Loading...
Wetland/Environmental Review Consulting Srvs. Agreement - ERA ENGINEERING SERVICES AGREEMENT VILLAGE OF OAK BROOK WETLAND/ENVIRONMENTAL REVIEW THIS AGREEMENT,made and entered into this day ofnL-+6 2019, by and between Engineering Resource Associates(hereinafter referred to as"ENGINEER")and the Village of Oak Brook, a municipal corporation(hereinafter referred to as"VILLAGE")covers certain professional engineering services in connection with the Wetland/Environmental Review, (hereinafter referred to as "PROJECT"). The VILLAGE wishes to retain ENGINEER for these certain professional engineering services and ENGINEER is willing to perform such services for the compensation and in accordance with the terms and conditions described in this Agreement. NOW, THEREFORE, in consideration of the mutual benefits, covenants and agreements contained within this Agreement, the parties agree as follows: 1. SCOPE OF SERVICES ENGINEER agrees to perform engineering consulting services as defined in the Scope of Services attached as Appendix I and made a part of this Agreement. 2. COMPENSATION AND PAYMENT ENGINEER shall be paid by VILLAGE for all services stipulated within this Agreement according to the Compensation Schedule attached as Appendix II and made a part of this Agreement. Payment to ENGINEER shall be made by VILLAGE upon receipt of ENGINEER'S monthly invoice. The invoice shall consist of a summary of direct labor hours by ENGINEER'S standard job classification times the respective factors as depicted in Appendix II plus listing of reimbursable costs incurred with copies of appropriate invoices. The invoice will state the phase of work for which it applies,if a multi-phase scope is used (e.g., design, construction, etc.). If VILLAGE identifies an item in the invoice which appears to be in error,VILLAGE may withhold the amount in question,pay the balance of the invoiced amount, and provide ENGINEER with a statement concerning the questioned item. Alternatively, VILLAGE may pay the invoiced amount in full,provide ENGINEER with a statement of the questioned item, and an adjustment, if appropriate,will be made in the next subsequent invoice submitted by ENGINEER. Engineer will mark"Invoice number and final"on the invoice which closes out this contract or a phase of the contract. If VILLAGE fails to make any payment due ENGINEER for services and expenses, including amounts wrongly withheld, within thirty (30) days after submittal of ENGINEER'S billing thereof, the amounts due ENGINEER shall include a charge at the Page 1 rate of one percent (1.0) per month from such thirtieth (30th) day; and, in addition, the ENGINEER may,after giving seven(7)days written notice to VILLAGE,suspend services under this Agreement until it has been paid in full the amounts due it for services and expenses. During the period of any such suspension, the parties shall have the same rights and obligations as are provided by Subsection 5(e) of this Agreement. 3. TIME SCHEDULE The services required by this Agreement shall be completed in accordance with the Time Schedule attached as Appendix III and made a part of this Agreement. It is recognized by the parties that the Time Schedule may be contingent upon factors beyond the control of either party. Both parties will take all reasonable steps to adhere to the Time Schedule. 4. TERM OF AGREEMENT Unless extended by amendment, this Agreement shall terminate at the time of receipt of final payment by the ENGINEER, provided that all warranties and representations shall survive said final payment. 5. GENERAL TERMS AND CONDITIONS a. Modification The nature and the scope of services specified in this Agreement may only be modified by written amendment to this Agreement approved by both parties. b. Relationship between ENGINEER and VILLAGE ENGINEER shall serve as VILLAGE'S professional engineering consultant in those phases of the PROJECT to which this Agreement applies. The relationship is that of a buyer and seller of professional services, and it is understood that the parties have not entered into any joint venture or partnership with the other. C. Responsibility of the ENGINEER That all plans and other documents furnished by the ENGINEER pursuant to this Agreement will be endorsed by him and will show his professional seal where such is required by law. Notwithstanding anything to the contrary which may be contained in this Agreement or any other material incorporated herein by reference, or in any agreement between VILLAGE and any other party concerning the PROJECT, ENGINEER shall not have control or be in charge of and shall not be responsible for the means,methods,techniques, sequences or procedures of construction,or the safety, safety precautions or programs of VILLAGE, the construction contractor, other contractors or subcontractors performing any of the work or providing any of the services on the PROJECT, nor shall ENGINEER be responsible for the acts or omissions of VILLAGE provided that the ENGINEER has properly executed his Page 2 #11850987_vl duties. ENGINEER shall not be responsible for the failure of VILLAGE, any architect, engineer, consultant, contractor or subcontractor to carry out their respective responsibilities in accordance with the PROJECT documents, or any other agreement concerning the PROJECT.Any provision which purports to amend this provision shall be without effect unless it contains a reference that the content of this Subsection 5(c) is expressly amended for the purposes described in such amendment and is signed by ENGINEER. d. Corrections In the event plans, surveys or construction staking is found to be in error and revisions of the plans or survey or construction staking are necessary, the ENGINEER agrees that he will perform such work without expense to the VILLAGE, even though final payment has been received by him. He shall give immediate attention to these changes so there will be a minimum delay to the contractor. e. Suspension of Services VILLAGE may, at any time, by written order to ENGINEER (Suspension of Services Order),require ENGINEER to stop all,or any part of,the services required by this Agreement. Upon receipt of such an order, ENGINEER shall immediately comply with its terms and take all reasonable steps to minimize the occurrence of costs allocable to the services covered by the order. ENGINEER will not be obligated to provide the same personnel employed prior to suspension when the services are resumed,in the event the period of any suspension exceeds thirty(30) days. £ Termination 1) The VILLAGE shall have the right to terminate this Agreement with or without cause upon serving thirty (30) days written notice upon the other party. 