Loading...
Boards & Commissions Supporting Documents - 12/13/2005 - Board of TrusteesI'1'om 9,1.11 * i), x 4 x %I AGENDA ITEM Regular Board of Trustees Meeting of December 13, 2005 SUBJECT: Award of Contracts: 1 - Fiber Optic Cable Restoration 2 — Fiber Optic Construction Management — Additional Services 3 — Network Design 4 - Telecommunications System Replacement FROM: Bruce Kapff, Information Services and Purchasing Director BUDGET SOURCE/BUDGET IMPACT: Total of $255,000 budgeted in the Information Services Program #151, comprised of $225,000 from the Equipment Replacement line item — 9020 — 2006 Budget, and $30,000 from the Computer Hardware and Software line item — 9160 — 2005 Budget. RECOMMENDED MOTIONS: 1 — Fiber Optic Cable Restoration - I move that the Village Board award a contract for Fiber Optic Cable Restoration to the lowest responsive and responsible proposer, Adesta, LLC, Romeoville, IL. subject to staff review, for the total cost of $50,230.84, as indicated on the attached proposal tabulation (Exh #2). 2 — Fiber Optic Construction Management — Additional Services - I move that the Village Board approve additional construction management services with TDSi, Naperville, IL. subject to staff review, for the added cost of $1,750, plus expenses, as indicated on the attached proposal (Exh #3). 3 — Network Design - I move that the Village Board award a contract for Network Design to TDSi, Naperville, IL. subject to staff review, for the total cost of $10,175, plus expenses, as indicated on the attached proposal (Exh #4). 4 — Telecommunications System Replacement - I move that the Village Board award a contract for Telecommunications System Replacement to the lowest responsive and responsible proposer, Sound, Inc., Naperville, IL. subject to staff review, for the total cost of $149,195, as indicated on the attached proposal tabulation (Exh #5). C \Documents and Settmgs \bkapf1\My Documents \word \BIDREC\2005 telecom fiber and network doc 41% Background/History: The Village Board, at its meeting of June 28, 2005, approved contracts with TDSi for telephone and fiber consulting services and authorized staff to obtain proposals for telephone systems and fiber upgrades. Exhibit #1 — Fiber Optic, Network and Telecom Summary. The highlighted center of this spreadsheet shows all of the work to be completed at this time. The items proposed for approval at the December 13, 2005 meeting are so indicated. The other items listed will either come back to the Board at a future meeting, be approved by the Village Manager, or may not be needed. Exhibit #2 — Fiber Optic Upgrades, and Exhibit #5 — Telecommunications System Replacement, summarize the proposals received for each project and provide back -up for the above recommendations. Exhibit #3 — Expanded Implementation Assistance — Fiber Project. This proposal from TDS1 accounts for additional construction management work than was anticipated when the original contract with TDSi was approved. It adds time for more site inspections, punch list follow -up, responding to contractor questions and an additional final inspection to verify all items have been completed correctly. Exhibit #4 — Network Design - Once proposals were received for both the fiber optic and telecom projects, it became clear that we should look at doing some additional work on the underlying data network (on which the telephone system will operate) in order for the Village to provide a good voice and data system. Exhibit #4 is a proposal from TDSi to do a thorough analysis of our entire data network. This added work is needed to provide an adequate network for the telephone system to run on and will show us improvements to be considered in future years. Although the current data network operates satisfactorily, this design work will improve the network to accept the anticipated increased usage for many years to come. Recommendation: That the Village Board approve the recommended motions listed above. C \Documents and Settings \bkapf \My Documents \word \BIDREC\2005 telecom fiber and network doc E E O Y N O 0 ca O j Z U y-. Q- 0 ui (D U_ O U) C O 0 L 3c W 'p C C L O rn > 0 > 2 Q E Q E O 0 0 _O r O O 0 c L w Q O N 0 C C Q Q 0 O ° Cc a o o O co �° (D co O U ('M -0 "a M N C _ N L N cn -0-0 N m CO cu cu co to > o> > > L � _0 0 ci �° L � a+ C O C 4- C C U C U (tea - O 3 O _0 p p -a c c o Q Q E- E- cn OO y co M Oco O m _ O O LO N ti 0) 0) � 1- O E LO � __ � Q 69 69 M 69 (f? � r LO N � 69 69 d .O d X W �- OOOO�t OU)U�0u)000 to 00 Q) 000 C! 7r(D-C6 w V 0 00000 0 0 0 0 T- 0d'Iq to to t0 to 0 0 w r 00 C) 000 Q) OODOOOt(�Op �����01�0 ttv0LO (D 0) 0 to O tC; Q� d I� 000 000 I- 0Ofl- 01-_ 0 tn000d 11)� -I� to e- 1- 000 1-- f` N M, � to 00 d f� O 00 r O 0 ( D O to to r d 69 69 69 69 69 69 to 6R 69 69 69 69 69 r- 69 to � `Cr LO CO N to 69 W 69 6�i 69 b`i ow T- V- N 69 N N ' 69 6R 6R 69 69 r V O O L IL a� co U 3 Q U 0 a m CD 3 c °u; o U) 3 cU x 06 � v 3a � C2�- >U) 0� ^ -0 m U N U? H : W C M W ON (3a)M�' 33,,5 C) �(D E me �c Z d (7 '6 r� C V t �« m () L 06 +� N m O L m 0 c (D U +- E d m CO m O U' U' p) m m CO U CO O c 0 (6 U O O Co 3 C" N C o 0 O �_ C L L L N N-0 N (L° L � d Z X� mc°n X m a = d �U �a m +' a� ++ d tm c U � ZL («g Lz)> to to cn N O o U� p E o m0 Om0 L `� NM c U La. UJ O v 2O Z +' N 4 > O ~ O� V V 0 V L O Um — m � to (6 +' O C O�� FQZZZZZ O N N O N �Z O O 2 O C7� 0 = 3~ O = O Q O� O _N -jUf-� Z� z> a ~H LLmQQ¢= �n �-' CO) a a� z ui (D U_ O U) C O 0 TECHNICAL. DESIGN SMVICES, INC. i "'D ; 3- ;t - Tciccontrrruniratinrr. J Netzt cork < rf Infrastructure Design & Consulting December 6, 2005 Mr. Bruce Kapff Information Services Director Purchasing Director CPPB Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523 Dear Mr. Kapff: The Village of Oak Brook and Technical Design Services, Inc. (TDSi) are in the process of evaluating contractor proposals for the Fiber Optic Restoration Project. In reviewing the contractor proposals TDSi is recommending that the Village of Oak Brook award the Fiber Optic Restoration Project to Adesta (contractor). Adesta has the lowest proposal price and from our detailed scope review and subsequent meeting they appear to have a complete understanding of the overall project. The overall project, at a total construction cost of $50,230.84, will consist of the following items as detailed in the proposal response: 1. Base Sum Price: $16,721.48 Multimode re- termination and testing, singlemode termination and testing and 12 -strand multimode fiber optic repair at hand hole #35. 2. Alternate #1: $6,577.61 • Replace deficient exterior junction boxes with new "outdoor rated" junction boxes. 3. Alternate #2: $3,566.94 • Elevate and re -work existing hand hole device box #25. 4. Alternate #3: $17,504.81 New outdoor pathway between GMB and SCA. 5. Hand Hole Device Box Upgrade Work: $520.00 ea. (Four Hand holes $2,080.00) 6. Rework locate wires throughout pathway system: $3,780.00 • Splice all locate wires throughout pathway system and provide four areas along route for locate equipment connection. 1075 SHORE ROAD, SUITE A • NAPERVILLE, IL 60563 • TEL 630.983.9906 FAX. 630 983 9908 www.tdsmc.biz � —� r` 4 c O W 00 AV W O n c O OMENS L O ^V/ W V BENNO r_--I /L W a O O �V i O O 4) m IMMEMN IMMEMS 5 NONE 00000 00000 H 0000 o 0 0 0 0 0 00000 to 0000 O N O o 0 r N M (D O r O O (D O O V h M o 61%,r- OD W) r) O to IT 0 - (D(n(Du)M to v O co Ln OtoIVti O un L6 W OD N CT 64 00 N (D : O O N v rN M Nr M 069Mr 64i � ui 69 �? E9 69 69 69 69 W X W Q' O O O r O O O r 0 0 (t) O O O 0) -T O r 00 It N It .- O O 1` (D O Y N (D 0 0 0 co M 1� 0 0 N O t O O ► t7 (n O v) 69 r 00 1` N co M O r (n r N O O N 1` (D O N M IT M O N (D M C p C M N 69 tT O (D N cl u7 N (n Di m to N 69 69 W r 619,69 N 69 V3 69 69 r 69 69 - m z C N � c � .1C 7 w 3 N m m i0 0 O > o Q z 0 0 0 0 0 0 0 0 0 0 to o 0 0 0 0 o o 0 0 0 00000 0 0 0 0 0 0 (n 000u> 0 (n0 0(n p o000 0 U e V N 69 1, V (n N r r O 10 N h O 1` M N r Ln N I- M) OD 0) (n O 1,. O Iw r+ O CD P (D I- N t h V M N (D N r 0) ` N 690 W r 69 69 N 69 69 r 69 EA - - 69 69 69 m O N m Y O O O O O 0 0 0 0 0 t9 0000 o O O I� O ► � O O O h I- >1 0 0 0 0 O C O (n O Cn CDN0069to (n W) (n It O V NO(D 0 0 0 0 0 O(nOO 0 )n -0 O C O O M 0) (n to co r o D) O co CD M st 69 0 �- OD (n O vi 69 N M � r u7 69 tR 69 N N 69 N r d+ D m 0 69 W 69 69 69 69 m Q c U (D a. O c 0 M ga U .o p) Uco O O O O O 00000 (A 0000 O 000040 O O O O O (0 O O O O O y 0 0 0 0 0 (D N N o o 0 0 0 0 O C O O r- 1- 69 N (() M to co (D CO N (- N M (n M M O 00 O (D O O M O LI) v .a = O O W [A V! M W Di - e-- M-7 �: a 69 69 609, 41 C4 _ v W 69 69 N - 69 69 CL c Q E 0 U (n 1• (D O O o to 1` co 00 N r IW r '' O O CO to 0 V to 1` u) U) 1' (D O O M O 00 1.. to o r M O r u7 r h (D v v O Cn(n069N CO (D - I` M(n1-CDN M M O - 1. )n 1`(DON to to Ln M N N 1� co CD O u1 69 69 CD O tD M 1-: �_ 69 r - E9 69 69 d! 69 69 69 69 W d 'C Q ca C mO C (� t]D to C .