•Village of Huntley;$4.7 million
Professional Organizations ■ Wilson Street Interconnect;City of Batavia;$2.6 million
■IL Route 31 at Klasen Road and Virginia Road;McHenry County Division of
Institute of Transportation Engineers Transportation;$9.0 million
■IL Route 31 Western Algonquin Bypass;McHenry County Division of
Areas of Specialization Transportation;$60.0 million
Traffic Signal and Signal System Design
Traffic Engineering and Impact Studies
Traffic Engineering and Impact Studies
■2016 Indefinite Quantities Traffic Engineering Services;City of Highland Park
Traffic Signal Timing and Optimization
•Crystal Lake Traffic Engineering Services;City of Crystal Lake
Traffic Modeling and Simulation
■ TE-1 On-Call Traffic Engineering Services;Village of Schaumburg
Safety Studies
■CVS Traffic Study;City of Crystal Lake
■Edwards Elementary School Annex Traffic Study;Public Building Commission
of Chicago
■ Traffic Engineering Services;Village of Libertyville
■2013 Maple Avenue/Fairview Avenue Traffic Study;Village of Downers Grove
■Roselle Road/Bethel Lane Intersection Study;Village of Schaumburg
■2013 Pleasant Square Traffic Impact Study Update;M/I Homes of Chicago,LLC
■Centegra Health System—Huntley Hospital;Centegra Health System
■Second Street One-Way/Two-Way Study;City of Elmhurst
■Memory Gardens Traffic Impact and Parking Study;SCI Illinois Services,Inc.
www.civiltechinccom
CMLTECH
Brian R . DeSalle , P. E . , PTOE
Engineer V
Representative Projects(Continued)
Traffic Engineering and Impact Studies(Continued)
•Lake County FairgroundslFarm Bureau Property Traffic Impact Study;
Lake County Division of Transportation
• Vernon Hills Traffic Engineering Services;Village of Vernon Hills
•Park Ridge Comprehensive Tragic and Parking Study;City of Park Ridge
• The Ravines Traffic Impact Study;The Harp Group
•Hamilton LakeslElgin-O Hare Expressway Access Study;Hamilton Partners
•I-90 at Meacham Road/Roselle Road Interchange Study;Village of Schaumburg
Traffic Signal Timing and Optimization
• 7horndale Avenue,Arlington Heights Road to IL Route 53;DuPage County
Division of Transportation
• Van Buren Street and Elgin Avenue Reconstruction;Gerald L.Heinz and Associates
• Various Tragic Control Warrant and Signal Timing Studies;City of Chicago
•Cubs Post-Game Timing Study—Irving Park Road;City of Chicago Office of
Emergency Management&Communications
Traffic Modeling and Simulation
•Stony Island Avenue Cycle Track(Synchro);Chicago Department of Transportation
•North Lake Shore Drive Phase I Study(Synchro and VISSIM);City of Chicago
•Ford Chicago Assembly Plant Traffic Simulation 2011 Update(VISSIM);
Alfred Benesch&Company
•CN Railway Acquisition of the E.J. &E.Railway—Traffic Impact Study(VISSIM);
Village of Barrington
•I-90/I-290/Meacham Road(Synchro);Village of Schaumburg
•IL Route 176lFairfield Road Phase I Study(VISSIM);—Lake County Division
of Transportation
• 7horndale Avenue Phase I Study(Synchro)—DuPage County Division of
Transportation
•Interstate 55 at IL Route 59 Interchange Study(Synchro)—City of Joliet
•Jane Addams Memorial Tollway(1-90)Master Planning Study,IL Route 53 to
Higgins Road(VISSIM);Illinois Tollway(VISSIM)
•Ridge Avenue,Howard Street to Lyons Street,Phase 1,II,and III(Synchro);
City of Evanston
•Lake Cook Road/Arlington Heights Road CFI Study(VISSIM);Lake County
Division of Transportation
REVISED:2017
www.civiltech i nc.com
CIVILTECH
Jenny J . Gantumur
Engineer II
Education Ms.Gantumur has been employed by Civiltech Engineering since June 2015.She
B.S.Civil Engineering and currently serves as a Design Engineer I for Phase I projects involving environmental and
Environmental Engineering,2015 location-design studies,public involvement,and traffic engineering.
University of Illinois at
Urbana-Champaign Representative Projects
Environmental Assessment and Design Studies
Professional Organizations ■2016 Surface Transportation Program Roadway Improvement Project;
Institute of Transportation Engineers Village of Libertyville
■Caton Farm-Bruce Road Phase I Study;Will County Division of Transportation
Areas of Specialization Traffic Engineering
Environmental Assessment and ■Quentin Road, U.S.Route 12 to IL Route 22;Lake County Division of Transportation
Design Studies
Accident Analysis Road and Highway Design
Road and Highway Design ■Meacham Road andAmerican Lane Pedestrian Enhancements;Village of Schaumburg
Traffic Engineering Accident Analysis
■State Parkway and National Parkway Roadway Improvements;Village of Schaumburg
REVISED:2017
www.civiltechinc.com
CMLTECH
James R . Woods , P. E . , PTOE
Project Manager
Education Mr.Woods has been employed in private consulting at Civiltech Engineering since June
B.S.Civil Engineering, 1997 1997.He currently serves as a Project Manager for the preparation of environmental and
Valparaiso University location-design studies and traffic engineering and impact studies.He also specializes in
highway noise measurement,modeling,analysis and reporting.In addition,Mr.Woods
FHWA Traffic Noise Model has expertise in transportation modeling and simulation packages including Synchro,
Training Course,August 1998 VISSIM and CORSIM.
Bowlby&Associates,Inc.
Phase I Process Overview and Location Representative Projects
and Environmental Studies,May 2004 Environmental Assessment and Design Studies
Illinois Department of Transportation ■Categorical Exclusion Group I,IL 83 at Greenleaf Avenue and PrattAvenue
Beginner-Advanced Synchro Intersection Improvements;Village of Elk Grove Village
and Sim Traffic Course,July 2000 a Project Development Report,7horndaleAvenueImprovements,IL Route 53(Rohlwing
University of Nebraska at Lincoln Road)to Arlington Heights Road,-DuPage County Division of Transportation
VISSIM Intro Training,May 2006 ■Environmental Class of Action Determination and Design Report,IL Route 22,
PTV America Quentin Road to IL Route 83;Illinois Department of Transportation;$36.0 million
■Project Development Report,Ridge Avenue Improvements,Howard Street to Lyons
Context Sensitive Street;City of Evanston;$6.6 million
Solutions Approach,May 2007
Illinois Department of Transportation a Project Development Report,95th Street Park and Ride,City of Naperville;$1.1 million
■Environmental Class of Action Determination and Combined Design Report,
Introduction to NEPA and Fairway Drive Extension, U.S.Route 45 to IL Route 60;Village of Vernon Hills;
Transportation Decision Making, $17.0 million
November 2009
FHWAlNationalHigovembes2009 ■Project Development Report,Naper Boulevard and Chicago Avenue/Maple Avenue
Course No. 142052 Intersection Improvement,•City of Naperville;$14.5 million
■Project Report, Washington Street,IL Route 83 to U.S.Route 45;Lake County
Highway Traffic Noise,August 2010 Division of Transportation;$6.5 million
FHWA/National Highway Institute
Course No. 142051 ■Design Study;Biesterfield Road Widening and Reconstruction,Meacham Road
to IL Route 53;Village of Elk Grove Village;$2.0 million
■Project Development Report,Rollins Road, U.S.Route 45 to IL Route 132;
Professional Registrations Lake County Division of Transportation;$5.0 million
Professional Engineer-Illinois; •Project Development Report,Prospect Street, U.S.Route 20 to IL Route 176,•
062-055445 City of Marengo;$3.6 million
Professional Traffic Operations Feasibility Studies
Engineer-National Certification;211 ■Hamilton Lakes/Elgin-O Hare Expressway Access Study;Hamilton Partners
■I-90 Corridor Study Local Agency Master Plan,IL Route 59 to Arlington Heights
Professional Organizations Road;Village of Schaumburg
Institute of Transportation Engineers ■Lake-Cook Road/Arlington Heights Road Continuous Flow Intersection Study;
Lake County Division of Transportation
Areas of Specialization •Strategic Regional Arterial Study—Subset No.5,•Illinois Department
Environmental Assessment of Transportation
and Design Studies •North-South Arterial Traffic Study;Village of Barrington
Feasibility Studies ■Naperville Road/Warrenville Road/I-88 Interchange Feasibility Study;DuPage
County Division of Transportation
Traffic Engineering and Impact Studies
Traffic Engineering and Impact Studies
Highway Noise Analysis •Batavia Park District Traffic Impact Study;City of Batavia
• Various Traffic Engineering Studies,City of Highland Park
•CN Railway Acquisition of the E,J&E Railway Traffic Impact Study;
Village of Barrington
•Memory Gardens Traffic Impact and Parking Study;SCI Illinois Services,Inc.
www.civiltechinc.com
OWLTECH
James R . Woods , P. E . , PTOE
Project Manager
Representative Projects(Continued)
Traffic Engineering and Impact Studies(Continued)
• Treehouse at the Ravines Traffic Impact and Parking Study;Harp Group
•Fairground/Farm Bureau Property Traffic Impact Study;Lake County Division
of Transportation
• Vernon Hills Traffic Engineering Services;Village of Vernon Hills
•Synnestvedt Property Redevelopment Traffic Impact Analysis and Preliminary
Engineering;Lennar Communities of Chicago,LLC
•IL Route 137 and Butterfield Road Traffic Access and Intersection Design Study;
Ashley Capital
•Proposed Plainfield Hospital Traffic Impact Analysis;Edward Hospital
•City-Wide Traffic Engineering Study;City of Aurora
•City Centre Traffic Circulation Study,City of Elmhurst
Highway Noise Analyses
•EnvironmentalAssessmentand Design Report,Weiland Road/Lake Cook Road,Lake
Cook Road to IL Route 22 and Buffalo Grove Road to Hastings Lane;Village of Buffalo
Grove and Cook County Highway Department;$80.0 million
•Environmental Assessment and Design Report, Quentin Road, U.S.Route 12 to IL
Route 22;Lake County Division of Transportation;$24.0 million
•Noise Analysis Technical Memorandum, Templeton Woods Traffic Noise Study,IL Route
83 from 31st Street to U.S.Route 34(Ogden Avenue);TK Templeton Woods,LLC
•Noise Analysis Technical Memorandum,Village of Oak Brook Noise Monitoring,
Interstate 294 from IL Route 38(Roosevelt Road)to 31st Street;Village of Oak Brook
•Project Development Report,Kreutzer Road Extension,IL Route 47 to south of Main
Street;Village of Huntley;$4.4 million
•EnvironmentalAssessmentand Design Report,Caton Farm Road and Bruce Road,
Gaylord Road to Cedar Road-Will County Department of Highways
•Environmental Class of Action Determination and Combined Design Report,IL
Route 22,Quentin Road to IL Route 83;Illinois Department of Transportation;
$36.0 million
•Jane Addams Memorial Tollway(I--90)Master Planning Study,IL Route 53
to Higgins Road;Illinois Tollway
•Project Development Report,Kreutzer Road Extension;Village of Huntley;
$3.7 million
•Project Development Report, Washington Street,Cedar Lake Road to Hainesville
Road;Lake County Division of Transportation;$6.6 million
•Environmental Assessment and Design Report,IL Route 31 Western Bypass,
Edgewood Drive to Rakow Road;McHenry County Division of Transportation;
$64.0 million
•Environmental Class of Action Determination and Project Development Report,
Orchard Road, U.S.Route 30 to Jericho Road;Kane County Division of
Transportation;$23.6 million
•Environmental Class of Action Determination and Project Development Report,
Fairway Drive Extension, U.S.Route 45 to IL Route 60;Village of Vernon Hills;
$17.0 million
•Project Development Report,Nailer Boulevard and Chicago Avenue/Maple Avenue
Intersection Improvement;City of Naperville;$14.5 million
REVISED:2014
www.civiltechinc.com
(_4�cz�_._
CIVILTECH
Jennifer M . Hyman , P. E .
Engineer IV
Education Ms.Hyman has been employed by Civiltech Engineering since November 2011.She
B.S.Civil Engineering,2010 currently serves as a Project Engineer for Phase I projects involving environmental and
Purdue University location-design studies,public involvement and traffic engineering and impact studies.
M.S.Civil Engineering,2011 Ms.Hyman specializes in geometric design studies and crash analyses.
Purdue University Representative Projects
Roadside Safety Design Environmental Assessment and Design Studies
FHWA/National Highway Institute
May 2016 ■Environmental Impact Study and Design Report,North Lake Shore Drive Phase I Study,-
Course No.380032A Illinois Department of Transportation,Chicago Department of Transportation
Roundabout Design Workshop, ■Environmental Assessment and Design Report,Darrell Road Phase I Study;
August 2015 Lake County Division of Transportation
Northwestern Center for Public Safety ■Environmental Assessment and Design Report, U.S.Route 14 Grade Separation at
Highway Safety Manual CNIEJ&E Railway;Village of Barrington;$60.5 million
Online Overview, ■Environmental Assessment and Design Report, Weiland Road/Lake Cook Road,
June 2015 Lake Cook Road to IL Route 22 and Buffalo Grove Road to Hastings Lane,
FHWA/National Highway Institute Village of Buffalo Grove,Cook County Department of Transportation;$96.0 million
Course No.380106 ■Environmental Assessment and Design Report, Caton Farm and Bruce Road,
Introduction to NEPA and Gaylord Road to Cedar Road;Will County Department of Highways
Transportation Decision Making, ■Project Development Report, Quentin Road, U.S.Route 12 to IL Route 22;
November 2014 Lake County Division of Transportation;$22.8 million
FHWA/National Highway Institute
Course No. 142052 ■Categorical Exclusion Group II, Church Road Bike Path Phase I Study, Grove
Avenue to Irving Park Road;Village of Bensenville
Professional Registrations ■Categorical Exclusion Group I, Caton Farm Road and Essington Road Intersection
Professional Engineer-Illinois; Improvement;City of Joliet;$2.5 million
062-066983 ■Categorical Exclusion Group I, Greentree Parkway/Red Top Drive/4th Avenue
Resurfacing;Village of Libertyville;$1.4 million
Professional Organizations ■Categorical Exclusion Group I,Higgins Road(IL Route 72)Bike Path Phase I
Study;Village of Schaumburg
Institute of Transportation Engineers
■Categorical Exclusion Group I,Rockland Road Phase I Study,IL Route 21 to St.
Areas of Specialization Mary's Road;Village of Libertyville,Libertyville Township
Environmental Assessment Feasibility Studies
and Design Studies ■ Tuscan Woods Noise Barrier;Village of Oak Brook
Road and Highway Design ■North York Road Feasibility Study;Village of Oak Brook
Intersection Design Studies ■Hamilton Lakes/Elgin-O Hare Expressway Access Study;Hamilton Partners
Feasibility Studies Traffic Engineering and Impact Studies
Traffic Engineering and Impact Studies ■Vernon Hills Traffic Engineering Studies;Village of Vernon Hills
Crash Analysis ■Roselle Road and Bethel Lane Traffic Study,Village of Schaumburg
■Meacham Road atAmerican Lane Crosswalk;Village of Schaumburg
■Glen Ellyn STPApplication and Pennsylvania One-Way, Two-Way Study;
Village of Glen Ellyn
Site Design Engineering
■Panera Bread Site Plans;Village of Highland Park
REVISED:2017
www.civiltechinc.com
CIVILTECH
Mary L. Young , P. E . , PTOE
Director of Traffic, Environmental and Design Studies
Education Ms.Young has been employed in private consulting engineering since 1991 and serves
B.S.Civil Engineering, 1991 as the Director of Civiltech's Traffic,Environmental and Design Studies Department.
University of Illinois at Ms.Young possesses expertise in comprehensive impact studies,traffic engineering,
Urbana-Champaign and environmental/location-design studies for projects ranging from intersection
Administrative Record,May 2016 improvements to major roadway corridor projects.Ms.Young has had extensive training
FHWA/National Highway Institute in the National Environmental Policy Act procedures and methodologies and is pre-
Course No. 142062 qualified by IDOT at the Environmental Impact Statement(EIS)level.She is able
NEPA and Transportation Decision to create effective stakeholder involvement programs as part of the context sensitive
Making,June 2007 design process through her extensive knowledge of the transportation planning and
FHWA/National Highway Institute implementation process combined with her communication skills.Ms.Young is a
Course No. 142005 registered Professional Engineer in Illinois as well as a nationally certified Professional
Beyond Compliance:Historic Traffic Operations Engineer.
Preservation in Transportation Project
Development,November 2013 Representative Projects
FHWA/National Highway Institute Environmental and Design Studies
Course No. 142049 ■Environmental Impact Statement,North Lake Shore Drive, Grand Avenue to
Environmental Impact Assessment: Hollywood Avenue;City of Chicago;$1.5 billion
National Environmental Policy Act and ■Environmental Assessment and Design Report, U.S.Route 14 at CNRailroad Grade
Related Requirements,April 2003 Separation;Village of Barrington;$62.8 million
American Law Institute/
Environmental Law Institute ■Environmental Assessment and Design Report,IL Route3l Western Bypass,
Environmental Impacts of Edgewood Drive to Rakow Road;McHenry County Division of Transportation;
Highway Projects,March 1998 $81.7 million
University of Wisconsin at Madison ■Environmental Assessment and Design Report, Weiland Road/Lake Cook Road,
Context Sensitive Solutions Lake Cook Road to IL Route 22 and Buffalo Grove Road to Hastings Lane;
Awareness Class,October 2006 Village of Buffalo Grove and Cook County Highway Department;$96.0 million
Illinois Department of Transportation ■Environmental Class of Action Determination and Design Report,IL Route 22,
Administrative Record,May 2016 Quentin Road to IL Route 83;Illinois Department of Transportation;$36.0 million
FHWA/National Highway Institute ■Environmental Class of Action Determination and Project Development Report,
Course No. 142062 Quentin Road,South of Lang Grove Road to North of U.S.Route 12;
Lake County Division of Transportation;$17.8 million
Professional Registrations ■Environmental Class of Action Determination and Project Development Report,
Orchard Road, U.S.Route 30 to Jericho Road;Kane County Division of
Professional Engineer-Illinois; Transportation;$23.6 million
062-050889
■Environmental Class of Action Determination and Project Development Report,
Professional Traffic Operations Fairway Drive Extension, U.S.Route 45 to IL Route 60;Village of Vernon Hills;
Engineer-National Certification;346 $17.0 million
■Project Development Report, Quentin Road, U.S.Route 12 to IL Route 22;Lake
Professional Organizations County Division of Transportation;$22.8 million
American Society of Civil Engineers ■Project Report,Fairfield Road/IL Route 176•Lake County Division of Transportation;
Institute of Transportation Engineers $20.0 million
■Project Development Report, Willow Road, West Village Limit to Provident Avenue,
Areas of Specialization Village of Winnetka;$6.0 million
Environmental and Design Studies ■Project Development Report,Caton Farm Road/Essington Road Intersection
Improvement,City of Joliet;$2.5million
Feasibility Studies ■Project Development Report,Kreutzer Road Extension;Village of Huntley;$4.7 million
Traffic Engineering
www.civiltechinc.com
CIVILTECH
Mary L. Young , P. E . , PTOE
Director of Traffic, Environmental and Design Studies
Representative Projects(Continued)
Environmental and Design Studies(Continued)
•Project Development Report, Washington Street,Cedar Lake Road to Hainesvide Road;
Lake County Division of Transportation;$8.5 million
•Project Development Report,Ridge Avenue Improvements,Howard Street to Lyons
Street;City of Evanston;$6.6 million
•Project Development Report,Arthur Avenue/Davis Street/U.S.Route 14
Improvement;Village of Arlington Heights;$5.0 million
•Project Development Report,Barrington Road/Schaumburg Road Intersection
Improvement,'Village of Schaumburg;$6.5 million
•Project Development Report,Arlington Heights Road/Devon Avenue Intersection
Improvement;Village of Elk Grove Village;$3.4 million
•Project Development Report, Wise Road,Roselle Road to Plum Grove Road;
Village of Schaumburg;$6.3 million
•Project Development Report,Lively Boulevard,Devon Avenue to TouhyAvenue,-
Village of Elk Grove Village;$4.6 million
•Project Development Report,Devon Avenue/Tonne Road Intersection Improvement;
Village of Elk Grove Village;$2.1 million
Feasibility Studies
•Jane Addams Memorial Tollway(1-90)Master Planning Study,IL Route 53
to Higgins Road,•Illinois Tollway
•1-55 at IL Route 59Joliet Interchange Improvement;City of Joliet
•1-90 Corridor Study Local Agency Master Plan,IL Route 59 to Arlington Heights
Road;Village of Schaumburg
•Lake-Cook Road/Arlington Heights Road Continuous Flow Intersection Study;
Lake County Division of Transportation
•IL Route 60/Butterfield Road Grade Separation Study;Lake County Division
of Transportation
•Strategic RegionalArterial Study-Subset No.5,Illinois Department
of Transportation
•North-South Arterial Traffic Study;Village of Barrington
•Naperville Road/Warrenville Road/I-88 Interchange Feasibility Study,DuPage
County Division of Transportation
•IL Route 6211L Route 31 Congestion Mitigation Feasibility Study;McHenry County
Division of Transportation
Traffic Engineering
• Traffic Impact Study,Bridge Street Town Centre,360-Acre Commercial
Development;City of Joliet
•City-Wide Traffic and Parking Study;City of Park Ridge
• Various Traffic and Safety Studies;Illinois Department of Transportation
•City-Wide Traffic Engineering Study;Bike and Pedestrian Plan;City of Aurora
REYISED:2017
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
Village of Oak Brook I April 28,2017
Phase II
CIVILTECH
Jonathan R . Vana, P. E .
Director of Design Services
Education Mr.Vana has been employed in private consulting engineering since 1994.He serves as
B.S.Civil Engineering, 1994 the head of the Phase I1 design department for projects including freeways,highways,local
Valparaiso University streets,municipal infrastructure and site developments.Mr.Vana has expertise in the areas
of highway and roadway geometrics and drainage,sewer and watermain design,local street
Professional Registrations rehabilitation and reconstruction,bicycle facilities,site planning and development and
construction inspection.
Professional Engineer-Illinois;
062-055021 Representative Projects
Roadway and Highway Design
Professional Organizations ■ Weiland Road-Lake Cook Road to IL Route 22 and Lake Cook Road-Buffalo
American Public Works Association Grove Road to Hastings Lane;Village of Buffalo Grove and Cook County
Department of Transportation and Highways;$68.0 million
American Society of Civil Engineers ■Fairfield Road/IL Route 176junction Improvement;Lake County Division of
ACEC-Illinois Tollway Subcommittee Transportation;$15.0 million
ACEC-IDOT District 1 Subcommittee •IL Route 31 Algonquin Western Bypass;McHenry County Division of
Transportation;$64.0 million
Areas of Specialization ' U.S.Route 30, U.S.Route 45 to IL 43;Illinois Department of Transportation;
$30.0 million
Freeway and Tollway Design ■Atkinson Road Extension;Village of Grayslake;$6.0 million
Roadway and Highway Design •Barrington RoadatSchaumburgRoad;Village of Schaumburg;$7.4 million
Preparation of Contract Plans, ■Shoe Factory Road Improvements;Village of Hoffman Estates;$15.5 million
Specifications and Estimates ■Stearns Road,Kane County Division of Transportation;$9.0 million
Drainage Design a Wright Boulevard;Village of Schaumburg;$5.3 million
Street Rehabilitation and Reconstruction 'Ridge Avenue,Lyons Street to Howard Street,Phase I,II and III,'City of Evanston;
$7.1 million
Site Design Engineering ■ Wise Road Phase 11 Improvements;Village of Schaumburg;$6.3 million
Construction Inspection ■Quentin Road Improvement,Long Grove Road to North of U.S.Route 12;
Lake County Division of Transportation;$10.0 million
■Haligus Road STP Improvement;Village of Huntley;$1.8 million
■ U.S.Route 14/Davis Street/Arthur Avenue Intersection Improvement-Stage 3;
Village of Arlington Heights;$2.5 million
■Lively Boulevard STP Improvement,Devon to Touby;Village of Elk Grove Village;
$5.0 million
■Biesterfield Road and Widening and Reconstruction;Village of Elk Grove Village;
$2.0 million
■Rollins Road Extension;Lake County Division of Transportation;$5.4 million
■Devon Avenue and Tonne Road STP Intersection Improvement;Village of Elk Grove
Village;$2.1 million
■Hawthorne Lane STP Improvement,Arbor Avenue to Prince Crossing Road;
City of West Chicago;$1.8 million
■Busch Parkway/Deerfield Parkway Connector;Village of Buffalo Grove;
$1.6 million
■Bell Road and 151st Street Intersection Improvement;Will County Highway
Department;$2.5 million
■IL Route 43 and Westmoreland Drive Intersection Improvement;City of Lake
Forest;$600,000
■Quentin Road and Lake Cook Road Improvements,'Village of Deer Park;$8.0 million
www.civiltechinc.com
CIVILTECH
Jonathan R . Vana, P. E .
Director of Design Services
Representative Projects(Continued)
Roadway and Highway Design(Continued)
•IL Route 83/Busse Road and Devon Avenue STP Intersection Improvement'
Village of Elk Grove Village;$3.65 million
•IL Route 83 1Busse Road and Landmeier Road Intersection Improvement;
Village of Elk Grove Village;$2.57 million
Freeway and Tollway Design
■Elgin O Hare Western Access(EOWA)IL-390,Lively Boulevard to Supreme Drive;
Illinois Tollway;$88.9 million
■I-90 Pavement Rehabilitation(Elmhurst Road to Golf Road);Illinois Tollway;
$20.0 million
•Northwest Tollway Resurfacing,Newburg Road to IL Route 173;Illinois Tollway;
$14.2 million
■I-90 Master Plan,IL Route 53 to Higgins Road;Ilinois Tollway;$240.0 million
Street Rehabilitation and Reconstruction
•South Broadway Improvements;Village of Lombard;$2.0 million
•Duane Street Main Basin Improvement;Village of Glen Ellyn;$2.5 million
•North Industrial Park Street Rehabilitation;Village of Lombard;$2.7 million
•Special Assessment 219 Watermain and Sanitary Sewer Replacement;Village of
Lombard;$1.0 million
•Olde Towne East Project;Village of Lombard;$5.0 million
•Lombard Road STP Project Fullerton Avenue to U.S.Route 20,Village of Addison;
$3.4 million
•Lombard Hills East Residential Street Improvement;Village of Lombard;$9.0 million
Bikeway and Pedestrian Facility Design
•Gilmer Road over Bicycle Path Underpass;Lake County Forest Preserve District;
$1.3 million
•Grand Avenue Underpass;Lake County Forest Preserve District
•Monaville Road Bike Path Underpass;Lake County Division of Transportation;
$1.6 million
•York Road/Harger Road Bicycle/Pedestrian Path STP Improvement;Village of Oak
Brook;$1.9 million
•Busse Road Transit Corridor Improvement Project;Village of Elk Grove Village;
$1.1 million
Site Design Engineering
•Nike Site Redevelopment Stage 1B, Stevenson High School Parcel;Adlai E.
Stevenson High School District#125;$1.5 million
•Fort Drum Exchange Site Design;The Jenkins Group
•Offutt Air Force Base Exchange;The Jenkins Group;$4.0 million
•Robins Air Force Base Commissary;The Jenkins Group;$2.0 million
•Fort McCoy Commissary;The Jenkins Group;(Site Design Engineering)$500,000
•Elk Grove Town Center;Hamilton Partners;$3.0 million
•Prairie Point Center;Hamilton Partners;$2.2 million
•Fort Hamilton Commissary,'The Jenkins Group;$700,000
•Scott Air Force Base Exchange Project,'The Jenkins Group;$2.2 million
REVISED:2015
www.civiltechinc.com
CIVILTECH
Reid T. Magner, P. E .
Project Manager
Education Mr.Magner has been employed in the private consulting engineering field since
1998.He serves as Project Manager assisting in roadway and highway design,bicycle/
B.S.Civil Engineering, 1997 pedestrian facilities,storm water management and drainage design,sanitary and water
Purdue University main design,and site development,and is responsible for the preparation of engineering
specialty reports for land acquisition and eminent domain projects.He is qualified as an
Professional Registrations expert witness through the Illinois Commerce Commission and Circuit Courts of Cook,
National Council of Examiners for McHenry,DuPage,Kane,Will and Lake Counties.Mr.Magner's experience is in the
Engineering and Surveying- implementation of projects for private development,local municipalities,counties,and
Record ur 43945 state agencies utilizing Local Federal,MFT,and other specialty type funding.
Professional Engineer-Illinois; He is very familiar with the conformance standards,guidelines,and regulations for
062-056273 implementing projects through each of the Storm Water Management Commissions,
Soil and Water Conservation Districts,Division of Transportations,Illinois Department
Professional Organizations of Transportation,U.S.Army Corps.Of Engineers,Illinois Department of Natural
American Society of Civil Engineers Resources,Illinois Historical Preservation Agency,Illinois Environmental Protection
Agency,Illinois Natural Resource and Conservation Service,and the U.S.Fish and
American Public Works Association— Wildlife Service.
Chicago Metro Chapter,
Suburban Branch President,2011 Representative Projects
American Public Works Association— Roadway and Highway Design
Chicago Metro Chapter,
Suburban Branch Awards Chair, 'Army Trail Boulevard Water Main and Resurfacing,Village of Addison
2008-2011 ■Industrial Drive Roadway Improvements;City of Elmhurst
American Public Works Association— ■Church Road Reconstruction,Jefferson to Grove;Village of Bensenville
Chicago Metro Chapter Awards Chair, ■Weiland Road,Lake Cook to IL Route 22;Lake County Division of Transportation;
2012-2016
$50.0 million
•Quentin Road Improvement,Long Grove Road to IL Route 22;Lake County
Areas of Specialization Division of Transportation;$40.0 million
Roadway and Highway Design ■Petite Lake Road Realignment,IL Route 59 to IL Route 83;Lake County Division
Bikeway and Pedestrian Facility Design of Transportation;$8.0 million
Municipal Utility Design ■Naperville Road/Warrenville Road Grade Separation and I-88 Interchange
Drainage Design Improvement;DuPage County Division of Transportation;$68.0 million
Site Design ■55th Street,Dunham Road to Clarendon Hills Road;DuPage County Division of
Transportation
Specialty Reports ■ U.S.Route 14 1Davis Street/Arthur Avenue Intersection Improvement-Stage 3;
Village of Arlington Heights;$5.0 million
Land Acquisition Engineer
■Ridge Avenue,Lyons Street to Howard Street,'City of Evanston;$6.0 million
Qualified as an expert witness through a North Industrial Park Concrete Overlay,•Village of Lombard;$3.0 million
the Illinois Commerce Commission
and Circuit Courts of Cook,McHenry, ■ Washington Street,Cedar Lake Road to Hainesville Road;Lake County Division
DuPage,Kane,Will and Lake Counties of Transportation;$6.0 million
■ Umbdenstock Road Bridge over the Chicago Central er Pacific Railroad;Kane
County Division of Transportation;$3.0 million
Bike and Pedestrian Facility Design
•Route 59 Sidewalks, 119th Street to 87th Street;City of Naperville;$1.0 million
•Middlefork Savanna Trail Connection;Lake County Forest Preserve District
•Gilmer Road Bicycle Path Underpass;Lake County Forest Preserve District;$1.3 million
•Mill Road Sidewalk Over I-290;Village of Addison;$500,000
www.civiltechinc.com
Reid T. Magner, P. E .
Project Manager
Representative Projects(Continued)
Bike and Pedestrian Facility Design(Continued)
•Grand Avenue Bicycle Underpass;Lake County Forest Preserve District;
$2.7 million
•Aptakisic Sidewalk over the Canadian National Railroad;Lake County Division of
Transportation;$500,000
Drainage Design
•Five Year Earth Embankment Dam Inspection;The Levy Organization
•Nike Site Water Well;Village of Vernon Hills;$160,000
•East Branch DuPage River Drainage Improvements Project;DuPage County
Division of Transportation;$1.0 million
•Rollins Road Extension;Lake County Division of Transportation;$5.4 million
•Metra North Central Service Expansion Commuter Parking Lot Improvements and
Detention Facilities,Buffalo Grove Station;Vernon Township;$1.2 million
•Raleigh Drive Drainage Improvements;Vernon Township;$60,000
Site Design Engineering
•Ridgefield Development-Door Township,McHenry County;Prudential First
Commercial Realty;$680,000
•New Faith Baptist Site Design;Harding Partners
• Woodfield Lake Office Campus Association Drainage Investigation;The Levy
Organization;$1.2 million
•One Woodfield Lake Parking Lot Improvement;The Levy Organization;
$1.0 million
•Rand l Deerpath Retail Center;Hamilton Partners;$800,000
•Joint NIKE Site Redevelopment;Village of Vernon Hills;$18.0 million
•Independence Grove Parking Lot Addition;Lake County Forest Preserve District;
$1.0 million
•Project Development Report,95th Street Park and Ride;City of Naperville;
$1.1 million
•Lemont Commuter Parking LotAddition;Village of Lemont;$140,000
Specialty Reports
• US 45,143rd to 179th;Illinois Department of Transportation—District 1
•IL 71US 6,I-355 to US 45;Illinois Department of Transportation—District 1
•IL 83 at Rollins Road;Illinois Department of Transportation—District 1
• Wood Street, US 6 to 138tb;Illinois Department of Transportation—District 1
•IL 64,Kautz to IL 59;Illinois Department of Transportation—District 1
•IL 21,IL 120 to IL 137'Illinois Department of Transportation—District 1
•IL 59,Aurora to Ferry;Illinois Department of Transportation—District 1
•IL 47,Kreutzer to Reed;Illinois Department of Transportation—District 1
•Elgin O Hare Expressway;Illinois Tollway
• US Route 41 at IL Route 132;Illinois Department of Transportation—District 1
REVISED:2017
www.civiltechinc.com
CIVILTECH
Petro Kravets , P. E .
Engineer IV
Education Mr.Kravets has worked for Civiltech Engineering since May 2008,where his duties
B.S.Civil Engineering,2008 involved plan and special provision preparation,geometric design,drainage design,and
University of Illinois at Chicago cost estimating.Previously he has worked for Village of Hoffman Estates as a summer
intern where his responsibilities included field inspection,surveying and working with
Professional Registrations construction plans.
Professional Engineer-Illinois; Representative Projects
062-064574 Roadway and Highway Design
■Quentin Road ImprovementLong Grove Road to North of U.S.Route 12;
Professional Organizations Lake County Division of Transportation;$6.7 million
Tau Beta Pi-The Engineering ■Quentin Road Improvement, U.S.Route 12 to IL Route 22;Lake County Division
Honor Society of Transportation
■ Weiland Road Improvements(Lake Cook Road to IL Route 22);Lake County
Areas of Specialization Division of Transportation
Roadway and Highway Design ■ Washington Street, Cedar Lake Rd to Hainesville Rd,•Lake County Division of
Bikeway and Pedestrian Facility Design Transportation;$5.9 million
Street Rehabilitation and Reconstruction a Petite Lake Road Re Alignment;Lake County Division of Transportation;
$3.4 million
■Petite Lake Road Reconstruction(IL Rte 59 to Fairfield Road);Lake County
Division of Transportation;$1.2 million
■Arlington Heights Road and Buffalo Grove Road Concrete Pavement Rehabilitation;
Lake County Division of Transportation;$2.4 million
a Addison Road Resurfacing and Watermain Improvements;Village of Addison;
$3.7 million
■Umbdenstock Road Bridge Replacement;Kane County Division of Transportation;
$2.9 million
■North Industrial Park Street Rehabilitation;Village of Lombard;$2.7 million
Bikeway and Pedestrian Facility Design
•Gilmer Road over Bicycle Path Underpass;Lake County Forest Preserve District;
$1.8 million
• Grand Avenue Underpass;Lake County Forest Preserve District;$2.7 million
•Route 59 Sidewalks, 199th Street to 87th Street,City of Naperville;$900,000
REVISED:2016
www.civiltechinc.com
OWLTECH
Trenton G . Bruns
Engineer I
Education Mr.Bruns joined the Phase II department of Civiltech in June of 2014 after completing his
B.S.Civil Engineering,2014 Bachelor's degree at the University of Illinois in Champaign-Urbana.During his time at the
University of Illinois University of Illinois,his coursework focused on the geometric design of roadways as well as
at Urbana-Champaign highway drainage.
Areas of Concentration Representative Projects
Roadway and Highway Design Preparation of Contract Plans,Specifications and Estimates
Freeway and Tollway design '2014 Sanitary Sewer Lining;Village of Berkeley;$700,000
Preparation of Contract Plans, Roadway and Highway Design
Specifications and Estimates .Quentin Road, US 12 to IL 22;Lake County Division of Transportation
Pavement Design .Lively Boulevard;Village of Elk Grove Village;$3.2 million
■Essington Roadand Caton Farm Road;City of Joliet;$1.8 million
■McDermott Drive;Village of Berkeley;$2.3 million
■Roselle Road at Schaumburg Road'Village of Schaumburg;$800,000
■Weiland Road Improvements,Lake Cook Road to IL Route 22,'Lake County Division
of Transportation
Parking Lot Design
■ Village of Berkeley Electric Avenue Parking Lot;Village of Berkeley;$200,000
Street Rehabilitation and Reconstruction
•Biesterfield Road and Gibson Drive Rehabilitation;Village of Elk Grove Village;
$1.2 million
•Berkeley Street Resurfacing 2015;Village of Berkeley;$600,000
REVISED:2016
www.civiltechinc.com
OWLTECH
Joseph J . Emry, P. E .
Project Manager
Education Mr.Emry has been employed as an engineer by Civiltech Engineering since 1999.His
B.S.Civil Engineering, 1999 responsibilities include overseeing the design of traffic signals for the Illinois Department of
Valparaiso University Transportation and other local agencies and municipalities.He also works to complete safety
Traffic Signal Workshop,April 2000 studies,traffic impact studies,and environmental/design study projects.
Northwestern University Center Representative Projects
for Public Safety
Traffic Signal and Signal System Design
Phase I Process Overview,March 2006
Illinois Department of Transportation 'Citywide Construction Engineering;Chicago Department of Transportation,
Division of Engineering
Road Safety Assessments,June 2007
Illinois Department of Transportation •Lake Cook Road;Village of Buffalo Grove;$43.5 million
'Essington Road and Caton Farm Road,City of Joliet
Highway Safety Manual,December 2008
Institute of Transportation Engineers ■Roselle Road at Schaumburg Road;Village of Schaumburg
Traffic Signal Seminar,October 2009 ■Quentin Road, U.S.Route 12 to IL Route 22;Lake County Division of
CECI/IDOT Transportation;$22.8.million
2009 MUTCD Workshop,May 2010 ■Barrington Road at ScbaumburgRoad;Village of Schaumburg;$6.6 million
Institute of Transportation Engineers ■Fairfield Road/Route 176 Improvement;Lake County Division of Transportation;
$11.8 million
Professional Registrations ■Elgin O Hare Western Access(EOWA)IL-390,Lively Boulevard to Supreme Drive;
Professional Engineer-Illinois; Illinois Tollway;$88.9 million
062-057496 ' Wise Road Phase H Improvements;Village of Schaumburg;$6.3 million
■Devon and Arlington Heights Intersection Phase 11;Village of Elk Grove Village;
Professional Organizations $2.6 million
Institute of Transportation Engineers 'Lively Boulevard STP Improvement,Devon to Touhy,-Village of Elk Grove Village;
$5.0 million
Areas of Specialization 'Fairview Avenue Traffic Signal Modernization and Interconnect;Village
of Downers Grove;$770,000
Traffic Signal and Signal System Design
■Quentin Road and Lake Cook Road Improvements;Lake County Division of
Environmental Assessment Transportation;$10.0 million
and Design Studies
■ Various Traffic Signal Projects,Region];Illinois Department of Transportation,
Traffic Engineering and Impact Studies Divison of Highways
Safety Studies ■Naperville Road/Warrenville Road/I-88 Reagan Tollway Improvement;
DuPage County Division of Transportation;$68.0 million
■Fabyan Parkway Traffic Signal Interconnect;Kane County Division
Of Transportation;$1.0 million
■Meacham Road, Tower Road to Algonquin Road;Village of Schaumburg;
$7.0 million
■ U.S.Route 14/Davis Street/Arthur Avenue Intersection Improvement;Village of
Arlington Heights;$5.0 million
■Deerfield Road Rehabilitation, Wilmot Road to Park Avenue;Village of Deerfield;
$3.3 million
■Deerfield Parkway Improvement,IL Route 83 to Weiland Road;Village of Buffalo
Grove;$7.0 million
■IL Route 31 Algonquin Western Bypass;McHenry County Division of
Transportation;$64.0 million
www.civiltechinc.com
(�4�cz�-.-
CIVILTECH
Joseph J . Emry, P. E .
Project Manager
Representative Projects(Continued)
Traffic Signal and Signal System Design(Continued)
• Wilson Street Interconnect;City of Batavia;$2.6 million
•Stearns Road;Kane County Division of Transportation;$9.0 million
•Quentin Road Improvement,Long Grove Road to White Pine Road,,Lake County
Division of Transportation;$17.8 million
• U.S.Route 30, U.S.Route 45 to IL Route 43;Illinois Department of Transportation;
$30.0 million
Environmental Assessment and Design Studies
•Environmental Assessment and Design Report, U.S.Route 14 Grade Separation at
CN/EJd'E Railway;Village of Barrington;$60.5 million
•Environmental Assessment and Design Report,IL Route 31 Western Bypass,
Edgewood Drive to Rakow Road,-McHenry County Division of Transportation;
$50.4 million
•Environmental Class of Action Determination and Design Report,IL Route 22
Quentin Road to IL Route 83;Illinois Department of Transportation;$29.0 million
•Project Development Report,•Deerpath Road at Mill Creek;City of Batavia;
$1.0 million
Traffic Engineering and Impact Studies
•Pinetree Mall Traffic Study,City of Crystal Lake
•Pleasant Square Traffic Impact Study;Village of Schaumburg
• Treehouse at the Ravines Tr-ffiic and Parking Study;The Harp Group
•Shoe Factory Road Improvements;Village of Hoffman Estates
•Elgin Regional Park;City of Elgin
•College of DuPage Traffic Study,•College of DuPage
•Wilson Street/Prairie Street Traffic Analysis;City of Batavia
Safety Studies
■ Various Safety Assessments,Region I/District 1;Illinois Department
of Transportation
REVISED:2017
www.civiltechinc.com
CIVILTECH
Derek N . Mall , P. E .
Project Manager
Education Mr.Mall has been employed in private consulting engineering since 1992.He currently
B.S.Civil Engineering, 1992 serves as a Project Manager focusing on geometric design and the development of
Bradley University contract plans and specifications for street and highway improvement projects.He also is
M.S.Civil Engineering, 1998 responsible for highway and pedestrian lighting designs.
University of Illinois at Chicago Representative Projects
Professional Registrations Roadway and Highway Design
■Algonquin Road at West Drive Intersection Improvements;Village of Schaumburg;
Professional Engineer-Illinois; $2.4 million
062-051308
■Finley Road Improvements;Village of Lombard;$3.9 million
Professional Organizations •Stearns Road;Kane County Division of Transportation;$9.0 million
American Society of Civil Engineers •Atkinson Road Extension;Village of Grayslake;$6.0 million
Illuminating Engineering Society ■Shoe Factory Road Improvements;Village of Hoffman Estates;$15.5 million
of North America ■Naperville Road/Warrenville Road Grade Separation and I-88 Interchange
Improvement;DuPage County Division of Transportation;$68.0 million
Areas of Specialization ■Belmont/Sheridan/Lake Shore Drive STP Improvement;Chicago Department of
Roadway and Highway Design Transportation-Bureau of Highways;$1.3 million
Freeway and Tollway Design ■Stearns School Road,Dilley's Road to Skokie Highway(U.S.41);Lake County
Division of Transportation;$1.2 million
Lighting Design a Cedar Lake Road Improvement,North Rosedale Court to Rollins Road;Lake
Watermain Design County Division of Transportation;$2.2 million
Street Rehabilitation and Reconstruction ■71st Street,South Shore Drive and Yates Boulevard Intersection Improvement;
Preparation of Contract Plans, Chicago Department of Transportation-Bureau of Highways;$1.4 million
Specifications and Estimates
Freeway and Tollway Design
•Elgin O Hare Western Access(EOWA)IL-390,Lively Boulevard to Supreme Drive;
Illinois Tollway;$88.9 million
•I-90 Pavement Rehabilitation(Elmhurst Road to Golf Road),•Illinois Tollway;$20.0 million
•I-90 Master Plan,IL Route 53 to Higgins Road;Ilinois Tollway;$240.0 million
•Contract RR-03-5168;I-Pass Only Lane Expansion(Plazas 37 and 51);Illinois
Tollway;$1.5 million
•Northwest Tollway Resurfacing,Newburg Road to IL Route 173;Illinois Tollway;
$14.2 million
•I-90 Interchange Improvement at Rockton Road;Illinois Tollway;$3.0 million
Lighting Design
•Arterial Street Lighting;Village of Schaumburg;$1.7 million
•Dundee Road Lighting;Village of Wheeling;$2.7 million
•Lake Cook Road;Village of Buffalo Grove;$45.0 million
•Lake Zurich Road at US Route 14;Village of Barrington;$3.9 million
•Barrington Road at Schaumburg Road;Village of Schaumburg;$6.6 million
• Wright Boulevard;Village of Schaumburg;$5.3 million
• Wise Road Phase 11 Improvements;Village of Schaumburg;$6.3 million
www.dviltechinc.com
OWLTECH
Derek N . Mall , P. E .
Project Manager
Representative Projects(Continued)
Lighting Design(Continued)
•Gilmer Road over Bicycle Path Underpass,Lake County Forest Preserve District;
$1.3 million
•Grand Avenue Underpass;Lake County Forest Preserve District
•IL Route 31(Western Algonquin Bypass);McHenry County Division of Transportation;
$60 million
•Main Street Lighting,Roosevelt Road to North Avenue;Village of Lombard;$3.0 million
•Lively Boulevard,Devon Avenue to Touhy Avenue;Village of Elk Grove Village;
$4.6 million
•Busse Road(IL 83)Lighting,Mark Street to Howard Street;Village of Elk Grove
Village;$2.2 million
•Haligus Road STP Improvement;Village of Huntley;$1.8 million
•Naperville Road/Warrenville Road Grade Separation and I-88 Interchange
Improvement; DuPage County Division of Transportation;$68.0 million
•Dundee Road(IL 68)Intersection Lighting Improvement at Arlington Heights Road
and Buffalo Grove Road,•Village of Buffalo Grove;$1.4 million
•I-90 Interchange Improvement at Rockton Road;Illinois Tollway;$3.0 million
•Green Bay Road Streetscape Improvement;Village of Wilmette;$1.3 million
•Canal Street Reconstruction and Streetscape;Village of Lemont;$1.14 million
•Mundelein Downtown Streetscape Improvement;Village of Mundelein;$1.9 million
Watermain Design
•Elgin O Hare Western Access(EOWA)IL-390-Lively Boulevard to Supreme Drive;
Illinois Tollway;$88.9 million
■2015 Street Reconstruction;Village of Libertyville;$1.0 million
■2014 Street Reconstruction;Village of Libertyville;$1.0 million
■Lake Street Resurfacing and Watermain Improvements;Village of Libertyville;
$1.1 million
■ Watermain and Sewer Improvements,Village of Hanover Park;$400,000
Street Rehabilitation and Reconstruction
■2016 Street Improvements;Village of Villa Park;$1.6 million
■Greentree Parkway,Red Top Drive and Fourth Avenue STP Resurfacing Project;
Village of Libertyville;$1.0 million
■2015 Street Reconstruction;Village of Libertyville;$1.0 million
■2014 Street Reconstruction;Village of Libertyville;$1.0 million
■2013 Street Reconstruction;Village of Libertyville;$1.0 million
■Reed Road Reconstruction;Village of Huntley;$800,000
•2007 Street Resurfacing Improvement;Village of Berkeley;$1.0 million
REVISED:2016
www.civiltechinc.com
CIVILTECH
James D . Ewers , P. E .
Director of Construction Engineering Services
Education Mr.Ewers is the Project/Quality Manager for all of Civiltech's Phase III(Construction
B.S.Civil Engineering, 1988 Engineering)projects.He provides his experienced guidance to improvements ranging
University of Illinois at from multi-use paths to expressway reconstructions.He has been the Construction
Urbana-Champaign Manager over hundreds of projects for various agencies such as the Illinois Department
of Transportation(IDOT),the Illinois Tollway,Counties,Forest Preserves,and
Professional Registrations Municipalities.He is responsible for ensuring that Civiltech performs the highest quality
resident engineering,construction administration,and constructability reviews while
Professional Engineer-Illinois; managing the engineering budgets.Prior to joining Civiltech,Mr.Ewers was employed
062-050067 with IDOT since his graduation from the University of Illinois in 1988.He served in the
IDOT ICORS Certified Bureaus of Land Acquisition,Programming,and 14 of his 16 years at IDOT were devoted
IDOT Documentation of Contract to projects in the Bureau of Construction.His experience in documentation procedures,
Quantities;05-0013 materials testing,construction layout,and field inspection generated his promotions to the
positions of Construction Supervisor over a major highway reconstruction program,and
Professional Organizations Local Agency Construction Supervisor responsible for all District One Federal Aid projects.
American Public Works Association Representative Experience
Illinois Association of Highway Engineers Construction Management
■Hill Ave over East Branch of the DuPage River,•Village of Lombard;$1.5 million
Areas of Specialization ■Damen Elston Fullerton Realignment/Reconstruction;Chicago Department of
Construction Management
Transportation;$17.0 million
■EOWA Advance Work Contracts—Lively,Mittel,and Salt Creek Bridges—Park l Hamilton
Resident Engineering New Roadway;Illinois Tollway;$41.0 million
Construction Inspection ■Salem Drive Improvement,•Village of Schaumburg;$2.3 million
■ US 30 from IL 31 to US 34 Road,Bridge and Interchange Reconstruction;Illinois
Department of Transportation;$45.0 million
■Lombard Meadows-Phase I,'Village of Lombard;$2.0 million
■EOWA Devon Avenue Bridge over I-290;Illinois Tollway;$9.3 million
■Fairf eld Road at IL Route 1761intersection Improvement;Lake County Division of
Transportation;$11.9 million
■Hawthorne Reconstruction Improvements Project;Village of Glen Ellyn;$3.9 million
■IL Route 31 at Virginia Road and Klasen Road;McHenry County Div.of Trans;$9.0 million
■ Orchard Road Reconstruction from Jericho to US Route 30,Kane County Division of
Transportation;$9.3 million
• Washington Street Resurfacing—Naper Boulevard to 75th Street'City of Naperville;$1.3 million
•Sunset/Turner Roadway Improvements;Village of Glen Ellyn;$2.2 million
• Gilmer Road Underpass;Lake County Forest Preserve District;$1.8 million
•North Industrial Park Reconstruction;Village of Bensenville;$10.7 million
•IL Route 83 Busse Road at Pratt Boulevard;Village of Elk Grove Village;$3.0 million
•IL Route 83 Busse Road at Greenleaf Avenue;Village of Elk Grove Village;$3.5 million
•Des Plaines River Trail Improvement;City of Des Plaines;$3.5 million
•Springinsguth Road Resurfacing Improvement,Village of Schaumburg;$967,000
•Des Plaines River Trail;City of Des Plaines;$1.0 million
•Essington Road/Hennepin Drive Interesection Reconstruction;City of Joliet;$2.7 million
•Bryant Avenue/7hain'Addition Improvments,Village of Glen Ellyn;$5.7 million
•Riford Road Reconstruction;Village of Glen Ellyn;$2.4 million
•I-290 1IL 53 Roadway and Bridge Rehabilitation,Higgins Road to Rand Road;Illinois
Department of Transportation$23.5 million
•Southwest Highway over B&O Railroad Bridge Reconstruction;Illinois Department of
Transportation;$9.1 million
www.civiltechinc.com
OWLTECH
James D . Ewers , P. E .
Director of Construction Engineering Services
Representative Projects(Continued)
Construction Management(Continued)
■2010 Schaumburg Street Improvements Contract 2;Village of Schaumburg;$3.7 million
■Stearns Road,Contract 5 from Randall Road to McLean Boulevard,-Kane County Division of
Transportation;$9.0 million
•1009 Street Improvements,Village of Glen Ellyn;$2.4 million
•Ridge Avenue Improvements,Howard Street to Lyons Street;City of Evanston;$6.6 million
•Montclair Commuter Parking Lot;Village of Glen Ellyn;$639,000
•Parkside-Summerdale Road Reconstruction;Village of Glen Ellyn;$3.9 million
•IL Route 60 over I-94 Improvement;Illinois Department of Transportation;$21.0 million
•I-90 at I-39,Cherry Valley Interchange,Illinois Tollway;$56 million
• Open Road Tolling,Plazas 1,5,and 7 Northwest Tollway,'Illinois Tollway;$89.0 million
•Kirk Road at IL 56,'Kane County Division of Transportation;$7.0 million
•Deerfield Parkway Improvement;Village of Buffalo Grove;$7.7 million
IDOT District One-Bureau of Construction
Construction Supervisor for South Cook and all of Will County:
•Responsible for implementing a program of more than 75 projects valued at over$100 million
per year from 2003 to 2004.
•Assigned,directed and successfully completed these tasks with a staff of 20 to 25 Resident
Engineers and 30 to 40 crew members.Tasks also include the proper allocation of other
resources such as vehicles and consultants.
•Required daily decisions regarding engineering issues,determination and authorization of
needed changes,scheduling and problem resolution for both project and employee concerns.
Conducted multiple pre-construction,progress and partnering meetings.
•Kept the public well informed through contacts with elected officials as well as newspaper,
radio and television interviews.
•Directly responsible for the reconstruction of the I-80/94 Kingery Expressway from the I-294/
IL 394 interchange into Indiana.This project is made of more than 20 contracts valued at over
$330 million to be completed in 2007.It requires coordination with the Local Agencies in the
area and their representatives,the Illinois Tollway and Indiana DOT.Proper administration of
this complicated reconstruction is being accomplished by directing four consultant firms.
