2012 Water Main Bid tabVILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMUNITTOTALUNITTOTAL UNIT TOTAL COSTNO. PAY ITEM UNIT QUANTITYPRICECOSTPRICECOST DIFF. DIFF.1TREE ROOT PRUNING (SPECIAL) EACH 65 $110.00$7,150.00$50.00$3,250.00 -$60.00 -$3,900.002TEMPORARY FENCEFOOT 11740 $1.50$17,610.00$1.20$14,088.00 -$0.30 -$3,522.003INLET AND PIPE PROTECTION EACH 34 $145.00$4,930.00$120.00$4,080.00 -$25.00 -$850.004AGGREGATE FOR TEMPORARY ACCESS TON 175 $27.00$4,725.00$11.80$2,065.00 -$15.20 -$2,660.005CONTAMINATED WASTE DISPOSAL TON 100 $70.00$7,000.00$80.00$8,000.00 $10.00 $1,000.006SODDING, SPECIALSQ YD 9575 $8.50$81,387.50$6.00$57,450.00 -$2.50 -$23,937.507SUPPLEMENTAL WATERINGUNIT 201 $18.00$3,618.00$60.00$12,060.00 $42.00 $8,442.008CLASS D PATCHES, 2", SPECIAL SQ YD 9213 $16.67$153,580.71$18.70$172,283.10 $2.03 $18,702.399HOT MIX ASPHALT DRIVEWAY PAVEMENT, 4" SQ YD 901 $45.00$40,545.00$37.00$33,337.00 -$8.00 -$7,208.0010PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6" SQ YD 280 $65.00$18,200.00$48.00$13,440.00 -$17.00 -$4,760.0011BRICK PAVER DRIVEWAY, REMOVAL AND REPLACEMENT SQ FT 1836 $16.00$29,376.00$6.00$11,016.00 -$10.00 -$18,360.0012COMBINATION CONCRETE CURB AND GUTTER, REMOVAL AND REPLACEMENT FOOT 1768 $25.00$44,200.00$20.00$35,360.00 -$5.00 -$8,840.0013CONCRETE CURB, REMOVAL AND REPLACEMENT FOOT 33 $22.00$726.00$20.00$660.00 -$2.00 -$66.0014PROTECTIVE COATSQ YD 588 $3.00$1,764.00$2.00$1,176.00 -$1.00 -$588.0015DRIVEWAY PAVEMENT REMOVAL SQ YD 1181 $8.50$10,038.50$6.00$7,086.00 -$2.50 -$2,952.5016PVC C-900 STORM SEWER 6", REMOVAL AND REPLACEMENT FOOT 22 $45.00$990.00$38.00$836.00 -$7.00 -$154.0017PVC C-900 STORM SEWER 10", REMOVAL AND REPLACEMENT FOOT 60 $50.00$3,000.00$44.00$2,640.00 -$6.00 -$360.0018PVC C-900 STORM SEWER 12", REMOVAL AND REPLACEMENT FOOT 146 $55.00$8,030.00$58.00$8,468.00 $3.00 $438.0019PVC C-905 STORM SEWER 16", REMOVAL AND REPLACEMENT FOOT 170 $60.00$10,200.00$75.00$12,750.00 $15.00 $2,550.0020PVC C-900 WATER MAIN, 6"FOOT 6962 $50.00$348,100.00$42.00$292,404.00 -$8.00 -$55,696.0021PVC C-900 WATER MAIN, 8"FOOT 1944 $55.00$106,920.00$46.00$89,424.00 -$9.00 -$17,496.0022STEEL CASING PIPE 12"FOOT 70 $80.00$5,600.00$53.00$3,710.00 -$27.00 -$1,890.0023STEEL CASING PIPE 16"FOOT 24 $85.00$2,040.00$70.00$1,680.00 -$15.00 -$360.0024GATE VALVE 6", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 13 $3,600.00$46,800.00$2,100.00$27,300.00 -$1,500.00 -$19,500.0025GATE VALVE 8", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 6 $3,900.00$23,400.00$2,400.00$14,400.00 -$1,500.00 -$9,000.0026 NON-PRESSURE WATER MAIN CONNECTION "A" L SUM 1$3,800.00$3,800.00$8,800.00$8,800.00 $5,000.00 $5,000.0027NON-PRESSURE WATER MAIN CONNECTION "B" L SUM 1 $3,800.00$3,800.00$8,800.00$8,800.00 $5,000.00 $5,000.0028NON-PRESSURE WATER MAIN CONNECTION "C" L SUM 1 $4,000.00$4,000.00$9,000.00$9,000.00 $5,000.00 $5,000.0029NON-PRESSURE WATER MAIN CONNECTION "D" L SUM 1 $3,300.00$3,300.00$4,800.00$4,800.00 $1,500.00 $1,500.0030 NON-PRESSURE WATER MAIN CONNECTION "E"L SUM1$3,300.00$3,300.00$4,800.00$4,800.00 $1,500.00 $1,500.0031 NON-PRESSURE WATER MAIN CONNECTION "F"L SUM1$3,500.00$3,500.00$4,500.00$4,500.00 $1,000.00 $1,000.0032NON-PRESSURE WATER MAIN CONNECTION "G" L SUM 1 $3,300.00$3,300.00$4,500.00$4,500.00 $1,200.00 $1,200.0033NON-PRESSURE WATER MAIN CONNECTION "H" L SUM 1 $3,500.00$3,500.00$4,600.00$4,600.00 $1,100.00 $1,100.0034NON-PRESSURE WATER MAIN CONNECTION "I" L SUM 1 $3,300.00$3,300.00$4,600.00$4,600.00 $1,300.00 $1,300.0035NON-PRESSURE WATER MAIN CONNECTION "J" L SUM 1 $3,300.00$3,300.00$4,800.00$4,800.00 $1,500.00 $1,500.0036NON-PRESSURE WATER MAIN CONNECTION "K" L SUM 1 $4,000.00$4,000.00$4,000.00$4,000.00 $0.00 $0.00FEBRUARY 21, 2012ENGINEERS