2) Upon such termination, the liabilities of the parties to this Agreement shall cease,but they shall not be relieved of the duty to perform their obligations up to the date of termination. All warranties and the provisions of Section 5, Paragraph I shall be in full force and effect after termination. Upon such termination, ENGINEER shall cause to be delivered to the VILLAGE all drawings, specifications, partial and completed estimates, and any and all other data concerning the PROJECT which ENGINEER is then accomplishing for the VILLAGE. ENGINEER shall be paid for any services completed and any services partially completed in accordance with Sections 2 and 3. Page 3 #11850987_v1 g. Warranties In addition to the covenants herein made, the ENGINEER represents and certifies that its engineering services shall be performed in accordance with the standards of professional practice,care, and diligence practiced by recognized engineering firms in the industry in performing services of a similar nature in existence at the time of performance. The representations and certifications expressed shall be in addition to any other representations and certifications expressed in this Agreement, or expressed or implied by law, which are hereby reserved unto the VILLAGE. h. Representations In addition to the covenants herein made, the ENGINEER represents and agrees: 1) That all plans and special provisions to be furnished by the ENGINEER pursuant to this Agreement will be in accordance with the current standard specifications and policies of the VILLAGE, it being understood that all such plans and drafts shall, before being finally accepted, be subject to approval by the VILLAGE. 2) That he has not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEER, to solicit or secure this Agreement, and that he has not paid or agreed to pay any company or person,other than a bona fide employee working solely for the ENGINEER, any fee, commission, percentage, brokerage fee, gifts, or any other consideration,contingent upon or resulting from the award or making of the Agreement. For breach or violation of this warranty, the VILLAGE shall have the right to annul this Agreement without liability, or in its discretion to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such fee, commission,percentage,brokerage fee, gift, or contingent fee. 3) The ENGINEER represents and certifies that the ENGINEER is not barred from contracting with a unit of state or local government as a result of (1) a delinquency in the payment of any tax administered by the Illinois Department of Revenue, unless the ENGINEER is contesting, in accordance with the procedures established by the appropriate revenue act, its liability for the tax or the amount of the tax, as set forth in Section 11- 42.1-1 et seq. of the Illinois Municipal Code, 65 ILCS 5/11-42.1-1 et seq.; or (2) a violation of either Section 33E-3 or Section 33E-4 of Article 33E of the Criminal Code of 1961, 720 ILCS 5/33E-1 et seq. ENGINEER represents that the only persons, firms, or corporations interested in this Agreement as principals are those disclosed to the VILLAGE prior to the execution of this Agreement, and that this Agreement is made without collusion with any other person, firm, or corporation. If at any time it shall be found that the ENGINEER has, in procuring this Agreement, colluded with any other person, firm, or corporation, then the ENGINEER shall be Page 4 #11850987_vl liable to the Village for all loss or damage that the VILLAGE may suffer, and this Agreement shall, at the VILLAGE's option,be null and void. 4) That he is qualified technically and is conversant with the policies applicable to the PROJECT; and that he has and will furnish sufficient, properly trained and experienced personnel to perform the services enumerated herein. 5) That he will not employ, for the duration of this Agreement, any person presently employed by the VILLAGE without the written consent of the VILLAGE. 6) ENGINEER represents and certifies that, to the best of its knowledge: (1) no elected or appointed VILLAGE official, employee or agent has a personal financial interest in the business of ENGINEER or in this Agreement, or has personally received payment or other consideration for this Agreement; (2) as of the date of this Agreement, neither ENGINEER nor any person employed or associated with ENGINEER has any interest that would conflict in any manner or degree with the performance of the obligations under this Agreement; and (3) neither ENGINEER nor any person employed by or associated with ENGINEER shall at any time during the term of this Agreement obtain or acquire any interest that would conflict in any manner or degree with the performance of the obligations under this Agreement. i. Documents Property of VILLAGE Drawings, specifications, reports, and any other documents prepared by ENGINEER in connection with any or all of the services furnished hereunder shall be the property of VILLAGE and the VILLAGE shall obtain any and all intellectual property rights in the drawings, specifications,reports, and documents prepared by