� C m w O y U V N to J c W y a C a) (a C C C m° mU) ca aaaa cm ad oal c E E E E 0 o m m CO m p w w l6 y N m ` C C (D_ N U E H m m m Co ELL a) 0 o 0 0 0 F h- o vvv10 m E QQQQ o 2 CD E 4))NQ co c v 022 2 o x 0 (n a E c c m °� o m = E 'mw co =m L) r to m g a) z N C �(7a C LL r N V7 ` a) a) G 0 (a O o = a) m c 7 IL y O w m m c (D *k 3: m N F` z s w y c a o 3 a y m (D z a c m Q o) m c E j a 0 v c, m to to e Q c a E m ca Q Q V December 6, 2005 Mr. Bruce F. Kapff Information Services Director Purchasing Director CPPB Village of Oak Brook 1200 Oak Brook Road Oak Brook, Illinois 60523 -2255 Re: Expanded Implementation Assistance (Fiber Optic Restoration Project) Dear Bruce: Technical Design Services, Inc. (TDSi) is pleased to offer you this proposal for expanded Implementation Assistance Services for the Fiber Optic Restoration Project. We have enjoyed working with you during the design phase of this important project and would like to offer Implementation Assistance Services for the construction portion of the project. We have provided a detailed explanation of the work that could be included in the final phase of this project and have also provided the approximate amount of time associated with each of the tasks and have assigned a value to all of the services. The following provides you with specific information about the work that we are proposing and our team approach to your project. We look forward to meeting with you to discuss this proposal further. If you have any questions or require any additional information regarding this proposal, please call me at 630.388.6580 Sincerely, TECHNICAL DESIGN SERVICES, INC. Brett Mersch 1075 SHORE ROAD, SUITE A NAPERVILLE, IL 60563 -8758 TEL: 630.983.9906 Fax: 630.983.9908 www tdsmc.biz /A /—,< �! TECHNICAL DESIGN SERVICES, INC. 4 °� sES ^� x Teleamniunicntioris / Netzoork Infrotructure Design & Coltsuftillg December 6, 2005 Mr. Bruce F. Kapff Information Services Director Purchasing Director CPPB Village of Oak Brook 1200 Oak Brook Road Oak Brook, Illinois 60523 -2255 Re: Expanded Implementation Assistance (Fiber Optic Restoration Project) Dear Bruce: Technical Design Services, Inc. (TDSi) is pleased to offer you this proposal for expanded Implementation Assistance Services for the Fiber Optic Restoration Project. We have enjoyed working with you during the design phase of this important project and would like to offer Implementation Assistance Services for the construction portion of the project. We have provided a detailed explanation of the work that could be included in the final phase of this project and have also provided the approximate amount of time associated with each of the tasks and have assigned a value to all of the services. The following provides you with specific information about the work that we are proposing and our team approach to your project. We look forward to meeting with you to discuss this proposal further. If you have any questions or require any additional information regarding this proposal, please call me at 630.388.6580 Sincerely, TECHNICAL DESIGN SERVICES, INC. Brett Mersch 1075 SHORE ROAD, SUITE A NAPERVILLE, IL 60563 -8758 TEL: 630.983.9906 Fax: 630.983.9908 www tdsmc.biz /A /—,< �! MR. BRUCE KAPFF CONSULTING SERVICES PROPOSAL VILLAGE OF OAK BROOK IMPLEMENTATION ASSISTANCE SERVICES FIBER OPTIC RESTORATION PROJECT IMPLEMENTATION ASSISTANCE SERVICES PROPOSAL UNDERSTANDING OF PROJECT SCOPE The Village of Oak Brook is in the process of restoring their fiber optic cabling infrastructure. Technical Design Services, Inc. (TDSi) has been involved with the design of the restoration project and has been requested by the Village of Oak Brook to provide a proposal for Expanded Implementation Assistance for this project. The services covered in this proposal include: attending a pre - construction meeting, punch -list creation for all accepted alternatives and oversight and final project acceptance. Each of the items are detailed and associated with an approximate number of hours to complete the task. A limited number of periodic site reviews, test report and as -built reviews are covered under our existing scope of work with the Village. Please refer to the following Project Methodology which details the work steps involved in the Implementation Assistance. PROJECT METHODOLOGY This proposal represents a proven methodology and approach for the Implementation Assistance portion of the construction project. The work proposed in this proposal is intended to compliment the work proposed in the Design Services Proposal. The following details provide the approximate number of hours associated with each task: Expanded Implementation Assistance Once a contractor has been selected it is essential that their work be monitored to unsure the system is installed per plans and