ESTIMATELOW BIDDER'S COMPARISONVIAN CONSTRUCTION VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMUNITTOTALUNITTOTAL UNIT TOTAL COSTNO. PAY ITEM UNIT QUANTITYPRICECOSTPRICECOST DIFF. DIFF.FEBRUARY 21, 2012ENGINEERS ESTIMATELOW BIDDER'S COMPARISONVIAN CONSTRUCTION37WATER SERVICE, NEAR SIDE, 1 1/2" EACH 39 $1,600.00$62,400.00$2,200.00$85,800.00 $600.00 $23,400.0038WATER SERVICE, NEAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 5 $1,400.00$7,000.00$2,100.00$10,500.00 $700.00 $3,500.0039WATER SERVICE, NEAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 10 $3,500.00$35,000.00$2,900.00$29,000.00 -$600.00 -$6,000.0040WATER SERVICE, FAR SIDE, 1 1/2" EACH 42 $2,700.00$113,400.00$2,600.00$109,200.00 -$100.00 -$4,200.0041WATER SERVICE, FAR SIDE, 1 1/2" (SPECIAL) EACH 4 $1,000.00$4,000.00$2,000.00$8,000.00 $1,000.00 $4,000.0042WATER SERVICE, FAR SIDE, 1 1/2" (OPEN CUT) EACH 2 $2,200.00$4,400.00$3,400.00$6,800.00 $1,200.00 $2,400.0043WATER SERVICE, FAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 7 $2,500.00$17,500.00$2,100.00$14,700.00 -$400.00 -$2,800.0044WATER SERVICE, FAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 8 $4,000.00$32,000.00$3,200.00$25,600.00 -$800.00 -$6,400.0045WATER SERVICE, NEAR SIDE, 2" EACH 9 $1,900.00$17,100.00$3,200.00$28,800.00 $1,300.00 $11,700.0046WATER SERVICE, FAR SIDE, 2" EACH 8 $3,000.00$24,000.00$3,500.00$28,000.00 $500.00 $4,000.0047DRAINAGE STRUCTURE TO BE ADJUSTED EACH 10 $300.00$3,000.00$300.00$3,000.00 $0.00 $0.0048WATER SERVICE ADJUSTMENT EACH 10 $410.00$4,100.00$150.00$1,500.00 -$260.00 -$2,600.0049TRACER WIRE IN CONDUITFOOT 9486 $1.50$14,229.00$3.00$28,458.00 $1.50 $14,229.0050TRACER WIRE ACCESS BOXEACH 29 $160.00$4,640.00$60.00$1,740.00 -$100.00 -$2,900.0051VALVE BOXES TO BE FILLEDEACH 15 $125.00$1,875.00$100.00$1,500.00 -$25.00 -$375.0052VALVE VAULTS TO BE FILLED EACH 5 $400.00$2,000.00$200.00$1,000.00 -$200.00 -$1,000.0053VALVE BOXES TO BE REMOVED EACH 4 $175.00$700.00$100.00$400.00 -$75.00 -$300.0054FIRE HYDRANTSEACH 29 $4,900.00$142,100.00$3,600.00$104,400.00 -$1,300.00 -$37,700.0055TEMPORARY FIRE HYDRANTEACH 1 $2,000.00$2,000.00$1,200.00$1,200.00 -$800.00 -$800.0056FIRE HYDRANTS TO BE REMOVED EACH 19 $300.00$5,700.00$150.00$2,850.00 -$150.00 -$2,850.0057SELECT GRANULAR BACKFILL CU YD 5882 $28.00$164,696.00$24.00$141,168.00 -$4.00 -$23,528.0058CLSM BACKFILL (FLOWABLE FILL) CU YD 70 $140.00$9,800.00$110.00$7,700.00 -$30.00 -$2,100.0059SANITARY SERVICE REPAIRFOOT 335 $40.00$13,400.00$42.00$14,070.00 $2.00 $670.0060SUMP LINE REPAIREACH 5 $265.00$1,325.00$400.00$2,000.00 $135.00 $675.0061STREET SWEEPINGHOUR 200 $155.00$31,000.00$135.00$27,000.00 -$20.00 -$4,000.0062TEST HOLESEACH 33 $600.00$19,800.00$100.00$3,300.00 -$500.00 -$16,500.0063THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 60 $15.00$900.00$9.00$540.00 -$6.00 -$360.0064THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 120 $25.00$3,000.00$14.00$1,680.00 -$11.00 -$1,320.0065THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 56 $30.00$1,680.00$22.00$1,232.00 -$8.00 -$448.0066TRAFFIC CONTROL & PROTECTION L SUM 1 $40,000.00$40,000.00$10,000.00$10,000.00 -$30,000.00 -$30,000.00TOTAL = $1,801,775.71 TOTAL = $1,593,301.10 TOTAL = -$208,474.61 VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITY1TREE ROOT PRUNING (SPECIAL) EACH 652TEMPORARY FENCEFOOT 117403INLET AND PIPE PROTECTION EACH 344AGGREGATE FOR TEMPORARY ACCESS TON 1755CONTAMINATED WASTE DISPOSAL TON 1006SODDING, SPECIALSQ YD 95757SUPPLEMENTAL WATERINGUNIT 2018CLASS D PATCHES, 2", SPECIAL SQ YD 92139HOT MIX ASPHALT DRIVEWAY PAVEMENT, 4" SQ YD 90110PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6" SQ YD 28011BRICK PAVER DRIVEWAY, REMOVAL AND REPLACEMENT SQ FT 183612COMBINATION