Local Agency Construction Supervisor:
•Responsible for all Federally funded Local Agency projects in District One,including
the City of Chicago,from 1999 to 2003.
•Averaged over 100 projects valued at$100 to$200 million per year.
•Directed five Area Professional Engineers to ensure that the Local Agencies and their
consultants executed and completed projects in accordance with the plans,specifications
and proper contract administration documentation.Also responsible for the District Bridge
Painting Technician and the Federal Reimbursable Force Account Engineer.
•Coordinated successfully with the designers,MFT Engineers and managers from the Bureau of Local
Roads as well as representatives from most every Local Agency in the six counties of IDOT District One.
Local Agency Area Engineer:
•Supervised over 30 projects in 1998 from bridges and pavement reconstructions to bicycle
paths.Projects totaled to more than$40 million.
•Guided various Local Agency personnel and their consultants through IDOT's policies and
procedures to ensure successful project completion and Federal Participation.
Resident Engineer/Assistant Resident Engineer:
•Ensured the Department's requirements and supervised other employees for numerous intersection
improvements with traffic signal modernization,bridge rehabilitations,pavement reconstructions,
resurfacing projects and interchange improvements,including the first to use the metric system.
•All projects were coordinated with the City of Chicago,multiple municipalities,utilities,
railroads,public representatives and businesses successfully,amicably and professionally.
REVISED:2016
www.civiltechinc.com
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Phase III
OWLTECH
James D . Ewers , P. E .
Director of Construction Engineering Services
Education Mr.Ewers is the Project/Quality Manager for all of Civiltech's Phase III(Construction
B.S.Civil Engineering, 1988 Engineering)projects.He provides his experienced guidance to improvements ranging
University of Illinois at from multi-use paths to expressway reconstructions.He has been the Construction
Urbana-Champaign Manager over hundreds of projects for various agencies such as the Illinois Department
of Transportation(IDOT),the Illinois Tollway,Counties,Forest Preserves,and
Professional Registrations Municipalities.He is responsible for ensuring that Civiltech performs the highest quality
resident engineering,construction administration,and constructability reviews while
Professional Engineer-Illinois; managing the engineering budgets.Prior to joining Civiltech,Mr.Ewers was employed
062-050067 with IDOT since his graduation from the University of Illinois in 1988.He served in the
IDOT ICORS Certified Bureaus of Land Acquisition,Programming,and 14 of his 16 years at IDOT were devoted
IDOT Documentation of Contract to projects in the Bureau of Construction.His experience in documentation procedures,
Quantities;05-0013 materials testing,construction layout,and field inspection generated his promotions to the
positions of Construction Supervisor over a major highway reconstruction program,and
Professional Organizations Local Agency Construction Supervisor responsible for all District One Federal Aid projects.
American Public Works Association Representative Experience
Illinois Association of Highway Engineers Construction Management
■HillAve over East Branch of the DuPage River;Village of Lombard;$1.5 million
Areas of Specialization ■Damen Elston Fullerton Realignment/Reconstruction;Chicago Department of
Transportation;$17.0 million
Construction Management ■EOWAAdvanceWorkContracts—Lively,Mittel,and Salt Creek Bridges—Park/Hamilton
Resident Engineering New Roadway;Illinois Tollway;$41.0 million
Construction Inspection ■Salem Drive Improvement,Village of Schaumburg;$2.3 million
■ US 30 from IL 31 to US 34 Road,Bridge and Interchange Reconstruction;Illinois
Department of Transportation;$45.0 million
■Lombard Meadows-Phase I,•Village of Lombard;$2.0 million
■EOWA Devon Avenue Bridge over I-290;Illinois Tollway;$9.3 million
•Fairfield Road at IL Route 176Intersection Improvement,Lake County Division of
Transportation;$11.9 million
■Hawthorne Reconstruction Improvements Project,Village of Glen Ellyn;$3.9 million
■IL Route 31 at Virginia Road and Klasen Road;McHenry County Div.of Trans;$9.0 million
■ Orchard Road Reconstruction from Jericho to US Route 30;Kane County Division of
Transportation;$9.3 million
■ Washington Street Resurfacing—Naper Boulevard to 75th Street;City of Naperville;$1.3 million
■Sunset/Turner Roadway Improvements;Village of Glen Ellyn;$2.2 million
■ Gilmer Road Underpass;Lake County Forest Preserve District;$1.8 million
■North Industrial Park Reconstruction;Village of Bensenville;$10.7 million
■IL Route 83 Busse Road at Pratt Boulevard,Village of Elk Grove Village;$3.0 million
■IL Route 83 Busse Road at GreenleafAvenue;Village of Elk Grove Village;$3.5 million
■Des Plaines River Trail Improvement;City of Des Plaines;$3.5 million
■Springinsguth Road Resurfacing Improvement;Village of Schaumburg;$967,000
■Des Plaines River Trail;City of Des Plaines;$1.0 million
■Essington Road/Hennepin Drive Interesection Reconstruction;City of Joliet;$2.7 million
•BryantAvenue/7hain'rAddition Improvments,Village of Glen Ellyn;$5.7 million
•Riford Road Reconstruction;Village of Glen Ellyn;$2.4 million
•I-290 1IL 53 Roadway and Bridge Rehabilitation,Higgins Road to Rand Road;Illinois
Department of Transportation$23.5 million
•Southwest Highway over B&O Railroad Bridge Reconstruction;Illinois Department of
Transportation;$9.1 million
www.civiltechinc.com
CIVILTECH
James D . Ewers , P. E .
Director of Construction Engineering Services
Representative Projects(Continued)
Construction Management(Continued)
•2010 Schaumburg Street Improvements Contract 2;Village of Schaumburg;$3.7 million
•Stearns Road,Contract 5 from Randall Road to McLean Boulevard;Kane County Division of
Transportation;$9.0 million
•2009 Street Improvements;Village of Glen Ellyn;$2.4 million
•Ridge Avenue Improvements,Howard Street to Lyons Street,'City of Evanston;$6.6 million
•Montclair Commuter Parking Lot;Village of Glen Ellyn;$639,000
•Parkside-Summerdale Road Reconstruction;Village of Glen Ellyn;$3.9 million
•IL Route 60 over I-94 Improvement,-Illinois Department of Transportation;$21.0 million
•I-90 at 1-39,Cherry Valley Interchange,Illinois Tollway;$56 million
• Open Road Tolling,Plazas 1,5,and 7,Northwest Tollway,'Illinois Tollway;$89.0 million
•Kirk Road at IL 56,'Kane County Division of Transportation;$7.0 million
•Deerfield Parkway Improvement,•Village of Buffalo Grove;$7.7 million
IDOT District One-Bureau of Construction
Construction Supervisor for South Cook and all of Will County:
•Responsible for implementing a program of more than 75 projects valued at over$100 million
per year from 2003 to 2004.
•Assigned,directed and successfully completed these tasks with a staff of 20 to 25 Resident
Engineers and 30 to 40 crew members.Tasks also include the proper allocation of other
resources such as vehicles and consultants.
•Required daily decisions regarding engineering issues,determination and authorization of
needed changes,scheduling and problem resolution for both project and employee concerns.
Conducted multiple pre-construction,progress and partnering meetings.
•Kept the public well informed through contacts with elected officials as well as newspaper,
radio and television interviews.
•Directly responsible for the reconstruction of the 1-80/94 Kingery Expressway from the 1-294/
IL 394 interchange into Indiana.This project is made of more than 20 contracts valued at over
$330 million to be completed in 2007.It requires coordination with the Local Agencies in the
area and their representatives,the Illinois Tollway and Indiana DOT.Proper administration of
this complicated reconstruction is being accomplished by directing four consultant firms.
Local Agency Construction Supervisor:
•Responsible for all Federally funded Local Agency projects in District One,including
the City of Chicago,from 1999 to 2003.
•Averaged over 100 projects valued at$100 to$200 million per year.
•Directed five Area Professional Engineers to ensure that the Local Agencies and their
consultants executed and completed projects in accordance with the plans,specifications
and proper contract administration documentation.Also responsible for the District Bridge
Painting Technician and the Federal Reimbursable Force Account Engineer.
•Coordinated successfully with the designers,MFT Engineers and managers from the Bureau of Local
Roads as well as representatives from most every Local Agency in the six counties of IDOT District One.
Local Agency Area Engineer:
•Supervised over 30 projects in 1998 from bridges and pavement reconstructions to bicycle
paths.Projects totaled to more than$40 million.
•Guided various Local Agency personnel and their consultants through IDOT's policies and
procedures to ensure successful project completion and Federal Participation.
Resident Engineer/Assistant Resident Engineer:
•Ensured the Department's requirements and supervised other employees for numerous intersection
improvements with traffic signal modernization,bridge rehabilitations,pavement reconstructions,
resurfacing projects and interchange improvements,including the first to use the metric system.
•All projects were coordinated with the City of Chicago,multiple municipalities,utilities,
railroads,public representatives and businesses successfully,amicably and professionally.
REVISED:2016
www.civiltechinc.com
CIVILTECH
Donald J . Marek
Resident Engineer V
Professional Registrations Mr.Marek has been employed in private consulting engineering as a Construction
IDOT ICORS Certified Technician/Resident Engineer,Surveyor and Designer/Draftsman since 1974.His
responsibilities include resident engineering,construction inspection and chief-of-party
IDOT Documentation of Contract for construction layout and design surveys.
Quantities; 17-12492(expires 02/16/2021)
IDOT Construction Material Representative Projects
Inspection Documentation Resident Engineering
IDOT QC/QA Mix Aggregate ■Caton Farm Rd at Essington Rd Intersection Improvement;City of Joliet;
Technician Course $1.8 million
IDOT Bituminous Concrete Level 1 ■Haligus/Faith's Way/Reed/Algonquin Improvements;Hammes Company;
IDOT Bituminous Concrete $1.8 million
Density Tester Course ■Dundee Road Lighting from Northgate to US 45/IL 21;Hammes Company;
IDOT Portland Cement $1.1 million
Concrete-Level I ■Caton Farm Road)from County Line Road to Drauden Road;Will County Division
IDOT Portland Cement of Transportation;$7.5 million
Concrete-Level II ■Beisner Road Reconstruction Improvement;Village of Elk Grove Village;$426,000
IDOT S-33 Soils Field ■City Wide Construction Engineering Services,Chicago's Aldermanic Menu
Testing and Inspection Program;Chicago Department of Transportation;$65.0 million per year
ACI Concrete Field Testing ■Wellington Avenue Reconstruction;Village of Elk Grove Village;$1.5 million
Technician-Grade I
■Biesterj'ield Road at 1290 Ramp Widening,'Village of Elk Grove Village;$858,000
Areas of Specialization ■Essington-Hennepin Interesection Reconstruction;City of Joliet;$2.7 million
Resident Engineering ■2009 Street Improvements;Village of Glen Ellyn;$2.4 million
Construction Layout ■Dundee Road Lighting;Village of Buffalo Grove;$1.4 million
Topographic Surveys ■95th Street Park and Ride;City of Naperville;$800,000
Preparation of Contract Plans, ■107th Street Improvement,'Cook County Highway Department;$4.2 million
Specifications and Estimates ■Deerfield Parkway Improvement;Village of Buffalo Grove;$7.7 million
■31st Street Bicycle/Pedestrian Path;Village of Oak Brook;$1.1 million
■ York Road/Harger Road Bicycle/Pedestrian Path STP Improvement;Village of
Oak Brook;$1.9 million
■Calumet Station Construction;Illinois Department of Transportation;$5.2 million
■Fairview Avenue Signals;Village of Downers Grove;$700,000
■Downtown Redevelopment Project;Village of Homewood;$1.4 million
■ Village Wide Street Resurfacing;Village of Berkeley;$1.2 million
■Circle Avenue Improvement,Roadway Reconstruction and Drainage Improvement,'
Village of Bloomingdale;$300,000
■Schick Road Improvement,Roadway Reconstruction and Drainage Improvement;
Village of Bloomingdale;$600,000
■CBD Traffic Signal System(73 Intersections);City of Chicago;$2.2 million
■County Farm Road Improvement and Roadway Reconstruction;DuPage County
Division of Transportation;$5.2 million
■City-Wide Street and Drain Improvement,Sections I through VI;City of Northlake
■Belmont Avenue Watermain Improvement;Village of Elmwood Park;$0.4 million
www.civiltechinc.com
CIVILTECH
Donald J . Marek
Resident Engineer V
Representative Projects(Continued)
Construction Inspection
•Citywide Construction Engineering;Chicago Department of Transportation,
Division of Engineering
•Lake Shore Drive Reconstruction,Jackson Park Pre-Stage;Chicago Department
of Transportation;$12.0 million
•Markham Yard/Center Street/Dixie Highway Bridge Improvements;
Illinois Tollway;$3.0 million
•Barrington Commuter Parking Lot;Village of Barrington;$1.3 million
•Southwest Highway/FAUS Improvement,•Village of Oak Lawn;$3.0 million
•Army Trail Road Plaza Improvements;Illinois Tollway;$30.0 million
Construction Layout
• Commuter Parking Lot Phase 11;Village of Hanover Park
•Farmwood ofAddison(Single Family Development);Village of Addison
• White Pines Industrial Park;Village of Bensenville
Preparation of Contract Plans,Specifications and Estimates
•1992 Resurfacing Program;Village of Lisle;$900,000
■1990 Resurfacing Program;Village of Lisle;$500,000
■City-Wide Street and Drain Improvement,Section Ii;City of Northlake;
$1.4 million
■Northway, Cherry and Poplar Drives;Village of Hanover Park;$700,000
■1998 Capital Improvement Program;Village of Lemont;$700,000
REVISED:2017
www.civiltechinc.com
OWLTECH
Samuel C . Moscatello
Chief Layout Specialist
Professional Registrations Mr.Moscatello joined the Civiltech team in November 2015.He has over 11 years of
CST Certified—Level 1 experience in the engineering and surveying industry.Prior to joining Civiltech,Mr.
Moscatello worked for Jacob&Hefner Associates as a survey crew chief.During his time
Areas of Specialization in the industry,Mr.Moscatello performed design topo and construction layout for a
wide variety of projects.
Survey Control
Land Surveys Representative Projects
Construction Layout Survey Control
Topographic Surveys •Hill Ave over East Branch of the DuPage River;Village of Lombard;$1.5 million
•Elgin O Hare Western Access(EOWA)-Mainline.Arlington Heights Road to Lively
Boulevard;Illinois Tollway;$52.6 million
•Damen/Elston/Fullerton Realignment&Reconstruction;Chicago Department of
Transportation;$16.9 million
• US 6(159th St.)Will-Cook Road;Illinois Department of Transportation;
$47.2 million
•Elgin O Hare Western Access Wood Dale Bridge;Illinois Tollway;$20.0 million
•Elgin O Hare Western AccessAdvanced Work;Illinois Tollway;$34.0 million
As an employee at Jacob&Hefner Associates,Mr.Moscatello worked on the
following projects:
•IL Route 30 Widening;Illinois Department of Transportation
•Heritage Crossings Business Park;Village of Lemont
REVISED:2017
www.civiitechinc.com
North York Road/Harger Road Intersection Improvement
CIWLTECH
Village of Oak Brook I April 28,2017
Attachement E
IC)OT 11 ; Iii�I i _ettt�r
Representative Project Experience
Team Organizational Chart and Resumes
Subconsultant Qualifications
Anticipated Project Schedule
Cost Estimate of Consultant Services
North York Road/Harger Road Intersection Improvement
Village of Oak Brook I April 28,2017
Phase I
i
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Jorgensen and Associates, Inc.
JORGENSEN & ASSOCIATES, INC.
LAND SURVEYORS
Est. 1990
March 1,2017
Mr.James R. Woods, P.E.
Civiltech Engineering,Inc.
450 East Devon Avenue
Suite 300
Itasca, Illinois 60143
Re: Village of Oak Brook- York Road/Harger Road Survey Proposal
Dear Mr. Woods:
Enclosed,please find our proposal to prepare a topographic survey for the referenced project. Our
proposal is based on the items contained in your email of February 26th and our telephone
conversation.
I would like to thank you for considering Jorgensen & Associates for this project. We look
forward to continuing our working relationship with your firm. Should you have any questions,
comments or require any further information concerning our proposal,please feel free to call me
at(847)356-3371.
Respectfully submitted,
Jorgensen&Associates, Inc.
,�Z; �- ' N
Christian H. Jorge n,P S.
President
CHJ/pt
Enclosures
EACivi1tech\0ak Brook\York Rd-Harger Rd\Cover Letter
120 PARK AVENUE, P.O. BOX 306- LAKE VILLA, ILLINOIS 60046-9093 • (847)356-3371 • FAX(847)356-3488
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Exhibit "A"
Payroll Burden& Fringe Costs
%of Direct
Productive
Payroll
Federal Insurance Contributions Act 11.37%
State Unemployment Compensation 0.97%
Federal Unemployment Compensation 0.11%
Workmen's Compensation Insurance 0.96%
Paid Holidays, Vacation, Sick Leave, Personal Leave 10.79%
Bonus 7.01%
Pension 0.93%
Group Insurance 35.63%
Total Payroll Burden& Fringe Costs 67.77%
EXiviltech\Oak Brook\York Rd-Harger Rd\EXA
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Exhibit"B"
Overhead and Indirect Costs
% of Direct
Productive
Pamoll
Business Insurance 4.48%
Depreciation 12.02%
Indirect wages and salaries 38.85%
Reproductive and printing costs 0.18%
Office Supplies 3.57%
Computer Costs 1.98%
Professional Fees 2.54%
Telephone 1.85%
Fees, license&dues 0.98%
Repairs and maintenance 0.96%
Business space rent 4.92%
Facilities - capital 0.66%
Travel - Meals 0.08%
Survey Supplies 2.80%
Automobile/travel expense 1.45%
Miscellaneous Expense 0.31%
State Income Tax 1.05%
Postage 0.20%
Educational &Professional Registrations 0.05%
Total Overhead 78.93%
E:\Civiltech\Oak Brook\York Rd-Harger Rd\EXB
PAYROLL ESCALATION TABLE
FIXED RAISES
FIRM NAME Jorgensen&Associates,Inc. DATE 03101/17
PRIME/SUPPLEMENT Prime PTB NO.
CONTRACT TERM 12 MONTHS OVERHEAD RATE 146.70%
START DATE 3/112017 COMPLEXITY FACTOR
RAISE DATE 9/1/2017 % RAISE 3.00%
ESCALATION PER YEAR
3/1/2017 - 9/1/2017 912/2017 - 3/1/2018
6 6
12 12
50.00% 51.50%
1.0150
The total escalation for this project would be: 1.50%
Printed 3/1/2017 Bureau of Design and Environment(Rev.05/08/15)
PAYROLL RATES
FIRM NAME Jorgensen &Associates DATE 03/01/17
PRIME/SUPPLEMENT Prime
PSB NO.
ESCALATION FACTOR 1.50%
CLASSIFICATION CURRENT RATE CALCULATED RATE
Principal/Officer $46.00 $46.69
Supervisor, P.L.S. $42.00 $42.63
Survey Party Chief, S.I.T. $26.75 $27.15
Instrument Operator $20.75 $21.06
Cadd Supervisor $30.75 $31.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Bureau of Design and
Printed 3/1/2017 PREPARED BY THE CONSULTANTEnvironment(Rev. 05/08/15)
COST PLUS FIXED FEE
COST ESTIMATE OF CONSULTANT SERVICES
FIRM Jorgensen&Associates,Inc. DATE 03101117
PSB OVERHEAD RATE 1.467
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES %OF
DROP ITEM MANHOURS PAYROLL & DIRECT FIXED Direct BY DBE TOTAL GRAND
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL TOTAL
(A) (B) (C) (D) (E) (F) (G) (H) (B-G)
1 Field-Topography Survey 238 5,652.50 8,292.22 ?.1: "i 2,129.57 16,816.29 61.33%
2 Office-Compile Field Data 34 1,113.00 1,632.77 398.14 3,143.91 11.47%
3 Office-Create Topography Base Sheets 70 2,265.00 3,322.76 810.22 6,397.98 23.33%
4 Office-Create T.I.N.&Contours 8 268.50 393.89 96.05 758.44 2.77%
(5). Coordination Meetings 2 92.00 134.96 37.10 38.29 302.35 1.10%
Subconsultant DL 0.00 0.00 0.00%
TOTALS 1 3521_ 9,391.00 13,776.60 779.10 3,472.27 0.00 0.00 0.00 27,418.97 100.00%
DBE 0.00%
Printed 3/1/2017 PREPARED BY THE CONSULTANT Bureau of Design and Environment(Rev.05/08/15)
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB DATE 03/01/17
PRIME/SUPPLEMENT Prime
SHEET 1 OF 1
PAYROLL AVG TOTAL PROJECT RATES (1)Field-To ography Survey (2)Office-Compile Field Data (3)Office-Create Topography Base Sheets (4)Office-Create T.I.N.&Contours (5)Coordination Meetings
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 2 0.57% 0.26 100,00% 46.00
Supervisor,P.L.S. 42.00 18 5.11% 2.15 17.65% 7.41 14.29% 6.00 25.00% 10.50
Survey Party Chief,S.I.T. 26.75 119 33.81% 9.04 119 50.00% 13.38
Instrument Operator 2075. 119 33.81% 7.01 110 50.00% 10.38
CaddSuper-visor 30.75 94 26.70% 8.21 82.35% 25.32 85.71% 26.36 75.00% 23.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTALS 352 100% $26.68 238 100.00% $23.75 34 100% $32.74 70 100% $32.36 8 100% $33.56 2 100% $46.00
Bureau of Design and
Printed 3/1/2017 PREPARED BY THE CONSULTANT Environment(Rev.05/08/15)
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Manhour Breakdown
Topographic Survey Estimate
York Road + 1,000' _+ 0.189 mile
Harger Road + 1,400' _+ 0.265 mile
Total Length +2,400' _+ 0.454 mile
1. Field—Topographic Survey
a. Establish horizontal &vertical controls points
14 hours x 2 men= 28 MH
b. Locate existing topography
105 hours x 2 men= 210 MH
Sub-total Item#1 238 MH
2. Office- Compile Field Data
a. Compute traverse, level circuit&G.P.S. survey
6 hours x 1 man= 6 MH
b. Edit&compile topographic survey
28 hours x 1 man= 28 MH
Sub-total Item#2 34 MH
3. Office - Create Existing Topography Base Sheets
a. Layout and drafting
60 hours x 1 man= 60 MH
b. Check topographic survey
10 hours x 1 man= 10 MH
Sub-total Item#3 70 MH
(1)
4. Office - Create T.I.N. &Contours
a. Compute contours
6 hours x 1 man= 6 MH
b. Check contours
2 hours x 1 man= 2 MH
Sub-total Item#4 8 MH
5. Coordination Meetings
1 meeting @ 2 hours= 2 MH
Total All Items 352 MH
(2)
E:\Civiltech\Oak Brook\York Rd-Harger RdTOP
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Breakdown of
In House Direct Costs
Item
1. Field- Topographic Survey
a. Trips to project site- 14 ea.
+ 100 miles/trip x 14 trips=+ 1,400 miles
+ 1,400 miles @ $0.53/mile= $ 742.00
5. Coordination Meetings
a. Meetings at Civiltech's office- 1 ea.
+70 miles/trip x 1 trip=+ 70 miles
+70 miles @ $0.53/mile= 37.10
Total All Items $ 779.10
EACiviltech\Oak Brook\York Rd-Harger Rd\IHC
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Midland Standard
Engineering & Testing, Inc.
i
i
(&MSET
www.mset.com
MIDLAND STANDARD ENGINEERING &TESTING, INC.
558 Plate Drive,Unit 6 East Dundee,Illinois
(847)844-1895 f(847)844-3875
April 10,2017
Mr. James R. Woods,P,E.
Civiltech Engineering,Inc.
Two Pierce Place, Suite 1400
Itasca,Illinois 60143
Re: Proposal for Roadway Geotechnical Report and Structure Geotechnical Reports
York Road at Harger Road
Oakbrook,Illinois
Dear Mr. Woods:
We are pleased to have the opportunity to submit the following proposal for the performance of a
soil exploration on the referenced project.
Project Description and Scope of Work
The project from a geotechnical standpoint includes the following items;
York Road and Harper Road Intersection
The Phase I study for this intersection improvement consists of a pavement and subgrade
soil investigation for approximately 2500 lineal feet of road alignment. For this work a
total of eight (8) roadway subgrade borings, spaced at approximate 300-foot intervals,
and nine(9)pavement cores are planned.
Retaining Wall Structures
Roadway widening improvements are anticipated to include the replacement of one
existing retaining wall. The proposed wall alignments will be explored with three (3)
structure soil borings.
Trail Underpass Structure
At one point near the intersection, a trail underpass is proposed under Harger Road. For
this structure, two (2) structure borings are planned to determine subsurface conditions.
Prevailing ground water levels will be determine by installing a temporary well pipe in
one of the boreholes for subsequent readings.
Method of Performance-Field Work and Laboratory Testing
The pavement subgrade and structure borings will involve drilling test holes that incorporate
standard penetration tests and split-spoon sampling at 2-1/2 foot intervals. The road subgrade
borings will be drilled to a depth of ten (10) feet and the retaining wall structure borings will be
drilled to a depth of twenty-five (25) to thirty (30) feet. The borings will be performed in
compliance with the current State of Illinois, Geotechnical Manual.
The soil survey borings will be performed in compliance with the current State of Illinois,
Geotechnical Manual'. In our proposal, we have assumed that the final locations and elevations
will be determined by the design section engineer or will be referenced to centerline stationing
provided by the DSE.
Midland Standard Engineering&Testing,Inc. 4/10/17
Laboratory testing will include moisture content determinations, consistency (penetrometer
value), determination on cohesive soil samples and classification tests as required to identify
( major subgrade soil types.
Method of Performance-Analysis and Report
Roadway Geotechnical Report
The roadway boring information will be presented on profile drawings with base drawings
provided by the DSE. The pavement core results will be presented in tabular form. The results of
this field exploration and laboratory testing would be used in an analysis and formulation of our
recommendations. Major subject areas for our analysis, recommendations and report would
consist of stating the subsurface soil and ground water conditions, a tabulation of the existing
pavement materials and thickness, and a review of subgrade conditions with recommendations for
treatment areas. A written report summarizing and presenting the data and recommendations will
be prepared by a Registered Professional Engineer.
Structure Geotechnical Reports
The structure boring information will be presented on borings logs. The results of this field
exploration and laboratory testing would be used in an analysis and formulation of our
recommendations. Major subject areas for our analysis, recommendations and report would
consist of stating the subsurface soil and ground water conditions, foundation, excavation, and
earth pressure recommendations for the various retaining wall types to be considered for the
project. A written report summarizing and presenting the data with recommendations will be
prepared by a Registered Professional Engineer.
Timing
We will begin on work after notice to proceed and as utility clearance becomes available. We
plan on mobilizing and doing all (roadway and structure) borings concurrently. We have
assumed that no borings are required within the Tollway ROW. The final reports are expected to
be complete within eight to ten weeks after notice to proceed.