ENGINEER in connection with any and all of the services furnished hereunder. ENGINEER shall have the right to retain copies of all documents and drawings for its files. All construction drawings shall be prepared electronically using MICROSTATION software. Paper copies will be provided to the VILLAGE in full-size(24"x 36")or quarter-size(11"x 17")as requested. Electronic design files will also be transferred to the VILLAGE. If construction services are a part of the ENGINEER'S work, he will create electronic "As-Built" conditions and will deliver them to the VILLAGE within thirty (30) days after completion of construction and before final payment to the ENGINEER. ENGINEER will title these files "Record Drawings". If construction services are not part of the ENGINEER'S work, he will deliver electronic MICROSTATION files to the VILLAGE upon request and before final payment to the ENGINEER. Page 5 #11850987_vl j. Access to Records The ENGINEER shall maintain all books, documents, papers, accounting records and other evidence pertaining to his costs incurred by reason of this Agreement and agrees to make such material available, at his office at the address indicated in Section 5, Paragraph u of this Agreement, at all reasonable times during the life of this Agreement and for a period of three(3)years from the date of final payment of the obligations of this Agreement by the VILLAGE or such longer time as requested by the VILLAGE, for inspection by personnel of the VILLAGE, or any authorized representative of the VILLAGE, and copies thereof shall be furnished if requested. The cost of any copies shall be paid by the VILLAGE. k. Reuse of Documents All documents, including drawings and specifications furnished by ENGINEER pursuant to this Agreement, are intended for use on the PROJECT only. They should not be used or modified by VILLAGE or others on extensions of the PROJECT or any other project without specific written verification or adaptation by ENGINEER. Any reuse or modification without written verification or adaptation by ENGINEER shall be at VILLAGE'S sole risk. 1. Indemnification ENGINEER agrees to indemnify,hold harmless, and defend(or pay the VILLAGE for the costs of defense if the Village so desires in its sole discretion)the VILLAGE and any of its officers, employees, or agents from and against all liability, claims, demands, and causes of action arising out of or related to any loss,damage, injury, death, or loss or damage to property resulting from any negligence, errors or omissions by the ENGINEER in the performance of this Agreement. In the event of joint or concurrent negligence of ENGINEER and VILLAGE, each shall bear that portion of the loss or expense that its share of the joint or concurrent negligence bears to the total negligence (including that of third parties) which caused the personal injury or property damage. M. Entire Agreement This Agreement sets forth all the covenants, conditions and promises between the parties. There are no covenants, promises, agreements, conditions or understandings between the parties, either oral or written, other than those contained in this Agreement. n. Governing Law This Agreement shall be governed by the laws of the State of Illinois both as to interpretation and performance. Page 6 #11850987_vl o. Successors and Assigns The terms of this Agreement shall be binding upon and inure to the benefit of the parties and their respective successors and assigns;provided,however,that neither party shall assign this Agreement in whole or in part without the proper written approval of the other. p. Waiver of Contract Breach The waiver of one party of any breach of this Agreement or the failure of one party to enforce at any time, or for any period of time, any of the provisions hereof, shall be limited to the particular instance, shall not operate or be deemed to waive any future breaches of this Agreement, and shall not be construed to be a waiver of any provision, except for the particular instance. q. Severability of Invalid Provisions If any provisions of this Agreement shall be held to contravene or be invalid under the laws of any particular State, County or jurisdiction where used, such contravention shall not invalidate the entire Agreement,but it shall be construed as if not containing the particular provision or provisions held to be invalid in the particular State, County or jurisdiction and the rights or obligations of the parties hereto shall be construed and enforced accordingly. r. Force Majeure Neither VILLAGE nor ENGINEER shall be liable for any fault or delay caused by any contingency beyond their control, including, but not limited to, acts of God, wars, strikes,walkouts, fires, or natural calamities. S. Access and Permits VILLAGE shall arrange for ENGINEER to enter upon public and private property and shall obtain all necessary approvals and permits required from all governmental authorities having jurisdiction over the PROJECT. t. Designation of Authorized Representatives Each party shall designate one or more persons to act with authority in its behalf in respect to appropriate aspects of the PROJECT. The persons designated shall review and respond promptly to all communications received from the other party. U. Address for Notices Whenever it is provided in this Agreement that notice shall be given or other communication sent to ENGINEER, such notices or communications shall be delivered or sent to: Page 7 #11850987 vl Engineering Resource Associates 35701 West Avenue Suite 150 Warrenville, Illinois 60555 Attn: John F. Mayer, PE, CFM Vice President Whenever it is provided in this Agreement that notice shall be given or other communication sent to the VILLAGE, such notices or communications shall be delivered or sent to: VILLAGE OF OAK BROOK 1200 Oak Brook Road Oak Brook, Illinois 60523 Attn: Doug Patchin Director of Public Works Notices personally delivered or sent via U.S. Mail, postage prepaid, shall be deemed, for all purposes, proper notice. V. Insurance ENGINEER agrees to obtain and maintain, for the term of this Agreement, and for a period of twelve(12)months after the services contracted for hereunder have been completed,insurance hereinafter provided, furnishing a certificate or certificates of insurance to the VILLAGE prior to commencing work under this Agreement. The certificate or certificates of insurance shall be in a form satisfactory to the VILLAGE from companies authorized to do business in Illinois and shall provide that the policies referred to shall not be canceled or changed without first giving thirty (30) days written notice thereof to the VILLAGE. Said insurance requirements are attached as Appendix IV and made a part of this Agreement ("REQUIRED INSURANCE POLICIES"). The VILLAGE shall be named as an additional insured and a cancellation notice recipient on all Required Insurance Policies. W. Additional Services ENGINEER shall supply such additional services as requested in writing by VILLAGE and agreed to by ENGINEER in connection with the PROJECT. Separate proposals shall be submitted by ENGINEER for furnishing these additional services. Compensation for such additional services shall be negotiated by the parties and included in this Agreement by a written amendment. ENGINEER shall supply such additional services as requested in writing by VILLAGE and agreed to by ENGINEER in connection with the PROJECT. Separate proposals shall be submitted by ENGINEER for furnishing these Page 8 #11850987 vl additional services.Compensation for such additional services shall be negotiated by the parties and included in this Agreement by a written amendment. X. Time Time is of the essence in the performance of all terms and provisions of this Agreement. Y. Third Party Beneficiary No claim as a third party beneficiary under this Agreement by any person,firm,or corporation shall be made or be valid against the Village. Z. Conflicts If any provisions of this Agreement conflict with any provisions of the attached appendices I through IV,the provisions of this Agreement shall control. IN WITNESS WHEREOF, the parties set their hands and seals on the date first written above. VILLAGE OF OAK BROOK ATTEST: A Municipal Corporatio Ofc Village Manager Village Clerk ENGINEERING RESOURCE ATTEST: ASSOCIATES � my Au oriz O cer Page 9 R11850987_v) APPENDIX 1 SCOPE OF SERVICES Per Proposal for Professional Services submitted by Engineering Resource Associates hereto attached Page 10 #11850987_vl APPENDIX II COMPENSATION SCHEDULE Per Proposal for Professional Services submitted by Engineering Resource Associates hereto attached Page 11 #11850987_vl APPENDIX III TIME SCHEDULE Per Proposal for Professional Services submitted by Engineering Resource Associates hereto attached Page 12 411850987_vl Hello Doug, Attached please find our company and staff information for providing wetland/environmental review services. The following hourly rates would apply to the staff anticipated for this assignment: Erin Pande, Director of Ecological Services $140/hr Andrew Kustusch, Environmental Engineer $12S/hr Bradley Earnest, Environmental Specialist $ 80/hr Should you have any questions, please contact me. John John F. Mayer, PE, CFM Vice President 3s701 West Avenue, Suite 150 Warrenville, IL 60555 (630)393-3060 x1043 office(630)918-7721 mobile ENGINEERING www.eraconsultants.com arsa:PU ASSMIAIrs xv' f i ENGINEERING A. � , n RESOURCE ASSOCIATES Engineering Resource Associates, Inc. (ERA) is a consulting firm } providing civil engineering, structural engineering, environmental science and surveying services to clients throughout Illinois,Indiana and Wisconsin. Our diverse clientele includes private development, municipalities, park districts, forest preserves, sanitary districts, county agencies and state agencies. ERA has over 29 years of experience identifying and working with a wide variety of local,state and federal funding sources. Our staff of 42 professionals includes licensed engineers, structural engineers, surveyors, environmental ----------------------- scientists, certified floodplain managers and CAD/GIS specialists. Our firm specializes in providing comprehensive services throughout the planning, design and construction phases of engineering and environmental assignments.The following is a partial listing of the primary types of projects that have been successfully completed by our firm. • Environmental Projects-Design and Rehabilitation of Wetland Facilities,Stream Bank Stabilization, Best Management Practices and Natural Area Restoration,Wetland Reviews - • Water Resource Projects-Hydraulics/Hydrology Analysis, Once L ocatilons Master Plans,Watershed Studies,Ordinance/Guidance Wanenv lle(00 r office Manuals,Storm/Sanitary Modeling, Floodplain Mapping, 3sYO1 West Avenue,Suite 150 Stream Restoration, Levee Certification and CRS Services Werrenville,IL 60555 • Transportation Projects-Design and Rehabilitation of Phone:(630)393-3060 Roadways, Intersections, Utility Relocation/Designs, Permitting, Chicago Traffic Signals, Lighting,Streetscape,and Parking Facilities 10 S.Riverside Plaza Suite 875 • Infrastructure Projects-Design and Rehabilitation of Sanitary Chicago,IL 60606 Sewers,Storm Sewers,Water Mains and Pumping Stations Phone:(312)474-7841 • Surveying and Mapping Projects-Topographic Surveys, Champaign Boundary,Surveys and GIS Services 2416 Galen Drive Champaign, IL 61821 • Construction Projects-Construction Management, Phone:(217)351-6268 Bidding Assistance, Construction Layout, Observation, IDOT ERA FEIN#36-3686466 Documentation and Construction Administration • Structural Projects-Design and Rehabilitation of Highway Primary Contact Bridges, Culverts, Retaining Walls, Dams, Levees and Buildings Erin Pande,PWS,CFM • Recreational Projects-Riverwalks, Golf Courses, Regional