CONCRETE CURB AND GUTTER, REMOVAL AND REPLACEMENT FOOT 176813CONCRETE CURB, REMOVAL AND REPLACEMENT FOOT 3314PROTECTIVE COATSQ YD 58815DRIVEWAY PAVEMENT REMOVAL SQ YD 118116PVC C-900 STORM SEWER 6", REMOVAL AND REPLACEMENT FOOT 2217PVC C-900 STORM SEWER 10", REMOVAL AND REPLACEMENT FOOT 6018PVC C-900 STORM SEWER 12", REMOVAL AND REPLACEMENT FOOT 14619PVC C-905 STORM SEWER 16", REMOVAL AND REPLACEMENT FOOT 17020PVC C-900 WATER MAIN, 6"FOOT 696221PVC C-900 WATER MAIN, 8"FOOT 194422STEEL CASING PIPE 12"FOOT 7023STEEL CASING PIPE 16"FOOT 2424GATE VALVE 6", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 1325GATE VALVE 8", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 626 NON-PRESSURE WATER MAIN CONNECTION "A" L SUM 127NON-PRESSURE WATER MAIN CONNECTION "B" L SUM 128NON-PRESSURE WATER MAIN CONNECTION "C" L SUM 129NON-PRESSURE WATER MAIN CONNECTION "D" L SUM 130 NON-PRESSURE WATER MAIN CONNECTION "E"L SUM131 NON-PRESSURE WATER MAIN CONNECTION "F"L SUM132NON-PRESSURE WATER MAIN CONNECTION "G" L SUM 133NON-PRESSURE WATER MAIN CONNECTION "H" L SUM 134NON-PRESSURE WATER MAIN CONNECTION "I" L SUM 135NON-PRESSURE WATER MAIN CONNECTION "J" L SUM 136NON-PRESSURE WATER MAIN CONNECTION "K" L SUM 1FEBRUARY 21, 2012UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOST$50.00$3,250.00$50.00$3,250.00$74.00$4,810.00$2.40$28,176.00$2.50$29,350.00$2.70$31,698.00$105.00$3,570.00$150.00$5,100.00$126.00$4,284.00$12.00$2,100.00$12.00$2,100.00$15.00$2,625.00$44.00$4,400.00$200.00$20,000.00$38.00$3,800.00$9.50$90,962.50$15.00$143,625.00$9.00$86,175.00$10.00$2,010.00$25.00$5,025.00$100.00$20,100.00$20.00$184,260.00$18.00$165,834.00$20.00$184,260.00$32.50$29,282.50$32.00$28,832.00$44.00$39,644.00$50.00$14,000.00$50.00$14,000.00$56.00$15,680.00$8.00$14,688.00$15.00$27,540.00$8.00$14,688.00$20.00$35,360.00$18.00$31,824.00$26.00$45,968.00$20.00$660.00$26.00$858.00$30.00$990.00$1.00$588.00$2.00$1,176.00$1.50$882.00$7.00$8,267.00$5.00$5,905.00$12.00$14,172.00$30.00$660.00$40.00$880.00$40.00$880.00$54.00$3,240.00$42.00$2,520.00$50.00$3,000.00$60.00$8,760.00$45.00$6,570.00$56.00$8,176.00$74.00$12,580.00$60.00$10,200.00$73.00$12,410.00$38.00$264,556.00$49.50$344,619.00$49.00$341,138.00$44.00$85,536.00$53.00$103,032.00$54.00$104,976.00$80.00$5,600.00$60.00$4,200.00$90.00$6,300.00$90.00$2,160.00$65.00$1,560.00$100.00$2,400.00$2,250.00$29,250.00$2,400.00$31,200.00$4,500.00$58,500.00$2,600.00$15,600.00$2,700.00$16,200.00$5,500.00$33,000.00$3,500.00$3,500.00$2,500.00$2,500.00$3,300.00$3,300.00$3,500.00$3,500.00$3,000.00$3,000.00$3,500.00$3,500.00$4,000.00$4,000.00$4,000.00$4,000.00$4,600.00$4,600.00$3,500.00$3,500.00$3,500.00$3,500.00$3,600.00$3,600.00$3,500.00$3,500.00$3,500.00$3,500.00$3,600.00$3,600.00$3,500.00$3,500.00$3,500.00$3,500.00$3,600.00$3,600.00$3,250.00$3,250.00$2,500.00$2,500.00$3,300.00$3,300.00$3,750.00$3,750.00$3,500.00$3,500.00$4,000.00$4,000.00$3,250.00$3,250.00$3,500.00$3,500.00$3,700.00$3,700.00$3,250.00$3,250.00$3,500.00$3,500.00$3,700.00$3,700.00$4,000.00$4,000.00$3,500.00$3,500.00$4,000.00$4,000.00GERARDI SEWER & WATER PATNICK CONSTRUCTION CERNIGLIA COMPANY VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITYFEBRUARY 21, 201237WATER SERVICE, NEAR SIDE, 1 1/2" EACH 3938WATER SERVICE, NEAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 539WATER SERVICE, NEAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 1040WATER SERVICE, FAR SIDE, 1 1/2" EACH 4241WATER SERVICE, FAR SIDE, 1 1/2" (SPECIAL) EACH 442WATER SERVICE, FAR SIDE, 1 1/2" (OPEN CUT) EACH 243WATER SERVICE, FAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 744WATER SERVICE, FAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 845WATER SERVICE, NEAR SIDE, 2" EACH 946WATER SERVICE, FAR SIDE, 2" EACH 