Fees
We propose to provide this work at the unit rates quoted on the attached Schedule of Services and
Fees, Attachments 1 and 2. These estimated quantities and unit rates are based on information as
outlined in this proposal and experience on past projects. On the basis of the above information,
we estimate that these services can be provided for a fee of $ 9,435.00 for the Roadway
Geotechnical Report, $ 5,568.00 for the Retaining Wall Structural Geotechnical Report, and
4,173.00 for the Harger Road trail underpass Structure Geotechnical Report.
General
MSET is acquainted with the local subsurface conditions and has participated in the planning,
development and execution of numerous highway soil explorations in this area. We are looking
forward to working with you on this project.
Respectfully submitted,
MIDLAND STANDARD ENGINEERING&TESTING, INC.
'V
William J. Wyzgala, P.E.
Principal Engineer
WJW
Enclosure: Attachments 1, 2, 3, and General Conditions
i
MSET, INC.
2/27/17
ATTACHMENT 1
t SCHEDULE OF SERVICES AND FEES
York Road and Harger Road Intersection Improvements
Oakbrook,Illinois
Item Estimated Quantity Unit Cost Extension
Field Services
Mobilization of Drilling equipment,
4 traffic control and personnel,lump sum l $475.00 $475.00
r
Roadway profile borings
with Split Spoon Sampling,l.f. 80 $19.00 $1,520.00
i
} Pavement Core,each 9 $175.00 $1,575.00
I
I Traffic Control,signs,barricades,
Flagmen,etc./day 2 $660.00 $1,320.00
Field Services Total: $4,890.00
I
Laboratory Services
Moisture Content Determinations,ea 43 $6.00 $258.00
Atterberg Limit Determination,ea. 3 $80.00 $240.00
Grain Size Analysis,including
Standard Proctor,ea. 3 $95.00 $285.00
i Organic Content Tests,ea. 1 $80.00 $80.00
Illinois Bearing Ratio Test including
Standard proctor Test,ea. 1 $315.00 $315.00
Laboratory Services Total: $1,178.00
Engineering Services for Soil Survey Including:
Layout Coordination w/Design Engineer
Utility Clearance and Permits
Engineering Supervision of Soil Borings
Preparation of Soil Profile Drawings
Summary of Exisiting Pavement Materials
Analysis and Recommendations for Earthwork
Report Preparation,Consultation
Principal Engineer,per hr. 0.5 $150.00 $75.00
Project Engineer,per hr. 4 $135.00 $540.00
Staff Engineer,per hr. 8 $100.00 $800.00
Field Engineer,per hr. 12 $95.00 $1,140.00
Technician,per hr. 8 $85.00 $680.00
Word Processing,per hour 2 $66.00 $132.00
Engineering Total: $3,367.00
PROJECT BUDGET TOTAL: $9,435.00
I
I
MSET, Inc.
ATTACHMENT 2 2/27/17
SCHEDULE OF SERVICES AND FEES
York Road and Harger Road Improvements,Retaining Wall
Oakbrook,Illinois
I
Item Estimated Quantity Unit Cost Extention
i
Field Services
i
Mobilization of Drilling equipment,
lump sum 0 $475.00
Soil boring with soil sampling,/I.f. 75 $23.00 $1,725.00
Shelby Tube Sample,each 1 $30.00 $30.00
Traffic Control, Signs,Flagmen,per day 1 $660.00 $660.00
Field Services Total: $2,415.00
Laboratory Services
Moisture Content Determinations,ea 32 $6.00 $192.00
Grain Size Analysis,Hydrometer,ea. 1 $90.00 $90.00
Atterberg Limit Test,ea. 1 $80.00 $80.00
Consolidation Test,each 1 $400.00 $400.00
Laboratory Services Total: $762.00
Engineering Services for Structure Geotechnical Report Including:
Layout Coordination
Utility Clearance and Permits
Field Supervision During Drilling
Preparation of Soil Boring Logs
Analysis and Recommendations
Report Preparation and Consultation
Principal Engineer,per hr. 1 $155.00 $155.00
Project Engineer,per hr. 6 $135.00 $810.00
Staff Engineer,per hr. 6 $100.00 $600.00
Field Engineer,per hr. 8 $95.00 $760.00
Technician,per hour $85.00
Draftsman/Word Processing,per hr. 1 $66.00 $66.00
Engineering Total: $2,391.00
PROJECT BUDGET TOTAL: $5,568.00
MSET, Inc.
ATTACHMENT 3 4/10/17
4{ SCHEDULE OF SERVICES AND FEES
I York Road and Harger Road Improvements,Trail Underpass
Oakbrook,Illinois
r
f Item Estimated Quantity Unit Cost Extention
Field Services
fMobilization of Drilling equipment,
lump sum Same Time as $475.00
Ret.Wall
Soil boring with split spoon sampling,
0-30'depth,per lineal foot 60 $23.00 $1,380.00
Ground Water Monitoring Well Materials
and Installation,30 foot depth,lump sum 1 $566.00 $566.00
Traffic Control,Signs,Flagmen,per day 0 $660.00
Field Services Total: $1,946.00
Laboratory Services
i
G
' Moisture Content Determinations,ea 26 $6.00 $156.00
i
Grain Size Analysis,Hydrometer,ea. 1 $90.00 $90.00
f Atterberg Limit Test,ea. 1 $80.00 $80.00
Laboratory Services Total: $326.00
j( Engineering Services for Structure Geotechnical Report Including:
j Layout Coordination
Utility Clearance and Permits
Field Supervision During Drilling
Preparation of Soil Boring Logs
Analysis and Recommendations
Report Preparation and Consultation
Principal Engineer,per hr. 1 $155.00 $155.00
Project Engineer,per hr. 4 $135.00 $540.00
Staff Engineer,per hr. 4 $100.00 $400.00
Field Engineer,per hr. 6 $95.00 $570.00
Technician,per hour 2 $85.00 $170.00
Draftsman/Word Processing,per hr. 1 $66.00 $66.00
1
Engineering Total: $1,901.00
PR03ECT BUDGET TOTAL: $4,173.00
I F
i
i t
I
i
1
Midland Standard Engineering & Testing, Inc.
CIVIL • GEOTECHNICAL • CONSTRUCTION MATERIALS
r
i FEE AND RATE SCHEDULE
GENERAL CONDITIONS
ENGINEERING AND ASSOCIATED SERVICES INVOICES
Progress invoices will be submitted to the client monthly
j Fees for our services will be based upon the time worked and a final bill will be submitted upon completion of the
on the project at the following rates: services. Invoices will show charges for different
personnel and expense classifications. A more detailed
Principal or Consulting Engineer.................. a separation of charges and backup data will be provided at
Project Engineer or Project Geologist.......... client's request,but each invoice is due on presentation
Senior Engineer,Senior Designer, o and is past due thirty(30)days from invoice date. Client
Or Senior Resident......................... p agrees to pay a finance charge of 11h%per month,or the
Staff Engineer or a maximum rate allowed by law,on past due accounts.
Senior Engineering Technician..... w The client's obligation to pay for the work contracted is in
Secretarial Services........................................ Ln no way dependent upon the client's ability to obtain
financing,zoning,approval of governmental or regulatory
agents,or upon the client's successful completion of the.
REIMBURSABLE EXPENSES project.
The following items are reimbursable to the extent of WE RESERVE THE RIGHT TO SUSPEND OR TERMINATE
1 actual expenses; WORK UNDER OUR AGGREEMENT UPON FAILURE OF TE
CLIENT TO PAY INVOICES AS DUE.
1.Transportation,lodging,and subsistence for out of
town travel
2.Special mailing and shipping charges. INSURANCE
3.Special materials and equipment unique to the project We maintain Workman's Compensation Insurance and
4.Automobile travel to projects. Employer's Liability Insurance in conformance with state
law. In addition,we maintain Comprehensive General
Liability Insurance and Automobile Liability Insurance
with bodily injury(limit$1,000,000,each occurrence,
TEST BORINGS AND FIELD INVESTIGATIONS $1,000,000.aggregate),and property damage(limit
$1,000,000.each occurrence,$1,000,000.aggregate).
On projects requiring test borings,test pits,or other Within the limits of said insurance,we agree to hold the
explorations,we may obtain the service of reputable client harmless from and against loss,damage,injury or
subcontractors to perform such work. liability arising directly from the negligent acts or
omissions of ourselves,our employees,agents,
subcontractors and their employees and agents. If the
SPECIAL RATES client places greater responsibilities upon us or requires
further insurance coverage,we,if specifically so directed,
Per Diem or other special rates can be established for will take out additional insurance(if producible)to protect
specific projects when conditions indicate the us,at the client's expense. But we shall not be responsible i
desirability of such rates. for property damage from any cause,including fife and
explosion,beyond the amounts and coverage of our I
insurance. j
ACCESS TO SITES
Unless otherwise agreed,the Client will furnish us with
right-of-access to the site in order to conduct the LIMITATION OF PROFESSIONAL LIABILITY
planned exploration. We will take responsible The Client recognizes the inherent risks connected with
precautions to minimize damage to the site due to our construction. In performing our professional services,we I
operations,but have not included in the fee the cost of will use that degree of care and skill ordinarily exercised,
restoration of any damage resulting from the operations. under similar circumstances,by reputable members of our
If the client desires,we will restore any damage to the profession practicing in the same or similar locality. No
site and add the cost of restoration to the fee, other warranty,express or implied,is made or intended by
the proposal for consulting services or by furnishing oral or
written reports of the findings made. It is agreed that the
INCREASES Client will limit any and all liability,claim for damages,cost
of defense,or.expenses to be levied against us on account
Fee schedule increases made by our firm on an over-all of any design defect,error,omission,or professional i
client basis will be applied to work on all projects as they negligence to a sum not exceed$50,000.,or the amount of
become effective, At least 30 days advance notice of such our fee,whichever is greater.
increases will be given.
Initial
i
I f
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Stuedemann Environmental
Consulting , LLC
STUEDEMANN
ENVIRONMENTAL CONSULTING
April 20, 2017
Mr.James R. Woods, P.E.
Project Manager
Civiltech Engineering, Inc.
Two Pierce Place, Suite 1400
Itasca, IL 60143
SUBJECT: Proposal to Provide Environmental Science Services
North York Road/Harger Road Intersection Improvement Project Phase I
Oak Brook, DuPage County, Illinois
Dear Mr. Woods:
Stuedemann Environmental Consulting, LLC(SEC) is pleased to present Civiltech Engineering, Inc.
(Civiltech) with this proposal to provide environmental science services for the Village of Oak Brook's
(Village) North York Road/Harger Road Intersection Improvement Project Phase I (North York
Road/Harger Road Project Phase 1), located in Oak Brook, DuPage County, Illinois. Services presented
herein coincide with the North York Road/Harger Road Project Phase I engineering services provided by
Civiltech to the Village and include preparation of a Wetland Delineation Report,Tree Survey Report,
National Environmental Policy Act (NEPA) support services, and preparation of a Preliminary
Environmental Site Assessment (PESA) Report. SEC presents this proposal in the following sections:
project understanding, limits and reliability,scope of work, project team, project schedule, project costs,
and proposal acceptance.
PROJECT UNDERSTANDING
SEC understands that Civiltech has been solicited by the Village to submit a proposal for Phase I
engineering services for improvements to the North York Road and Harger Road intersection,which
includes the Harger Road intersection with the westbound entrance ramp to 1-88.This design must fulfill
requirements of the DuPage County Division of Transportation (DuDOT) and the Illinois Department of
Transportation (IDOT).Civiltech has solicited SEC to prepare a scope of environmental science services
for the North York Road/Harger Road Project Phase I; necessary for compliance with biological, wetland,
and special waste clearances from IDOT. SEC's proposed scope of work is to coordinate, collect, and
prepare the applicable environmental related documentation for compliance with IDOT.
On February 26, 2017, Civiltech provided SEC with the August 2, 2016, Proposed Intersection Concept
Plan, which identifies the limits of the Project Corridor for the North York Road/Harger Road Project
Phase I. On April 18, 2017,Civiltech provided SEC with revised limits of the Project Corridor to include
areas for additional tree survey services.The Project Corridor consists of all areas within the North York
Road and Harger Road right-of-way(ROW) as shown on the plan, plus an additional 100 feet per the
Village and DuPage County requirements.
ON419 Taylor Drive,Geneva, IL 60134 1 331-588-1805 1 main @stuedenv.com
www.stuedemannec.com
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase I
Oak Brook, DuPage County, IL
SEC proposes to conduct the biological,wetland, and special waste surveys and investigations presented
in this scope of work in accordance with the following:
• October 11, 2016, edition of the Oak Brook Village Code Title 9 -Stormwater, Floodplain, and
Sedimentation and Erosion Control Regulations (Village Code);
• April 23, 2013, edition of the DuPage County Countywide Stormwater and Flood Plain Ordinance
(Ordinance);
• Biological,wetland, and special waste clearance requirements from the Illinois Department of
Transportation (IDOT);
• April 1, 2017, U.S. Army Corps of Engineers(USACE) Chicago District Regional Permit Program
(RPP);and
• "A Manual for Conducting Preliminary Environmental Site Assessments for Illinois Department
of Transportation Highway Projects" (Erdmann et al., 1996, and revisions in preparation) (IDOT-
ISGS PESA Manual).
In preparing this proposal,SEC has made the following assumptions:
1. SEC understands that the North York Road/Harger Road Project Phase I is an IDOT pass-through
funded project; and therefore,the scope of services for this proposal includes IDOT
coordination;
2. Oak Brook is a Complete Waiver Community and preliminary permitting coordination will occur
with the Village and the USACE;
3. There are no DuPage County critical wetlands or high-quality aquatic resources (HQAR) within,
adjoining, or adjacent to the Project Corridor;
4. There is no wetland mitigation coordination, design, plan preparation, monitoring, or
management included in this proposal;
5. There is no permitting coordination included in this scope of work;
6. Preliminary Site Investigation (PSI)services are not included in this proposal; and
7. There are no additional environmental concerns within the Project Corridor that would require
Village, DuPage County, IDOT, or U.S.Army Corps Engineers (USACE) coordination,such as the
presence of state and federal endangered and threatened species, protected historical and
cultural sites, and environmental due diligence.
LIMITS AND RELIABILITY
SEC understands that the proposed North York Road/Harger Road Project Phase I must conform to [DOT
procedures.SEC will utilize methods and procedures consistent with good commercial or customary
practices referenced in the IDOT-ISGS PESA Manual. SEC proposes to prepare a PESA to identify
environmental conditions and levels of risk associated with the North York Road/Harger Road Project
Phase I.This PESA is limited to the information available at the time that services are rendered.
Information sought may include:visual observations made on the day of inspection; review of readily
available and relevant data/reports; and statements made and information provided by the client,
agents, land-owners, and tenants within the Project Corridor and adjacent properties.
April 20, 2017 Page 2 of 6
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase I
Oak Brook, DuPage County, IL
SCOPE OF WORK
SEC proposes to complete the requested services in four tasks as follows:
Task 1: Wetland Delineation Report
SEC understands that regulated wetlands and/or waters are potentially located within the Project
Corridor. SEC proposes to prepare a Wetland Delineation Report for all areas within the Project Corridor
in accordance with the USACE Regional Supplement to the Corps of Engineers Wetland Delineation
Manual: Midwest Region (Version 2.0), (Supplemental Wetland Manual),the Village Code, and the
Ordinance. Delineating both USACE jurisdictional "waters of the U.S." (WOUS) and DuPage County
regulated Waters of DuPage will satisfy requirements of the Illinois Interagency Wetlands Policy Act of
1989 (IWPA)for the Illinois Department of Natural Resources (IDNR) and the Illinois Department of
Transportation (IDOT) Phase I process.
SEC proposes to conduct investigations of all potential wetlands and waters within the Project Corridor.
These investigations include an off-site records/document review followed by an on-site investigation.
Proposed services include:the identification and delineation of wetlands and waters;the determination
of USACE HQARs; and the determination of DuPage County critical wetlands and waters. Wetland
delineation field investigation activities include on-site testing for the presence of hydric soils,
hydrophytic vegetation, and sufficient hydrology. A floristic quality assessment (FQA)will be conducted
for each identified wetland. Waters delineation field activities include the determination of the Ordinary
High Water Mark (OHWM) of all identified waters.
SEC proposes to flag all USACE "waters of the U.S." (WOUS)jurisdictional wetland limits and DuPage
County wetlands and waters within the Project Corridor. SEC also proposes to estimate the location of
adjacent wetlands within 100 feet of the Project Corridor per the Village Code and the Ordinance. SEC
will coordinate with Civiltech and their surveyors to ensure that all wetland and soil pit flags are
surveyed. SEC proposes that Civiltech provide wetland survey information to SEC in AutoCAD format for
inclusion in the wetland delineation report figures.
SEC proposes to prepare a Wetland Delineation Report that will include findings from the field
investigations.A final Wetland Delineation Report in Adobe PDF format file will be forwarded to
Civiltech for review and distribution.
Task 2: Tree Survey Report(If Necessary)
SEC proposes to conduct an on-site tree survey and to prepare a comprehensive Tree Survey Report for
the North York Road/Harger Road Project Phase I if necessary.Tree survey services presented in this
proposal include a tagged tree survey of all trees 4 inches diameter at breast height (DBH) and greater,
and an inventory tree survey of all trees between 2 inches DBH and 4 inches DBH.Trees will be surveyed
in accordance with the appropriate IDOT tree survey methodologies. SEC proposes to document the
diameter, height, species, health, and structure of each tree 4 inches DBH and greater within the Project
Corridor. SEC proposes to document the species of each tree between 2 inches DBH and 4 inches DBH
within the Project Corridor.
As part of this task, SEC proposes to coordinate with Civiltech,their surveyors, and their CAD
technicians. SEC assumes that Civiltech will provide AutoCAD files with the topographic survey of tagged
trees for the tree location figure in the Tree Survey Report. All findings from the tree survey
April 20, 2017 Page 3 of 6
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase I
Oak Brook, DuPage County, IL
investigation will be included in the Tree Survey Report. A final Tree Survey Report in Adobe PDF format
file will be forwarded to Civiltech for review and distribution.
Task 3: NEPA Support and Preliminary Regulatory Coordination
SEC proposes to assist Civiltech in preparing,finalizing, and submitting NEPA related documentation
with regard to biological and wetland IDOT review and clearance. For areas within, adjoining, and
adjacent to the Project Corridor,SEC proposes to prepare the preliminary Section 7 consultation
memorandum to the U.S. Fish and Wildlife Service(USFWS)for identification of federally listed
endangered and threatened species habitats.As part of this task,SEC will also work closely with Civiltech
to obtain (DOT's TREC Report,complete IDOT's Wetland Impact Evaluation (WIE) submittal, and
complete the IDOT's Environmental Survey Request(ESR)submittal for IDOT clearance.
As part of Task 3, SEC proposes to validate the Wetland Delineation Report with the Village and the
USACE for the North York Road and Harger Road Improvement Project Phase II design and permitting.
SEC proposes to submit the Wetland Delineation Report to the Village for preliminary jurisdictional
determination (PJD) and boundary verification (BV) of Waters of DuPage. SEC proposes to also submit
the Wetland Delineation Report to the USACE for concurrence and jurisdictional determination of
WOUS, including wetlands. Any fees required for these submittals have not been included in this scope
of services and are the responsibility of the Village and Civiltech. SEC will schedule and attend on-site
pre-application meetings with the USACE,the Village, and Civiltech as needed.
Task 4: Preliminary Environmental Site Assessment(PESA)Report
SEC proposes to begin the PESA investigation with a records review to collect environmental related
information associated within the Project Corridor and to identify areas with recognized environmental
conditions (RECs) and de minimis conditions that may exist from current or past uses of properties
within the Project Corridor. SEC proposes to prepare the PESA Report using reasonably ascertainable
historical and geological information sources, including:aerial photographs; United States Geological
Survey (USGS)topographic maps; county plat maps; Office of the Illinois State Fire Marshal (OSFM)files;
and various other regulatory information sources from federal, state, and other agencies. As part of the
records review,SEC will obtain an environmental data search from Environmental Data Resources, Inc.
(EDR)that will include information from state and federal regulatory databases such as NPL, CERLIS,
RCRA CORRACTS, ERNS, IL SSU, IL LUST, and IL UST.
SEC proposes to conduct a site reconnaissance that will include a walkover of the Project Corridor to
verify RECs and de minimis conditions identified in the records review, and to identify any additional
areas of environmental interest. Utilities in and adjacent to the Project Corridor,such as transformers
and capacitors, railways, natural gas pipelines, will also be viewed for potential sources and dumping
areas. Photographic documentation of the site, RECs,di minimis conditions, parcels of environmental
interest, and other concerning features will be included in the PESA Report.
SEC proposes to conduct interviews with owners of parcels located within or adjacent to the Project
Corridor to validate information obtained from the records review.An owner, manager,tenant, or
individual with good knowledge of the uses and physical characteristics of the parcel will be interviewed.
Owners or occupants may provide information not identifiable in the records review and site
reconnaissance that would indicate areas of environmental concern.
SEC proposes to prepare a comprehensive PESA Report that summarizes information obtained in the
records review, site reconnaissance, and parcel interviews.This PESA Report will present RECs and di
�
r
April 20, 2017 1 ) f"( Page 4 of 6
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase I
Oak Brook, DuPage County, IL
minimis conditions associated with man-made and natural hazards that may impact the North York
Road/Harger Road Project Phase I. SEC will prepare and submit a draft PESA Report to Civiltech for
review. SEC will incorporate Civiltech's comments,finalize the PESA Report, and submit a final PESA
Report to Civiltech. A final PESA Report in Adobe PDF format file will be forwarded to Civiltech for
review and distribution.
PROJECT TEAM
SEC proposes to manage this project out of our Geneva, Illinois office with a support network of
scientists and engineers who have experience in conducting environmental science services in DuPage
County. Mr. Barry Stuedemann, P.E., P.W.S. will serve as the Professional Wetland Scientist and
Environmental Engineer.
PROJECT SCHEDULE
SEC will proceed with the scope of work presented in this proposal immediately upon authorization
from Civiltech.Specific schedules for each task are unknown at this time and will be coordinated with
Civiltech throughout the duration of the North York Road/Harger Road Project Phase I. Wetland field
investigations and the final floristic quality assessment work should be completed during the DuPage
County growing season, from April 30th to October 12th.The schedule to complete each task is
influenced by the responses, concerns, and requests of Civiltech and the pertaining agencies.
PROJECT COSTS
SEC estimates the cost to complete the task outlined in this proposal to be a maximum "not-to-exceed"
fee of$24,003. An itemization of these costs is presented in Table 1, Cost Estimate for Consulting
Services.
The following is a summary of these costs:
SCOPE OF WORK COSTS
Task 1: Wetland Delineation Report $8,816
Task 2: Tree Survey Report(If Necessary) $4,282
Task 3: NEPA Support and Preliminary Regulatory Coordination $3,208
Task 4: Preliminary Environmental Site Assessment(PESA) Report $7,697
Total: $24,003
April 20, 2017 Page 5 of 6
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase I
Oak Brook, DuPage County, IL
PROPOSAL ACCEPTANCE
To indicate your acceptance of this proposal, please notify me by mail or e-mail. SEC will assume the
mail or e-mail correspondence as your signature and date for our authorization to proceed with the
tasks presented in this proposal.
SEC appreciates this opportunity to provide environmental science services to Civiltech. If you have any
questions, please do not hesitate to contact me at your convenience.
Sincerely,
Baron H.Stuedemann, P.E., P.W.S.
Technical Director I Managing Member
Stuedemann Environmental Consulting, LLC
Mobile: 630-664-4550
E-Mail: bstuedemann @stuedenv.com
April 20, 2017 SEC Page 6 of 6
TABLE 1
Cost Estimate for Consulting Services
ENVIRONMENTAL SCIENCE SERVICES
NORTH YORK ROAD/HARGER ROAD INTERSECTION IMPROVEMENT PROJECT PHASE I
OAK BROOK,DUPAGE COUNTY,IL
Prepared for Civiltech Engineering,Inc.
Prepared by Stuedemann Environmental Consulting,LLC
April 20,2017
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE I Project Project Total Direct Overhead In-House Fixed Other Not-to-
ENVIRONMENTAL SCIENCE SERVICES Manager Coordinator Hours Labor of 150% Direct Fee Direct Exceed
TASK DESCRIPTION Costs Costs Costs
$64.00 $24.00 (DL) OH(DL) (IHDC) (FF)
Task 1: Wetland Delineation Report 46 2 48 $2,992 $4,488 $220 $1,116 $0 $8,816
Task 2: Tree Survey Report(if Necessary) 22 1 23 $1,432 $2,148 $160 $542 $0 $4,282
Task 3: NEPA Support and Preliminary Regulatory Coordination 16 2 18 $1,072 $1,608 $122 $406 $0 $3,208
Task 4: Preliminary Environmental Site Assessment(PESA)Report 36 2 38 $2,352 $3,528 $842 $975 $0 $7,697
TOTAL: 120 7 127 $7,848 $11,772 $1,344 $3,039 $0 $24,003
DL(Direct Labor)= Hours x Hourly Rate
R(Complexity Factor)= 0
OH(Overhead Rate)= 150%
IHDC(In-House Direct Costs)= See Table Below for Itemization
FF(Fixed Fee)= 14.5%[DL+R(DL)+OH(DL)+IHDCI
Other Direct Costs= Testing,Drilling,and Hauling are not included in these costs.
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE I Mileage Delivery Copies EDR In-House
ENVIRONMENTAL SCIENCE SERVICES ($0.535/mile) ($25/package) ($0.60/page) ($600/each) Direct
TASK DESCRIPTION Costs
Miles $ Packages $ Pages $ Each $ (IHDC)
Task 1: Wetland Delineation Report 140 $75 1 $25 200 $120 0
$0 $220
Task 2: Tree Survey Report(If Necessary) 140 $75 1 $25 100 $60 0 $0 $160
Task 3: NEPA Support and Preliminary Regulatory Coordination 70 $37 1 $25 100 $60 0 $0 $122
Task 4: Preliminary Environmental Site Assessment(PESA)Report 70 $37 1 $25 300 $180 1 $600 $842
TOTAL: 420 $224 4 $100 700 $420 1 $600 1 $1,344
Mileage(miles)= 70 miles Round Trip to/from Site
Delivery(packages)= UPS,FedEx,or USPS
Copies(pages)= Average Cost for Black and White,Color,8"x 11.5",and 11"x 17"
EDR(each)= Environmental Data Resources(EDR)Report for PESA
April 20,2017 Table I
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Phase 11
North York Road/Harger Road Intersection Improvement
CIVILTECH Village of Oak Brook I April 28,2017
Jorgensen and Associates, Inc.
JORGENSEN & ASSOCIATES, INC.
LAND SURVEYORS
Est. 1990
April 10,2017
Mr. Reid T. Magner, P.E.
Civiltech Engineering, Inc.
Two Pierce Place
Suite 1400
Itasca, Illinois 60143
Re: Village of Oak Brook- York Road/Harger Road Phase II Survey Proposal
Dear Mr. Magner:
Enclosed,please find our revised proposal to prepare a topographic survey and a statutory plat
of highways with legal descriptions for the referenced project. Our proposal is based on the
items contained in your email of April 6th and our telephone conversation.