Project Manager Trails/Paths,Community Parks, Dog Parks,and Sledding Hills 3s701 West Avenue,Suite 150 Warrenville, IL 60555 • Site Development-Design and Rehabilitation of Municipal Phone:(630)393-3060 Facilities, Education, Healthcare, Commercial and Residential Fax:(630)393-2152 Email:epandeCeraconsuttants.com Warrenvilie I Chicago I Champaign I ENGINEERING RESOURCE ASSOCIATES ERA provides wetland review services for various DuPage County W municipalities. Below are examples of some of the ERA projects. Village of Burr Ridge Wetland Reviews ERA provides Burr Ridge(a dual countycommunity)review services for projects to enforce the standards of the DuPage County Countywide Stormwater and Flood Plain Ordinance and Cook County Watershed Management Ordinance with regard to wetlands, riparian areas and BMP's and permit process with federal and state agencies involved in wetland permitting. ERA meets with landowners, design consultants and contractors to coordinate wetland verifications and permit review/inspection process. Client Contact: David Preissig, PE, Director of Public Works/ Village Engineer, (630)323-4733 x452 McHenry County Stormwater and Subdivision Review Consultant ERA was responsible for the expedited reviews of permit applications for compliance with the McHenry County Stormwater Management Ordinance and other relevant Federal,State,and local laws and ordinances in situations - -- -- where applicants are willing to pay directly for such reviews. We were also r--- responsible for performing supplementary reviews of permit applications for compliance with the McHenry County Stormwater Management Ordinance and other relevant Federal,State,and local laws and ordinances. Client Contact:Joanna Colletti,Water Resources Manager, (815) 334-4560 DuPage County Stormwater Permit Reviews and Audits Since 1995, ERA has served as the primary consultant providing review services for the conformance of permit submittals with the requirementsrrn td� of the DuPage County Stormwater and Flood Plain Ordinance. Over the I r course of our review contract, ERA has completed thousands of site reviews. 06 Our broad experience with several stormwater modeling and analysis � � ' programs has helped to expedite reviews. Our scope of services has been N"I" PC A expanded several times to also incorporate community audit reviews, 9 facilitating pre-application meetings, general public assistance, and comprehensive review of all aspects of development and municipal projects. Ba ; � YfF�t� t Client Contact:Clayton Heffter,Stormwater Permitting Manager (630)407-6729 i5yZIO ikl Village of Bensenville Review Consultants e<liehaiktq,PE,Ci~M ERA provides stormwater,flood pla in,wetland and B M P review services for the prd ; plter Village of Bensenville on an as-requested basis. ERA provided professional assistance to the Village to explain how 2012 revisions to the Countywide blichal ll+ skl^PE,CIFM Ordinance impact new developments. ERA has recently been tasked with r performing an internal audit of 12 old and open permits from 2001-2008. ArtdrewKustusch.PC,CFM- This task entailed wetland inspection and reports and identification of critical Etinonrrlpntrit mer permitting tasks that were never completed by bankrupt developments. Adrienne Stockhausen,PE Client Contact: Mehul Patel, PE,Assistant Director of Public Works Staff Itngin (630) 594-1196 Warrenviile Chicago Champaign a ENGINEERING l turii�"ip I L6�i�i 6 tL RESOURCE ASSOCIATES City of Elgin Reviews 2013 ERA provides review assistance and advises the City in storm water and engineering matters including:soil erosion and sedimentation control,storm water runoff,tree surveys,water quality,flood plain,wetlands,storm sewers, open channels, and all generally accepted engineering improvements. ERA's work includes general review of the preliminary and final plans, plats, storm water submittals and supporting documents. Additionally, ERA will represent the City relative to property conveyance, homeowners associations, conditions and restrictions, operation manuals, maintenance responsibilities for the public or quasi-public infrastructure improvement. Client Contact: Ron Rudd, City Engineer II, (847)931-6081 City of Warrenville Wetland&BMP Review Consultants ERA provides review services for projects to enforce the standards of the DuPage County Countywide Stormwater and Flood Plain Ordinance with regard to wetlands, riparian areas and BMP's and permit process with federal and state agencies involved in wetland permitting. ERA meets with fi landowners, design consultants and contractors to coordinate the permit review/inspection process. , Client Contact: Kristine Hocking,Senior Civil Engineer, (630)836-3066 Village of Carol Stream Review Services ERA provides stormwater,floodplain, wetland and BMP review services for the Village of Carol Stream on an as-requested basis. Carol Stream strives to provide outstanding customer service and asks their consultants to work with the applicant. ERA guides applicants through the permit process to great satisfaction of the Village. Client Contact: Bill Cleveland,Assistant Village Engineer, (630)871-6220 City of Wheaton BMP Review Consultants ERA provides Best Management Practice review services for the city on an as-requested basis. Reviews have included businesses and single family residential developments where BMPs are required. Client Contact: Joe Tebrugge PE, Development Engineer, (630) 260-2868 City of Batavia Permit Reviews Many new developments within the City of Batavia are required to have detention with a retention component or best management practice, such 1� as rain gardens or bioswales per the Kane County Stormwater Ordinance. In order to ensure these components are functioning as intended after installation they need to be reviewed and inspected. In order to meet the Ordinance requirements ERA performs the following services for the City of