R-1273 - 06/11/2013 - ENGINEERING - Resolutions RESOLUTION 2013-ENG-DESIGN-AG-EX-R-1273
A RESOLUTION APPROVING AND AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT BY
AND BETWEEN THE VILLAGE OF OAK BROOK AND HITCHCOCK DESIGN GROUP FOR DESIGN
AND ENGINEERING SERVICES FOR A PEDESTRIAN ACCESS PROJECT
WHEREAS, the Village desires to improve pedestrian and bicycle access to the Oakbrook Center
(the "Project'); and
WHEREAS, the Village desires to retain an engineer to provide prefinal design and engineering
services, final design and engineering services, and bidding and negotiation assistance for the Project, as
more fully described in the proposal attached hereto as Exhibit A("Services"); and
WHEREAS, Hitchcock Design Group ("Hitchcock') has previously provided satisfactory
engineering services to the Village in connection with engineering and infrastructure projects; and
WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act'), 50
ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the
notice, evaluation, and selection procedures set forth in the Act for engineering services provided by
engineers who have a satisfactory relationship with the Village; and
WHEREAS, the Village and Hitchcock desire to enter into and execute an agreement for
Hitchcock to provide the Services to the Village for an amount not to exceed $58,310, which agreement
shall be in a final form acceptable to the Village Manager and the Village Attorney ("Agreement'); and
WHEREAS, the President and Board of Trustees have determined that it is in the best interest of
the Village to enter into the Agreement;
NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows:
Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part
of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook.
Section 2: Approval of the Agreement. The President and Board of Trustees hereby
approve the Agreement by and between the Village and Hitchcock for the Services, which Agreement
shall be completed in a final form acceptable to the Village Manager and Village Attorney.
Section 3: Authorization and Execution of the Agreement. The Village President and Village
Clerk shall be, and hereby are, authorized to execute the Agreement on behalf of the Village.
Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and
approval in the manner provided by law.
[SIGNATURE PAGE FOLLOWS]
Resolution 2013-ENG-DESIGN-AG-EX-R-1273
Engineering Services for Pedestrian Access Project
2 of 3
r
APPROVED THIS 11th day of June, 2013
Gopal G. Lalmalani
Village President
PASSED THIS 11th day of June, 2013
Ayes: Trustees Adler Baar, Moy Wolin Yusuf
Nays: None
Absent: Trustee Manzo
ATTEST,
Charlotte K. Pruss
j �� � Village Clerk
Resolution 2013-ENG-DESIGN-AG-EX-R-1273
Engineering Services for Pedestrian Access Project
3of3
EXHIBIT A
1
May 22,2013
better
Mr.Michael Hullihan
Director of Public Works
Village of Oak Brook
1200 Oak Brook Road
Oak Brook,Illinois 60523
RE: Pedestrian Circulation Improvements—Final Design and Engineering Services
Dear Mike,
Thank you for asking Hitchcock Design Group to submit this proposal to provide Final Design and
Engineering services for the pedestrian circulation improvements around the Oakbrook Center Mall.
We appreciate the opportunity to continue our relationship with you and your colleagues at the
Village of Oak Brook.
Project Understanding
Over the past few months,we have completed Preliminary Design and Engineering services for each
of the project areas as originally identified in the Pedestrian Circulation Planning Study. The Village
would now like to move forward with Final Design and Engineering for the projects that have support
from the Oakbrook Center Mall and effected private property owners. The attached Summary of
Improvements outlines the proposed improvements by project area.
Scope of Services
During Final Design and Engineering,we will prepare Pre-Final Plans(Design Development)that
illustrate the improvements that will be submitted for permitting,and advanced for construction.
Then we will prepare Final Plans(Construction Documents),including drawings and specifications
221 W.1effmwAvenue that will be used to competitively bid and construct the improvements. Finally,we will assist you
Nape ville,min*60540 with Bidding and Negotiation to select the most qualified Contractor. The work is described in
630.961.1787 greater detail in the attached Scope of Services.
We can also provide important Construction Administration,Observation and Contract Close-out
hitftoddeggrgoup.corn services that will help you administer your contract with the Contractor. We typically provide these
services on an hourly basis invoiced as additional services at our standard hourly rates.