specifications. TDSi is able to provide these services and offers the following steps: 1. Pre - construction meeting. TDSi will meet with the cabling contractor prior to construction beginning to clarify any questions and set the basis for understanding the design and intent of the systems to be installed. During this meeting, project scheduling will be discussed. Additional construction meetings can be accommodated and will be billed on a T &M basis. Approximate Time: 3 Hours 2. Create punch list and punch list oversight. TDSi will assist the Village of Oak Brook with monitoring the contractor's installation to assure that it follows the designed plans and specifications. Based on increased size and scope of this project, TDSi is suggesting additional work effort will be required to verify the installation quality of the system. Near the completion of the project TDSi will conduct a walkthrough of the installation to develop a final punch list of items for the TECHNICAL DESIGN SERVICES, INC. Page 2 MR. BRUCE KAPFF CONSULTING SERVICES PROPOSAL VILLAGE OF OAK BROOK IMPLEMENTATION ASSISTANCE SERVICES contractor to correct prior to final acceptance of the project by the Village of Oak Brook. TDSi then proposes to work with the Village and the contractor to implement the punch list items and answer any related questions. When the contract states that all punch list items have been resolved, TDSi will again inspect the installation and verify that these items have indeed been resolved and that the system is complete. Recommended hours: 11 hours ■ Substantial completion walk - through - 4 Hours ■ Develop punch list - 2 Hours ■ Contractor questions and answer - 2 Hours ■ Final inspection and verification - 3 Hours PROJECT TIMING TDSi will schedule site reviews based on the contractor's schedule of the outlined milestones as discussed at the pre - construction meeting. TDSi will also make any reasonable attempt to attend other meeting / site reviews requested by the owner based on the above outlined project methodology. PROJECT FEES Our fees reflect the experience and expertise of each individual that would be assigned to the project. The time and resources allocated are determined based upon our understanding of the specific requirements of the project, as explained in the project scope. These services will be available on a Time and Material basis. The Village of Oak Brook will decide which portions of this proposal they will require and will direct TDSi accordingly. Should there be significant changes in the scope or required methodology, we would inform The Village of Oak Brook of the required change in our fees before proceeding. Direct expenses will be billed in addition to our fees. The fees for completion of Implementation Assistance Services are based on the estimated time of 13 hours to complete the requested work. 1. Our fee for this project is: • $1,750.00. (Plus expenses not detailed above) Payment terms, unless agreed upon otherwise: We will issue an invoice for our services rendered on a monthly basis or when the pricing documents are issued. The fees will be payable upon receipt. 2. Additional services and work performed that is out of scope will be billed as Time and Expenses at a rate of $95.00/hr — $125.00/hr depending on the individuals performing the task. TECIiNICAL DESIGN SERVICES, INC. Page 3 ap MR. BRUCE KAPFF VILLAGE OF OAK BROOK Acceptance of Proposal CONSULTING SERVICES PROPOSAL IMPLEMENTATION ASSISTANCE SERVICES If the scope and arrangements outlined in this proposal are acceptable, please sign a copy and return to us or issue a Purchase Order for the fees listed above. Once authorization from the Village is received, we will establish a project schedule with you and proceed with the project. We appreciate this opportunity and look forward to working with you. Consulting Services Proposal for The Village of Oak Brook — Fiber Optic Restoration Project — Implementation Assistance Services Accepted by: The Village of Oak Brook Authorized Signature: Name/Title: Consulting Services Proposal for The Village of Oak Brook — Fiber Optic Restoration Project — Implementation Assistance Services Accepted by: TECHNICAL DESIGN SERVICES, INC. Brett Mersch, Senior Consultant December 6, 2005 I , 2005 I I I TECHNICAL DESIGN SERVICES, INC. Page 4 , fi -E T �HNiCALDESIGN StRVICES, INC. s•x€ �,T r�sn : ;'tefi Telecommunications INetwork a It!frasfructiae Design & Consulting December 6, 2005 Mr. Bruce F. Kapff Information Services Director Purchasing Director CPPB Village of Oak Brook 