I would like to thank you for considering Jorgensen & Associates for this project. We look
forward to continuing our working relationship with your firm. Should you have any
questions, comments or require any further information concerning our proposal, please feel
free to call me at(847)356-3371.
Respectfully submitted,
Jorgensen&Associates,Inc.
Christian H. Jo nse , L.S.
President
CHJ/pt
Enclosures
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase IRRevised Cover Letter
120 PARK AVENUE, P.O. BOX 306 • LAKE VILLA, ILLINOIS 60046-9093• (847)356-3371 • FAX (847) 356-3488
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Exhibit"A"
Payroll Burden& Fringe Costs
% of Direct
Productive
Payroll
Federal Insurance Contributions Act 11.37%
State Unemployment Compensation 0.97%
Federal Unemployment Compensation 0.11%
Workmen's Compensation Insurance 0.96%
Paid Holidays, Vacation, Sick Leave, Personal Leave 10.79%
Bonus 7.01%
Pension 0.93%
Group Insurance 35.63%
Total Payroll Burden&Fringe Costs 67.77%
EACiviltech\Oak Brook\York Rd-Harger RdThase II\EXA
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Exhibit"B"
Overhead and Indirect Costs
% of Direct
Productive
Payroll
Business Insurance 4.48%
Depreciation 12.02%
Indirect wages and salaries 38.85%
Reproductive and printing costs 0.18%
Office Supplies 3.57%
Computer Costs 1.98%
Professional Fees 2.54%
Telephone 1.85%
Fees, license & dues 0.98%
Repairs and maintenance 0.96%
Business space rent 4.92%
Facilities- capital 0.66%
Travel - Meals 0.08%
Survey Supplies 2.80%
Automobile/travel expense 1.45%
Miscellaneous Expense 0.31%
State Income Tax 1.05%
Postage 0.20%
Educational &Professional Registrations 0.05%
Total Overhead 78.93%
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase II\EXB
PAYROLL ESCALATION TABLE
FIXED RAISES
FIRM NAME Jorgensen&Associates,Inc DATE 04/10/17
PRIME/SUPPLEMENT Prime PTB NO.
CONTRACT TERM 12 MONTHS OVERHEAD RATE 146.70
START DATE 5/112017 COMPLEXITY FACTOR
RAISE DATE 11/1/2017 %OF RAISE 3.00
ESCALATION PER YEAR
5/1/2017 - 11/1/2017 11/2/2017 - 5/1/2018
6 6
12 12
= 50.00% 51.50%
1.0150
The total escalation for this project would be: 1.50%
Printed 4/10/2017 Bureau of Design and Environment(Rev.05108/15)
PAYROLL RATES
FIRM NAME Jorgensen &Associates DATE 04/10/17
PRIME/SUPPLEMENT Prime
PSB NO.
ESCALATION FACTOR 1.50%
CLASSIFICATION CURRENT RATE CALCULATED RATE
Principal/Officer $46.00 $46.69
Supervisor, P.L.S. $42.00 $42.63
Survey Party Chief, S.I.T. $26.75 $27.15
Instrument Operator $20.75 $21.06
Cadd Supervisor $30.75 $31.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Bureau of Design and
Printed 4/10/2017 PREPARED BY THE CONSULTANTEnvironment(Rev. 05/08/15)
COST PLUS FIXED FEE
COST ESTIMATE OF CONSULTANT SERVICES
FIRM Jorgensen&Associates,Inc. DATE 04110117
PSB OVERHEAD RATE 1.467
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES %OF
DROP ITEM MANHOURS PAYROLL 8 DIRECT FIXED Direct BY DBE TOTAL GRAND
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL TOTAL
(A) (B) (C) (D) (E) (F) (G) (H) (B-G)
1 Field-Topography Survey 38 902.50 1,323.97 C; 345.89 2,731.36 54.45%
2 Office-Compile Field Data 6 207.00 303.67 74.05 584.72 11.66%
3 Office-Create Topography Base Sheets 121 391.50 574.33 140.05 1,105.88 22.04%
4 Office-Create T.I.N.&Contours 31 103.50 151.83 37.02 1 292.36 5.83%
5 Coordination Meetings 2 92.00 134.96 37.10 38.29 302.35 6.03%
Subconsultant DL i 0.00 1 1 0.001 0.00%
TOTALS 1 611 1,696.50 2,488.77 196.101 635.301 0.00 0.001 0.001 5,016.661 100.00%
DBE 0.00%
Printed 4/10/2017 PREPARED BY THE CONSULTANT Bureau of Design and Environment(Rev.05/08/15)
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB DATE 04110/17
PRIME/SUPPLEMENT Prime
SHEET 1 OF 1
PAYROLL AVG TOTAL PROJECT RATES (1)Field-Topography Survey (2)Office-Complle Field Data (3)Office-Create Topo raphy Base Sheets 4)Office-Create T.I.N.&Contours (5)Coordination Meetings
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 2 3.28% 1.51 2 100.00% 46.00
Supervisor,P.L.S. 42.00 5 8.20% 3.44 2 33.33% 14.00 2 16.67% 7.00 1 33.33% 14.00
Survey Party Chief,S.I.T. 26.75 19 31.15% 8.33 19 50.00% 13.38
Instrument Operator 20.75 19 31.15% 6.46 19 50.00% 10.38
Cadd Supervisor 30.75 16 26.23% 8.07 4 66.67% 20.50 10 1 83.33% 25.63 2 66.67% 1 20.50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTALS 61 1 100% 1 $27.81 38 100.00% $23.75 1 6 1 100% 1 $34.50 1 12 1 100% $32.63 3 100% $34.50 2 100% $46.00
Bureau of Design and
Printed 4/10/2017 PREPARED BY THE CONSULTANT Environment(Rev.05/08/15)
Route: York Road/Harger Road Phase I1
Section:
County: DuPage
Job No.:
Manhour Breakdown
Topographic Survey Estimate
York Road + 850' _+ 0.161 mile
Total Length + 850' _+0.161 mile
1. Field—Topographic Survey
a. Establish horizontal &vertical controls points
3 hours x 2 men= 6 MH
b. Locate existing topography
16 hours x 2 men= 32 MH
Sub-total Item#1 38 MH
2. Office - Compile Field Data
a. Compute traverse &level circuit
2 hours x 1 man= 2 MH
b. Edit&compile topographic survey
4 hours x 1 man= 4 MH
Sub-total Item#2 6 MH
3. Office - Create Existing Topography Base Sheets
a. Layout and drafting
10 hours x 1 man= 10 MH
b. Check topographic survey
2 hours x 1 man= 2 MH
Sub-total Item#3 12 MH
(1)
4. Office -Create T.I.N. &Contours
a. Compute contours
2 hours x 1 man= 2 MH
b. Check contours
1 hour x 1 man= 1 MH
Sub-total Item#4 3 MH
5. Coordination Meetings
1 meeting @ 2 hours= 2 MH
Total All Items 61 MH
(2)
EACiviltechDak BrookWork Rd-Harger Rd\Phase II LOP
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Breakdown of
In House Direct Costs
Item
1. Field -Topographic Survey
a. Trips to project site- 3 ea.
+ 100 miles/trip x 3 trips=+ 300 miles
+300 miles @ $0.53/mile= $ 159.00
5. Coordination Meetings
a. Meetings at Civiltech's office- 1 ea.
+ 70 miles/trip x 1 trip=+70 miles
+ 70 miles @ $0.53/mile= $ 37.10
Total All Items $ 196.10
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase II\IHC
DF-824-039
REV 12/04
PAYROLL ESCALATION TABLE
FIXED RAISES
FIRM NAME Jorgensen&Associates,Inc DATE 04/10/17
PRIME/SUPPLEMENT nrimr PTB NO.
CONTRACT TERM 12 MONTHS OVERHEAD RATE 146.70%
START DATE 5/1/2017 COMPLEXITY FACTOR
RAISE DATE 11/1/2017 %OF RAISE 3.00
ESCALATION PER YEAR
5/1/2017 - 11/1!2017 11/2/2017 - 5!1/2018
6 6
12 12
50,00% 51.50%
1.0150
The total escalation for this project would be: 1.50%
Bureau of Design and Environment Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
PAYROLL RATES
FIRM NAME Jorgensen &Associates, Inc. DATE 04/10/17
PRIME/SUPPLEMENT Prime
PSB NO.
ESCALATION FACTOR 1.50%
CLASSIFICATION CURRENT RATE CALCULATED RATE
Principal/Officer $46.00 $46.69
Supervisor, P.L.S. $42.00 $42.63
Survey Party Chief, S.I.T. $26.75 $27.15
Instrument Operator $20.75 $21.06
Cadd Supervisor $30.75 $31.21
Administrative Assistant $20.75 $21.06
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PREPARED BY THE AGREEMENTS UNITPrinted 4/10/2017 5:14 PM
COST PLUS FIXED FEE
COST ESTIMATE OF CONSULTANT SERVICES DF-824-039
REV 12/04
FIRM Jorgensen&Associates,Inc. DATE 04110/17
PSB OVERHEAD RATE 1.467
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES %OF
DROP ITEM MANHOURS PAYROLL & DIRECT FIXED Direct BY DBE TOTAL GRAND
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL TOTAL
(A) (B) (c) (D) (E) (F) (G) (H) (B-G)
1 Pre-Survey 5 143.75 210.88 ",? 66.36 450.00 973.99 5.83%
2 Survey Reconnaissance 8 190.00 278.73 67.97 536.70 3.22%
3 Project Survey Plan 1 30.75 45.11 11.001 86.861 0.52%
4 First Submittal Plat of Hwys.&Description. 33 1,059.75 1,554.65 25.00 382.71 3,022.12 18.10%
5 Survey Field 84 1,995.00 2,926.67 318.00 759.75 5,999.42 35.94%
6 Survey Office 27 1,100.25 1,614.07 393.58 3,107.89 18.62%
7 Final Submittal Plat of Hwys&Description 7 196.50 288.27 31.80 74.90 591.47 3.54%
8 Coordination Meetings 2 92.00 134.96 37.10 38.29 302.35 1.81%
9 QC/QA 18 733.50 1,076.04 262.38 2,071.93 12.41%
Subconsultant DL 0.00 0.00 0.00%
TOTALS i 1851 5,541.50 8,129.38 514.90 2,056.94 0.00 450.00 0.001 16,692.721 100.00%
DBE 0.00%
DBE
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB DATE 04/10/17
PRIME/SUPPLEMENT Prime
SHEET 1 OF 2
PAYROLL AVG TOTAL PROJECT RATES (1)Pre-Survey (2)Survey Reconnaissance (3)Project Survey Plan (4)First Submittal Plat of Hwys.&Descriptions (5)Survey(Field)
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 2 1.08% 0.50
Supervisor,P.L.S. 42.00 45 24.32% 10.22 12.12% 5.09
Survey Party Chief,S.I.T. 26.75 46 24.86% 6.65 50.00% 13.38 50.00% 13.38
Instrument Operator 20.75 46 24.86% 5.16 50.00% 10.38 50.00% 10.38
Cadd Supervisor 30.75 42 22.70% 6.98 80.00% 24.60 100.00% 30.75 87.88% 27.02
Administrative Assistant 20.75 4 2.16% 0.45 20.00% 4.15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTALS 185 100% $29.95 5 100.00% $28.75 8 100% $23.75 1 100% $30.75 33 100% $32.11 84 100% $23.75
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB DATE 04/10/17
PRIMEISUPPLEMENT Prime
SHEET 2 OF 2
PAYROLL AVG (6)Survey(Office) (7)Final Submittal Plat of Hwys&Descriptions (8)Coordination Meetings (9)QC/QA
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Av Part. Avg Part. Av Part. Avg Part. Avg
Principal/Off icer 46.00 100.00% 46.00
Supervisor, P.L.S. 42.00 %a 88.89% 37.33 14.29% 6.00 88.89% 37.33
Survey Party Chief, 26.75
Instrument Operator 20.75
Cadd Supervisor 30.75 11.11% 3.42 42.86% 13.18 11.11% 3.42
Administrative Assis 20.75 42.86% 8.89
TOTALS 27 100% $40.75 7 100% $28.07 2 100% $46.001 18 100% $40,750 0% °
$0.00 0 0/o $0.00
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Manhour Breakdown
Land Acquisition Estimate
York Road + 1,000' =+0.189 mile
Harger Road + 1,400'= +0.265 mile
Total Length + 2,400'= +0.454 mile
1 Parcel: 1 Permanent Easement& Temporary Easement—A &B.
1. Pre-Survey Phase
Research available records
a. Title Co. ) 4 MH
b. Recorder's Office )
C. I.D.O.T. )
d. Utilities )
e. Private Surveyors )
f. Land Owners ) 1 MH
Sub-total Item# 1 5 MH
2. Reconnaissance Survey
4 hours x 2 men= 8 MH
(1)
3. Project Survey Plan +2,640'/sheet - 1 sheet
a. Alignment info )
b. Existing R.O.W. info )
C. Land line data )
d. Subdivision data ) 1 hr./sheet x 1 = 1 MH
Sub-total Item#3 1 MH
4. First Submittal Plat of Highways &Descriptions
a. Ownership info )
b. Total holding boundaries )
C. Total holding area listing ) 1 MH
d. Private survey info )
e. Deed calculated closures )
f. Layout and drafting + 2 sheets
20 hours x 1 man= 20 MH
Cover/Index sheet 2 hours/sheet x 1 = 2 MH
Total Holding sheets 4 hours/sheet x 1 = 4 MH
Alignment&Tie sheets 3 hours/sheet x 1 = 3 MH
g. Legal descriptions 3 descriptions 3 MH
Sub-total Item#4 33 MH
(2)
5. Survey (Field)
a. Monument&Reference center line alignments
Harger Road - 1,400'- 7 hrs. x 2 men= 14 MH
York Road - 1,000' - 4 hrs. x 2 men= 8 MH
b. Measure existing R.O.W., section&property lines
24 hours x 2 men= 48 MH
C. Appraisal topography
3 hours x 2 men= 6 MH
d. Monument &reference proposed right of way
4 hours x 2 men= 8 MH
Sub-total Item#5 84 MH
6. Survey(Office)
a. Compute traverse
2 hours x 1 man= 2 MH
b. Compute existing R.O.W., section&property lines
22 hours x 1 man= 22 MH
C. Compile appraisal topography
1 hour x 1 man= 1 MH
d. Compute center line alignment
1 hour x 1 man= 1 MH
e. Compute proposed easements
1 hour x 1 man= 1 MH
Sub-total Item#6 27 MH
(3)
7. Final Submittal Plat of Highways &Descriptions
a. Final drafting+ 5 sheets
3 hours x 1 man= 3 MH
b. Final descriptions 3 descriptions 1 MH
C. Assembly of final papers 3 MH
Sub-total Item#7 7 MH
8. Coordination Meetings
1 meeting @ 2 hours= 2 MH
9. QC/QA
a. Check preliminary plats
5 sheets 13 MH
b. Check preliminary legal descriptions
3 legal descriptions 1 MH
C. Check final plats
5 sheets 3 MH
d. Check final legal descriptions
3 legal descriptions 1 MH
Total All Items 185 MH
(4)
E:\Civiltech\Oak Brook\York Rd-Harger Rd\Phase II\LALOP
Route: York Road\Harger Road
Section:
County: DuPage
Job No.:
Breakdown of
In House Direct Costs
Item
1. Pre-Survey Phase
a. Trips to Recorder's Office- 1 ea.
• 100 miles/trip x 1 trip=+ 100 miles
• 100 miles @ $0.53/mile= $ 53.00
b. Records from Recorder's Office $ 50.00
Sub-total Item#1 $ 103.00
4. First Submittal Plat of Highways &Descriptions
a. Plat of Highways Mylars
5 sheets @ $5.00/sheet= $ 25.00
5. Survey(Field)
a. Trips to project site - 6 ea.
+ 100 miles/trip x 6 trips=+600 miles
+ 600 miles @ $0.53/mile= $ 318.00
7. Final Submittal Plat of Highways & Descriptions
a. Deliver Final Papers to District One Office
+60 miles/trip x 1 trip=+60 miles
+60 miles @ $0.53/mile= $ 31.80
8. Coordination Meetings
a. Meetings at Civiltech's office— 1 ea.
+ 70 miles/trip x 1 trip=±70 miles
+ 70 miles @ $0.53/mile= 37.10
Total All Items $ 514.90
EXiviltech\Oak Brook\York Rd-Harger Rd\Phase IRLAINH
Route: York Road\Harger Road
Section:
County: DuPage
Job No.:
Breakdown of
Services by Others
Item
1. Pre-Survey Phase
a. Commitments for Title Insurance
1 Commitment @ $450.00 each= $ 450.00
EACiviltech\Oak Brook\York Rd-Harger RdThase II\LASBO
North York Road/Harger Road Intersection Improvement
CIVILTECH
Village of Oak Brook I April 28,2017
Stuedemann Environmental
Consulting , LLC
STUEDEMANN
ENVIRONMENTAL CONSULTING
March 2, 2017
Mr.James R. Woods, P.E.
Project Manager
Civiltech Engineering, Inc.
Two Pierce Place, Suite 1400
Itasca, IL 60143
SUBJECT: Proposal to Provide Environmental Science Services
North York Road/Harger Road Intersection Improvement Project Phase II
Oak Brook, DuPage County, Illinois
Dear Mr. Woods:
Stuedemann Environmental Consulting, LLC(SEC) is pleased to present Civiltech Engineering, Inc.
(Civiltech) with this proposal to provide environmental science services for the Village of Oak Brook's
(Village) North York Road/Harger Road Intersection Improvement Phase 11 Project(North York
Road/Harger Road Project Phase II), located in Oak Brook, DuPage County, Illinois. Services presented
herein coincide with the North York Road/Harger Road Project Phase II engineering services provided by
Civiltech to the Village and includes wetland science related permitting services and Clean Construction
or Demolition Debris (CCDD) coordination. SEC presents this proposal in the following sections: project
understanding, limits and reliability, scope of work, project team, project schedule, project costs, and
proposal acceptance.
PROJECT UNDERSTANDING
SEC understands that Civiltech has been solicited by the Village to submit a proposal for Phase II
engineering services for improvements to the North York Road and Harger Road intersection,which
includes the Harger Road intersection with the westbound entrance ramp to 1-88. Civiltech has solicited
SEC to prepare a scope of environmental science services for the North York Road/Harger Road Project
Phase II in accordance with requirements associated with the Oak Brook Village Code, DuPage County,
Illinois Department of Transportation (IDOT), and the U.S. Army Corps of Engineers (USACE) Chicago
District.To comply with and obtain permits, SEC's proposed Phase If scope of work is to coordinate and
prepare the applicable wetland related documents for permit submittals to the Village and the USACE.
On February 26, 2017, Civiltech provided SEC with the August 2, 2016, Proposed Intersection Concept
Plan, which identifies the limits of the Project Corridor for the North York Road/Harger Road Project
Phase 11.This Project Corridor consists of all areas within the North York Road and Harger Road right-of-
way(ROW) as shown on the plan, plus an additional 100 feet per Village and DuPage County
requirements.
ON419 Taylor Drive,Geneva,IL 60134 1 331-588-1805 1 main @stuedenv.com
www.stuedemannec.com
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
SEC proposes to conduct the biological,wetland,and special waste surveys and investigations presented
in this scope of work in accordance with the following:
• October 11, 2016, edition of the Oak Brook Village Code Title 9-Stormwater, Floodplain,and
Sedimentation and Erosion Control Regulations (Village Code);
• April 23, 2013,edition of the DuPage County Countywide Stormwater and Flood Plain Ordinance
(Ordinance);
• Biological,wetland,and special waste clearance requirements from the Illinois Department of
Transportation (IDOT);
• April 1, 2012, U.S. Army Corps of Engineers (USACE) Chicago District Regional Permit Program
(RPP);and
• Illinois Environmental Protection Agency(IEPA) regulations for CCDD disposal, 35 Illinois
Administrative Code 1100 (35 III.Adm. Code 1100).
In preparing this proposal,SEC has made the following assumptions:
1. All relevant coordination, documents, and correspondence from the North York Road/Harger
Road Intersection Improvement Project Phase I (North York Road/Harger Road Project Phase 1)
will be available for use by SEC in the North York Road/Harger Road Project Phase 11;
2. Oak Brook is a Complete Waiver Community and all wetland related permitting coordination will
occur directly with the Village and the USACE;
3. DuPage County Critical Wetlands, high-quality aquatic resources(HOAR),and federal or state
listed endangered and threatened species habitats, are not located within, adjoining,or
adjacent to the Project Corridor;
4. Fees associated with wetland mitigation banking or fee-in-lieu are not included in this proposal
and are the responsibility of the Village and Civiltech;
5. Wetland mitigation design is not included in this proposal;
6. Preliminary Site Investigation (PSI)services are not included in this proposal; and
7. There are no additional environmental concerns within the Project Corridor that are not
referenced in this proposal that would impede the Village, IDOT,and USACE coordination and
permitting process,such as the presence of state and federal endangered and threatened
species, protected historical and cultural sites, and environmental due diligence.
LIMITS AND RELIABILITY
SEC understands that the North York Road/Harger Road Project Phase II is anticipated to generate Clean
Construction or Demolition Debris(CCDD) materials,and therefore must comply with Illinois
Environmental Protection Agency(IEPA) regulations for CCDD disposal, 35 Illinois Administrative Code
1100 (35 III.Adm. Code 1100).The IEPA defines CCDDs as:
"CCDD is uncontaminated broken concrete without protruding metal bars, bricks, rock,
stone, or reclaimed asphalt pavement generated from construction or demolition
activities. When uncontaminated soil is mixed with any of these materials, the
uncontaminated soil is also considered CCDD."
March 2, 2017 f ( Page 2 of 4
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
SEC proposes to provide CCDD services prior to disposal of appropriate clean materials during
excavation. CCDD services are limited by:the information available at the time that services are
rendered; review of readily available and relevant data/reports; and statements made and information
provided by the client,agents, land-owners,contractors, and tenants within the Project Corridor and
adjacent properties.
SCOPE OF WORK
SEC proposes to complete the requested services in two tasks as follows:
Task 1: USACE and Oak Brook Permit Coordination
SEC proposes to prepare documents necessary to comply with the Village Code,the Ordinance,the
USACE Joint Application, and the USACE Chicago District RPP. SEC proposes to utilize all coordination,
documents,and correspondence from the North York Road/Harger Road Project Phase I Project for the
Village and USACE permit submittals. Documents necessary for the Phase II Wetland and Buffer Impact
submittals include: a Wetland Buffer Memorandum; a Wildlife Habitat Assessment Memorandum;a
wetland and buffer submittal narrative; and the wetland and buffer checklists and tabs.These
documents will be prepared and presented to Civiltech for inclusion in their permit submittals to the
Village. SEC will also utilize these documents to coordinate, prepare, and submit the Joint Application to
the USACE. SEC will coordinate with Civiltech to obtain appropriate engineering related documents for
inclusion in the Joint Application permit submittal to the USACE.
SEC proposes to schedule and attend on-site pre-application meetings as needed with the Village,the
USACE, and Civiltech,to review the Wetland Delineation Report and other associated documents
prepared by SEC. All permit submittals will be prepared and submitted by SEC's Professional Wetland
Scientist.SEC will assist Civiltech through the wetland provisions portions of the Village and USACE
permit submittals until all wetland related permits are received.
Task 2: Clean Construction or Demolition Debris(CCDD)Services
SEC proposes to provide CCDD coordination services for the off-site disposal of uncontaminated soils
generated by the construction of the North York Road/Harger Road Project Phase II. In accordance with
current IEPA CCDD regulations,SEC will: prepare a Materials Disposal Plan; identify pre-approved CCDD
facilities;and complete the appropriate pre-construction permit application forms for material disposal.
Testing,disposal,and permitting fees are estimated in this proposal and any overages are the
responsibility of the Village and Civiltech. SEC will coordinate with Civiltech until all appropriate CCDD
documentation is prepared for contractor bidding.
PROJECT TEAM
SEC proposes to manage this project out of our Geneva, Illinois office with a support network of
scientists and engineers who have experience in conducting environmental science services in DuPage
County. Mr. Barry Stuedemann, P.E., P.W.S.will serve as the Professional Wetland Scientist and
Environmental Engineer.
PROJECT SCHEDULE
SEC will proceed with the scope of work presented in this proposal immediately upon authorization
from Civiltech.Specific schedules are unknown at this time and will be coordinated with Civiltech
March 2, 2017 SEC Page 3 of 4
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
throughout the duration of the North York Road/Harger Road Project Phase II.The schedule to complete
each task is influenced by the responses, concerns, and requests of Civiltech and the pertaining
agencies.
PROJECT COSTS
SEC estimates the cost to complete the task outlined in this proposal to be a maximum "not-to-exceed"
fee of$12,944.An itemization of these costs is presented in Table 1, Cost Estimate for Consulting
Services.
The following is a summary of these costs:
SCOPE OF WORK COSTS
Task 1: USACE and Oak Brook Permit Coordination $7,079
Task 2: Clean Construction or Demolition Debris(CCDD)Services $5,865
Total: $12,944
PROPOSAL ACCEPTANCE
To indicate your acceptance of this proposal, please notify me by mail or e-mail. SEC will assume the
mail or e-mail correspondence as your signature and date for our authorization to proceed with the
tasks presented in this proposal.
SEC appreciates this opportunity to provide environmental science services to Civiltech. If you have any
questions, please do not hesitate to contact me at your convenience.
Sincerely,
Baron H. Stuedemann, P.E., P.W.S.
Technical Director I Managing Member
Stuedemann Environmental Consulting, LLC
Mobile: 630-664-4550
E-Mail: bstuedemann @stuedenv.com
March 2, 2017 " Page 4 of 4
TABLE 1
Cost Estimate for Consulting Services
ENVIRONMENTAL SCIENCE SERVICES
NORTH YORK ROAD/HARGER ROAD INTERSECTION IMPROVEMENT PROJECT PHASE II
OAK BROOK,DUPAGE COUNTY,IL
Prepared for Civiltech Engineering,Inc.
Prepared by Stuedemann Environmental Consulting,LLC
March 2,2017
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE II Project Project Total Direct Overhead In-House Fixed Other Not-to-
ENVIRONMENTAL SCIENCE SERVICES Manager Coordinator Hours Labor of 150% Direct Fee Direct Exceed
TASK DESCRIPTION Costs Costs Costs
$64.00 $24.00 (DL) OH(DL) (IHDC) (FF)
Task 1: USACE and Oak Brook Permit Coordination 36 4 40 $2,400 $3,600 $182 $896 $0 $7,079
Task 2: Clean Construction or Demolition Debris(CCDD)Services 20 4 24 $1,376 $2,064 $1,682 $743 $0 $5,865
TOTAL: 56 8 64 $3,776 $5,664 $1,865 $1,639 $0 $12,944
DL(Direct Labor)= Hours x Hourly Rate
R(Complexity Factor)= 0
OH(Overhead Rate)= 150%
IHDC(In-House Direct Costs)= See Table Below for Itemization
FF(Fixed Fee)= 14.5%[DL+R(DL)+OH(DL)+IHDC)
Other Direct Costs= Testing,Drilling,and Hauling are not included in these costs.
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE II Mileage Delivery Copies Analytic Testing In-House
ENVIRONMENTAL SCIENCE SERVICES ($0.535/mile) ($25/package) ($0.60/page) ($1,500/each) Direct
TASK DESCRIPTION Costs
Miles $ Packages $ Pages $ Each $ (IHDC)
Task 1: LISACE and Oak Brook Permit Coordination 70 $37 1 $25 200 $120 0 $0 $182
Task 2: Clean Construction or Demolition Debris(CCDD)Services 70 $37 1 $25 200 $120 1 $1,500 $1,682
TOTAL: 140 $75 2 $50 400 $240 1 $1,500 $1,865
Mileage(miles)= 70 miles Round Trip to/from Site
Delivery(packages)= UPS,Fed Ex,or USPS
Copies(pages)= Average Cost for Black and White,Color,8"x 11.5",and 11"x 17"
Analytic Testing(each)= Environmental Monitoring and Technologies,Inc.(EMT)or Similar
March 2,2017 Table 1
North York Road/Harger Road Intersection Improvement
CIVILTECH
Village of Oak Brook I April 28,2017
Phase III
North York Road/Harger Road Intersection Improvement
CIVUTECH Village of Oak Brook I April 28,2017
Jorgensen and Associates, Inc.
JORGENSEN & ASSOCIATES, INC.
LAND SURVEYORS
Est 1990
April 10,2017
Mr. Reid T. Magner, P.E.
Civiltech Engineering, Inc.
Two Pierce Place
Suite 1400
Itasca, Illinois 60143
Re: Village of Oak Brook- York Road/Harger Road Phase II Survey Proposal
Dear Mr. Magner:
Enclosed, please find our revised proposal to prepare a topographic survey and a statutory plat
of highways with legal descriptions for the referenced project. Our proposal is based on the
items contained in your email of April 6th and our telephone conversation.
I would like to thank you for considering Jorgensen & Associates for this project. We look
forward to continuing our working relationship with your firm. Should you have any
questions, comments or require any further information concerning our proposal, please feel
free to call me at(847)356-3371.
Respectfully submitted,
Jorgensen &Associates, Inc.
Christian H. Jo nse , L.S.
President
CHJ/pt
Enclosures
E:\Civiltech\Oak Brook\York Rd-Harger Rd\Phase 1hRevised Cover Letter
120 PARK AVENUE, P.O. BOX 306 • LAKE VILLA, ILLINOIS 60046-9093• (847)356-3371 • FAX (647) 356-3488
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Exhibit "A"
Payroll Burden& Fringe Costs
% of Direct
Productive
Pa ry_oll
Federal Insurance Contributions Act 11.37%
State Unemployment Compensation 0.97%
Federal Unemployment Compensation 0.11%
Workmen's Compensation Insurance 0.96%
Paid Holidays, Vacation, Sick Leave,Personal Leave 10.79%
Bonus 7.01%
Pension 0.93%
Group Insurance 35.63%
Total Payroll Burden&Fringe Costs 67.77%
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase II\EXA
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Exhibit "B"
Overhead and Indirect Costs
% of Direct
Productive
Payroll
Business Insurance 4.48%
Depreciation 12.02%
Indirect wages and salaries 38.85%
Reproductive and printing costs 0.18%
Office Supplies 3.57%
Computer Costs 1.98%
Professional Fees 2.54%
Telephone 1.85%
Fees, license& dues 0.98%
Repairs and maintenance 0.96%
Business space rent 4.92%
Facilities - capital 0.66%
Travel - Meals 0.08%
Survey Supplies 2.80%
Automobile/travel expense 1.45%
Miscellaneous Expense 0.31%
State Income Tax 1.05%
Postage 0.20%
Educational &Professional Registrations 0.05%
Total Overhead 78.93%
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase II\EXB
PAYROLL ESCALATION TABLE
FIXED RAISES
FIRM NAME Jorgensen R Associates,Inc. DATE 04/10/17
PRIME/SUPPLEMENT ',nmr PTB NO.
CONTRACT TERM 12 MONTHS OVERHEAD RATE 146.70%
START DATE 5/1/2017 COMPLEXITY FACTOR
RAISE DATE 11/112017 %OF RAISE 3.00%
ESCALATION PER YEAR
5/1/2017 - 11/1/2017 l 1 1112/2017 - 5/1/2018
6 6
12 12
50.00% 51.50%
= 1.0150
The total escalation for this project would be: 1.50%
Printed 4/10/2017 Bureau of Design and Environment(Rev.05/08/15)
PAYROLL RATES
FIRM NAME Jorgensen &Associates DATE 04/10/17
PRIME/SUPPLEMENT Prime
PSB NO.
ESCALATION FACTOR 1.50%
CLASSIFICATION CURRENT RATE CALCULATED RATE
Principal/Officer $46.00 $46.69
Supervisor, P.L.S. $42.00 $42.63
Survey Party Chief, S.I.T. $26.75 $27.15
Instrument Operator $20.75 $21.06
Cadd Supervisor $30.75 $31.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Bureau of Design and
Enviro
Printed 4/10/2017 PREPARED BY THE CONSULTANT Environment(Rev. 05/08115)
COST PLUS FIXED FEE
COST ESTIMATE OF CONSULTANT SERVICES
FIRM Jorgensen&Associates,Inc. DATE 04/10/17
PSB OVERHEAD RATE 1.467
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES
OF
DROP ITEM MANHOURS PAYROLL & DIRECT FIXED Direct BY DBE TOTAL GRAND
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL TOTAL
(A) (B) (C) (D) (E) (F) (G) (H) (B-G)
1 Field-Topography Survey 38 902.50 1,323.97 159.00 345.89 2,731.36 54.45%
2 Office-Compile Field Data 6 207.00 303.67 74.05 584.72 11.66%
3 Office-Create Topography Base SheeTl 121 391.50 574.33 140.05 1,105.88 22.04%
4 Office-Create T.I.N.&Contours 3 103.50 151.83 37.02 292.36 5.83%
(5)Coordination Meetings 2 92.00 134.96 37.10 38.29 302.35 6.03%
Subconsultant DL 0.00 0.001 0.00%
TOTALS 61 1,696.50 2,488.77 196.101 635.301 0.00 0.00 0.00 5,016.661 100.00%
DBE 0.00%
Printed 4/10/2017 PREPARED BY THE CONSULTANT Bureau of Design and Environment(Rev.05/08/15)
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB
PRIME/SUPPLEMENT Prime DATE 04/10117
SHEET 1 OF 1
PAYROLL AVG TOTAL PROJECT RATES (1)Field•To ography Survey (2)Office-Compile Field Data 3 Office-Create To ogre h Base Sheets 4 Office-Create T.I.N.S Contours 5)Coordination Meetings
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 2 3.28% 1.51 z 100.rt. Avg
Supervisor,P.L.S. 42.00 5 8.20% 3.44 2 33.33% 14.00 2 16.67% 7.00 1 33.33% 14.00
Survey Party Chief,S.I.T. 26.75 19 31.15% 8.33 19 50.00% 13.38
Instrument Operator 20.75 19 31.15% 6.46 19 50.00% 10.38
Cadd Supervisor 30.75 16 26.23% 8.07 4 66.67% 20.50 1 10 83.33% 25.63 2 1 66.67% 20.50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTALS 61 100% $27.81 38 100.00% $23.75 6 100% 1 $34.50 1 12 100% 1 $32.63 3 100% 1 $34.50 2 100% $46.00
Bureau of Design and
PREPARED BY THE CONSULTANT
Printed 4/10/2017 Environment(Rev.05/08/15)
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Manhour Breakdown
Topographic Survey Estimate
York Road + 850' _+ 0.161 mile
Total Length + 850' _+0.161 mile
1. Field—Topographic Survey
a. Establish horizontal&vertical controls points
3 hours x 2 men= 6 MH
b. Locate existing topography
16 hours x 2 men= 32 MH
Sub-total Item#1 38 MH
2. Office - Compile Field Data
a. Compute traverse & level circuit
2 hours x I man= 2 MH
b. Edit&compile topographic survey
4 hours x 1 man= 4 MH
Sub-total Item#2 6 MH
3. Office - Create Existing Topography Base Sheets
a. Layout and drafting
10 hours x 1 man= 10 MH
b. Check topographic survey
2 hours x 1 man= 2 MH
Sub-total Item#3 12 MH
(1)
4. Office -Create T.I.N. &Contours
a. Compute contours
2 hours x 1 man= 2 MH
b. Check contours
1 hour x 1 man= 1 MH
Sub-total Item#4 3 MH
5. Coordination Meetings
1 meeting @ 2 hours= 2 MH
Total All Items 61 MH
(2)
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase IIXLOP
Route: York Road/Harger Road Phase II
Section:
County: DuPage
Job No.:
Breakdown of
In House Direct Costs
Item
1. Field -Topographic Survey
a. Trips to project site- 3 ea.
+ 100 miles/trip x 3 trips=+ 300 miles
+300 miles @ $0.53/mile= $ 159.00
5. Coordination Meetings
a. Meetings at Civiltech's office- 1 ea.
+ 70 miles/trip x 1 trip=+ 70 miles
+70 miles @ $0.53/mile= $ 37.10
Total All Items $ 196.10
EACiviltech\Oak Brook\York Rd-Harger Rd\Phase II\IHC
DF-824-039
REV 12/04
PAYROLL ESCALATION TABLE
FIXED RAISES
FIRM NAME Jorgensen&Associates,Inc. DATE 04/10/17
PRIME/SUPPLEMENT Prime PT13 NO.
CONTRACT TERM 12 MONTHS OVERHEAD RATE 146.70%
START DATE 5/1/2017 COMPLEXITY FACTOR
RAISE DATE 11/1/2017 %OF RAISE 3.00%
ESCALATION PER YEAR
5/1/2017 - 11/1/2017 1 11/212017 - 5/1/2018
6 6
12 12
50.00% 51.50%
1.0150
The total escalation for this project would be: 1.50°i
Bureau of Design and Environment Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
PAYROLL RATES
FIRM NAME Jorgensen &Associates, Inc. DATE 04/10/17
PRIME/SUPPLEMENT Prime
PSB NO.
ESCALATION FACTOR 1.50%
CLASSIFICATION CURRENT RATE CALCULATED RATE
Principal/Officer $46.00 $46.69
Supervisor, P.L.S. $42.00 $42.63
Survey Party Chief, S.I.T. $26.75 $27.15
Instrument Operator $20.75 $21.06
Cadd Supervisor $30.75 $31.21
Administrative Assistant $20.75 $21.06
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PREPARED BY THE AGREEMENTS UNITPrinted 4/10/2017 5:14 PM
COST PLUS FIXED FEE
COST ESTIMATE OF CONSULTANT SERVICES DF-824-039
REV 12/04
FIRM Jorgensen&Associates,Inc. DATE 04110/17
PSB OVERHEAD RATE 1.467
PRIME/SUPPLEMENT Prime COMPLEXITY FACTOR 0
DBE OVERHEAD IN-HOUSE Outside SERVICES %OF
DROP ITEM MANHOURS PAYROLL & DIRECT FIXED Direct BY DBE TOTAL GRAND
BOX FRINGE BENF COSTS FEE Costs OTHERS TOTAL TOTAL
(A) (B) (C) (D) (E) (F) (G) (H) (B-G)
1 Pre-Survey 5 143.75 210.88 103.00 66.36 973.99 5.83%
(2)Survey Reconnaissance 8 190.00 278.73 67.97 536.70 3.22%
3 Project Survey Plan 11 30.75 45.11 11.00 86.86 0.52%
4 First Submittal Plat of Hwys.&Description 33 1,059.75 1,554.65 25.00 382.71 3,022.12 18.10%
5 Survey Field 84 1,995.00 2,926.67 318.00 759.75 5,999.42 35.94%
6 Survey Office 27 1,100.25 1,614.07 393.58 3,107.89 18.62%
7 Final Submittal Plat of Hwys&Description 7 196.50 288.27 31.80 74.90 591.47 3.54%
8 Coordination Meetings 2 92.00 134.96 37.10 38.29 302.35 1.81%
9 QC/QA 18 733.50 1,076.04 262.381 2,071.931 12.41%
Subconsultant DL 0.001 0.00 0.00%
TOTALS 1 1851 5,541.50 8,129.38 514.901 2,056.941 0.00 450.00 0.001 16,692.721 100.00%
DBE 0.00%
DBE
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
AVERAGE HOURLY PROJECT RATES
FIRMA Jorgensen&Associates,Inc.
PSB DATE 04110117
PRIME/SUPPLEMENT Prime
SHEET 1 OF 2
PAYROLL AVG TOTAL PROJECT RATES (1)Pre-Survey (2)Survey Reconnaissance (3)Project Survey Plan (4)First Submittal Plat of Hwys.&Descriptions (5)Survey(Field)
HOURLY Hours % Wgtd Hours I % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg ParL Avg Part. Avg Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 2 1.08% 0.50
Supervisor,P.L.S. 42.00 45 24.32% 10.22 12.12% 5.09
Survey Party Chief,S.I.T. 26.75 46 24.86% 6.65 50.00% 13.38 50.00% 13.38
Instrument Operator 20.75 46 24.86% 5.16 1 1 1 50.00% 10.38 42 50.00% 10.38
Cadd Supervisor 30.75 42 22.70% 6.98 80.00% 24.60 1100.00% 30.75 87.88% 27.02
Administrative Assistant 20.75 4 2.16% 0.45 20.00% 4.15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTALS 185 100% $29.95 5 100.00% $28.75 8 100% $23.75 1 100% $30.75 33 100% $32.11 84 100% $23.75
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
DF-824-039
REV 12/04
AVERAGE HOURLY PROJECT RATES
FIRM Jorgensen&Associates,Inc.
PSB DATE 04110/17
PRIME/SUPPLEMENT Prime
SHEET 2 OF 2
PAYROLL AVG (6)Survey(Office) (7)Final Submittal Plat of Hwys&Descriptions (8)Coordination Meetings (9)OC/QA
HOURLY Hours % Wgtd Hours % Wgtd Hours % R466. Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Part. Avg Part. Avg Part. Avg
Principal/Officer 46.00 100.00%
Supervisor, P.L.S. 42.00 88.89% 37.33 14.29% 6.00 88.89% 37.33
Survey Party Chief, 26.75
Instrument O erator 20.75
Cadd Supervisor 30.75 11.11% 3.42 42.86% 13.18 11.11% 3.42
Administrative Assis 20.75 42.86% 8.89
TOTALS 1 27 1 100% $40.75 7 100% $28.07 2 100% IS46.001 18 100% $40.75 0 1 0% 1 $0.00 1 0 0% 1 $0.00
PREPARED BY THE AGREEMENTS UNIT Printed 4/10/2017 5:14 PM
Route: York Road/Harger Road
Section:
County: DuPage
Job No.:
Manhour Breakdown
Land Acquisition Estimate
York Road + 1,000' _+0.189 mile
Harger Road + 1,400'= +0.265 mile
Total Length + 2,400'= +0.454 mile
1 Parcel: 1 Permanent Easement & Temporary Easement—A &B.
1. Pre-Survey Phase
Research available records
a. Title Co. ) 4 MH
b. Recorder's Office )
C. I.D.O.T. )
d. Utilities )
e. Private Surveyors )
f. Land Owners ) 1 MH
Sub-total Item# 1 5 MH
2. Reconnaissance Survey
4 hours x 2 men= 8 MH
(1)
3. Project Survey Plan +2,640'/sheet - 1 sheet
a. Alignment info )
b. Existing R.O.W. info )
C. Land line data )
d. Subdivision data ) 1 hr./sheet x 1 = 1 MH
Sub-total Item#3 1 MH
4. First Submittal Plat of Highways & Descriptions
a. Ownership info )
b. Total holding boundaries )
C. Total holding area listing ) 1 MH
d. Private survey info )
e. Deed calculated closures )
f. Layout and drafting +2 sheets
20 hours x 1 man= 20 MH
Cover/Index sheet 2 hours/sheet x 1 = 2 MH
Total Holding sheets 4 hours/sheet x 1 = 4 MH
Alignment &Tie sheets 3 hours/sheet x 1 = 3 MH
g. Legal descriptions 3 descriptions 3 MH
Sub-total Item#4 33 MH
(2)
5. Survey(Field)
a. Monument&Reference center line alignments
Harger Road - 1,400'- 7 hrs. x 2 men= 14 MH
York Road - 1,000' - 4 hrs. x 2 men= 8 MH
b. Measure existing R.O.W., section&property lines
24 hours x 2 men= 48 MH
C. Appraisal topography
3 hours x 2 men= 6 MH
d. Monument&reference proposed right of way
4 hours x 2 men= 8 MH
Sub-total Item#5 84 MH
6. Survey(Office)
a. Compute traverse
2 hours x 1 man= 2 MH
b. Compute existing R.O.W., section&property lines
22 hours x 1 man= 22 MH
C. Compile appraisal topography
1 hour x 1 man= 1 MH
d. Compute center line alignment
1 hour x 1 man= 1 MH
e. Compute proposed easements
1 hour x 1 man= 1 MH
Sub-total Item#6 27 MH
(3)
7. Final Submittal Plat of Highways &Descriptions
a. Final drafting±5 sheets
3 hours x 1 man= 3 MH
b. Final descriptions 3 descriptions 1 MH
C. Assembly of final papers 3 MH
Sub-total Item#7 7 MH
8. Coordination Meetings
1 meeting @ 2 hours= 2 MH
9. QC/QA
a. Check preliminary plats
5 sheets 13 MH
b. Check preliminary legal descriptions
3 legal descriptions 1 MH
C. Check final plats
5 sheets 3 MH
d. Check final legal descriptions
3 legal descriptions 1 MH
Total All Items 185 MH
(4)
E:\Civi1tech\Oak Brook\York Rd-Harger Rd\Phase IN.ALOP
Route: York Road\Harger Road
Section:
County: DuPage
Job No.:
Breakdown of
In House Direct Costs
Item
1. Pre-Survey Phase
a. Trips to Recorder's Office- 1 ea.
+ 100 miles/trip x 1 trip=+ 100 miles
+ 100 miles @ $0.53/mile= $ 53.00
b. Records from Recorder's Office $ 50.00
Sub-total Item#1 $ 103.00
4. First Submittal Plat of Highways & Descriptions
a. Plat of Highways Mylars
5 sheets @ $5.00/sheet= $ 25.00
5. Survey(Field)
a. Trips to project site -6 ea.
+ 100 miles/trip x 6 trips=+ 600 miles
+600 miles @ $0.53/mile= $ 318.00
7. Final Submittal Plat of Highways &Descriptions
a. Deliver Final Papers to District One Office
+60 miles/trip x 1 trip =+60 miles
+ 60 miles @ $0.53/mile= $ 31.80
8. Coordination Meetings
a. Meetings at Civiltech's office— 1 ea.
+70 miles/trip x 1 trip=+ 70 miles
+70 miles @ $0.53/mile= $ 37.10
Total All Items $ 514.90
E:\Civiltech\Oak Brook\York Rd-Harger Rd\Phase ILLAINH
Route: York Road\Harger Road
Section:
County: DuPage
Job No.:
Breakdown of
Services by Others
Item
1. Pre-Survey Phase
a. Commitments for Title Insurance
1 Commitment @ $450.00 each= $ 450.00
EXiviltech\Oak Brook\York Rd-Harger RdThase IALASBO
North York Road/Harger Road Intersection Improvement
CIVILTECH
Village of Oak Brook I April 28,2017
Stuedemann Environmental
Consulting, LLC
$TUEDEMANN
ENVIRONMENTAL CONSULTING
March 2, 2017
Mr.James R. Woods, P.E.
Project Manager
Civiltech Engineering, Inc.
Two Pierce Place, Suite 1400
Itasca, IL 60143
SUBJECT: Proposal to Provide Environmental Science Services
North York Road/Harger Road Intersection Improvement Project Phase II
Oak Brook, DuPage County, Illinois
Dear Mr. Woods:
Stuedemann Environmental Consulting, LLC(SEC) is pleased to present Civiltech Engineering, Inc.
(Civiltech) with this proposal to provide environmental science services for the Village of Oak Brook's
(Village) North York Road/Harger Road Intersection Improvement Phase II Project(North York
Road/Harger Road Project Phase II), located in Oak Brook, DuPage County, Illinois. Services presented
herein coincide with the North York Road/Harger Road Project Phase II engineering services provided by
Civiltech to the Village and includes wetland science related permitting services and Clean Construction
or Demolition Debris (CCDD) coordination. SEC presents this proposal in the following sections: project
understanding, limits and reliability,scope of work, project team, project schedule, project costs, and
proposal acceptance.
PROJECT UNDERSTANDING
SEC understands that Civiltech has been solicited by the Village to submit a proposal for Phase II
engineering services for improvements to the North York Road and Harger Road intersection,which
includes the Harger Road intersection with the westbound entrance ramp to 1-88. Civiltech has solicited
SEC to prepare a scope of environmental science services for the North York Road/Harger Road Project
Phase II in accordance with requirements associated with the Oak Brook Village Code, DuPage County,
Illinois Department of Transportation (IDOT), and the U.S. Army Corps of Engineers (USACE) Chicago
District.To comply with and obtain permits, SEC's proposed Phase II scope of work is to coordinate and
prepare the applicable wetland related documents for permit submittals to the Village and the USACE.
On February 26, 2017, Civiltech provided SEC with the August 2, 2016, Proposed Intersection Concept
Plan,which identifies the limits of the Project Corridor for the North York Road/Harger Road Project
Phase II. This Project Corridor consists of all areas within the North York Road and Harger Road right-of-
way(ROW) as shown on the plan, plus an additional 100 feet per Village and DuPage County
requirements.
ON419 Taylor Drive,Geneva,IL 60134 1 331-588-1805 1 main @stuedenv.com
www.stuedemannec.com
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
SEC proposes to conduct the biological,wetland, and special waste surveys and investigations presented
in this scope of work in accordance with the following:
• October 11, 2016, edition of the Oak Brook Village Code Title 9-Stormwater, Floodplain, and
Sedimentation and Erosion Control Regulations (Village Code);
• April 23, 2013, edition of the DuPage County Countywide Stormwater and Flood Plain Ordinance
(Ordinance);
• Biological,wetland,and special waste clearance requirements from the Illinois Department of
Transportation(IDOT);
• April 1,2012, U.S. Army Corps of Engineers (USACE)Chicago District Regional Permit Program
(RPP);and
• Illinois Environmental Protection Agency(IEPA) regulations for CCDD disposal, 35 Illinois
Administrative Code 1100 (35 III. Adm. Code 1100).
In preparing this proposal,SEC has made the following assumptions:
1. All relevant coordination, documents,and correspondence from the North York Road/Harger
Road Intersection Improvement Project Phase I (North York Road/Harger Road Project Phase 1)
will be available for use by SEC in the North York Road/Harger Road Project Phase 11;
2. Oak Brook is a Complete Waiver Community and all wetland related permitting coordination will
occur directly with the Village and the USACE;
3. DuPage County Critical Wetlands, high-quality aquatic resources (HQAR), and federal or state
listed endangered and threatened species habitats,are not located within,adjoining,or
adjacent to the Project Corridor;
4. Fees associated with wetland mitigation banking or fee-in-lieu are not included in this proposal
and are the responsibility of the Village and Civiltech;
5. Wetland mitigation design is not included in this proposal;
6. Preliminary Site Investigation (PSI)services are not included in this proposal; and
7. There are no additional environmental concerns within the Project Corridor that are not
referenced in this proposal that would impede the Village, IDOT, and USACE coordination and
permitting process,such as the presence of state and federal endangered and threatened
species, protected historical and cultural sites, and environmental due diligence.
LIMITS AND RELIABILITY
SEC understands that the North York Road/Harger Road Project Phase II is anticipated to generate Clean
Construction or Demolition Debris(CCDD) materials,and therefore must comply with Illinois
Environmental Protection Agency (IEPA) regulations for CCDD disposal, 35 Illinois Administrative Code
1100 (35 III. Adm. Code 1100).The IEPA defines CCDDs as:
"CCDD is uncontaminated broken concrete without protruding metal bars, bricks, rock,
stone, or reclaimed asphalt pavement generated from construction or demolition
activities. When uncontaminated soil is mixed with any of these materials, the
uncontaminated soil is also considered CCDD."
March 2, 2017 SEC Page 2 of 4
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
SEC proposes to provide CCDD services prior to disposal of appropriate clean materials during
excavation. CCDD services are limited by:the information available at the time that services are
rendered; review of readily available and relevant data/reports; and statements made and information
provided by the client,agents, land-owners,contractors, and tenants within the Project Corridor and
adjacent properties.
SCOPE OF WORK
SEC proposes to complete the requested services in two tasks as follows:
Task 1: USACE and Oak Brook Permit Coordination
SEC proposes to prepare documents necessary to comply with the Village Code,the Ordinance, the
USACE Joint Application, and the USACE Chicago District RPP. SEC proposes to utilize all coordination,
documents, and correspondence from the North York Road/Harger Road Project Phase I Project for the
Village and USACE permit submittals. Documents necessary for the Phase II Wetland and Buffer Impact
submittals include: a Wetland Buffer Memorandum; a Wildlife Habitat Assessment Memorandum;a
wetland and buffer submittal narrative;and the wetland and buffer checklists and tabs.These
documents will be prepared and presented to Civiltech for inclusion in their permit submittals to the
Village. SEC will also utilize these documents to coordinate, prepare, and submit the Joint Application to
the USACE. SEC will coordinate with Civiltech to obtain appropriate engineering related documents for
inclusion in the Joint Application permit submittal to the USACE.
SEC proposes to schedule and attend on-site pre-application meetings as needed with the Village,the
USACE, and Civiltech,to review the Wetland Delineation Report and other associated documents
prepared by SEC. All permit submittals will be prepared and submitted by SEC's Professional Wetland
Scientist. SEC will assist Civiltech through the wetland provisions portions of the Village and USACE
permit submittals until all wetland related permits are received.
Task 2: Clean Construction or Demolition Debris(CCDD)Services
SEC proposes to provide CCDD coordination services for the off-site disposal of uncontaminated soils
generated by the construction of the North York Road/Harger Road Project Phase II. In accordance with
current IEPA CCDD regulations,SEC will: prepare a Materials Disposal Plan;identify pre-approved CCDD
facilities;and complete the appropriate pre-construction permit application forms for material disposal.
Testing,disposal, and permitting fees are estimated in this proposal and any overages are the
responsibility of the Village and Civiltech.SEC will coordinate with Civiltech until all appropriate CCDD
documentation is prepared for contractor bidding.
PROJECT TEAM
SEC proposes to manage this project out of our Geneva, Illinois office with a support network of
scientists and engineers who have experience in conducting environmental science services in DuPage
County. Mr. Barry Stuedemann, P.E., P.W.S. will serve as the Professional Wetland Scientist and
Environmental Engineer.
PROJECT SCHEDULE
SEC will proceed with the scope of work presented in this proposal immediately upon authorization
from Civiltech.Specific schedules are unknown at this time and will be coordinated with Civiltech
March 2, 2017 SEC Page 3 of 4
Mr.James R.Woods, P.E.
North York Road/Harger Road Project Phase II
Oak Brook, DuPage County, IL
throughout the duration of the North York Road/Harger Road Project Phase II.The schedule to complete
each task is influenced by the responses, concerns, and requests of Civiltech and the pertaining
agencies.