Professional Fees
We propose to complete the outlined services for the following fees:
Phase II—Final Design and Engineering
Pre-Final Design and Engineering: $20,830
Final Design and Engineering: $31,130
Bidding and Negotiation: $6,350
Total Hourly Not-to-Exceed Fee Amount: $58,310
In addition to the fees,we will also invoice customary reimbursable expenses such as printing,
mileage and courier services at cost plus a 15%markup.
Please note that services,meetings,and revisions to previously completed work,not specified in the
Scope of Services,will be considered Additional Services.
The Village and HDG acknowledge that the Village is continuing to negotiate with property owners
and stakeholders regarding optional approaches,lighting and other enhancements,which may
affect,decrease or increase the scope and costs of specific projects. Both parties agree that,by
written direction,the Village may choose to modify the"Scope of Improvements by Project Area"to
ff""
LandtWl r&ftC+ftlfrf P\Morketing106Mims DevelopmentWok Brook VillageoHPedestrion(iralation-final Design�oropdr20130521ookbrookpedimprovements.doa
December 6,2012
Village of Oak Brook—Pedestrian Circulation Improvements
Page 2
add,delete,or modify elements of the projects,and that the parties will negotiate and agree on the
appropriate cost adjustments.
Project Team
I will be our Project Manager under the supervision of Rick Hitchcock. I will be directly responsible for
routine project communications with you and rest of the project team. Engineering Resource
Associates will provide civil and electrical engineering services. Other members of the Urban Studio
will participate as needed in order to advance the work in a timely way.
Schedule
We can begin this assignment right-away with your authorization and under normal circumstances,
can advance the work to meet or exceed your timeline. However,the schedule will be dependent on
establishing a timeline based on Village,stakeholder and property owner reviews and negotiations.
If this proposal is acceptable,we will forward our standard Professional Services Agreement for your
review and authorization to proceed.
Thanks,again,for the opportunity to participate on this important project.
Sincerely,
Hitchcock Design Group
Tim King,RLA
Principal
End: Scope of Services
Proposed Improvements—Key Map
Summary of Improvements by Project Area
Standard Billing Rates and Expenses
cc: Rick Hitchcock,Dawn Jones,Hitchcock Design Group
May 22,2013
Village of Oak Brook—Pedestrian Circulation Improvements
Page 1
Scope of Services
PHASE I-PRELIMINARY DESIGN AND ENGINEERING SERVICES
Completed
PHASE II-FINAL DESIGN AND ENGINEERING SERVICES
A. Pre-final Design and Engineering(Design Development)
Objective: Reach consensus with the Village,property owners,and jurisdictional authorities on the
final design,probable cost and construction strategy for the proposed improvements.
Process: Specifically,based on the approved Preliminary Design Plans and Summary of Improvements
Memorandum for areas B,C,D,E,F,G,and H,the HDG team will:
1. Finalize the size,horizontal and vertical geometry,structure,materials and finish,as
appropriate,for the proposed improvements,including:
a. Sidewalks
b. Specialty paving
c. Crosswalks(intersection and mid-block)
d. Median refuge islands
e. Benches and furnishings
f. Bollard lights
g. Pedestrian traffic signals and countdown timers
h. Mid-block crossing signage and signals
i. Retaining walls
j. Landscape
2. Identify the site engineering requirements including:
a. Grading,drainage,storm sewer improvements and modifications
b. Other required utility modifications
c. Electrical requirements
d. Traffic signal improvements and modifications
e. Impacts to roadway,traffic,and travel lanes
f. Soil borings for structural retaining walls
3. Prepare Outline Specifications,including the products,materials and finishes of each
component or system.
4. Prepare a summary of quantities and updated Construction Cost Opinion.
5. (Mtg#1)Review the drawings,specifications,product data and material samples with Village
representatives.
6. (Mtg#2)Review the drawings,specifications,product data and material samples with GGP
(Oakbrook Center)representatives.
7. (Mtgs#3-7)Review the drawings,specifications,product data and material samples with
each individual property owner representative.
8. Revise the drawings and supporting materials as may be required.
9. (Mtg#8)Review the drawings,specifications,product data and material samples with Village
officials,Streetscape Committee members,property owners and other stakeholders at a joint
Streetscape Committee meeting.