1200 Oak Brook Road Oak Brook, Illinois 60523 -2255 Re: Fiber Optic Campus Backbone Dear Bruce: We felt yesterday's meeting to determine the next steps for the Village of Oak Brook's infrastructure improvement was productive. The meeting generated a clear direction for moving forward that will provide for a measured introduction of new technologies into the Village in a cost effective manner. Based on our meeting, Technical Design Services, Inc. (TDSi) is pleased to offer the following proposal to the Village for assisting in the design of a new network infrastructure to support voice and data services for the Village. Proiect Background The Village has an installed base of multimode and singlemode fiber that connects the majority of their facilities on the campus bounded by Jorie Boulevard, York Road, 31St Street, and 22nd Street. The Village has entertained proposals to upgrade the fiber installation and will proceed with upgrades over the next two months. At the same time, the Village will be replacing the existing telecommunications system with a new system that utilizes the data network to provide voice services to the majority of sites served by fiber. While the existing network can support Voice over IP (VoIP), an upgrade to the data network will improve the network's capabilities. It also appears to be prudent to review current network performance prior to implementing any voice services over the data network. The following proposal describes a cooperative network review and design process that will meet the Villages desire for improved data network services to the sites served by fiber and review current network performance. Proiect Scope Based on our walk - through and subsequent discussions, we believe we can assist the Village with the above referenced activities. Following is our understanding of the requested scope of services the Village would like us to perform: • Develop a detailed data network design to support the implementation of voice over the data network from the Government Center to the sites served by fiber optic cable. • Advise in the procurement of all necessary components of the above data network design. 1075 SHORE ROAD, SUITE NAPERVILLE, IL 60563 -8758 TEL: 630.983.9906 Fax: 630 983.9908 www tdsinc biz Mr. Bruce Kapff Consulting Services Proposal Village of Oak Brook Data Network Design • Develop a budgetary design for a future upgrade of the data network at the Government Center campus. • In conjunction with Village staff, conduct a review of data network performance and develop a course of action to improve the network as necessary based on any issues found and information technology best practices. • Assist the Village with project management of the selected contractor's work. We will visit the site periodically, answer questions and review project close -out materials. Proiect Worksteps This proposal represents a proven methodology and approach for the Network Design and Review project. The work proposed in this proposal will compliment the work TDSi is already engaged in for telecommunications systems implementation and fiber optic systems improvements. The following details provide the approximate number of hours associated with each task: 1. Network Performance Review Meeting. TDSi will meet with Village staff to document any current network performance issues. In addition to documenting these issues, TDSi will work with the Village to isolate any symptoms for these issues and develop a set of actionable steps for determining the root cause of the problems. Tom Jakobsen will lead the meeting and document the steps; Pete Graziano will provide additional network and operating system expertise. Approximate Total Time: 8 • Tom Jakobsen — 4 Hours • Peter Graziano — 4 Hours 2. Network Performance Investigation. In conjunction with Village staff, TDSi will spend up to sixteen (16) hours conducting detailed investigations to specifically identify the root cause of any network performance issues. The result of this workstep will be the immediate resolution of any issues that may be quickly resolved or a listing of next steps that will be required for resolution. Approximate Total Time: 16 hours ■ Peter Graziano— 16 Hours 3. Network Design Meeting. TDSi will assist the Village of Oak Brook in the detailed design of a replacement data network for the sites served by fiber optic cabling. The design will be developed jointly by TDSi staff and Village technical staff. The design process will include a high -level design meeting that will discuss network