PROJECT COSTS
SEC estimates the cost to complete the task outlined in this proposal to be a maximum "not-to-exceed"
fee of$12,944.An itemization of these costs is presented in Table 1, Cost Estimate for Consulting
Services.
The following is a summary of these costs:
SCOPE OF WORK COSTS
Task 1: USACE and Oak Brook Permit Coordination $7,079
Task 2: Clean Construction or Demolition Debris (CCDD)Services $5,865
Total: $12,944
PROPOSAL ACCEPTANCE
To indicate your acceptance of this proposal, please notify me by mail or e-mail. SEC will assume the
mail or e-mail correspondence as your signature and date for our authorization to proceed with the
tasks presented in this proposal.
SEC appreciates this opportunity to provide environmental science services to Civiltech. If you have any
questions, please do not hesitate to contact me at your convenience.
Sincerely,
Baron H.Stuedemann, P.E., P.W.S.
Technical Director I Managing Member
Stuedemann Environmental Consulting, LLC
Mobile: 630-664-4550
E-Mail: bstuedemann @stuedenv.com
March 2, 2017 SEC Page 4 of 4
TABLE 1
Cost Estimate for Consulting Services
ENVIRONMENTAL SCIENCE SERVICES
NORTH YORK ROAD/HARGER ROAD INTERSECTION IMPROVEMENT PROJECT PHASE II
OAK BROOK,DUPAGE COUNTY,IL
Prepared for Civiltech Engineering,Inc.
Prepared by Stuedemann Environmental Consulting,LLC
March 2,2017
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE II Project Project Total Direct Overhead In-House Fixed Other Not-to-
ENVIRONMENTAL SCIENCE SERVICES Manager Coordinator Hours Labor of 150% Direct Fee Direct Exceed
TASK DESCRIPTION Costs Costs Costs
$64.00 $24.00 (DL) OH(DL) (IHDC) (FF)
Task 1: USACE and Oak Brook Permit Coordination 36 4 40 $2,400 $3,600 $182 $896 $0 $7,079
Task 2: Clean Construction or Demolition Debris(CCDD)Services 20 4 24 $1,376 $2,064 $1,682 $743 $0 $5,865
TOTAL: 56 8 64 $3,776 $5,664 $1,865 $1,639 $0 $12,944
DL(Direct Labor)= Hours x Hourly Rate
R(Complexity Factor)= 0
OH(Overhead Rate)= 150%
IHDC(In-House Direct Costs)= See Table Below for Itemization
FF(Fixed Fee)= 14,5%[DL+R(DL)+OH(DL)+IHDC J
Other Direct Costs= Testing,Drilling,and Hauling are not included in these costs.
NORTH YORK ROAD/HARGER ROAD PROJECT PHASE II Mileage Delivery Copies Analytic Testing In-House
ENVIRONMENTAL SCIENCE SERVICES ($0.535/mile) ($25/package) ($0.60/page) ($1,500/each) Direct
TASK DESCRIPTION Costs
Miles $ Packages $ Pages $ Each $ (IHDC)
Task 1: USACE and Oak Brook Permit Coordination 70 $37 1 $25 200 $120 0 $0 $182
Task 2: Clean Construction or Demolition Debris(CCDD)Services 70 $37 1 $25 200 $120 1 $1,500 $1,682
TOTAL: 140 $75 2 $50 400 $240 1 $1,500 $1,865
Mileage(miles)= 70 miles Round Trip to/from Site
Delivery(packages)= UPS,FedEx,or USPS
Copies(pages)= Average Cost for Black and White,Color,8"x 11.5",and 11"x 17"
Analytic Testing(each)= Environmental Monitoring and Technologies,Inc.(EMT)or Similar
March 2,2017 Table 1
North York Road/Harger Road Intersection Improvement
CIWLTECH
Village of Oak Brook I April 28,2017
Attachement F
I[DI, P1oq(aalific:ati( I I I (-)Iler
Stale
n 1F-;1-11 Cif Q. aalific :al ir?r Is
Representative Project Experience
Team Organizational Chart and Resumes
Su bconsultal dt
Anticipated Project Schedule
Cost Estimate of Consultant Services
ANTICIPATED PROJECT SCHEDULE
North York Road/Harger Road Intersection Improvement
Work Item 2017 2018 2019
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Notice to Proceed June 1,2017 A
PHASE l ENGINEERING Fk.oat ESa SubmnWlE aker Village Review
2f
I Data Collection and Early Coordination Emlmmvr�iswe R actor
2 Field Survey&Preparation of Base CAD File cutumi ck,r,meg ma.Jrom eb/wewm cka.am<l2 ma.EmmynE
3 Crash Analyses -
4 Traffic Analyses
5 Geometric Studies lour lour
6 Subsurface Solis and Pavement Investigations
7 PESA
8 Wetlands Delineations&Impact Evaluations ® -
9 Location Drainage Study nor ioor
10 Seaton 4(f)Eval,and Doc.(if necessary) EPooc _
11 Traffic Noise Analysis(H necessary) I r
12 Structural Studies(If necessary) BKtt lour
13 Draft Project Development Report Village Kkk-0R call a IpOT Publk Hearinga
anerfkarana
14 Agency Coordination I vwlk Neetln smmn Afbr
�� w.yRJbRrgvd
15 Public Involvement FxwMomNRkge
16 Final Project Development Report
17 Supervision,Admin.and Project Coord. ongoing throughout project
PHASE 2 ENGINEERING IWTKIck-CV_.
1 Project Kick Off Meeting
2 Coordination with Phase 1 PDR
3 Data Collection and Review
4 Field Survey and Base Sheet Development
5 Geometric Studies I
6 Subsurface Soils and Pavement Investigation
7 Special Waste and CLOD Testing
8 Wetland Permitting and Coordination
9 Drainage Design and Permits w/Support Docs R.CMIIle49y
taOrtA-Mp2M9
10 NDDES Permitting and Documentation
11 Confirm Project Right-of-Way Requirements vktorxl IDOT a auh TOOT
12 Maintenance of Traffic Concept
13 Preliminary Plans(65%)
14 Traffic Signal Installation Plan
15 Lighting Design
16 Structural Design
17 Pre-Final(90%)P,S,&E roor EJ�Atr.amank
18 Final(100%)P,S,&E pM2019
1[gTIRtWig
19 Protect Administration and Coordination
w.2ms
20 Construction Assistance
North York Road/Harger Road Intersection Improvement
Village of Oak Brook I April 28,2017
Attachement G
IC)(.-)! Pre(1(.aalilit.,ati( )i i L_elle't
talon InN 0 Otialifir;ai10rIs
Representative Project Experience
Team Organizational Chart and Resumes
SuhCol Isullani
Anticipated Project Schedule
Cost Estimate of Consultant Services
North York Road/Harger Road Intersection Improvemem
Village of Oak Brook,Illinois
COST ESTIMATE OF CONSULTANT SERVICES
Phase I Engineering
Staff Classifications,Direct Labor Rate and Workhours
Item
Senior Project Chief Total %of Direct Labor
No.
Task Project Manager Engineer IV Engineer 11 Structural Technician Workhours Workhours Cost
Manager Engineer
$70.00 $53.00 $37.00 $29.00 $70.00 $32.00
1 Data Collection and Early Coordination 0 22 40 20 0 18 100 5% $3,802.00
2 Field Survey and Preparation of Base CAD File 0 4 8 6 0 6 24 1% $874.00
3 Crash Analyses 0 2 6 6 0 0 14 1% $502.00
4 Traffic Analyses 0 10 22 32 0 36 100 5% $3,424.00
5 Geometric Studies 0 48 126 146 0 60 380 18% $13,360.00
6 Subsurface Soils and Pavement Investigations 0 2 2 0 0 0 4 0% $180.00
7 Preliminary Environmental Site Assessment 0 2 2 0 0 0 4 0% $180.00
8 Wetland Delineations and Impact Evaluations 8,Tree Survi 0 2 2 0 0 0 4 0% $180.00
9 Location Drainage Study 14 38 244 244 0 0 540 25% $19,098.00
10 Section 4(f)Eval.and Doc.(if necessary) 4 12 16 16 0 0 48 2% $1,972.00
11 Traffic Noise Analysis(if necessary) 0 44 2 110 0 24 180 8% $6,364.00
12 Structural Studies(if necessary) 0 0 124 0 42 0 166 8% $7,528.00
13 Draft Project Development Report 2 12 36 46 0 34 130 6% $4,530.00
14 Agency Coordination 6 18 18 0 0 0 42 2% $2,040.00
15 Public Involvement 20 46 94 94 0 46 300 14% $11,514.00
16 Final Project Development Report 2 14 14 28 0 12 70 3% $2,596.00
17 Supervision,Administration and Project Coordination 6 24 14 6 0 0 50 2% $2,384.00
G-la
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
COST ESTIMATE OF CONSULTANT SERVICES
Phase I Engineering
Staff Classifications,Direct Labor Rate and Workhours
Item Senior Project Chief Total %of Direct Labor
Task Project Engineer IV Engineer II Structural Technician Workhours Workhours Cost
g
No. Manager Manager Engineer
$70.00 $53.00 $37.00 $29.00 $70.00 $32.00
Total Workhours by Staff Classification: 54 300 770 754 42 236 2,156
Percentage of Total Workhours: 3% 14% 36% 35% 2% 11% 100%
Direct Labor Cost by Staff Classification: $3,780.00 $15,900.00 $28,490.00 $21,866.00 $2,940.00 $7,552.00
Total Direct Labor Cost: $80,528.00
Times 2.49 Direct Labor Multiplier: $200,514.72
Total In-House Direct&Subconsultant Costs(see separate calculation): $74,586.17
2,156 100% $275,100.89
G-1a
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase I Engineering
Staff Classifications&Workhours
Item Task Project Senior Chief Total %of
No. Project Manager Engineer IV Engineer 11 Structural Technician Workhours Workhours
Manager Engineer
1 Data Collection and Early Coordination
a. Kick-off meeting with Village staff. 4 4 8 8.0%
b. Kick-off meeting with IDOT;(Already completed March 21,2017.) 0
c. Kick-off meeting with Tollway staff. 4 4 8 8.0%
d. Obtain recent digital aerial photography from stock sources. 2 2 2.0%
e. Collect land use,zoning,school district,etc.maps from the Village. 2 2 2.0%
f. Obtain record plans and other available items from Village. 2 2 2.0%
g. Obtain any traffic studies for potential developments in area. 2 2 2.0%
...__. _.-.____.-.-...._.. - _---------
h. Obtain utility atlases by initiating a J.U.LI.E.design stage request. 0
i. Two field visits and and photo log. 4 4 8 8:0%
j. Prepare PPI form in accordance with IDOT requirements. _ 2 2 2.0%
k. Prepare ESR in accordance with IDOT requirements. _ 2 6 8 8 24 24.0%
I. Preapre-Initial Coordination Meeting Data Form. 2 2 2.0%
m. Prepare STP/TCM Application for Pedestrian Underpass. 8 12 12 8 40 40.0%
Item 1 Subtotal 0 22 40 20 0 18 100 100.0%
2 Field Survey and Preparation of Base CAD File
Field Survey by Sub-Consultant:Jorgensen&Associates,Inc. — ___ _—0
a. Prepare base cad file using topographic survey. 2 6 6 6 20
b. Civiltech coordination with sub-consultant. 2 2 4 16.7%
Item 2 Subtotal 0 4 8 6 0 6 24 100.0%
3 Crash Analyses _
a. Collect 5 years of crash data. 2 2 14.3%
b. Tabulate data and prepare collision diagrams. 2 4 6 42.9%
c. Evaluate safety improvement needs,identify countermeasures,write 2 2 2 6 42.9%
text.
Item 3 Subtotal 0 2 6 6 0 0 14 100.0%
G-lb
North York Road/Harger Road Intersection Improvemenl
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase I Engineering
Staff Classifications&Workhours
Item Task Senior Chief Total %of
No. Project Project Manager Engineer IV Engineer II Structural Technician Workhours Workhours
Manager Engineer
4 Traffic Analyses
a. Collect a 24 hour turning movement count at one intersection. 6 6 6.0%
b. Upload data to Miovision for processing 2 2 2.0%
_ _ _..._-- ._.___.._..
c. Perform-existing peak hour capacity analyses at three intersections. 2 2 4 4.0%
d_Perform 2040 peak hour capacity analyses at three intersections_ -_ _ — - - - 2_ 2 4 4.0%
e. Evaluate vehicle storage needs. 2 2 --- 2.0%
f.Prepare a Draft Intersection Design Study(IDS). 6 12 16 16 50 50.0%
g. Revise Draft IDS based on Village comments submit to IDOT. 4 4 6 8 22 22.0%
h. Revise Draft IDS based on IDOT comments and prepare final IDS. 2 2 6 10 10.0%
_-
Item 4 Subtotal 0 10 22 32 0 36 100 0.0%
5 Geometric Studies
a.:Detailed horizontal geometrics. 30 24 32 8 74 19.5
_ -- -_-_._... _ _.�_. -_---__ %. .-._.5_....__
b Autoturn analyses. 2 4 6 1.6%
c,Detailed vertical profiles. 6 14 16 8 44 11.6%
d. Proposed cross-sections, 16 18 -8_ 48 - 12.6%
e. Roadside barrier warrant analysis. 2 6 6 14 3.7%
-— ---- ---- .�_..___.--- ----------- - ----- ---- ._.._ .-_ --
f. Investigate feasibility of Salt Creek Trail tunnel. 10 16 20 8 54 14.2%
g: Incorporate tunnel plans into roadway plans if feasible. —� ---_ _- - 6 10 10 6 32 8.4%
h. Disposition of earlier IDOT comments. --- - -__-- — _ 1-_ _ 2 2 0.5%
_.-._-�--- _ .___-.
L Prepare and submit geometrics review package for Village review. 2 8 30 6 26 6.8%
2 12
_ —
1. Refine geometrics and submit package to IDOT. ..-
-B_ 14 8 36 9.5%
k. Refine geometris based on 2 IDOT reviews and include in PDR. 4 16 16 8 44 11.6%
Item 5 Subtotal 0 48 126 146 0 60 380 100.0%
6 Subsurface Soils and Pavement Investigations
By Sub-Consultant:Midland Standard Engineering&Testing,Inc.
0
a. Civiltech coordination with sub-consultant 2 2 4 100.0%
Item 6 Subtotal 0 2 2 0 0 0 4 100.0%
7 Preliminary Environmental Site Assessment
By Sub-Consultant:Stuedemonn Environmental Consulting,LLC 0
a. Civiltech coordination with sub consultant. 2 2 4 100.0%
Item 7 Subtotal 0 2 2 0 0 0 4 100.0%
G-1b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase I Engineering
Staff Classifications&Workhours
Item Task Senior Project Chief Total %of
No. Project Manager Engineer IV Engineer II Structural Technician Workhours Workhours
Manager Engineer
8 Wetland Delineations and Impact Evaluations&Tree Survey
a. By Sub-Consultant Stuedemann Environmental Consulting,LLC- _. _ -- _ 0.
b. Civiltech coordination with sub-consultant. 2 2 4 100.0%
Item 8 Subtotal 0 2 2 0 0 0 4 100.0%
9 Location Drainage Study
Existing Conditions
a. General Location Drainage Map 1 4 4 9 1.7%
b. Existing Drainage Plan(6 Planview Sheets) 2 2 32 32 68 12.6%
c. Identified Drainage Problems- -_- _-.1 8 8 __. 17 3.1%
d. Identified Base Floodplains 1 4 4 9 1.7%
-e. Major Drainage Features(NONE) 0
Proposed Conditions
a. Design Criteria 1 1 6 6 14 2.6%
b. Outlet Evaluation 2 16 16 34 6.3%
c.Stormwater Detention Analysis 1 2 16 16 3S 6.5%
- d. Right of Way Analysis 1 2 16 16 35 6.5%
e. Drainage Alternatives 1 2 32 32 67 12.4%
f. Local and Other Agency_Coordination 4 - 12 - 4 - 4 - 24 4.4%
g. Proposed Drainage Plan -_.? 8 - -�58 126 23.3%
h. Water Quality Best Management Practices 2 12 12 26 4.8%
i. Floodplain Encroachment Evaluation(not anticipated) _ __�..-
j. LDS Study Assembly 2 2 36 36 76 14.1%
Item 9 Subtotal 14 38 244 244 0 0 540 100.0%
30 Section 4(f)Eval.and Doc.(if necessary)
a.:Complete checklist and appendices. 2 4 4 10 20.8%
b. Prepare 4(f)exhibits. 2 4 6 12.5%
c. Address any public comments. 2 2 4 8.3%
d. Prepare materials for FPDDC review. 2 4 2 4 12 25.0%
e. One meeting with Forest Preserve District of DuPage.- -- 2 4 4 -_ - -- 10 20.8%
f. Provide a draft letter to FPDDC for signature. 2 2 4.2%
g. Submit documentation to IDOT/FHWA for approval. 2 2 4 8.3%
Item 10 Subtotal 4 12 16 16 0 0 48 100.0%
G-1b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase I Engineering
Staff Classifications&Workhours
Item Task Senior Project Chief Total %of
No. Project Manager Engineer IV Engineer 11 Structural Technician Workhours Workhours
Manager Engineer
11 Traffic Noise Analysis(if necessary)
a. Field measurements. 6 8 14 7.8%
b.-Existing conditions noise model. 4 24 28 15.6%
-_-..._..___..... ..__-.--._.__.----_.___ . _
c.:2040 No-Action conditions noise model. 2 12 14 7.8%
d. 2040 Proposed Improvement noise model _2 - - --, 16 18 10.0%
e. Identify noise impacts and consider abatement. 2 - 4, _ -�-- -� - 6 _ 3.3%
f. Evaluate feasibility of noise barriers. 2 4 6 3.3%
g. Evaluate reasonableness of noise barriers. 2- _ 4 6 3.3%
h. Prepare technical report including exhibits and tables. 12 18 24 54 30.0%
i. Revise technical report up to two times. 8 18 26 14.4%
j. Incorporate results into the Project Development Report. 2 2 2 6 3.3%
k. Transmit noise analysis results to local officials. 2 2 1.1%
Item 11 Subtotal 0 44 2 110 0 24 180 100.0%
12 Structural Studies(if necessary)
a. Site Visit and Review of Existing Data(soil-borings,plans) -� _ 8 4 12 7.2%
b. Retaining Wall Study&TSL Plan Preparation 36 12 48 28.9%
c. Pedestrian Underpass Study&TSL Preparation -- - --- A _ __ ----72 16 88 53.0%
d. Complete BLR 10210 for Pedestrian Underpass 4 2 6 3.6%
e. Prepare Cost Estimates for Wall and Underpass ---_ -__ _ -_ _ - -4- ? _.-_ ._. -_6 _ 3.6%
f. Project Administration and Coordination 6 6 3.6%
Item 12 Subtotal 0 0 124 0 42 0 166 100.0%
13 Draft Project Development Report
a. Prepare report exhibits 2 8 16 18 44 33.8%
b. Prepare a construction cost estimate and revise up to two t_i_m_ es._ 2_ _ A 8 8 18 13.8%
c. Write,proofread and edit Draft PDR text. - _ 2 4 12 10 28 215%
d Print bind and deliver Draft PDR to Village._ _- 2 4 6 4.6%
e. Revise Draft PDR based on Village comments. - - ..._. ' ._. 2 4 8 8 22 16.9%
f. Print,bind and deliver Draft PDR to IDOT. 2 4 6 4.6%
g. Attend review meeting with IDOT and Village. 2 4 6 4.6%
Item 13 Subtotal 2 12 36 46 0 34 130 100.0%
G-lb
North York Road/Harger Road Intersection Improvemeni
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase I Engineering
Staff Classifications&Workhours
Item Task Senior Chief Total %of
No. Project Project Manager Engineer IV Engineer II Structural Technician Workhours Workhours
Manager Engineer
14 Agency Coordination
a. One FHWA/IDOT/Local Agency meeitng. 2 6 6 14 33.3%
b. One meeting with Forest Preserve District of DuPage.(See Item 10)
c. One meeting with IllinoisToliway_-- .._._.._ ._. _4 ..._..__.e._. 4
d. Two additional meetings with Village. 2 8 8 -- 18 42.9%
Item 14 Subtotal 6 18 18 0 0 0 42 100.0%
15 Public Involvement
Public Information Meeting
a Select and coordinate meeting venue. 2 2 4 1.3% _
b. Prepare and coordinate newspaper ad. — -- ---°---- ___2 2__._--- 0.7%
c. Prepare and distribute notification letters. 4 6 10 3.3%
d. Prepare brochure,comment forms,sign-In 2 2 4 1.3%
e. Prepare exhibits. 8 16 20 24 68 22.7%
f. Prepare for and attend dry run with Village staff. 4 4 4 4 16 5.3%
g. Revise materials based on dry run 2 4 4 4 14 4.7%
h. Attend meeting. 6 6 6 6 24 8.0%
L Prepare meeting summary and disposition of comments. 4 8 6
Public Hearins
a. Select and coordinate meeting venue. — 2 2 4 1.3%
b. Prepare and coordinate newspaper ad. 2 2 0.7%
c. Prepare and distribute notification letters. 4 6 10 3.3%
d. Prepare brochure,comment forms,sign-in. 2 2 4 1.3%
- --- g— __.•..___.__.