HUCHCOCK
DESIGN
GROUP
an91
May 22,2013
Village of Oak Brook—Pedestrian Circulation Improvements
Page 2
Deliverables:Pre-Final Plans(one(1)set of 24x36 plans,11x17 copies,PDF file for your reproduction
and distribution;Outline Specifications(8.5x11 copies,PDF file for your reproduction and
distribution);Construction Cost Opinion(8.5x11 B&W copies,PDF file for your reproduction and
distribution)
Note: Coordination and permitting with IDOT for work within the 22nd Street right-of-way is
excluded. If work within the 22nd Street right-of-way is included in the project,IDOT coordination and
permitting will be considered additional services.
B. Final Design and Engineering(Construction Documents)
Objective: Obtain the required permits and produce the final drawings,specifications,quantity
schedules,project manual and other bid documents that will be used to competitively bid and
construct the improvements.
Process: Specifically,following your approval of the Design Development documents,the HDG team
will:
1. Finalize the plans that will be used to bid and construct the improvements in one bid set
including:
a. Project identification and general information
b. Notes,index and standards
c. Summary of estimated quantities
d. Alignment,ties and bench marks
e. Maintenance of traffic
f. Erosion and sedimentation control
g. New and relocated underground utilities
h. Grading and drainage
i. Sidewalks
j. Specialty paving
k. Crosswalks(intersection and mid-block)
I. Median refuge islands
m. Benches and furnishings
n. Bollard lighting and power distribution
o. Pedestrian traffic signals and countdown timers
p. Mid-block crossing signage and signals
q. Retaining walls
r. Landscape
s. Construction details as required
2. Finalize the written documentation that will be used to bid and construct the improvements
in one set including:
a. Specifications and project manual
b. Other required bid documents
3. Finalize the summary of quantities and Construction Cost Opinion.
4. Finalize a construction strategy including:
a. Anticipated construction schedule
b. Access,staging and other logistics
c. Public relations
d. Owner and consultant roles
5. (Mtg#9)Review the documents with Village representatives and other team members.
6. Make minor revisions as may be required.
7. Submit our recommendations for Village Board authorization to permit and bid the project.
HITCHCOCK
DESIGN
GROUP
cn tingW erpkxA
May 22,2013
/ Village of Oak Brook—Pedestrian Circulation Improvements
Page 3
Deliverables: Final Design Plans(one(1)set 24x36 plans,11 x17 copies,8.5x11 copies,PDF file for
your reproduction and distribution);Specifications(8.5x11 copies,PDF file for your reproduction and
distribution);Final Construction Cost Opinion(8.5x11 B&W copies,PDF file for your reproduction
and distribution)
C. Bidding and Negotiation
Objective: Help select a qualified contractor to construct the improvements.
Process: Following your approval of the Contract Documents,the HDG team will:
1. Provide a digital and 1 set of contract documents for your reproduction for bidding.
2. Conduct a pre-bid meeting for interested bidders.
3. Answer questions and issue written addenda,when appropriate,to all bidders regarding
changes to or clarifications of the Contract Documents.
4. Review the bids,tabulate the results and issue a recommendation to you regarding the
contract award.
5. Submit our recommendations for Village Board approval of the contract award.
Deliverables: Final Bid Documents(one(1)set 24x36 plans,11 x17 copies,PDF file for your
reproduction and distribution)
GENERAL PROJECT ADMINISTRATION
In addition to the services outlined above,HDG will administer the performance of its own work
throughout the term of the contract by providing the following services:
A. Communications
1. Schedule,create agendas and summarize the highlights of periodic meetings
2. Rehearse,attend and present at public forums identified
3. Collect and disseminate communications from other parties
4. Periodically inform your representative about our progress
B. Schedules
1. Create,periodically update and distribute the project schedule
2. Coordinate the activities of our staff and our consultants
C. Staffing
1. Select and assign staff members and consultants to appropriate tasks and services
2. Prepare and administer consultant agreements
D. File Maintenance
1. Establish and maintain appropriate correspondence,financial,drawing and data files
2. Obtain appropriate insurance certificates from consultants
3. Maintain appropriate time and expense records
OPTIONAL,ADDITIONAL SERVICES
Services,meetings,or revisions to previously completed work not specified in this scope of services
will be considered Additional Services. If circumstances arise during HDG's performance of the
outlined services that require additional services,HDG will promptly notify Client about the nature,
extent and probable additional cost of the Additional Services,and perform only such Additional
Services following Client's written authorization.