connectivity alternatives, necessary features and functions and potential systems providers for the overall network. TECHNICAL DESIGN SERVICES, INC. Page 2 Mr. Bruce Kapff Consulting Services Proposal Village of Oak Brook Data Network Design Approximate Total Time: 6 hours ■ Tom Jakobsen — 3 Hours ■ Brett Mersch — 3 Hours 4. Development of Network Design and Future Phases. Following the network design meeting, TDSi will develop a detailed network design for the site to be served by fiber optic cabling and a high level budgetary design for the Government Center. This design will consist of physical network diagrams, virtual network diagrams and bills of material with expected purchase prices. Also in this workstep, TDSi will develop a logical progression of project phases that incorporates the resolution of all identified network performance issues and future infrastructure improvements required to prepare the Village for the implementation of next generation applications. Approximate Total Time: 24 hours ■ Tom Jakobsen — 16 Hours ■ Peter Graziano — 4 Hours ■ Brett Mersch — 4 Hours 5. Network Design and Future Phases Presentation. When we have completed the network design and have created a list of future infrastructure improvement phases, we will present the design and future plans to the Village for discussion and comment. We expect the discussion to be lively and we have included time in this step for revisions to the design and the future phases as directed by the Village. Approximate Total Time: 8 hours ■ Tom Jakobsen — 5 Hours ■ Peter Graziano — 3 Hours 6. Network Equipment Procurement Advice At this time, the Village expects to use an existing multi -state purchasing agreement to procure the equipment included in the design. TDSi will provide technical advice during the procurement process, assisting with recommendations for alternates as needed. Approximate Total Time: 2 hours ■ Tom Jakobsen — 2 Hours TECHNICAL DESIGN SERVICES, INC. Page 3 Mr. Bruce Kapff Consulting Services Proposal Village of Oak Brook Data Network Design Proiect Time Schedule We estimate that the consulting and design project will take no longer than four weeks to complete. Events that could delay the project would include extended times for review and approval of design documents, changes to the scope of services to be performed, changes or delays caused by other Village projects being performed simultaneously, etc. Should such events occur, we will inform the Village of any expected delays in completing the project. Proiect Fees Our fees reflect the experience and expertise of each individual that will be assigned to the project. The time and resources allocated are determined based upon our understanding of the specific requirements of the project as explained in the project scope. Should there be changes in the scope or required methodology, we will inform the Village of the required change in our fees. Direct expenses, such as the plotting of a reasonable number of drawing sets for internal review, are included in our price. The fees for completion of the Data Network Design and Review project are based on the estimated time of 64 hours to complete the requested work. 1. Our fee for this project is: • $10,175.00. (Plus expenses not detailed above) Payment terms, unless agreed upon otherwise: We will issue an invoice for our services rendered on a monthly basis. The fees will be payable upon receipt. 2. Additional services and work performed that is out of scope will be billed as Time and Expenses at a rate of $125.00/hr — $175.00/hr depending on the individuals performing the task. Acceptance of Proposal If the scope and arrangements outlined in this proposal are acceptable, please sign a copy and return to us or issue a Purchase Order for the fees listed above. Once authorization from the Village is received, we will establish a project schedule with you and proceed with the project. We appreciate this opportunity and look forward to working with you. Consulting Services Proposal for The Village of Oak Brook — Data Network Design and Review Accepted by. The Village of Oak Brook Authorized Signature: Name/Title: , 2005 Consulting Services Proposal for The Village of Oak Brook — Data Network Design and Review Accepted by. TECHNICAL DESIGN SERVICES, INC. lM �- Tom Jakobsen, Practice Leader December 6, 2005 TECHNICAL DESIGN SERVICES, INC. Page 4 Mr. Bruce Kapff Consulting Services Proposal Village of Oak Brook Data Network Design If you require further information or have questions, please do not hesitate to call me at 630 -388- 6581. We look forward to working with you. Sincerely, Technical Design Services, Inc. Tom Jakobsen Practice Leader TECHNICAL DESIGN SERVICES, INC. Page 5 TECHNICAL I1ESTGN S%t2V1C -S, INC. " Felecoatinunic-ations /Network tfrastructure Design & Consulting December 8, 2005 Mr. Bruce F. Kapff Information Services Director Purchasing Director CPPB Village of Oak Brook 1200 Oak Brook Road Oak Brook, Illinois 60523 -2255 Re: Telecommunications System Recommendation Dear Bruce: Technical Design Services, Inc. (TDSi) has completed its analysis of the telecommunications proposals received by the Village of Oak Brook. As you know, we released a Request for Proposal (RFP) specification in October to number of potential vendors and eighteen (18) different organizations attended the mandatory pre -bid conference and site survey. Eleven (11) of these organizations choose to submit proposals for the Village -wide telecommunications system. In fact, one vendor, SBC, submitted an alternate proposal. The twelve (12) alternatives are summarized on the attached spreadsheet. All twelve (12) proposals for the Village -wide telecommunications system would fulfill the needs of the Village, yet they ranged in price from a low of approximately $133,000 to a high of over $260,000. The proposals included most of the major manufacturers of telecommunications equipment and included Voice over IP (VoIP), traditional Time Division Multiplexing (TDM) or combinations of both technologies. Two of the proposals offered a partially outsourced telecommunications system as an alternative. The proposed outsourced telecommunications services alternatives have a different annual utility cost structure as well as different annual maintenance costs. Therefore, a total cost of ownership was computed by adding the initial purchase price, the annual maintenance cost and estimated utility costs together for periods of 5, 7, and 10 years to determine if which alternative will be less costly over the long run. Also, the VoIP alternatives would have required a minor enhancement to the Village's data network. The costs for this enhancement were computed and added to the VoIP alternatives. The results are shown on the attached document. There are other factors which should be considered in a decision of this nature. These include: the installed base of the product proposed, the products acceptance, ease of implementation within the industry, manufacturer stability, and the technical depth of the distributor who represents the product. TDSi used these criteria to score each proposal, applied agreed upon factor weights and totaled the scores. As shown on the attached spreadsheet, the NEC proposal from Sound, Inc. received the highest score. 1075 SHORE ROAD, SUITE A NAPER VILLE, IL 60563 -8758 TEL: 630.983.9906 Fax: 630.983.9908 www tdsinc biz 0--- ,tL-x /f. Mr. Bruce Kapff Village of Oak Brook Telecommunications Systems Recommendation Therefore, we recommend the purchase of the NEC system as bid by Sound, Inc. After the committee met with Sound, Inc. they decided that certain enhancements could be cost effectively added to the original proposal. These include a slightly more expensive, but greatly enhanced function telephone set, and an enhanced software package that allows access to more system information. This increases the total cost to $149,195.00. If you require further information or have questions, please do not hesitate to call me at 630 - 388 -6582. We look forward to working with you. Sincerely, Technical Design Services, Inc. Thomas Weiman, Consulting Services Practice Leader cc: Bernie Schaaf TECHNICAL DESIGN SERVICES, INC. Page 2 N iw o 0 N t`0 N r C 0 a 0 U 0 a 0 L Q. �+d Y 0 0 V m Y O 0 4) J 0 o 0 0 0 O O o O 0 0 0 0 00000000000000 L 0• O 00000000000000 c O O 0 In 0 0 0 0 E r 0 0 O O 0 Lq 0 0 O O 0 4 0 O O r O r' 00 0 0^ 00 CO CI r• 0 N M V3 r 6%16916i? 1 6916A 619, 6%1V} 611), W Vi V 6 60 6ii In O O v M T N O O O n Cn O n O O O� O 0 M r t0 r v oD tD O �O V0Mmt0mmlO010,0N vOnnCDM01OnoD���� T T n N 0 p- N Cp r T C O�Mv0r r• -- m Mlnnr• 0 69 V: (O v M n T O r M In M M O N O M m r v m r 0 M N N CD N (0 r Vi E9 V! fR o �!: O m O M v N C) S f. N co co n CD CO Cl) v N CO CO p CO CO CO CO CD r• (C) C — (D r- V! 69 69 .691V> 1 69 V) fA 1 (0 m (0 !A In o m— CO ano N O C CA CD (O 0 (0 CO — CD CO M CO CD (D t tD�����CAV�oovv�N W) CD r- 'a ' r 0 m v at M CO NO O m (0 �� M r n n n m to 7 7 O _ V)V4 N T C C IMP N n n m r v N 69 61 .010164. 0 In !A tnTM 0 Op nvnnmaoom T. n T N N w N tD n (D N T m IA M O v 07 N n W T n v (0 o M 0 0 C6,.