e. Prepare exhibits. 6 12 14 18 50 16.7%
f. Prepare for and attend dry run with Village staff. 4 4 4 4 16 5.3%
g. Revise materials based on dry run_ 2 4 4 30 3.3%
h. Attend meeting 6 6 6 6 24 8.0%
L Preparation of transcript 2 2 0.7%
m. Prepare meeting summary and disposition of comments. 4 8 6 18 6.0%
_ --
Item 15 Subtotal 20 46 94 94 0 46 300 100.0%
G-lb
North York Romu/xorge Road Intersection/mvmvemen
Village v,Oak Brook,Illinois
SUMMARY OF PROPOSED WOnKHomns
Phase|Engineering
Staff Classifications mmm,xxvun
Item Senior co/e, rvm| m'*
No. Project Project ProjeProject cn�"esm Engineer 11 s^mc "=/ nsh"ma" Wvmho"m wmmnoun
"vana�e,
xxanone, Engineer
16 Final Project Development Report
_
a.,Revise Draft PDn exhibits. 4 « . u � 8 _24 34.3%__
-_ u. Revise construction cost estimate!one time. _-_ -4 « 8 _-' -__ -_- 16__- _- 22.9% _
f. Revise Draft pox text,proofread and edit._ _ z- 6 _ - - ' -6-_ 8 _ _ -_22--_- - _31.4m -_
d. Print,bind and deliver Final pon. . 4_ _. . _ o_ . n u.*n
Item 16 Subtotal z 14 14 om o 12 xu 100.0%
17 Supervision,Administration and Project Coordination
,. Project setup and monthly invoicing. _ -__-~-'---_---__---8--__'-_-_8 16-_-_-'_32/0%�_-
u. Three in-house coordination meetings. ----'-------- '----___--2866 22�_- _-_*4.0%__
cuc/o« _ __- « o � - . � zo __,--24.um-
Item 17 Subtotal * a« 14 o o n m 100.0%
mm/wmmmmrs: 54 300 rm 754 m 236 2,156
%mwm,xoum: 2.5% 13.9m 35.7% 35.0» 1.9m zueu 100.0u
G-1b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook, Illinois
SUMMARY OF IN-HOUSE DIRECT& SUBCONSULTANT COSTS
Phase I Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
1 Data Collection and Early Coordination
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Printing: 100 8"x11" pages @ $0.10/ea. $10.00
Printing: 20 11"x17" pages @ $0.15/ea. $3.00
Printing: 20 22"x34" sheets @ $1.00/ea. $20.00
Item 1 Subtotal $76.20
2 Field Survey and Preparation of Base CAD File
Sub-Consultant: Jorgensen & Associates, Inc. $27,418.97
Item 2 Subtotal $27,418.97
4 Traffic Analyses
Process Traffic Videos (Miovision):1 intersection @ $350/ea. $350.00
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Deliveries:3 deliveries at$50/ea. $150.00
Item 4 Subtotal $543.20
5 Geometric Studies
Printing: 200 11"x17" pages @ $0.15/ea. $30.00
Printing: 100 22"04" sheets @ $1.00/ea. $100.00
Deliveries:2 @ $50/ea. $100.00
Item 5 Subtotal $230.00
6 Subsurface Soils and Pavement Investigations
Sub-Consultant: Midland Standard Engineering and Testing, Inc. $19,176.00
Item 6 Subtotal $19,176.00
Page 1 of 4
Prepared by:Civiltech Engineering,Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-1c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF IN-HOUSE DIRECT& SUBCONSULTANT COSTS
Phase I Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
7 Preliminary Environmental Site Assessment
Sub-Consultant: Stuedemann Environmental Consulting, LLC $7,697.00
Item 7 Subtotal $7,697.00
8 Wetland Delineations and Impact Evaluations&Tree Survey
Sub-Consultant: Stuedemann Environmental Consulting, LLC $16,306.00
Item 8 Subtotal $16,306.00
9 Location Drainage Study
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Printing: 500 8"x11" pages @ $0.10/ea. $50.00
Printing: 100 11"x17" pages @ $0.15/ea. $15.00
Printing: 20 22"x34" sheets @ $1.00/ea. $20.00
Deliveries:4 @ $50/ea. $200.00
Item 9 Subtotal $328.20
Page 2 of 4
Prepared by:Civiltech Engineering,Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-1c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF IN-HOUSE DIRECT&SUBCONSULTANT COSTS
Phase I Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
10 Section 4(f) Eval.and Doc.(if necessary)
Printing: 100 8"x11" pages @ $0.10/ea. $10.00
Printing: 100 11"x17" pages @ $0.15/ea. $15.00
Deliveries:2 @ $50/ea. $100.00
Item 10 Subtotal $125.00
11 Traffic Noise Analysis(if necessary)
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Printing:300 8"x11" pages @ $0.10/ea. $30.00
Printing:80 11"x17" pages @ $0.15/ea. $12.00
Printing:20 22"04" sheets @ $1.00/ea. $20.00
Deliveries:2 @ $50/ea. $100.00
Item 11 Subtotal $205.20
12 Structural Studies(if necessary)
Printing: 100 8"x11" pages @ $0.10/ea. $10.00
Printing: 100 11"x17" pages @ $0.15/ea. $15.00
Printing: 50 22"x34" sheets @ $1.00/ea. $50.00
Mileage: 2 trips @ 30 mi./round trip @ $0.54/mi. $32.40
Item 12 Subtotal $107.40
13 Draft Project Development Report
Printing: 500 8"x11" pages @ $0.10/ea. $50.00
Printing: 200 11"x17" pages @ $0.15/ea. $30.00
Printing: 100 22"04" sheets @ $1.00/ea. $100.00
Deliveries:2 @ $50/ea. $100.00
Item 13 Subtotal $280.00
Page 3 of 4
Prepared by:Civiltech Engineering,Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-1c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook, Illinois
SUMMARY OF IN-HOUSE DIRECT& SUBCONSULTANT COSTS
Phase 1 Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
14 Agency Coordination
Mileage: 5 trips @ 40 mi./round trip @ $0.54/mi. $108.00
Item 14 Subtotal $108.00
15 Public Involvement
Printing: 500 8"x11" pages @ $0.10/ea. $50.00
Printing: 200 11"x17" pages @ $0.15/ea. $30.00
Postage: 250 letters @ $0.50/ea. $125.00
Newspaper Ad:4 @ $250/ea. $1,000.00
Court Reporter $500.00
Item 15 Subtotal $1,705.00
16 Final Project Development Report
Printing: 500 8"x11" pages @ $0.10/ea. $50.00
Printing: 200 11"x17" pages @ $0.15/ea. $30.00
Printing: 100 22"x34" sheets @ $1.00/ea. $100.00
Deliveries:2 @ $50/ea. $100.00
Item 16 Subtotal $280.00
Total In-House Direct Costs: $3,988.20 -
Total Subconsultant Costs: - $70,597.97
TOTAL IN-HOUSE DIRECT&SUBCONSULTANT COSTS: $74,586.17
Page 4 of 4
Prepared by:Civiltech Engineering, Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-1c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
COST ESTIMATE OF CONSULTANT SERVICES
Phase ll Engineering
Staff Classifications,Direct Labor Rate and Workhours
Senior Chief Water Water Traffic
Item Project Design Structural Lighting Total %of Direct Labor
No. Task Project Manager Engineer IV Engineer II Technician Structural Engineer III Resources Resources Signals Engineer IV Workhours Workhours Cost
Manager Engineer Manager Engineer ll Engineer
$70.00 $54.00 $36.00 $29.00 $31.00 $70.00 532.00 $70.00 $29.00 $43.00 $37.00
1 Project Kick Off Meeting 4 4 4 0 0 0 0 0 0 0 0 12 0% $640.00
2 Coordination with Phase I Project Development Report 4 4 2 2 2 4 2 4 2 2 2 30 1% $1,530.00
3 Data Collection and Review 2 6 4 8 2 4 2 4 2 4 2 40 1% $1,830.00
4 Field Survey and Base Sheet Development 0 6 16 12 12 5 3 6 4 5 3 72 2% $2,928.00
5 Geometric Studies 8 22 42 60 32 4 0 4 0 4 0 176 6% $6,724.00
6 Subsurface Soils and Pavement Investigation 0 0 0 0 0 0 0 0 0 0 0 0 0% $0.00
7 Special Waste and CCDD Testing 2 2 4 2 0 0 0 0 0 0 0 10 0% $450.00
8 Wetland Permitting and Coordination 1 4 4 4 4 0 0 0 0 0 0 17 1% $670.00
9 Drainage Design,Storm Water Permitting,and Supporting 2 6 16 12 4 2 4 12 48 0 0 106 3% $4,012.00
10 NPDES Permitting and Documentation 2 8 12 12 0 0 0 4 8 0 0 46 2% $1,864.00
11 Review and Confirm Project Right-of-Way Requirements 4 8 12 4 12 2 0 4 0 4 2 52 2% $2,298.00
12 Maintenance of Traffic Concept 2 6 16 16 8 2 4 4 2 2 0 62 2% $2,444.00
13 Traffic Signal Installation Plan 0 0 0 0 0 0 0 0 0 0 0 0 0% $0.00
14 Lighting Design(if necessary) 2 4 4 0 0 0 0 0 0 6 32 48 2% $1,942.00
15 Structural Design(if necessary) 2 6 8 0 0 4 16 2 0 0 2 40 1% $1,758.00
16 Preliminary Plans(65%) 26 62 154 160 48 5 8 25 56 36 2 582 19% $22,442.00
17 Pre-Final(90%)Plans,Special Provisions and Estimates 38 78 186 149 203 92 245 21 37 86 63 1,198 39% $47,034.00
18 Final(100%)Plans,Special Provisions and Estimates 15 25 46 44 34 15 28 16 27 17 17 284 9% $11,595.00
19 Project Administration and Coordination 18 72 36 26 4 2 4 2 4 8 8 184 6% $8,486.00
20 Construction Assistance 4 30 30 0 0 8 0 0 0 8 8 88 3% $4,180.00
G-2a
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
COST ESTIMATE OF CONSULTANT SERVICES
Phase II Engineering
Staff Classifications,Direct Labor Rate and Workhours
Senior Chief Water Water Traffic
Item Project Design Structural Lighting Total %of Direct Labor
Task Project Engineer IV Engineer 11 Structural Engineer III Resources Resources Signals
No. Manager Technician Engineer IV Workhours Workhours Cost
Manager Engineer Manager Engineer II Engineer V
$70.00 $54.00 $36.00 $29.00 $31.00 $70.00 $32.00 $70.00 $29.00 $43.00 $37.00
Total Workhours by Staff Classification: 136 353 596 511 365 149 316 108 190 182 141 3,047
Percentage of Total Workhours: 45/6 12% 20% 17% 12% 5% 10% 4% 6% 6% 5% 100%
Direct Labor Cost by Staff Classification: $9,520.00 $19,062.00 $21,456.00 $14,819.00 $11,315.00 $10,430.00 $10,112.00 $7,560.00 $5,510.00 $7,826.00 $5,217.00
Total Direct Labor Cost: $122,827.00
Times 2.49 Direct Labor Multiplier: $305,839.23
Total In-House Direct&Subconsultant Costs(see separate calculation): $45,439.18
3,047 100% $351,278.41
G-2a
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase 11 Engineering
Staff Classifications&Workhours
Item Task Senior Chief Water Water Traffic Total %of
No. Project Project Engineer IV Engineer II Design Structural Structural Resources Resources Signals Lighting Workhours Workhours
Manager Manager Technician Engineer Engineer III Manager Engineer II Engineer V Engineer IV
1 Project Kick Off Meeting
a.Initial Meeting with Village 2 2 2 6 50.01A
b.IDOT Project Kick-Off Meeting 2 2 2 6 50.0°%
Item i Subtotal 4 4 4 0 0 0 0 0 0 0 0 12 100.0%
2 Coordination with Phase I Project Development Report
a.Design Criteria&Preliminary Design Studies 4 4 2 2 2 4 2 4 2 2 2 30 100.0%
Item 2 Subtotal 4 4 2 2 2 4 2 4 2 2 2 30 100.0%
3 Data Collection and Review
a.Obtain/Update and Review Record Data 2 4 2 2 2 4 2 4 2 4 2 30 75.0°/
b.Preliminary Utility Company Coordination 2 2 6 10 25.0°.6
Item 3 Subtotal 2- 6 4 8 2- 4 - 2- 4 2 4 2 40 100.0%
4 Field Survey and Base Sheet Development
a.Supplemental Topographic Survey 2 12 8 12 2 2 2 40 55.6%
b.Field Review of Survey_ _ 4 4 4 3 3 4 4 3 3 32 44.4%
Item 4 Subtotal 0 6 16 12 12 5 3 6 4 5 3 72 100.0%
5 Geometric Studies
a.Coordination with Phase I Scope of Work 2 6 6 4 4 4 4 4, _ 34 19.3%
b.Detailed horizontal geometrics. 2 6 16 24 12 60 34.1%
c.Detailed vertical profiles. 2 6 8 16 8 40 22.7%
d.Proposed cross-sections. 2 4 12 16 8 _ 42 23.9%
Item 5 Subtotal 8 22 42 60 32 4 0 4 0 4 0 176 100.0%
6 Subsurface Solis and Pavement Investigation
a.By Sub-Consultant:Midland Standard Engineering&Testing,Inc. 0
b.Pavement Design _ 0
Item 6 Subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
7 Special Waste and CCDD Testing
a.By Sub-Consultant:Stuedemann Environmental Consulting 0
b.Coordination to comply(IEPA)regulations for CCDD 2 2 4 2 10 100.0%
Item 7 Subtotal 2 2 4 2 0 0 0 0 0 0 0 10 100.0%
8 Wetland Permitting and Coordination
a.By Sub-Consultant:Stuedemann Environmental Consulting _ 0
b.Coordination to comply USACE regulations for Permitting 1 _ 4 4 4 4 17 100.0%
Item 8 Subtotal 1 4 4 4 4 0 0 0 0 0 0 17 100.0%
G-2b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase II Engineering
Staff Classifications&Workhours
Item Senior Chief Water Water Traffic Total %of
Task Project Design Structural Lighting
NO. Project Manager Engineer IV Engineer II Technician Structural Engineer III Resources Resources Signals Engineer IV Workhours Workhours
Manager Engineer Manager Engineer H Engineer V
9 Drainage Design,Storm Water Permitting,and Supporting Docs
a.Drainage Design and Coordination with Phase I Loaction Drainage Study 2 6 16 12 4 2 4 12 48 106 100.0%
Item 9 Subtotal 2 6 16 12 4 2 4 12 48 0 0 106 100.0%
10 NPDES Permitting and Documentation
a.Storm Water Pollution Prevention Plan(SWPPP)and Permitting 2 8 12 12 4 8 46 100.0%
2 8 12 12 0 0 0 4 8 0 0 46 100.0%
11 Review and Confirm Project Right-of-Way Requirements
a.By Sub-Consultant:Jorgensen Plat of Highways 0
b.By In-House CEI Consultant: David White Appraisal U.
c..By Sub-Consultant:TEngineenngReview Appraisal _._..__..___-_ _---..----___._----_________.__ ___.0------
d.By Sub-Consultant:Santacruz AssoclatesNegotlations __
e.Determination of Construciton Limits and Boundaries w/Exhibits 2 4 8 4 12 2 4 4 2 42 80.8%
f.Coordination of Plat of Highways,Appraisals,and Negotiation/IGA 2 4 4 10
Item 11 Subtotal 4 8 12 4 12 2 0 4 0 4 2 52 100.0%
12 Maintenance of Traffic Concept
a.Maintenance of Traffic Concept w/Exhibits 2 6 16 16 8 2 4 4 _- 2 _ 2 _ 62 100.0%
Item 12 Subtotal 2 6 16 16 8 2 4 4 2 2 0 62 100.0%
13 Traffic Signal Installation Plan
a.Reference the Preliminary,Pre-Final and Final Plan Development _ 0
Item 13 Subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0.0%
14 Lighting Design(if necessary)
a.Reference the Preliminary,Pre-Final and Final Plan Development .. 0 _.
b.Lighting Calculations w/Summary Report for the Underpass 2 4 4 6 32 48 100.0%
Item 14 subtotal 2 4 4 0 0 0 0 0 0 6 32 48 100.0%
15 Structural Design(if necessary)
a.Reference the Preliminary,Pre-Final and Final Plan Development 0
b.Retaining Wall and Underpass Type Studies 2 6 8 4 16 2 _ _ .2 40 100.0%
Item 15 subtotal 2 6 8 0 0 4 16 2 0 0 2 40 100.0%
G-2b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase II Engineering
Staff Classifications&Workhours
Item Senior Chief Water Water Traffic Total %of
Task Project Design Structural Lighting
No. Project Manager Engineer IV Engineer II Technician Structural Engineer III Resources Resources Signals Engineer IV Workhours Workhours
Manager Engineer Manager Engineer 11 Engineer V
16 Preliminary Plans(65%)
a.Preliminary Plans
Cover Sheet and Index of Sheets(1 sheet) 2 4 2 8 1.4%
General Notes and list of State and Local Standards(2 sheets) 2 2 4 0.7%
.Existing Typical Sections(1 sheet) --_--.-- 2 __--_4__ -. _.6 4-.__.-..-'_-- 16_ -.. 2.7%
Proposed Typical Sections(lsheet)--°,------_.- -..-. -----_.._. -.2---_-_._4 10 4 .-_--__._ _._ -_--, -.__.--- -____.-..-_.-'--•---- 20 34%
Erosion Control and Landscaping-3 stages 1'=50'(3 sheets)
Roadway Plan and Profile 1"=20'(4 sheets) 4 8 24 32 16 2 2 88 15.1%
Bike Path Plan and Profile 1=20'(1 sheet) _ 2_ _ 4 36 32 8 _-- 2_ _ -2_ 2 2 70 12.0%__.
Drainage and Utilities 1"-20' 4sheets _ ._2_._ 6 8 _8 - - -6 _
__ __ _ 2 2 8 24 2 __ 68 11.7%
Detention Basin Grading Plan and Details 1"=2('(1 sheet) _..,. . 2 2 2 --------_ 4 _ 8 _.___ _ ._ _ ..___._ 18 _ 3.1%
Detention Basin Planting Plan 1"=5d(1 sheet) 22 -____ -_ 6__. .______._..__.._._ 14
Traffic Signal Installation Plan(1 sheet) _ _ _ 2 4 _ _ _`- _ .. 20 _ _ 26 _4.5%
Traffic Signal Cable Plan and Sequences(1 sheet) 2 4 _-__- _---___ 16 _ 22 _3.8%
- -- -- -- ---------
Pavement Marking Plan 1 50'(1 sheet) _ 2 4 4 2 12 2.1%
Signing Plan 1"=S('(1 sheet) 2 _-4-, _4 _ 2 12 2.1%
York and Harger Intersection Grading Plan 1"=10'(1 sheet) _ 2 2 6 8 _ _ 18 3.1%
_ York and Timber Edge Drive Intersection Grading Plan 1"=1 (1 sheet) 2 2 6 8 18 3.1%
York and 1,88 Entrance Ramp intersection Grading Plan 1"=SO'(1 sheet) 2 2 6 8 18 3.1%
Overall Project Grading Plan with Contours l"=50(i sheet) ---. 2 _ 4_._ _._ 24 _ 6 _. 1 - - 4- -- 1 _°- 4 ----_ -_---_. _-_�'___ .__7
Roadway Cross Sections(10 sheets) 2 _ 4 12 16 - _ _ _ - 34 5.8%
b Preliminary Design Review Meeting-_- -_--____ 4 __-- -_ 4 --,6 --_ 14 24%
_._..._c_DuPageCountyForestPreserveCoordlnation -_? .- _, 4 4 10 1.7%
d.Aesthetic Features Coordination Meeting and nce
Coptual Design -- -. 2 as- 4 4 10 1.7%
Item 16 Subtotal 26 62 154 160 48 5 8 25 56 36 2 582 100.0%
G-2b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase II Engineering
Staff Classifications&Workhours
Item Senior Chief Water Water Traffic Total %of
No. Task Project Project Engineer IV Engineer II Design Structural Structural Resources Resources Signals Lighting Workhours Workhours
Manager Manager Technician Engineer Engineer III Manager Engineer II Engineer V Engineer IV
17 Pre-Final(90%)Plans,Special Provisions and Estimates
a.Pre-Final Plans
------- _ _-___ -._. _.__. ..-- - ..
Cover Sheet and Index of Sheets(1 sheet) _ 1 . 2 1 _ _ _ 4 0.3%
General Notes and List of State and Local Standards(2 sheets) 1 __ 1 _ _ 2 0.2% -
Existing Typical Sections(1 sheet),._ - -_.. 1 2 4 2 _._-_---,_- _ - _ ,._9 0.8%
Proposed Typical Sections(1 sheet) -_ _ 1 2 6 _? _.._ ____. .__._.-. -'_-- ----'- 11 0.9%
Erosion Control and Landscaping-3 stages 1"=S0'(3 sheets) ----._---.._ 1 .._._., 4 --'--'_'6 --.-----..?__....__-.._._.- -..._-._.. 4 _-_---.-6-_._-------- .__ ._23 _ .-. 1.9%
Roadway Plan and Profile 1"=20'(4 sheets) 2 6 16 24 8_.___________.- 2 2 _.____.w__.-.__ ...._.__�__ Sad
_.-_ - - - __--- _ -_ - _
Bike Path Plan and Profile I"=20'(1 sheet)__ 30 _— 1__._ _- _2 - _ _2 2 52 4.3%
Drainage and Utilities)"=20'.(4 sheets) -----.. _....__... -3._.._ __._4_.___..._._12. _ ...-$__ 4._. 1-__.._ .--_._.1-..-._._---4 --___.-12 J. 50 42%
Detention Basin Grading Plan and Details 1"=20'(1 sheet) 1 1 _ 2 1 _ 2 -_ - 4 11 0.91A
Detention Basin Planting Plan 1"=50'(1 sheet) 1 1 1 1 1 2 7 0.6%
-
TrafficSignalInstallationPlan(1 sheet)- __.___...._...__ .__l._. 6 4 43
Traffic Signal Cable Plan and Sequences(1 sheet) - - - -_ ___ __-_ 1 6 7- 0.6%
Traffic Signal Mast Arm Mounted,Street Name-Signs-(Ssheet),__.__-_____-
Traffic Signal Interconnect Plan-Wood Glen Road to Harger Road(1 sheet) 1 20 __- -_ 21 _ ,1.8%
_.
Traffic Signal interconnect Schematic-York Road(1 sheet)__ _
Traffic Signal IDOT Standard
5 0.4%
Lighting Plan Pedestrian Underpass(Ssheet)_--•------__.--_.._.__:'- 1 2 _4 _? 2 . ._ -._._-____ 40 51 4.3%
Lighting Details Ped.Underpass-Controller,_Fixture,Service(3 sheets) 1_._ ..2 4----_.--22 16 2.3%__.
Pavement Marking Plan 1=50'(I sheet) _ _.. 1 ._-. 2 _...._2 ... _._._ 4 _.. _.._ _._ ._. __. .. _....__ _.. ._..._.._ .. _ 9 0.8% ..
Signing Plan 1"=5('(.I sheet)- 1 _.--2 2 4
York and Harger Intersection Grading Plan 11_10'(1 sheet)_ 2 2 4 8 _-16--_ _ 1_3%
York and Timber Edge Drive Intersection Grading Plan 1"=10'(S sheet) 2 4 8 _-, _-_ -___--___ _ . _-__ 16 13%
York and I-88 Entrance Ramp Intersection.Grading Plan 1"=10'(1 sheet) 2 2 4 S_ __ _ _ 16 1.3%
Overall Project Grading Plan with Contours 1"=50'(1 sheet)
Roadway Cross Sections(10 sheets) ._._. _-_ 2 _'-_4 12 .. -8 ---,_-___-- -'-- ... --._ _-- '---' 26 _- 2.2%_.
Structural Bike Path and Pedestrian Underpass
General Plan and Elevation(1 sheet) 1 2 6 2 _____ ,6 - _ 17 14%
__... _.. ___. _ _.._..._...__ _._ -.__.---....--_-.__._.._ ._._.__._._ .-.--_.-_-_-----__ ._._.._____ --___ _. ._...__ __._.- .. .. _
General Notes,Staging Details,and Total Bill of Material(1 sheet) _ . 1 2 12 S 16 39 3.3%
Underpass Details(2 sheets) -_ 1 2 _-_--_32 _ —16 40 91 7.6%
Wingwall&Headwall Details(8 sheets) --------- 1__-.—? - ------ ----- -32_- -_-% -_-- 171 143%
_ __ ----.-.--_ __ ._.
Pedestrian Railing&Architectural Details f sheet) 1 2 12 4 12 - -- 31 2.6%
Bar Splicer Assembly Details(1 sheet) 1 2 2 1 1 _ _ _ __ _-7 0.6%
Temporary Concrete Barrier Details(1 sheet) 1 2 2 1 1 7 006_
Boring.Logs(2sheet) --- 1 2 4 2 •-?- _--'.-------.^__ ._ 11 ... 0.9%
Structural Retaining Wall
General Plan and Elevation(1 sheet) _ _ __ -_1 _ _.2 12 _ 4 _ 24 _ __ _ _ 43 _ 3.6%
General Notes and Total Bill of Material(1 sheet) __ _ 1 2 8 4 16 -_- •-_ 31 2.6%
TYPIcaI Wall Sections and.Details(S sheet) 1-.-_----2--_ 12 8 16-_--, ---_-.�---°---_---- '-,_---ii
Boring Logs(2 sheets)
b.Pre-Final Special Provisions _ 2 8 16 8 34 2.8%
c.Pre-Final Quantity Calculations 4 12 12 _ 12 4 ----8 4 S _,-,4 _--__-4 72 6.0%
d.Pre-Final Estimate of Cost and Construction Time 1 4 6 11 0.9%
G-2b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook,Illinois
SUMMARY OF PROPOSED WORKHOURS
Phase II Engineering
Staff Classifications&Workhours
Item Task Project Design Str ctural Senior Chief u Water Water Traffic Lighting Total %of
NO. Project Engineer IV Engineer 11 Technician Structural Engineer III Resources Resources Signals Engineer IV Workhours Workhours
Manager
Manager Engineer Manager Engineer ll Engineer
e.Pre-Final QA/QC Review 12 6 6 6 6 2 2 2 2 2 46 3.8%
f.Pre-Final Project Review Meeting with Village 2 2 3 7 0.6%
g.Pre-Final Project Review Meeting with IDOT_ .-?_..__.. :,..._.2 3 , _ _._. _.._ - ._ -,_ _. 7 0.6%
Item 17Subtotal 38 78 186 149 203 92 245 21 37 86 63 1,198 100.0%
18 Final(100%)Plans,Special Provisions and Estimates
a.Final Plans 6 12 _ - 24 24 24 12 24 12 24 12 1.2 186 65.5%
b.Final Special Provisions 2 4 6 4 16 5.6%
c.Final Quantity Calculations 4 8 8 8 1 2 2 3 3 3 42 14.8%
_.. _..._._ ..._.-._-.._._....__. ._.-'_-.. .___._.' __.. _.._ ._._ _-.- _-_ _. __.._. _.
d.Final Estimate of Cost and Construction Time 1 3 6 6 16 _ 5.6%
e.Final QA/QC Review _..- _ 6 _.._ -... 2 2 _. 2 .2 2 2 21 2 .. 24 8.5%
Item 18 Subtotal 15 25 46 44 34 15 28 16 27 17 17 284 100.0%
19 Project Administration and Coordination
a.Project Administration 2 32 4 4 42 22.8%
b.Project Submittals _ - . 12 _- 12._., 12 -.. 4_,..__.. 2.__._. .4-_ 2-_-_ 4 ......__ 4 4 32.6%
c.Status Meetings 8 12 20 10.91A
d.Utility.Companycoordination 4 8..._.. 16 ...__8 _._ _._. ._._. _.___.. _._. 4 ....._. _. 4 _ _. 44 23.9%
e.Bidding Assistance 2 -,___6.- 2 ,..? ._ _ . 12 -6.5%
f.Pre-Construction Meeting Attendance 2 2 2 ____„ <, - < - 6 3.3%
Item 19 Subtotal i8 72 36 26 4 2 4 2 4 8 8 184 100.0%
20 Construction Assistance
a.Construction Shop Drawing Reviews 6 6 4 4 __ 4^ 24 27.3%
b.Construction Review and Meeting Attendance _ 4 24 24 r 4 4 ___ _4 _ 64 72.7%
Item 20 Subtotal 4 30 30 0 0 8 0 0 0 8 8 88 100.0%
Total Workhours: 136 353 596 511 365 149 316 108 190 182 141 3,047
%of Workouts: 4.5% 11.6% 19.6% 16.8% 12.0% 4.9% 10.4% 3.5% 6.2% 6.0% 4.6% 100.0%
G-2b
North York Road/Harger Road Intersection Improvement
Village of Oak Brook, Illinois
SUMMARY OF IN-HOUSE DIRECT&SUBCONSULTANT COSTS
Phase II Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
1 Project Kick Off Meeting
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Item 1 Subtotal $43.20
4 Field Survey and Base Sheet Development
Sub-Consultant: Jorgensen &Associates, Inc. $5,016.66
Mileage: 4 trips @ 40 mi./round trip @ $0.54/mi. $86.40
Item 4 Subtotal $86.40 $5,016.66
7 Special Waste and CCDD Testing
Sub-Consultant: Stuedemann Environmental Consulting, LLC $5,865.00
Item 7 Subtotal $5,865.00
8 Wetland Permitting and Coordination
Sub-Consultant: Stuedemann Environmental Consulting, LLC $7,079.00
Item 8 Subtotal $7,079.00
9 Drainage Design,Storm Water Permitting,and Supporting Docs
Mileage: 2 trips @ 40 mi./round trip @ $0.54/mi. $43.20
Item 9 Subtotal $43.20
Page 1 of 3
Prepared by:Civiltech Engineering, Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-2c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook, Illinois
SUMMARY OF IN-HOUSE DIRECT&SUBCONSULTANT COSTS
Phase II Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
11 Review and Confirm Project Right-of-Way Requirements
Sub-Consultant: Jorgensen &Associates, Inc. (Plat of Highways) $16,692.72
In-House Civiltech Consultant: David White (Appraisals) $2,800.00
Sub-Consultant:T-Engineering (Review Appraisals) $900.00
Sub-Consultant: Santacruz Associates (Negotiations and ROW Certification) $3,000.00
Item 11 Subtotal $2,800.00 $20,592.72
16 Preliminary Plans(65%)
Printing:Village 2 Sets of 37 Sheets 11"x17" pages @ $0.15/ea. $11.10
Printing:Village 1 Set of 37 22"x34" sheets @ $1.00/ea. $37.00
Printing: Utilities 10 Sets of 37 22"x34" sheets @ $1.00/ea. $370.00
Deliveries:Village 1 @ $50/ea. $50.00
Shipping: Utilities 10 @ $25/ea. $250.00
Item 16 Subtotal $718.10
17 Pre-Final (90%) Plans,Special Provisions and Estimates
Printing:Village 2 Sets of 89 Sheets 11"x17" pages @ $0.15/ea. $26.70
Printing:Village 1 Set of 89 22"04" sheets @ $1.00/ea. $89.00
Printing: IDOT 8 Sets of 89 Sheets 11"x17" pages @ $0.15/ea. $106.80
Printing: Utilities 10 Sets of 89 22"x34" sheets @ $1.00/ea. $890.00
Printing:Specification Books 10 Sets @ $25.00/ea. $250.00
Deliveries:Village 1 @ $50/ea. $50.00
Deliveries:IDOT 1 @ $50/ea. $50.00
Shipping: Utilities 10 @ $25/ea. $250.00
Item 17 Subtotal $1,712.50
Page 2 of 3
Prepared by:Civiltech Engineering,Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-2c
North York Road/Harger Road Intersection Improvement
Village of Oak Brook, Illinois
SUMMARY OF IN-HOUSE DIRECT& SUBCONSULTANT COSTS
Phase II Engineering
Item Task In-House Sub-Consultant
No. Direct Cost Cost
18 Final (100%) Plans,Special Provisions and Estimates
Printing:Village 2 Sets of 89 Sheets 11"x17" pages @ $0.15/ea. $26.70
Printing:Village 1 Set of 89 22"x34" sheets @ $1.00/ea. $89.00
Printing: IDOT 2 Sets of 89 Sheets 11"x17" pages @ $0.15/ea. $26.70
Printing: Utilities 10 Sets of 89 22"x34" sheets @ $1.00/ea. $890.00
Printing:Specification Books 4 Sets @ $25.00/ea. $100.00
Deliveries:Village 1 @ $50/ea. $50.00
Deliveries:IDOT 1 @ $50/ea. $50.00
Shipping: Utilities 10 @ $25/ea. $250.00
Item 17 Subtotal $1,482.40
Total In-House Direct Costs: $6,885.80 -
Total Subconsultant Costs: - $38,553.38
TOTAL IN-HOUSE DIRECT&SUBCONSULTANT COSTS: $45,439.18
Page 3 of 3
Prepared by:Civiltech Engineering,Inc. Summary of In-House Direct &Subconsultant Costs
Printed:4/27/2017 G-2c