H17CHCOCK
GROUP
DESIGN
w Y
O
d m
�A Y
>O
y
x g C E � ad 3pp
°c pp 5ii y
E 3 2
a 3 A 'Z z A �. _ ✓.
Q. E OD y D ci ii t;J = rn L A •� N d 't
y d d
`1 cam• p�
g �L
r E
W W W E W` q W A Y m m W°W
.°n W rn r N V •W N �`
0 o ( " e �► 1
* u�
� g t
m
av6tl s - � » r >►
us ,..
�` �.„k Y � Yoh �. � ,� � �!►
0 N
7r
P3'd�
A 14 L
h.aEv asp,.. l O do
� r
F
p
M HMOs AVMH91H Atl3PNUl
•. f° `s , 'Miff arc h.
r
_.. Summary of Improvements
Revised: May 22,2013
RE: Village of Oak Brook-Pedestrian Circulation Improvements
Project: 03-0745-012-01-02
Area B. Oak Brook Club Connection to Existing Bike Path
Village right-of-way,limited construction on Oak Brook Club property
Public Rig-ht-of-way
• Standard sidewalk
• Low non-structural wall to retain grade along sidewalk
• Specialty paving crosswalk
• Refuge island in existing median
• Pedestrian crossing warning device(Ped.Activated Flashing LED)
• Relocate street sign and street light
• Landscape restoration
Private Property
• Easement to construct improvements in public right-of-way due to limited space
• Landscape restoration
• Electrical service connection behind existing retaining wall
221 W.lefferwn Avenue
Napm&,nl'mas60540 Area C. Double Tree Connection to Mall
630.961,1787 Village right-of-way,improvements on Double Tree and Mall property
htdx0ckd4sIq,jgMWaM Public Right-of-way
• Standard sidewalk(alternate to upgrade to specialty paving)
• Specialty paving sidewalk at intersection corners
• Bench and trash receptacle at intersection corners
• Specialty paving crosswalks
• Bollard lights,control panel and electrical service connection
• New pedestrian signal heads and push buttons
• Adjust utility handholes
• Modify pavement markings and vehicle detectors
• Landscape restoration
Double Tree Private Property
• Standard sidewalk(alternate to upgrade to specialty paving)
• Stone non-structural retaining walls to match existing
• Bollard lights,control panel and electrical connection from existing service
• Landscape restoration
Mall Private Property
• Standard sidewalk(alternate to upgrade to specialty paving)
• Painted crosswalks on entry drive(alternate to upgrade to specialty paving)
• Bollard lights,control panel and electrical connection from existing service
Plmmin4
Lan&WAnh&ffW 1.ularkeraro,76Business DevelopmenWakftok,VillageoMedestrian(irruladon-FinalDesignVRAlmemo10130511impmvements summary-jfm.dm
Page 2
• Landscape restoration
Area D. East Mall Parking Lot
Mall property only
Mall Private Property
• Standard sidewalk connection between parking deck and parking lot
• Painted crosswalks(alternate to upgrade to specialty paving)
• Landscape restoration
Area E. Commerce Drive and Spring Road Connection to Mall
Village right-of-way,Mall property,limited construction on Commerce Plaza property
Public Right-of-way
• Standard sidewalk(alternate to upgrade to specialty paving)
• Specialty paving sidewalk at intersection corners
• Bench and trash receptacle at intersection corners
• Specialty paving crosswalks
• Bollard lights,control panel and electrical service connection
• New pedestrian signal heads and push buttons
• Adjust utility handholes
• Modify pavement markings and vehicle detectors
• New landscaped median at mid-block crossing
• Pedestrian crossing warning device Wed.Activated Flashing LED)
• Landscape restoration
Mall Private Property
• Standard sidewalk along entry drive and across ring road to repair ADA issues and connect to
existing sidewalk(alternate to upgrade to specialty paving)
• Non-structural retaining wall along parking lot
• Specialty paving at Ring Road intersection
• Painted crosswalks on entry drive(alternate to upgrade to specialty paving)
• Bollard lights,control panel and electrical connection from existing service
• Landscape restoration
Commerce Plaza Private Property
• Easement to construct improvements in public right-of-way due to limited space
• Landscape restoration
Area F. Resident Inn Connection to Existing Bike Path
Utility easement,Resident Inn property
Utility Easement
• Asphalt bike path
• Structural Retaining walls