847DRAINAGE STRUCTURE TO BE ADJUSTED EACH 1048WATER SERVICE ADJUSTMENT EACH 1049TRACER WIRE IN CONDUITFOOT 948650TRACER WIRE ACCESS BOXEACH 2951VALVE BOXES TO BE FILLEDEACH 1552VALVE VAULTS TO BE FILLED EACH 553VALVE BOXES TO BE REMOVED EACH 454FIRE HYDRANTSEACH 2955TEMPORARY FIRE HYDRANTEACH 156FIRE HYDRANTS TO BE REMOVED EACH 1957SELECT GRANULAR BACKFILL CU YD 588258CLSM BACKFILL (FLOWABLE FILL) CU YD 7059SANITARY SERVICE REPAIRFOOT 33560SUMP LINE REPAIREACH 561STREET SWEEPINGHOUR 20062TEST HOLESEACH 3363THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 6064THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 12065THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 5666TRAFFIC CONTROL & PROTECTION L SUM 1UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOSTGERARDI SEWER & WATER PATNICK CONSTRUCTION CERNIGLIA COMPANY$1,650.00$64,350.00$1,600.00$62,400.00$1,500.00$58,500.00$1,500.00$7,500.00$1,600.00$8,000.00$1,700.00$8,500.00$2,000.00$20,000.00$1,800.00$18,000.00$2,000.00$20,000.00$2,075.00$87,150.00$2,000.00$84,000.00$1,600.00$67,200.00$1,100.00$4,400.00$2,000.00$8,000.00$1,200.00$4,800.00$3,200.00$6,400.00$2,000.00$4,000.00$2,100.00$4,200.00$1,900.00$13,300.00$2,000.00$14,000.00$1,900.00$13,300.00$2,350.00$18,800.00$2,600.00$20,800.00$2,100.00$16,800.00$2,200.00$19,800.00$2,000.00$18,000.00$2,100.00$18,900.00$2,800.00$22,400.00$2,600.00$20,800.00$2,300.00$18,400.00$375.00$3,750.00$500.00$5,000.00$350.00$3,500.00$150.00$1,500.00$150.00$1,500.00$250.00$2,500.00$1.25$11,857.50$3.00$28,458.00$2.00$18,972.00$25.00$725.00$200.00$5,800.00$110.00$3,190.00$50.00$750.00$50.00$750.00$200.00$3,000.00$275.00$1,375.00$100.00$500.00$300.00$1,500.00$100.00$400.00$200.00$800.00$100.00$400.00$4,250.00$123,250.00$3,300.00$95,700.00$4,900.00$142,100.00$1,600.00$1,600.00$3,400.00$3,400.00$4,200.00$4,200.00$500.00$9,500.00$100.00$1,900.00$550.00$10,450.00$26.00$152,932.00$24.00$141,168.00$25.00$147,050.00$80.00$5,600.00$95.00$6,650.00$80.00$5,600.00$64.00$21,440.00$46.00$15,410.00$16.00$5,360.00$250.00$1,250.00$400.00$2,000.00$150.00$750.00$140.00$28,000.00$95.00$19,000.00$45.00$9,000.00$100.00$3,300.00$200.00$6,600.00$160.00$5,280.00$3.25$195.00$20.00$1,200.00$6.00$360.00$10.00$1,200.00$20.00$2,400.00$12.50$1,500.00$20.00$1,120.00$120.00$6,720.00$28.00$1,568.00$87,500.00$87,500.00$12,000.00$12,000.00$13,000.00$13,000.00TOTAL = $1,609,860.50 TOTAL = $1,656,856.00 TOTAL = $1,691,336.00 VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITY1TREE ROOT PRUNING (SPECIAL) EACH 652TEMPORARY FENCEFOOT 117403INLET AND PIPE PROTECTION EACH 344AGGREGATE FOR TEMPORARY ACCESS TON 1755CONTAMINATED WASTE DISPOSAL TON 1006SODDING, SPECIALSQ YD 95757SUPPLEMENTAL WATERINGUNIT 2018CLASS D PATCHES, 2", SPECIAL SQ YD 92139HOT MIX ASPHALT DRIVEWAY PAVEMENT, 4" SQ YD 90110PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6" SQ YD 28011BRICK PAVER DRIVEWAY, REMOVAL AND REPLACEMENT SQ FT 183612COMBINATION CONCRETE CURB AND GUTTER, REMOVAL AND REPLACEMENT FOOT 176813CONCRETE CURB, REMOVAL AND REPLACEMENT FOOT 3314PROTECTIVE COATSQ YD 58815DRIVEWAY PAVEMENT REMOVAL SQ YD 118116PVC C-900 STORM SEWER 6", REMOVAL AND REPLACEMENT FOOT 2217PVC C-900 STORM SEWER 10", REMOVAL AND REPLACEMENT FOOT 6018PVC C-900 STORM SEWER 12", REMOVAL AND REPLACEMENT FOOT 14619PVC C-905 STORM SEWER 16", REMOVAL AND REPLACEMENT FOOT 17020PVC C-900 WATER MAIN, 6"FOOT 696221PVC C-900 WATER MAIN, 8"FOOT 194422STEEL CASING PIPE 12"FOOT 7023STEEL CASING PIPE 16"FOOT 2424GATE VALVE 6", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 1325GATE VALVE 8", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 626 NON-PRESSURE WATER MAIN CONNECTION "A" L SUM 127NON-PRESSURE WATER MAIN CONNECTION "B" L SUM 128NON-PRESSURE WATER MAIN CONNECTION "C" L SUM 129NON-PRESSURE WATER MAIN CONNECTION "D" L SUM 130 NON-PRESSURE WATER MAIN CONNECTION "E"L SUM131 NON-PRESSURE WATER MAIN CONNECTION "F"L SUM132NON-PRESSURE WATER MAIN CONNECTION "G" L SUM 133NON-PRESSURE WATER MAIN CONNECTION "H" L SUM 134NON-PRESSURE WATER MAIN CONNECTION "I" L SUM 135NON-PRESSURE WATER MAIN CONNECTION "J" L SUM 136NON-PRESSURE WATER MAIN CONNECTION "K" L SUM 1FEBRUARY 21, 2012UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOST$53.00$3,445.00$90.00$5,850.00$150.00$9,750.00$2.25$26,415.00$2.50$29,350.00$1.70$19,958.00$128.00$4,352.00$175.00$5,950.00$155.00$5,270.00$33.00$5,775.00$15.00$2,625.00$5.00$875.00$51.00$5,100.00$50.00$5,000.00$88.00$8,800.00$6.00$57,450.00$10.50$100,537.50$8.30$79,472.50$0.01$2.01$10.00$2,010.00$150.00$30,150.00$9.00$82,917.00$23.00$211,899.00$26.00$239,538.00$25.00$22,525.00$33.00$29,733.00$37.50$33,787.50$59.00$16,520.00$56.00$15,680.00$54.00$15,120.00$5.00$9,180.00$12.00$22,032.00$7.50$13,770.00$12.00$21,216.00$5.00$8,840.00$24.00$42,432.00$12.00$396.00$35.00$1,155.00$28.00$924.00$1.00$588.00$1.50$882.00$1.00$588.00$11.00$12,991.00$9.00$10,629.00$5.50$6,495.50$54.00$1,188.00$40.00$880.00$54.50$1,199.00$68.00$4,080.00$48.00$2,880.00$53.00$3,180.00$70.00$10,220.00$58.00$8,468.00$51.00$7,446.00$107.00$18,190.00$74.00$12,580.00$68.00$11,560.00$48.00$334,176.00$44.00$306,328.00$29.00$201,898.00$58.00$112,752.00$48.00$93,312.00$32.50$63,180.00$103.00$7,210.00$80.00$5,600.00$99.50$6,965.00$114.00$2,736.00$85.00$2,040.00$135.00$3,240.00$2,634.00$34,242.00$2,800.00$36,400.00$2,600.00$33,800.00$2,987.00$17,922.00$3,250.00$19,500.00$2,900.00$17,400.00$4,092.00$4,092.00$2,100.00$2,100.00$3,600.00$3,600.00$4,092.00$4,092.00$2,100.00$2,100.00$3,600.00$3,600.00$4,577.00$4,577.00$2,800.00$2,800.00$3,775.00$3,775.00$4,343.00$4,343.00$2,100.00$2,100.00$3,550.00$3,550.00$4,343.00$4,343.00$21,000.00$21,000.00$3,550.00$3,550.00$4,343.00$4,343.00$2,100.00$2,100.00$3,550.00$3,550.00$4,048.00$4,048.00$1,950.00$1,950.00$3,600.00$3,600.00$4,605.00$4,605.00$2,200.00$2,200.00$3,500.00$3,500.00$4,231.00$4,231.00$3,800.00$3,800.00$3,775.00$3,775.00$4,048.00$4,048.00$2,200.00$2,200.00$3,300.00$3,300.00$4,475.00$4,475.00$2,750.00$2,750.00$3,775.00$3,775.00JOHN NERI CONSTRUCTION R. A. MANCINILENNY HOFFMAN EXCAVATING VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITYFEBRUARY 21, 201237WATER SERVICE, NEAR SIDE, 1 1/2" EACH 3938WATER SERVICE, NEAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 539WATER SERVICE, NEAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 1040WATER SERVICE, FAR SIDE, 1 1/2" EACH 4241WATER SERVICE, FAR SIDE, 1 1/2" (SPECIAL) EACH 442WATER SERVICE, FAR SIDE, 1 1/2" (OPEN CUT) EACH 243WATER SERVICE, FAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 744WATER SERVICE, FAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 845WATER SERVICE, NEAR SIDE, 2" EACH 946WATER SERVICE, FAR SIDE, 2" EACH 847DRAINAGE STRUCTURE TO BE ADJUSTED EACH 1048WATER SERVICE ADJUSTMENT EACH 1049TRACER WIRE IN CONDUITFOOT 948650TRACER WIRE ACCESS BOXEACH 2951VALVE BOXES TO BE FILLEDEACH 1552VALVE VAULTS TO BE FILLED EACH 553VALVE BOXES TO BE REMOVED EACH 454FIRE HYDRANTSEACH 2955TEMPORARY FIRE HYDRANTEACH 156FIRE HYDRANTS TO BE REMOVED EACH 1957SELECT GRANULAR BACKFILL CU YD 588258CLSM BACKFILL (FLOWABLE FILL) CU YD 7059SANITARY SERVICE REPAIRFOOT 33560SUMP LINE REPAIREACH 561STREET SWEEPINGHOUR 20062TEST HOLESEACH 3363THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 6064THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 12065THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 5666TRAFFIC CONTROL & PROTECTION L SUM 1UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOSTJOHN NERI