Loading...
2012 Crack Sealing Bid TabBid Tabulation 2012 Crack Sealing Project2009Cost Approximate ExtendedExtendedItemQuantitiesUnit PricePriceUnit PriceUnit PricePriceFiber Asphalt 31,622 LB $1.60 $50,595.20 $1.52 $1.45 $45,851.90 Routing and Rubberized Sealant 38,212 LB $1.60 $61,139.20 $1.59 $1.53 $58,464.36 Rubberized Sealant 7,888 LB $1.60 $12,620.80 $1.59 $1.53 $12,068.64EstimatedTotal$124,355.20$116,384.90SKC Construction,Inc. 2011 Project Unit Price for Fiber AsphaltCarol Stream $1.57/lbNaperville $1.46/lbSKC Construction,Inc. 2011 Project Unit Price for Rubberized SealantRiverside $1.85/lbEngineer'sEstimateSKCConstruction, Inc.J:\SPREADOC\2012 Tabs\2012 Crack Seal.xls 1 Bid Tabulation 2012 Crack Sealing ProjectJ:\SPREADOC\2012 Tabs\2012 Crack Seal.xls 2