Batavia: permit reviews, inspections during construction and after completion,and annual vegetation monitoring inspections and reporting to determine permit compliance in order to obtain signoff and closeout project permits. Client Contact:Andrea Podraza, Civil Engineer, (630)454-2757 Warrenville Chicago I Champaign P' ENGINEERING Mtll I: iitn ; fiL' RESOURCE ASSOCIATES City of Elmhurst Reviews and Audits ERA provides the City an ERA Engineer for one or two days a week to complete development reviews. ERA uses city maps and software in City offices,to serve as an extension to their staff. ERA generates Stormwater and Public Works comments for applicants to comply with the County and City codes. Reviews with wetland, buffer or riparian elements are forwarded to the Environmental Department in our Warrenville Office. Client Contact: Kent Johnson, City Engineer, (630) 530-3024 Village of Lisle Interim Stormwater Engineering/Administrative . Services ; e ERA is acting as the Interim Stormwater Engineer for the Village of Lisle. Tasks include in-house stormwater reviews, and professional opinions as they relate to the regulation of wetlands and buffers, CRS program administration, NPDES Phase II Program Administration and regulatory agency coordination. Shauna Urlacher, PE, CFM, CPESC was selected to be the main point of contact for the Village. Shauna is supported by Molly Garrow for daily stormwater administration, Erin Pande for wetland and buffer related tasks, Andrew Kustusch for NPDES Phase II task and other water resources staff on an as-needed basis. Client Contact: Michael R.Smetana,AICP, Development Services Director (630) 271-4153 City of Elmhurst Reviews and Audits ERA provides the City an ERA Engineer for one or two days a week to i complete development reviews. ERA uses city maps and software in City offices,to serve as an extension to their staff. ERA generates Stormwater and Public Works comments for applicants to comply with the County and City codes.Reviews with wetland,buffer or riparian elements are forwarded to the Environmental Department in our Warrenville Office. Client Contact: Kent Johnson, City Engineer, (630) 530-3024 City of Naperville Permit Reviews ERA provides site development review services for the city on an as-requested basis. Reviews have included a bankrupt commercial development and all aspects of a high-profile riverwalk development. Client Contact: William Novack, PE, City Engineer, (630) 420-6704 Village of Glen Ellyn Drainage and Review Consultants ERA provided site plan review services from 1998-2012 for development projects in the Village of Glen Ellyn. In 2005, ERA's scope was expanded to include review of all residential, commercial, industrial and institutional site development projects. This includes review of both preliminary site plans and final site plans.As part of the final site plan review,site inspections were completed to ensure compliance with the approved site plan. Client Contact: Staci Hulsberg, Director of Planning and Development (630)547-5240 Warrenville I Chicago I Champaign ENGINEERING RESOURCE ASSOCIATES _. Project Team Effectiveness ";roiec�tman�ager Erin Pande, PWS, CFM, will serve as the Project Manager/ Environmental Services J Environmental Lead: Lead forthis project.She has over 18 years of experience in wetland review services. Erin Pande, PWS, CFM Erin meets is a Lake County Certified Wetland Specialist. Erin will be the primary contact with City staff. Erin will perform all wetland verifications and be present at any other meetings as requested. She will complete the final review of all permit submittals and finalize comment letters prepared by her staff. In the event that the development is complex with large impacts, Erin will be the sole reviewer. Erin will provide written approval for all submittals complying with the Watershed Development Ordinance. Environmental Engineer: Andrew Kustusch, PE, CFM, will serve as an Environmental Engineer for this Andrew Kustusch, PE, assignment. He has over 7 years of experience working on wetland and buffer CFM related projects. He will review projects with minor wetland or buffer impacts.He will review: wetland delineation reports; high-quality aquatic resource determinations; direct/indirect impacts; alternatives analysis's; and mitigation, planting, maintenance and monitoring plans. Andrew is well versed in stormwater modeling programs and will review projects to determine if indirect impacts are proposed. He will draft comment letters and provide them to Erin for her final review. Wetland Scientist Bradley Earnest will serve as a wetland scientist for this assignment. Bradley Bradley Earnest performs wetland delineations throughout northeastern Illinois and prepares delineations reports, permit submittal documents and planting maintenance and monitoring plans. As Wetland Scientist he will perform the initial review of development projects with wetlands on-site with no impacts proposed and minor buffer impacts. He will review: wetland delineation reports; standard or high-quality wetland determinations; buffer impacts; and buffer/riparian mitigation, planting, maintenance and monitoring plans. He will draft comment letters and provide them to Erin for her final review. He will also review monitoring reports and make recommendations to bring sites into compliance with performance criteria. Bradley has previous experience performing field maintenance and is well versed in invasive species treatment methods. He will draft monitoring letters and provide them to Erin for her final review. 