-: 0 In m m r` 0 v IA In 0 N w 00 O M r f` m Cn to M m p CA 0 m w vv InN0vNv It e- In CD fA Vi VO 6% 69 M r (A 69 V) Vi 44 CD O to N V) 1 CA 6% 0101.1-1, 69 VT V! V) 69 /A CO v 0 0 0 0 0 0 00 O O v 0 0001.00 NNvCON� O O O m r CO 0 0 M T O'D CO Ln m m 0 m� CO CO (4 0) M N N M O n m to O tD 0 0 m y m M o m N Olnn m CO vC, tDrN� In In Cr; N fz co n n n N r C cn T.- 6%169169 In 1691613, Vi CA 69 69 60, 6A (D M M M m m t0 M In v 0 CA nlnIf) n In InlnlnmmvMO to r M r r' O 0) (0 n T O IT n (D CM —0 O n mvm (O r n 0 0 &0 M M M In r M W I- v 0 r) W) In M N n n In In 1Cj N 0 th M (0 CV N co M N N In C- In nvNvinnr r V> V! V) 69 6A V) V) 6A V) V) 69 6q In M O n v T CO m O n 0 P OD N In 0 M N O 0 o M v to V In 0) T O CO 0 M O M 0 ri t0 O Mm h In nn(0Mm'000MW CD (0 M 000 CI h O 0) CO n r (7 O O 06 M (D M (0 N CD r T r r O v r U 0 0 N p CO v m r' 0 mvmRCllt O n c Cn M N 69 (A 69 69069fA69 (V � � 69690611, r p 0 0 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 0 0 0 0 O Ov0 M Ovv�D(OOOO M In Iri 0 r n O -t CD n O (OOOn*'nlnN n O N 0 00 N n 0 0 0 n n M In In CO N (D It) O O v 0 r r M v (n r V: V6 V) fO fH 0 V), 441641619-161i1 T r- 6q CV M 06 - O O v v O In N O M (00 O ) 0 CD C O v 0 T C CD O N O T v M v v o v OD v (0 00 r• N V a) v 'ON d N -0 -D n CO v -0 r 0 0 0 r o MIn N M 0 U v C r t0 64 0% E9 69 V) 6% di M to r Vi V) O O 69 V! Vi V! 6R w w to O w Ln M n It It CO V— m W 0o000DvuimnNvnNCD `07 N N m ao O M co m r- 0 00 OOO In v � V C Mn co vlritDCOr M 0 0014 v N O In oD Ch N N N Cn r r r M M N T- 641 fo V) V) V3 Vi 64 eA M m 0 CO o v 0 r O N CD M N M m v v v r OW) O 0 O (0 O N co v N V v M CO M v r n (D n m O r 0 T W 0 (0 O r M M O N 0 p mvn N N MvtDTr O In 3ODtO M r N n O O tO O oo f` CO N n m m CIO .� 0 t0 N 0 N N N w 5 vi 6 to n C O N r• V! V) Vl fO (fl V! fO fO V% 64 60 0 C to N C CO C C c U)) U 7 c CC l6 r. C O w C U� .. Q� a c J y m N r w .� () Cn 00 L 4) 7 c U O N N } «. O j LO O 0 N N r C O coN L a E O V N O a O L a. Y O O ML W O 4- O 0 J cc .` U C 0 .N .0 d 0 v � C (p > N O O O d U � O cu U V 0 cm cc U O O O O m yU Z U V m x C rl- O O O O co Vi 0 U 0 W NZ- N O W cp U m_ v co qT Iq (.0 cD P- 01 0 Q CL L) O Z 0 O O O O O N O N O O V =Q 0 U a FO- _ ca U `O ca F 0 M t` to O tp Q a >0X W O O co v I- "' co ,r O— U &) � Qw III 0 co to O I- tNp� 0 020 M O O co O O O cM co 00 ti O o O co O M O N O O C L U N O w L Q cn m .. o U cn c O to 0 CD O +r � Q U O CD E cu Q Q x x cn cn O O E E O O > > O O x x w .� N N O J J } O to r 06 O .0 CD .0 UO fII U a� I I `- O0 u0> --0 O c)= c T-0 R L L- > cu 5ww� W2CL cA r� O m O CL C tm O N O w N Z 11 LO m O E O U (D a) F- N rn 0 J 11 ti m 0 0 U N N c O cu Z It O Q O U O co O 0 N 0 LL NO Q N N W U d P4 U) W _U > Z X 0 W ch U) Z Q LD a U) WO 0 U J J U U) z0 UO H a •1J� • � r AGENDA ITEM Regular Board of Trustees Meeting of December 13, 2005 SUBJECT: Follow -up - Waiver of Fees for Private Wells FROM: Robert L. Kallien, Jr., AICP, Community Development Director BUDGET SOURCE /BUDGET IMPACT: N/A RECOMMENDED MOTION: Please consider this information in your final deliberations on the ordinance amending the fee schedule in Chapter 4 of Title 10 Building Regulations. Background /History: At the November 22, 2005 Board meeting, Trustee Yusuf requested that consideration be given to waiving the required fee for anyone wanting to construct a private well to be used for irrigation purposes. To determine the impact that this would have, Staff was requested to look into the issue of private wells in Oak Brook. Staff contacted the Village Plumbing Inspector who has worked for the Village for approximately 20 years to see what history Oak Brook has with private wells. The Inspector indicated that several private wells do exist in Oak Brook. However, to his recollection, the Village has not processed a permit application for a new private well in last 15 years. He also indicated that the DuPage County Health Department must also approve any request for a private well and may also assess a separate fee. Recommendation: Since no recent permit requests for a private well have been filed with the Village, the specific permit fee for a new private well may not be necessary and can be eliminated from our fee ordinance. If any request for a new private well is submitted, they would only be assessed the Village's application fee and a plumbing inspection fee that are both designed to cover our Staff costs. Last saved by RKalhen \\ash \users \ComDev \GPOLANEK \1 -FROM BOB\Bot - PC - ZBA\BOT -Well Permits - Followup doc I act nrmtarl 17/0/7()(1; 1 01 PXA ll_ 6 /A