2016 Street Improvements Notice toBiddersVILLAGE OF OAK BROOK CONTRACT FOR THE CONSTRUCTION OF 2016 STREET IMPROVEMENT PROJECT BID PACKAGE INVITATION FOR BIDDER’S PROPOSALS OWNER: Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523-2255 1. Invitation to Bid Owner invites sealed Bidder’s Proposals for the Work described in detail in the Contract and generally described as follows: Area 1 (Acorn Hill Lane, Washington Street, Wood Road, Glendale Avenue) The proposed improvements will include resurfacing of all of Acorn Hill Lane, Washington Street, and Wood Road approximately 5,300 square yards. The improvements also include 2” surface patching on Glendale Avenue at the direction of the Village. The resurfacing will include building up the pavement at the centerline in order to raise the crown. This involves hot-mix asphalt surface removal, 3” at the edge of pavement and 2” at the centerline, hot-mix asphalt leveling binder, 1”, and hot-mix asphalt surface course, 2”. The work will also include the addition of PCC shoulders along Wood Road and Acorn Hill Lane, along with 100 linear feet of PCC shoulder removal and replacement on 35th Street. Area 2 (Bath and Tennis Drive): This work will involve resurfacing of Bath and Tennis Drive off of Oak Brook Road; approximately 6,500 square yards. This involves hot-mix asphalt surface removal, 3”, hot-mix asphalt leveling binder, 1”, and hot-mix asphalt surface course, 2”. Miscellaneous curb and gutter replacement, drainage improvements, and installation of aggregate shoulders will also be included. Area 3 (St. Stephens Green): St. Stephens Green improvements will involve the resurfacing of all of St. Stephens Green, approximately 9,800 square yards. The resurfacing will include building up the pavement at the centerline in order to raise the crown. This involves hot-mix asphalt surface removal, 3” at the curb line and 2 1/2” at the centerline, hot-mix asphalt leveling binder, 1”, and hot-mix asphalt surface course, 2”. The work will also include the replacement of deteriorated curb and gutter. Area 4 (Mockingbird Lane and Camelot Drive): This area includes reconstruction of approximately 3,800 square yards along Mockingbird Ln between Concord Drive and Regent Drive. The proposed reconstruction will include full depth removal of the existing asphalt pavement (5”) and removal of an additional 5-inch of deteriorated hydrated steel slag sand base course in order to provide for the installation of a new 5-inch pavement section and 5-inch aggregate base course placed upon a Tensar Geogrid system. The proposed pavement section will consist of 3-inches of hot-mix asphalt binder course and 2-inches of hot-mix asphalt surface course. The resurfacing of Mockingbird between Midwest Road and Concord Drive will include approximately 6,600 square yards of 5” surface removal, 3” hot-mix asphalt binder course, and 2” hot-mix asphalt surface course. The resurfacing of Camelot Drive will include approximately 4,400 square yards of 4” surface removal, 2 ¼” hot-mix asphalt binder course, and 2” hot-mix asphalt surface course. Work will also include replacement of deteriorated curb and gutter. The scope also includes 2” surface patching of the west half of Regent Drive from Mockingbird Lane halfway to Heather Lane, and drainage improvements on Devonshire Drive. Area 5 (Ave Loire): This area involves removing and replacing the entire asphalt pavement section, approximately 4,250 square yards. This involves hot-mix asphalt surface removal, 5”, hot-mix asphalt binder course, 3”, and hot-mix asphalt surface course, 2”. Work will also include curb and gutter repairs and drainage improvements. Area 6 (Camden Court): This area involves the resurfacing of Camden Court to include approximately 2,650 square yards of hot-mix asphalt surface removal, 3”, hot-mix asphalt leveling binder, 1”, and hot-mix asphalt surface course, 2”. Curb and gutter replacement, drainage improvements, and pavement markings will also be included. Area 7 (York Road, Clearwater Drive, Harger Road): This area includes 2” class D patching of York Road from the I-294 ramp Tollway Bridge to the northern village limit, and the resurfacing of Clearwater Drive from York Road to Hunter Drive; approximately 5,600 square yards. Spot repairs will be made to the concrete median along York Road at the discretion of the Village. Resurfacing of Clearwater Drive will include hot-mix asphalt surface removal, 3”, hot-mix asphalt leveling binder, 1”, and hot-mix asphalt surface course, 2”. Work will also include the removal of the old turn-around on Clearwater Drive as well as curb and gutter repairs and drainage improvements. Work on Harger Road will consist of 2” class D patches at locations directed by the Village. Area 8 (PATCHING ONLY Yorkshire Woods, Timber Trails Subdivisions, and Spring Road North of 16th Street): The work to be completed in these areas involves surface patching of approximately 5% of the total pavement areas within these subdivisions. This will amount to approximately 3,300 square yards of patching to be marked out by the Village. The patching will involve a 2” surface removal to be patched with hot-mix asphalt surface course, 2”. Related PCC shoulder patching and some minor drainage improvements may be included at the direction of the Village following resident input. Area 9 (16th Street, Castle Drive): This area involves concrete pavement patches (class B) at locations determined by the Village. Work will also include curb and gutter repairs, pavement markings and structure adjustments/reconstructions. Area 10 (Well Tower Access Lot): This area includes reconstructing the water tower access lot off of Tower Rd; approximately 240 square yards. The work involves 5” surface removal, 3” hot-mix asphalt binder course and 2” hot-mix asphalt surface course. This work also includes 2-inch edge patching along Tower Drive and spot curb and gutter improvements. Area 11 (Adams Road Culvert Replacements): Three deteriorated large diameter metal culverts crossing Adams Road and a 12” driveway