0 ") V1larrerl+7Coh�ca4go � CF�ampa gn' Erin Pande, RW , CFM ENGINEERING Ecological Services Director RESOURCE ASSOCIATES Project Experience: Professional Wetland/Environmental Consulting Services,Batavia, IL- Ecological Services Director for new developments within the City of Batavia which require detention with a retention component or best management practice, such as rain gardens or bioswales per the Kane County Stormwater Ordinance. Erin helped perform permit reviews, inspections during construction and after completion, and annual vegetation monitoring inspections and reporting to determine > permit compliance in order to obtain signoff and closeout project permits. McHenry County Wetland Reviews - Reviewed projects and enforces the wetland and buffer requirements of the McHenry County Watershed Development Ordinance. Erin coordinated with applicants and design engineers to expedite permits involving wetlands and t et.a ln�coonI . buffers in a timely manner. 1300hetarofAtrtsMajoi=Woo, Stormwater and Review Consulting Services, Elgin, IL - Ecological EnvhbrimentakaEtudies&Geology Services Director that was retained by the City of Elgin to provide AuPWaris College-2001 review assistance a nd advise the City on matters involving Stormwater, ProfessionatWetland`Scientist permitting, soil erosion/sedimentation control, storm water runoff, #1927 tree surveys,water quality,flood plain, wetlands,open channels,and Certified Floodplain Manager= all generally accepted improvements. IC14-00661 Bensenville Review Consultant,Bensenville,IL-Ecologica l Services • Lake County&- ormwater Mgtnt• Director provided stormwater,floodplain,wetland,buffer,riparian and Comm,Certified We nd BMP review services for the Village of Bensenville on an as-requested iaft"C- 83 basis. She also assisted on the team that performed an internal Kane County Stormwater Mgmt. audit of 12 old and open permits from 2001-2008.This task entailed Quaff Wind Review wetland inspection and reports and identification of critical permitting Specialist W-049 tasks that were never completed by bankrupt developments. McHenry County Certified Wetland Specialist Plan Review Services, Warrenville, IL - Erin reviewed Special Institute for Wetland&Env. Management Area stormwater permit submittals for conformance Education&Research Corps Wetland with the wetland, wetland buffer, and riparian area requirements of Delineation Manual,09/2001 the DuPage County Stormwater and Flood Plain Ordinance. Rosgen level I:Applied Fluvial Downers Grove Permit Reviews - Reviewed Special Management Geomorphology Area stormwater permit submittals for conformance with the wetland, professional Experience: wetland buffer, riparian area and BMP provisions of the DuPage Engineering Resource Associates County Stormwater and Flood Plain Ordinance. Ecological Services Director/ Glen Ellyn Permit Reviews - Ecological Services Director reviewed Environmental Specialist development projects for the Village of Glen Ellyn,including residential, (2004-Present) institutional and commercial developments. Reviews included site • DuPage County Stormwater visits pre- and post-construction for compliance with Village and County Ordinances. Management Division Carol Stream Permit Reviews - Reviewed Special Management Senior Environmental Technician(2001-2004)Area stormwater permit submittals for conformance with the wetland, wetland buffer, riparian area and BMP provisions of the DuPage Years of Experience: County Stormwater and Flood Plain Ordinance. 18 years,15 with ERA Warrenville I Chicago I Champaign Andrew Kustusch, PE, CFM ENGINEERING Review Engineer RESOURCE ASSOCIATES Project Experience: «� Professional Wetland/Environmental Consulting Services, Batavia, IL - Environmental Engineer for new developments within the City of Batavia which require detention with a retention component or best management practice,such as rain gardens or bioswales per the Kane County Stormwater Ordinance. Drew helped perform permit reviews, inspections during construction and after completion, and annual vegetation monitoring inspections and reporting to determine permit . .t compliance in order to obtain signoff and closeout project permits. Bensenville Review Consultant, Bensenville, IL- Environmental Engineer that provided stormwater, floodplain, wetland, buffer, riparian and BMP review services for the Village of Bensenville on an as-requested basis. He also assisted on the team that performed an internal audit of 12 old and open permits from 2001-2008. This task entailed wetland inspection and reports and identification of critical permitting tasks that were never completed by bankrupt developments. llurt1911/GerflfiCa#lun;l • Master of Science Downers Grove Permit Reviews - Reviewed Special Management Env ronmentat Engineering Area stormwater permit submittals for conformance with the wetland, University of California wetland buffer,riparian area and BMP provisions of the DuPage County Berkeley-2012 Stormwater and Flood Plain Ordinance. Bachelor of Science Civil and Carol Stream Permit Reviews - Reviewed Special Management Environmental Engineering Area stormwater permit submittals for conformance with the wetland, University of Illinois-2011 wetland buffer,riparian area and BMP provisions of the DuPage County PE-ILOSZ4016i78ri8-2015 Stormwater and Flood Plain Ordinance. EI=IL-06tO36000 011 Warrenville Permit Reviews - Reviewed Special Management Area September odpl • Certified Floodplain Manger. stormwater permit submittals for conformance with the wetland, IL14-00657 wetland buffer, and riparian area requirements of the DuPage County Stormwater and Flood Plain Ordinance. Professional Training: FHWA-NHI-NEPACourse 2017 Stormwater Management Ordinance Comprehensive Review 0 IDOT Traffic Noise Course-2018 and Revision, Kane County Division of Environmental and Water . FHWA-NH1-HWYTraffic Noise Resource, IL - Environmental Engineer for the review, revisions and Course-201€3 adoption of the Kane County Stormwater Management Ordinance and . Wetland Plant Identification Course, Technical Guidance Manual. Drew will review the existing Ordinance DuPage County Stormwater and associated County Plans to incorporate revised regulations that Mangement