Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
s-1490 - 04/11/2017 - VARIATION - Ordinances
12.09.2016 2016052.000© 2016 Solomon Cordwell Buenz SITE PLAN 60'-0"30'-0"0' 2017-01-31 01.20.2017 2016052.000© 2017 Solomon Cordwell Buenz HUB GROUP PHASE II - SE AERIAL VIEW 2017-01-31 Q. 01.20.2017 2016052.000© 2017 Solomon Cordwell Buenz HUB GROUP PHASE II - WEST ELEVATION EXISTING HUB PHASE I PREFINISHED CORRUGATED METAL MECHANICAL SCREENWALL INSULATED SPANDREL GLAZING INSULATED VISION GLAZING ALUMINUM SLAB EDGE COVER PREFINISHED PERFORATED METAL SCREEN COMPOSITE METAL ENTRY CANOPY GLASS ENTRY VESTIBULE RECESSED LOADING DOCK / UTILITY AREA WELL ALUMINUM CURTAINWALL WITH INSULATED GLAZING INSULATED GLAZING / STEEL STRUCTURE AT PEDESTRIAN BRIDGE 2ND FLOOR 14'-0" 3RD FLOOR 28'-0" 4TH FLOOR 42'-0" ROOF 56'-0" T/O SCREENWALL 69'-8" WEST ELEVATION - OVERALL WEST ELEVATION - PHASE II NEW PEDESTRIAN BRIDGENEW PHASE II BUILDING WEST ELEVATION 2017 Solomon Cordwell Buenz ZONING BOARD OF APPEALS JANUARY 20, 2017 HUB GROUP - PHASE II OFFICE OAK BROOK, IL SCB #2016052 SCALE: 1" = SCALE: 1" =30'-0" 10'-0" 2017-01-31 01.20.2017 2016052.000© 2017 Solomon Cordwell Buenz HUB GROUP PHASE II - NORTH ELEVATION 2ND FLOOR 14'-0" 3RD FLOOR 28'-0" 4TH FLOOR 42'-0" ROOF 56'-0" T/O SCREENWALL 69'-8" INSULATED SPANDREL GLAZING INSULATED VISION GLAZING ALUMINUM SLAB EDGE COVER ALUMINUM CURTAINWALL WITH INSULATED GLAZING PREFINISHED CORRUGATED METAL MECHANICAL SCREENWALL PAINTED STEEL SHADING STRUCTURE COMPOSITE METAL ENTRY CANOPY AREA WELL RAILING SLOPED DOCK ENTRANCELOWER LEVEL LOADING / MECHANICAL NORTH ELEVATION SCALE: 1" = PREFINISHED PERFORATED METAL SCREEN WALKWAY / MECHANICAL ROOF METAL GRATING OVER LOADING 10'-0" 2017-01-31 01.20.2017 2016052.000© 2017 Solomon Cordwell Buenz HUB GROUP PHASE II - EAST ELEVATION NEW PHASE II BUILDING 2017 Solomon Cordwell Buenz ZONING BOARD OF APPEALS JANUARY 20, 2017 HUB GROUP - PHASE II OFFICE OAK BROOK, IL SCB #2016052 EAST ELEVATION NEW PEDESTRIAN BRIDGEEXISTING PHASE I BUILDING PREFINISHED CORRUGATED METAL MECHANICAL SCREENWALL INSULATED SPANDREL GLAZING INSULATED VISION GLAZING ALUMINUM SLAB EDGE COVER PREFINISHED PERFORATED METAL SCREEN ALUMINUM CURTAINWALL WITH INSULATED GLAZING INSULATED GLAZING / STEEL STRUCTURE AT PEDESTRIAN BRIDGE 2ND FLOOR 14'-0" 3RD FLOOR 28'-0" 4TH FLOOR 42'-0" ROOF 56'-0" T/O SCREENWALL 69'-8" PAINTED STEEL SUPPORT STRUCTURE AREA WELL RAILING PAINTED STEEL SHADING STRUCTURE EAST ELEVATION - OVERALL EAST ELEVATION - PHASE II SCALE: 1" = SCALE: 1" = 10'-0" 30'-0" 2017-01-31 01.20.2017 2016052.000© 2017 Solomon Cordwell Buenz HUB GROUP PHASE II - SOUTH ELEVATION2017 Solomon Cordwell Buenz ZONING BOARD OF APPEALS JANUARY 20, 2017 HUB GROUP - PHASE II OFFICE OAK BROOK, IL SCB #2016052 SOUTH ELEVATION 2ND FLOOR 14'-0" 3RD FLOOR 28'-0" 4TH FLOOR 42'-0" ROOF 56'-0" T/O SCREENWALL 69'-8" INSULATED SPANDREL GLAZING INSULATED VISION GLAZING ALUMINUM SLAB EDGE COVER ALUMINUM CURTAINWALL WITH INSULATED GLAZING PREFINISHED CORRUGATED METAL MECHANICAL SCREENWALL COMPOSITE METAL ENTRY CANOPY BEYOND PEDESTRIAN BRIDGE SHOWN IN SECTION PAINTED STEEL SHADING STRUCTURE SOUTH ELEVATION SCALE: 1" =10'-0" 2017-01-31