culvert will be replaced. Work will also include the removal and replacement of the double yellow centerline and single white edge lines along Adams Road. The Work shall be performed at the following Work Sites: STREET IMPROVEMENTS STREET FROM TO Acorn Hill Lane Spring Road Terminus Washington Street Spring Road Glendale Avenue Wood Road Washington Street Terminus Glendale Avenue Washington Street Village Limit Bath and Tennis Drive Oak Brook Road Terminus St. Stephens Green 35th Street Terminus Mockingbird Lane Midwest Road Regent Drive Camelot Drive Regent Drive Terminus Regent Drive Mockingbird Lane 19 Regent Drive Avenue Loire Meyers Road Western Village Limit Camden Court Butterfield Road Terminus York Road - Alternate 1 I-294 Tollway Bridge Northern Village Limit Clearwater Drive Hunter Drive York Road Harger Road Spring Road York Road Yorkshire Woods Subdivision NA NA Timber Trails Subdivision NA NA 16th Street – Alternate 2 Oak Brook Center Terminus Castle Drive – Alternate 2 16th Street Parking Lot Tower Drive 22nd Street Water Tower Access Lot Water Tower Access Lot Tower Drive NA Adams Road Spring Road Ogden Avenue 2. The Bid Package The Bid Package consists of the following documents, all of which are by this reference made a part of this Invitation for Bidder’s Proposals as though fully set forth herein: A. Invitation for Bidder’s Proposals; B. General Instructions to Bidders; C. Addenda, if any are issued during the bidding process; D. Bidder’s Proposal; E. Bidder’s Sworn Acknowledgement; F. Bidder’s Sworn Work History Statement; G. Other information submitted by Bidder, if requested during the bidding process; H. Notice of Award; and I. Contract, including all of its attachments and appendices, if any. 4. Inspection and Examination A hard copy of the Bid Documents may be obtained in person from Engineer’s Office at Christopher B. Burke Engineering, Ltd. 9575 West Higgins Road, Suite 600, Rosemont, Illinois 60018. A $50 non-refundable copy fee is required prior to issuance of Bid Documents. All checks shall be payable to “Christopher B. Burke Engineering, Ltd.”. For this project, the Contractor must be qualified to bid in IDOT’s Section 003 Hot-Mix Asphalt (HMA) Plant Mix types of construction or have their own HMA Plant capable of producing HMA that conforms to the mix designs specified herein. The Bid Package may be examined at the office of Engineer as listed above. In making copies of the Bid Package available to prospective Bidders, Owner does so only for the purpose of obtaining Bidder’s Proposals and such provision does not confer a license or grant for any other use. Each prospective Bidder shall, before submitting its Bidder’s Proposal, carefully examine the Bid Package. Each prospective Bidder shall inspect in detail the Work Site and the surrounding area and shall familiarize itself with all local conditions, including subsurface, underground and other concealed conditions, affecting the Contract, the Work and the Work Site. The Bidder whose Bidder’s Proposal is accepted will be responsible for all errors in its Bidder’s Proposal including those resulting from its failure or neglect to make a thorough examination and investigation of the Bid Package and the conditions of the Work Site and the surrounding area. The Contract specifications may include the Illinois Department of Transportation’s General Conditions of the Contract, "State of Illinois Standard Specifications for Road and Bridge Construction" (SSRB); "Standard Specifications for Water and Sewer Main Construction in Illinois" (SSWS); "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways" (MUTCD). The specifications also may include Owners’ Village Code and Building Code. References to any of these manuals, codes, and specifications means the latest editions effective on the date of the bid opening. 5. Pre-Bid Meeting NONE 6. Bid Opening Owner will receive sealed Bidder’s Proposals for the Work until 10:00, a.m., local time, March 23, 2016, at the Office of the Village Clerk, by Rania Serences, Senior Purchasing Assistant, Village of Oak Brook, 1200 Oak Brook Road, Oak Brook, IL 60523, at which time, or as soon thereafter as possible, all Bidder’s Proposals will be publicly opened and read aloud in the Samuel E. Dean Board Room, in the Butler Government Center, 1200 Oak Brook Road, Oak Brook, Illinois 60523. Bidders or their agents are invited to be present. 7. Bid Security, Bonds and Insurance A. Bid Security. Each Bidder’s Proposal shall be accompanied by a security deposit of at least 5 percent of the Bidder’s Price Proposal in the form of (1) a Cashier’s Check or Certified Check drawn on a solvent bank insured by the Federal Deposit Insurance Corporation and payable without condition to Owner or (2) a Bid Bond in a form satisfactory to Owner from a surety company licensed to do business in the State of Illinois with a general rating of A minus and a financial size category of Class X or better in Best’s Insurance Guide. B. Performance and Payment Bonds. The successful Bidder will be required to furnish a Performance Bond and a Labor and Material Payment Bond on award of the Contract, each in the penal sum of the full amount of the Contract Price, on forms provided by, or otherwise acceptable to, Owner, from a surety company meeting the requirements set forth above. Each Bidder’s Proposal must be accompanied by a letter from such a surety company stating that it will execute Bonds on forms provided by, or otherwise acceptable to, Owner, on award of the Contract to Bidder. C. Insurance. The successful Bidder will be required to furnish certificates of insurance as required by Section 4.2 of the Contract on award of the Contract. Each Bidder’s Proposal must be accompanied by a letter from Bidder’s insurance carrier or its agent certifying that said insurer has read the requirements set forth in the Contract and will issue the required certificates and policies of insurance on award of the Contract to Bidder. DATED: March 02, 2016 Village of Oak Brook Charlotte Pruss Village Clerk