meet current flooding prevention,water quality,and stormwater runoff 0 ADA PROWAG Requirements Class reduction standards. He will assist with the project meetings including . Beyond the Basics Sormwater BMP the Technical Advisory Committee(TAC). Seminar • Wetland Delineation Course, Institute for Wetland and Environmental Education • [EPA Field Sampling Methods Years of Experience: 7 years,7 with ERA Warrenville I Chicago I Champaign Bradley Eamt ENGINEERING Wetlands Scientist RESOURCE ASSOCIATES Project Experience: Kane County Stormwater Ordinance Review - Literature review of Kane County Stormwater Ordinances in comparison to other Chicago area collar counties. Introduction of new measures in wetland mitigation and performance standards as well as proposal to add several new Best Management Practices to the County's list of accepted stormwater runoff control methods. Review of 2040 Green Infrastructure plan proposed by the County and bringing updates to stormwater ordinance to best reflect the goals of the 2040 Green Infrastructure Plan. Village of Winnetka, Stormwater Ordinance Update - Review of existing stormwater ordinance and suggestion of new measures that would lessen the impact of single family developments on the surrounding watershed through implementation of post construction best management practices. Village of Schaumburg NPDES Permit Compliance - Preparation E�uc>alon�CertOns: of educational and professional materials to be presented to various Bache.WofScience groups within the Village of Schaumburg. Construction of educational Environmental Studies slideshows to be presented to various groups including high-school Northern NtinosUnhersity classes and homeowners associations regarding water conservation, Associates of Arts.Graphic Design resource protection,and ecological concepts. Preparation of reporting Elgin c€irrtimunity checklists and operating procedures to be used by Village public works 20181WEER/f E;ll €and employees in tracking, containing, and eliminating illicit discharges Delineation Certification and Training found in local waterways. 0 2017 SCA Hydric Sail trd'rcatars for Bliss Road Culverts, Sugar Grove, IL - Assisted in permitting Wetland Delineation Course processes and correspondence with the Kane-DuPage Soil and Water Work Experience Conservation District, US Army Corps of Engineers, and Kane County Officials. 0 Field Restoration Intern May 2017 Wetland Delineation Project,Taylorville Township,IL-Environmental Hampton Lenzini Ifs Renwick Inc, Scientist for a large-scale wetland delineation in Taylorville Township Elgin,IL to allow approval of solar panel installation for a farm sitting on Areas of Focus' approximately 80 acres of land. Included both farmed wetlands to be determined as well as natural areas between windbreaks featuring • Wetland delineation Environmental narrow waterways. Preparation of farmed wetland slides to show Monitoring and Restoration possible signs of hydrology and analysis of the slides in conjunction • Conducted undergraduate research with data presented on WETS table formed a preliminary investigation, under the direction of Dr.Holty Jones Field visit consisted of visiting each area highlighted to show signs focusing on soil pH at Nachusa of hydrology and conduct determinations on the ground. Preparation Grasslands in Taylor Township,IL of delineation report included compilation of vegetative survey and • Volunteer experience at Elgin various other information to be assembled into a presentable medium Community College and N.I.U. such as data forms and visual exhibits.Correspondence with the Solar greenhouse Power company True North Inc, to ensure compliance with federal • Native plants and Ecosystems standards to complete this large-scale project. Years of Experience: Hobson Mill Drive Culvert, Naperville, IL - Conducted wetland and Waters of US delineation on site and authored report to be presented 2 years,2 with ERA to the city of Naperville and used in preparing development plans. Warrenville 1 Chicago I Champaign APPENDIX IV Insurance Engineer shall maintain for the term of this Agreement, and for a period of twelve months after the services is contracted for hereunder have been completed, insurance policies covering: 1. Workers Compensation: Statutory. 2. Employers Liability Insurance: $1,000,000 injury-per occurrence $500,000 disease-per employee $1,000,000 disease-policy limit Such insurance shall evidence that coverage applies in the State of Illinois. 3. Comprehensive General Liability Insurance: $2,000,000 per occurrence combined single limit. Coverages shall include Broad Form Property Damage Endorsements and Blanket Contractual Liability(must expressly cover the indemnity provisions of the Agreement). 4. Comprehensive Automobile Liability Insurance: $1,000,000 combined single limit, any auto. 5. Professional Liability Insurance(errors and omissions): $1,000,000 per claim and $2,000,000 in aggregate. 6. Umbrella or excess liability: The required coverages may be in any combination of primary, excess, and umbrella policies. Any excess or umbrella policy must provide excess coverage over underlying insurance on a following-form basis such that when any loss covered by the primary policy exceeds the limits under the primary policy, the excess or umbrella policy becomes effective to cover such loss. 7. Engineer will provide the Village with a certificate of insurance and additional insured endorsement showing the Village added to the General Liability Insurance as an additional insured. 8. Coverage shall not be suspended, voided, canceled, or reduced except after thirty (30) days prior written notice by certified mail has been given to the Village. If a standard Certificate of Insurance form is used with a cancellation clause,the words "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives" will be stricken or crossed out. Page 13 #11850987_v1