CONSTRUCTION R. A. MANCINILENNY HOFFMAN EXCAVATING$1,596.00$62,244.00$1,800.00$70,200.00$1,530.00$59,670.00$1,693.00$8,465.00$1,850.00$9,250.00$1,400.00$7,000.00$2,012.00$20,120.00$200.00$2,000.00$2,400.00$24,000.00$2,080.00$87,360.00$2,100.00$88,200.00$2,320.00$97,440.00$2,056.00$8,224.00$1,000.00$4,000.00$750.00$3,000.00$1,866.00$3,732.00$2,400.00$4,800.00$2,250.00$4,500.00$2,137.00$14,959.00$2,200.00$15,400.00$2,125.00$14,875.00$2,341.00$18,728.00$2,750.00$22,000.00$2,760.00$22,080.00$1,947.00$17,523.00$2,500.00$22,500.00$2,050.00$18,450.00$2,503.00$20,024.00$2,750.00$22,000.00$3,000.00$24,000.00$315.00$3,150.00$275.00$2,750.00$650.00$6,500.00$522.00$5,220.00$50.00$500.00$650.00$6,500.00$1.08$10,244.88$2.75$26,086.50$1.50$14,229.00$390.00$11,310.00$100.00$2,900.00$175.00$5,075.00$205.00$3,075.00$50.00$750.00$200.00$3,000.00$364.00$1,820.00$250.00$1,250.00$425.00$2,125.00$190.00$760.00$100.00$400.00$320.00$1,280.00$3,764.00$109,156.00$3,800.00$110,200.00$4,500.00$130,500.00$4,349.00$4,349.00$5,500.00$5,500.00$1,700.00$1,700.00$483.00$9,177.00$600.00$11,400.00$560.00$10,640.00$31.00$182,342.00$35.00$205,870.00$47.50$279,395.00$279.00$19,530.00$120.00$8,400.00$91.00$6,370.00$57.00$19,095.00$42.00$14,070.00$50.00$16,750.00$354.00$1,770.00$150.00$750.00$650.00$3,250.00$25.00$5,000.00$5.00$1,000.00$130.00$26,000.00$168.00$5,544.00$100.00$3,300.00$450.00$14,850.00$5.00$300.00$5.00$300.00$6.00$360.00$15.00$1,800.00$8.00$960.00$18.00$2,160.00$30.00$1,680.00$30.00$1,680.00$37.00$2,072.00$181,137.11$181,137.11$66,000.00$66,000.00$40,000.00$40,000.00TOTAL = $1,696,624.00 TOTAL = $1,709,677.00 TOTAL = $1,744,144.50AS-READ =$1,690,777.00 VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITY1TREE ROOT PRUNING (SPECIAL) EACH 652TEMPORARY FENCEFOOT 117403INLET AND PIPE PROTECTION EACH 344AGGREGATE FOR TEMPORARY ACCESS TON 1755CONTAMINATED WASTE DISPOSAL TON 1006SODDING, SPECIALSQ YD 95757SUPPLEMENTAL WATERINGUNIT 2018CLASS D PATCHES, 2", SPECIAL SQ YD 92139HOT MIX ASPHALT DRIVEWAY PAVEMENT, 4" SQ YD 90110PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6" SQ YD 28011BRICK PAVER DRIVEWAY, REMOVAL AND REPLACEMENT SQ FT 183612COMBINATION CONCRETE CURB AND GUTTER, REMOVAL AND REPLACEMENT FOOT 176813CONCRETE CURB, REMOVAL AND REPLACEMENT FOOT 3314PROTECTIVE COATSQ YD 58815DRIVEWAY PAVEMENT REMOVAL SQ YD 118116PVC C-900 STORM SEWER 6", REMOVAL AND REPLACEMENT FOOT 2217PVC C-900 STORM SEWER 10", REMOVAL AND REPLACEMENT FOOT 6018PVC C-900 STORM SEWER 12", REMOVAL AND REPLACEMENT FOOT 14619PVC C-905 STORM SEWER 16", REMOVAL AND REPLACEMENT FOOT 17020PVC C-900 WATER MAIN, 6"FOOT 696221PVC C-900 WATER MAIN, 8"FOOT 194422STEEL CASING PIPE 12"FOOT 7023STEEL CASING PIPE 16"FOOT 2424GATE VALVE 6", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 1325GATE VALVE 8", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 626 NON-PRESSURE WATER MAIN CONNECTION "A" L SUM 127NON-PRESSURE WATER MAIN CONNECTION "B" L SUM 128NON-PRESSURE WATER MAIN CONNECTION "C" L SUM 129NON-PRESSURE WATER MAIN CONNECTION "D" L SUM 130 NON-PRESSURE WATER MAIN CONNECTION "E"L SUM131 NON-PRESSURE WATER MAIN CONNECTION "F"L SUM132NON-PRESSURE WATER MAIN CONNECTION "G" L SUM 133NON-PRESSURE WATER MAIN CONNECTION "H" L SUM 134NON-PRESSURE WATER MAIN CONNECTION "I" L SUM 135NON-PRESSURE WATER MAIN CONNECTION "J" L SUM 136NON-PRESSURE WATER MAIN CONNECTION "K" L SUM 1FEBRUARY 21, 