Loading...
R-1744 - 08/14/2018 - ENGINEERING - Resolutions Supporting DocumentsBOT AGENDA Page 1 BOARD OF TRUSTEES MEETING SAMUEL E. DEAN BOARD ROOM BUTLER GOVERNMENT CENTER 1200 OAK BROOK ROAD OAK BROOK, ILLINOIS 630-368-5000 AGENDA ITEM Regular Board of Trustees Meeting of August 14, 2018 SUBJECT: Award of Contract - 2018 Street Improvements FROM: Doug Patchin, Public Works Director BUDGET SOURCE/BUDGET IMPACT: $1,233,725 from account 461-90700, Street Improvements. RECOMMENDED MOTION: I move the Village Board award a contract to Burke LLC, Rosemont, Illinois, in the amount of $1,233,725, subject to final attorney review, for the Construction Management Contract for Designer-Led Design-Build of the 2018 Street Improvements, and approve Resolution R-1744. Background/History: We have postponed the annual road project while we contracted with Christopher B. Burke Engineering to conduct a complete evaluation of all village streets. The preliminary evaluation is completed and we are working to merge this report with the Water Master Plan. When evaluating the streets, it was determined that surface repairs were needed to Village streets that had premature pavement failure, these repairs will require grinding of the surface course and replacing the top 2-inches with a hot-mix asphalt. Some patches will require full depth repairs, up to 8-inch removal to repair the base. There are also two areas that will need reconstruction, Grant Street and the front driveway at Fire Station #93. The 2018 Street Improvements will include areas marked out in Brook Forest, Trinity Lakes, on Jorie Boulevard and Grant Street at Fire Station’s # 93 and #94, also repairs made to large utility excavations in the Oakbrook Center Mall and Brandywine Association. ITEM 6.D.6 BOT AGENDA Page 2 Below is the breakdown of fees associated with this contract. Base Professional Fees Remaining Design Fee $23,075 Construction Management $81,900 General Conditions (Insurance OH and Profit) $53,750 $158,725 Street Improvements Construction $1,075,000 Total Contract Price $1,233,725 Please be advised that the remaining balance, $107,976.06 of the CBBEL Professional Services Contract for design and construction management will be forfeited. This project will be paid through the Village’s Street Improvement fund. Recommendation: That the Village Board award a contract to Burke LLC, Rosemont, Illinois, in the amount of $1,233,725, subject to final attorney review, for the Construction Management Designer-Led Design-Build of the 2018 Street Improvements, and approve Resolution R-1744. RESOLUTION 2018-ENG-ST-PRJT-R-1744 A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE VILLAGE OF OAK BROOK AND BURKE, LLC FOR CONSTRUCTION ENGINEERING SERVICES RELATED TO THE 2018 STREET IMPROVEMENT WHEREAS, the Village of Oak Brook (the “Village”) has budgeted funds for construction engineering for the 2018 Street Improvement Project, which includes certain street and infrastructure improvements to Brook Forest, Trinity Lakes, Jorie Boulevard, Grant Street at Fire Stations #93 and #94, as well as repairs made to utility excavations in the Oakbrook Center Mall and Brandywine Association (collectively, the "Project"); and WHEREAS, the Village desires to retain an engineer to provide surface repairs to Village streets that have premature pavement failures ("Services"); and WHEREAS, BURKE, LLC ("Burke") previously provided satisfactory engineering services to the Village; and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act"), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, the Village and Burke desire to enter into and execute an agreement for Burke to provide the Services to the Village for an amount not to exceed $1,233,725 ("Agreement”), which Agreement is attached to this Resolution as Exhibit A; and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Burke in substantially the same form as attached as Exhibit A, and in a final form approved by the Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village Manager and Village Clerk shall be, and hereby are, authorized to execute the Agreement after receipt of the final Agreement fully executed by Burke. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2018-ENG-ST-PRJT-R-1744 Construction Engineering Services for 2018 Street Improvement Project 2 of 3 4850-3447-2047, v. 1 APPROVED THIS ______ day of _________, 2018. Gopal G. Lalmalani Village President PASSED THIS ______ day of _________, 2018. Ayes: Nays: Absent: ATTEST: Charlotte K. Pruss Village Clerk Resolution 2018-ENG-ST-PRJT-R-1744 Construction Engineering Services for 2018 Street Improvement Project 3 of 3 4850-3447-2047, v. 1 EXHIBIT A AGREEMENT REV=EW OF CONTRACTS Attprded contract Pttce:智ir把:町 ′ Under$20,000 ・ 920′000・ $500′000 岬 $500′001‐$1,6oo′o00 OVer$1,000′00o 盤ξ謂 Date:Σ ―ιす Three (3) Orlglnals slgned by other party Original provlded to staff member for other party Origlnal provlded to Offlclal Flles Date/1n:tials Date/1n:tiais Date/1nitials VillageofoakBrook|ApprovedbyBoardofTrUslee5.oate/iniiratt: