Loading...
1038-Mtg-Pre-Bid MinutesMeeting Minutes Project [16-172-1038] - Village of Oak Brook - Butler Govmn't Ctr Restroom Renovations View Date 8/4/2016 Kluber, Inc. 10 S. Shumway Ave. Batavia, IL 60510 Phone: (630) 406-1213 Meeting No. 16-172- 1038-004 Meeting Type Pre-Bid Subject Butler Government Center Restroom Renovations Prepared By Don Ware, Jr., P.E., LEED AP Date 8/3/2016 Time 10:00 AM CT Location Butler Government Center, Oak Brook, IL Meeting Attendance Company - Attendee Required Attended Company - Attendee Required Attended Kluber, Inc. - Jeff Bruns, S.E., LEED AP Village of Oak Brook - Doug Patchin Village of Oak Brook - Darren Martens Village of Oak Brook - Rania Serences Ordered By Item No. 16-172-1038-004-001 Summary Project Team Desired Outcome Originated Due Resolved Complete Discussion Details 1. Kluber Architects + Engineers a. Chris Hansen, Project Architect b. Don Ware, PE, Mechanical Engineer 2. Village of Oak Brook a. Darren Martens b. Doug Patchin, Public Works/Dengineering Director c. Rania Serences, Senior Purchasing Agent 3. Project Work Site Butler Government Center, 1200 Oak Brook Road, Oak Brook, IL 60523 No comments, all understood. 16-172-1038-004-002 Summary Invitation for Bidder's Proposals Desired Outcome Originated Due Resolved Complete Discussion Details 1. Scope of Work: Plumbing upgrades, fixture replacement, new interior finishes including porcelain tile, new toilet partitions, new toilet accessories, painting, fire suppression and electrical work. Page 1 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1... 2. Bid package consists of the following documents: a. Invitation for Bidder's Proposals; b. General Instructions to Bidders; c. Addenda,if any are issued during the bidding process; d. Bidder's Proposal; e. Bidder's Sworn Acknowledgement; f. Bidder's Sworn Work History Statement; g. Other information submitted by Bidder,if requested during the bidding process; h. Notice of Award;and i. Contract,including all of its attachments and appendices, if any. 3. Inspection and examination of bid documents. a. Via the Internet at www.oak-brook.org,at no charge. b. A paper hard copy may be obtained in person from Owner's Purchasing Division, Butler Government Center, 1200 Oak Brook Road,Oak Brook,Illinois 60523 for a $25.00 non refundable copy fee. 4. Pre-Bid Meeting: Every prospective bidder is required to attend a Bid Meeting scheduled for 10:00 A.M.,Wednesday, August 3 ,2016 In the Samuel E. Dean Board Room,at the Butler Government Center located at 1200 Oak Brook Road, Oak Brook, Illinois 60523,to review the scope of the Improvements and the project specifications. Failure to attend this mandatory meeting will disqualify the bidder. a. Make sure you have signed in on the Sign-In sheet. b. Leave business card with all contact information. 5. Bid Opening: Owner will receive sealed Bidder's Proposals for the Work until 10:00 a.m.., local time, Wednesday, August 10, 2016, in the Samuel E.Dean Board Room,at the Butler Government Center located at 1200 Oak Brook Road,Oak Brook,Illinois 60523, at which time,or as soon thereafter as possible,all Bidder's Proposals will be publicly opened and read aloud. Bidders or their agents are Invited to be present. 6. Bid Security,Bonds and Insurance: a. Bid Security. Each Bidder's Proposal shall be accompanied by a security deposit of at least 5 percent of the Bidder's Price Proposal in the form of (1) a cashier's Check or Certified Check drawn on a solvent bank Insured by the Federal Deposit Insurance Corporation and payable without condition to Owner or (2) a Bid Bond in a form satisfactory to Owner from a surety company licensed to do business in the State of Illinois with a general rating of A minus and a financial size category of Class X or better In Best's Insurance Guide. b. Performance and Payment Bonds. The successful Bidder will be required to furnish a Performance Bond and a Labor and Material Payment Bond on award of the Contract,each in the penal sum of the full amount of the Contract Price,on forms provided by,or otherwise acceptable to,Owner,from a surety company meeting the requirements set forth above. Each Bidder's Proposal must be accompanied by a letter from such a surety company stating that it will execute Bonds on forms provided by, or otherwise acceptable to,Owner,on award of the Contract to Bidder. c. Insurance. The successful Bidder will be required to furnish certificates of insurance as required by Section 4.2 of the Contract on award of the Contract. Each Bidder's Proposal must be accompanied by a letter from Bidder's insurance carrier or its agent certifying that said insurer has read the requirements set forth in the Contract and will issue the required certificates and policies of insurance on award of the Contract to Bidder. Contractor raised question about need for contractor to provide the builder's insurance as stated in the documents. Darren responded that yes, this is required per the village attorney. 16-172-1038-004-003 Summary General Instructions to Bidders Desired Outcome Originated Due Resolved Complete Discussion Details Page 2 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1... 1. Addenda, if required,will be issued prior to bid opening and shall become part of the Bid Package. Intent is to issue final addenda no later than August 8, 2016 at 4:00p.m. 2. Prevailing wages are required. 3. Owner is exempt from state and local sales,use,and excise taxes. 4. Contractor shall be responsible for applying for and obtaining all permits. Permit fees associated with the Village of Oak Brook Building Department will be waived. 5. Bid security is required. 6. Time of award ,if contract is awarded, will be made within 45 days following the opening of bidder's proposal. 7. Any questions,clarifications or substitution requests need to occur in writing via email to dware@kluberinc.com Oral or other interpretations or clarifications will be without legal effect. a. Note: Last day to submit questions,substitution requests for incorporation into addenda will be August 5, 2016 at 1:00 p.m. b. Responses will be emailed to all bidder's present at the pre-bid meeting. No comments, all understood. 16-172-1038-004-004 Summary Bidder's Proposal Desired Outcome Originated Due Resolved Complete Discussion Details 1. The bidder's bid proposal includes the following: a. Proposal b. Sworn Acknowledgement c. Sworn Work History d. Notice of Award No comments, all understood. 16-172-1038-004-005 Summary Contract Terms Desired Outcome Originated Due Resolved Complete Discussion Details 1. The bidder's contract with the Village of Oak Brook includes the following: a. Article I =The Work b. Article II = Changes and Delays c. Article III= Contractor's Responsibility for Defective Work d. Article IV= Financial Assurances e. Article V = Payment f. Article VI = Disputes and Remedies g. Article VII= Legal Relationships and Requirements h. Attachment A = Supplemental Schedule of Contract Terms i. Attachment B = Specifications j. Attachment C = List of Drawings Page 3 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1... k. Attachment D = Special Project Requirements 1. Appendix 1 = Prevailing Wage Ordinance 2. Appendix 2 = Form of Performance Bond 3. Appendix 3 = Labor and Materials Payment Bond No comments, all understood. 16-172-1038-004-006 Summary Preliminary Schedule Desired Outcome Originated Due Resolved Complete Discussion Details 1. Award of Contract: September 14, 2016 2. Contractor to apply for Building permit 3. Commencement of construction: October 3, 2016 4. Substantial Completion: January 18, 2017 No comments, all understood. 16-172-1038-004-007 Summary Summary (Section 01 10 00) Desired Outcome Originated Due Resolved Complete Discussion Details 1. Contract Description a. Contract Type: A single prime contract based on Lump Sum contract as described in the Village of Oak Brook Contract for the Construction of Butler Government Center Restroom Renovations. 2. Owner Occupancy a. Owner intends to continue to occupy adjacent portions of the existing building during the entire construction period. b. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. c. Schedule the Work to accommodate Owner occupancy. 3. Contractor use of Site and Premises a. Construction Operations: Limited to areas designated by Owner. b. Provide access to and from site as required by law and by Owner. 1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporary altered. 2. Do not obstruct roadways, sidewalks,or other public ways without permit. c. Existing building spaces may not be used for storage. d. Utility Outages and Shutdown: 1. Limit disruption of utility services to hours the building is unoccupied. 2. Do not disrupt or shut down life safety systems without 7 days notice to Owner and authorities having jurisdiction. 3. Prevent accidental disruption of utility services and other facilities. No comments, all understood. Page 4 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1... 16-172-1038-004-008 Summary Temporary Facilities and Controls (Section 01 50 00) Desired Outcome Originated Due Resolved Complete Discussion Details 1. Temporary Utilities a. Owner will provide the following: 1. Electrical power metering, consisting of connection to existing facilities. 2. Water supply, consisting of connection to existing facilities. 2. Telecommunications Services shall include: a. Cellular Phone: Site Superintendent, Project Manager and all sub-contractors are required to carry mobile cell phones. 3. Temporary Sanitary Facilities: Use of existing facilities located at Butler Government Center permitted. 4. Barriers: Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for Owner's use of site and to protect existing facilities and adjacent properties from damage from construction operatons and demolition. 5. Fencing: a. Construction: Commercial grade chain link fence. b. Provide 6 foot high fence around construction site. 6. Interior Enclosures: Provide temporary partitions as required to separate work areas from Owner-occupied areas, to prevent penetration of dust and moisture into Owner-occupied areas, and to prevent damage to existing materials and equipment. 7. Vehicular Access and Parking: Coordinate parking and haul routes with Owner. 8. Waste Removal: Provide waste removal facilities and services as requied to maintain the site in clean and orderly condition. No comments, all understood. 16-172-1038-004-009 Summary Owner Comments Desired Outcome Originated Due Resolved Complete Discussion Details No comments, all understood. 16-172-1038-004-010 Summary Contractor Questions Desired Outcome Originated Due Resolved Complete Discussion Details Q1. Is fencing required around dumpster? Page 5 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1... A1. No. Q2. Can work occur at same time for both bathrooms? A2. Yes, no phasing required. 16-172-1038-004-011 Summary Tour of Space Desired Outcome Originated Due Resolved Complete Discussion Details Tour was given by Darren Martens. Page 6 of 6Meeting Minutes 8/4/2016https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=1...