2012UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOST$165.00$10,725.00$81.75$5,313.75$60.00$3,900.00$2.75$32,285.00$1.10$12,914.00$4.00$46,960.00$125.50$4,267.00$115.00$3,910.00$160.00$5,440.00$22.00$3,850.00$21.25$3,718.75$24.00$4,200.00$126.50$12,650.00$87.00$8,700.00$60.00$6,000.00$12.10$115,857.50$9.00$86,175.00$9.00$86,175.00$38.50$7,738.50$45.00$9,045.00$20.00$4,020.00$22.70$209,135.10$16.50$152,014.50$24.00$221,112.00$45.25$40,770.25$35.00$31,535.00$38.00$34,238.00$48.10$13,468.00$52.00$14,560.00$56.00$15,680.00$9.20$16,891.20$15.10$27,723.60$20.00$36,720.00$23.40$41,371.20$39.00$68,952.00$27.00$47,736.00$24.90$821.70$39.50$1,303.50$26.00$858.00$0.88$517.44$6.50$3,822.00$1.00$588.00$8.80$10,392.80$10.40$12,282.40$12.00$14,172.00$50.70$1,115.40$47.00$1,034.00$48.00$1,056.00$60.40$3,624.00$55.60$3,336.00$70.00$4,200.00$75.80$11,066.80$76.80$11,212.80$87.00$12,702.00$63.60$10,812.00$82.90$14,093.00$103.00$17,510.00$51.40$357,846.80$61.00$424,682.00$50.00$348,100.00$57.50$111,780.00$61.00$118,584.00$55.00$106,920.00$70.00$4,900.00$70.00$4,900.00$80.00$5,600.00$85.00$2,040.00$82.00$1,968.00$85.00$2,040.00$2,499.25$32,490.25$1,940.00$25,220.00$3,600.00$46,800.00$2,775.25$16,651.50$2,650.00$15,900.00$4,100.00$24,600.00$3,172.80$3,172.80$4,890.00$4,890.00$4,000.00$4,000.00$3,172.80$3,172.80$4,890.00$4,890.00$4,000.00$4,000.00$3,730.55$3,730.55$4,890.00$4,890.00$5,800.00$5,800.00$3,461.45$3,461.45$4,890.00$4,890.00$4,800.00$4,800.00$3,461.45$3,461.45$4,890.00$4,890.00$4,800.00$4,800.00$3,461.45$3,461.45$4,890.00$4,890.00$5,100.00$5,100.00$3,122.20$3,122.20$4,890.00$4,890.00$4,400.00$4,400.00$3,762.75$3,762.75$4,890.00$4,890.00$5,900.00$5,900.00$3,332.65$3,332.65$4,890.00$4,890.00$4,700.00$4,700.00$3,332.65$3,332.65$4,890.00$4,890.00$4,000.00$4,000.00$3,893.85$3,893.85$4,890.00$4,890.00$6,100.00$6,100.00UNIQUE PLUMBING PIRTANO CONSTRUCTION RICCIO CONSTRUCTION VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITYFEBRUARY 21, 201237WATER SERVICE, NEAR SIDE, 1 1/2" EACH 3938WATER SERVICE, NEAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 539WATER SERVICE, NEAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 1040WATER SERVICE, FAR SIDE, 1 1/2" EACH 4241WATER SERVICE, FAR SIDE, 1 1/2" (SPECIAL) EACH 442WATER SERVICE, FAR SIDE, 1 1/2" (OPEN CUT) EACH 243WATER SERVICE, FAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 744WATER SERVICE, FAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 845WATER SERVICE, NEAR SIDE, 2" EACH 946WATER SERVICE, FAR SIDE, 2" EACH 847DRAINAGE STRUCTURE TO BE ADJUSTED EACH 1048WATER SERVICE ADJUSTMENT EACH 1049TRACER WIRE IN CONDUITFOOT 948650TRACER WIRE ACCESS BOXEACH 2951VALVE BOXES TO BE FILLEDEACH 1552VALVE VAULTS TO BE FILLED EACH 553VALVE BOXES TO BE REMOVED EACH 454FIRE HYDRANTSEACH 2955TEMPORARY FIRE HYDRANTEACH 156FIRE HYDRANTS TO BE REMOVED EACH 1957SELECT GRANULAR BACKFILL CU YD 588258CLSM BACKFILL (FLOWABLE FILL) CU YD 7059SANITARY SERVICE REPAIRFOOT 33560SUMP LINE REPAIREACH 561STREET SWEEPINGHOUR 20062TEST HOLESEACH 3363THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 6064THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 12065THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 5666TRAFFIC CONTROL & PROTECTION L SUM 1UNITTOTALUNITTOTALUNITTOTALPRICECOSTPRICECOSTPRICECOSTUNIQUE PLUMBING PIRTANO CONSTRUCTION RICCIO CONSTRUCTION$2,400.00$93,600.00$2,215.00$86,385.00$1,840.00$71,760.00$2,250.00$11,250.00$2,075.00$10,375.00$2,025.00$10,125.00$3,275.00$32,750.00$1,845.00$18,450.00$3,300.00$33,000.00$2,750.00$115,500.00$2,040.00$85,680.00$2,800.00$117,600.00$3,100.00$12,400.00$1,750.00$7,000.00$2,500.00$10,000.00$2,600.00$5,200.00$3,150.00$6,300.00$3,500.00$7,000.00$2,250.00$15,750.00$2,515.00$17,605.00$3,000.00$21,000.00$3,275.00$26,200.00$1,845.00$14,760.00$3,900.00$31,200.00$3,600.00$32,400.00$2,615.00$23,535.00$2,800.00$25,200.00$3,900.00$31,200.00$2,250.00$18,000.00$4,000.00$32,000.00$210.00$2,100.00$260.00$2,600.00$325.00$3,250.00$465.00$4,650.00$555.00$5,550.00$465.00$4,650.00$1.60$15,177.60$1.45$13,754.70$5.00$47,430.00$72.00$2,088.00$