• Light bollards,control panel and electrical service connection
• Landscape restoration
I
Page 3
Resident Inn Private Property
• Standard sidewalk
• Painted crosswalks(alternate to upgrade to specialty paving)
• Landscape restoration
• Bollard lights,control panel and electrical connection from existing service
Area G. Marriott,Executive Plaza,Regency Towers Connection to Mall
Marriott,Executive Plaza,Regency Towers private property
Marriott Private Property
• Standard sidewalk(alternate to upgrade to specialty paving)
• Painted crosswalks(alternate to upgrade to specialty paving)
• Non-structural retaining walls to make room for sidewalk
• Relocate existing bollard lights to make room for sidewalk
• Bollard lights,control panel and electrical connection from existing service
• Landscape restoration
Executive Plaza Property
• Standard sidewalk(alternate to upgrade to specialty paving)
• Painted crosswalks(alternate to upgrade to specialty paving)
• Retaining walls to make room for sidewalk
• Relocate existing bollard lights to make room for sidewalk
• Bollard lights,control panel and electrical connection from existing service
• Landscape restoration
Regency Towers Property
• Specialty paving crosswalk across Oakbrook Center Drive
• Refuge island in existing median
• Landscape restoration
Area H. South Mall Parking Lot,Connection Across 22nd Street
Mall private property,22nd Street IDOT right-of-way
Mall Private Property
• Bollard lights,control panel and electrical connection from existing service
• Landscape restoration
22"d Street IDOT Right-of-way
• Improve sidewalk curb ramps
• Improve crosswalks(painted or specialty paving,to be determined)
• Evaluate pedestrian signal timing and addition of pedestrian countdown signals and enhanced
crossing signals at 22nd/Mall Drive
• Landscape restoration
i
E
Standard Billing Rates and Expenses
Effective April 1,2012
For projects or phases that are invoiced on an hourly basis,we invoice time based on the activity
performed rather than the salary of the person performing the activity. That way,we are
compensated for the value of the service instead of the cost of the service. We track eight different
activities based on the complexity and the experience required to perform each activity. Those
activities and their corresponding hourly billing rates are:
Billing Rates
Leadership $210
Management $140
Planning $130
Design $120
Documentation $85
Administrative Support $75
Construction Administration $130
Construction Observation $110
Expenses
In addition to our standard hourly rates,we invoice authorized sub-consultant fees,travel and
reproduction expenses,at 115%of our cost. We will invoice mileage in personal or company-owned
cars at 115%of the current IRS reimbursement rate.
i
I
f
I
HITCHCOCK H
GROUP
III, r
EXHIBIT A
ENGINEERING RESOURCE ASSOCIATES, INC.
Client Hourly Rate Schedule
CHARGES FOR PROFESSIONAL SERVICES
JANUARY 1, 2012 THROUGH DECEMBER 31, 2013
Staff Category Hourly Rate
Professional Engineer VI $175.00
Professional Engineer V $165.00
Professional Engineer IV $154.00
Professional Engineer III $125.00
Professional Engineer II $115.00
Professional Engineer 1 $90.00
Structural Engineer VI $175.00
Structural Engineer III $110.00
Staff Engineer III $85.00
Staff Engineer II $78.00
Staff Engineer 1 $70.00
Engineering Intern II $40.00
Engineering Intern 1 $32.00
Engineering Technician V $95.00
Engineering Technician IV $80.00
Engineering Technician III $65.00
Engineering Technician II $42.00
Engineering Technician 1 $23.00
Environmental Specialist III $110.00
Environmental Specialist II $82.00
Environmental Specialist 1 $70.00
Professional Surveyor II $130.00
Professional Surveyor 1 $110.00
Surveyor V $80.00
Surveyor IV $75.00
Surveyor III $60.00
Surveyor II $50.00
Surveyor 1 $35.00
Administrative Director $125.00
Administrative Staff IV $73.00
Administrative Staff III $65.00
Administrative Staff II $55.00
Administrative Staff 1 $50.00
DIRECT COSTS
Direct Costs will be billed at their actual rate with (10%) percent mark up.