22.00$638.00$110.00$3,190.00$50.00$750.00$17.60$264.00$100.00$1,500.00$150.00$750.00$465.00$2,325.00$170.00$850.00$150.00$600.00$281.00$1,124.00$95.00$380.00$3,460.50$100,354.50$4,355.00$126,295.00$4,350.00$126,150.00$6,444.50$6,444.50$4,225.00$4,225.00$7,450.00$7,450.00$350.00$6,650.00$520.00$9,880.00$400.00$7,600.00$22.00$129,404.00$39.50$232,339.00$26.00$152,932.00$187.50$13,125.00$100.00$7,000.00$145.00$10,150.00$28.80$9,648.00$40.00$13,400.00$40.00$13,400.00$400.00$2,000.00$180.00$900.00$90.00$450.00$113.85$22,770.00$85.00$17,000.00$105.00$21,000.00$385.00$12,705.00$198.00$6,534.00$115.00$3,795.00$3.65$219.00$3.55$213.00$7.00$420.00$13.20$1,584.00$10.85$1,302.00$8.00$960.00$27.50$1,540.00$21.50$1,204.00$15.00$840.00$4,950.00$4,950.00$7,100.00$7,100.00$32,600.00$32,600.00TOTAL = $1,824,731.64 TOTAL = $1,858,427.00 TOTAL = $1,948,809.00 VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITY1TREE ROOT PRUNING (SPECIAL) EACH 652TEMPORARY FENCEFOOT 117403INLET AND PIPE PROTECTION EACH 344AGGREGATE FOR TEMPORARY ACCESS TON 1755CONTAMINATED WASTE DISPOSAL TON 1006SODDING, SPECIALSQ YD 95757SUPPLEMENTAL WATERINGUNIT 2018CLASS D PATCHES, 2", SPECIAL SQ YD 92139HOT MIX ASPHALT DRIVEWAY PAVEMENT, 4" SQ YD 90110PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6" SQ YD 28011BRICK PAVER DRIVEWAY, REMOVAL AND REPLACEMENT SQ FT 183612COMBINATION CONCRETE CURB AND GUTTER, REMOVAL AND REPLACEMENT FOOT 176813CONCRETE CURB, REMOVAL AND REPLACEMENT FOOT 3314PROTECTIVE COATSQ YD 58815DRIVEWAY PAVEMENT REMOVAL SQ YD 118116PVC C-900 STORM SEWER 6", REMOVAL AND REPLACEMENT FOOT 2217PVC C-900 STORM SEWER 10", REMOVAL AND REPLACEMENT FOOT 6018PVC C-900 STORM SEWER 12", REMOVAL AND REPLACEMENT FOOT 14619PVC C-905 STORM SEWER 16", REMOVAL AND REPLACEMENT FOOT 17020PVC C-900 WATER MAIN, 6"FOOT 696221PVC C-900 WATER MAIN, 8"FOOT 194422STEEL CASING PIPE 12"FOOT 7023STEEL CASING PIPE 16"FOOT 2424GATE VALVE 6", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 1325GATE VALVE 8", VALVE VAULT 4' DIA, TYPE 1 FRAME, CLOSED LID EACH 626 NON-PRESSURE WATER MAIN CONNECTION "A" L SUM 127NON-PRESSURE WATER MAIN CONNECTION "B" L SUM 128NON-PRESSURE WATER MAIN CONNECTION "C" L SUM 129NON-PRESSURE WATER MAIN CONNECTION "D" L SUM 130 NON-PRESSURE WATER MAIN CONNECTION "E"L SUM131 NON-PRESSURE WATER MAIN CONNECTION "F"L SUM132NON-PRESSURE WATER MAIN CONNECTION "G" L SUM 133NON-PRESSURE WATER MAIN CONNECTION "H" L SUM 134NON-PRESSURE WATER MAIN CONNECTION "I" L SUM 135NON-PRESSURE WATER MAIN CONNECTION "J" L SUM 136NON-PRESSURE WATER MAIN CONNECTION "K" L SUM 1FEBRUARY 21, 2012UNITTOTALUNITTOTALPRICECOSTPRICECOST$175.00$11,375.00$60.00$3,900.00$2.50$29,350.00$5.00$58,700.00$150.00$5,100.00$125.00$4,250.00$25.00$4,375.00$9.50$1,662.50$100.00$10,000.00$50.00$5,000.00$8.00$76,600.00$9.75$93,356.25$1.00$201.00$125.00$25,125.00$32.00$294,816.00$24.00$221,112.00$40.00$36,040.00$45.00$40,545.00$50.00$14,000.00$65.00$18,200.00$12.00$22,032.00$18.00$33,048.00$18.00$31,824.00$35.00$61,880.00$25.00$825.00$45.00$1,485.00$1.00$588.00$6.50$3,822.00$10.00$11,810.00$17.50$20,667.50$40.00$880.00$85.00$1,870.00$50.00$3,000.00$115.00$6,900.00$60.00$8,760.00$100.00$14,600.00$95.00$16,150.00$120.00$20,400.00$70.00$487,340.00$62.00$431,644.00$75.00$145,800.00$65.00$126,360.00$125.00$8,750.00$120.00$8,400.00$165.00$3,960.00$155.00$3,720.00$3,400.00$44,200.00$5,250.00$68,250.00$3,850.00$23,100.00$5,500.00$33,000.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00$5,000.00$5,000.00$8,500.00$8,500.00SWALLOW CONSTRUCTIONA LAMP CONCRETE CONTRACTORS VILLAGE OF OAK BROOK2012 WATER MAIN REPLACEMENTPROJECT 1370BID TABULATION ITEMNO. PAY ITEM UNIT QUANTITYFEBRUARY 21, 201237WATER SERVICE, NEAR SIDE, 1 1/2" EACH 3938WATER SERVICE, NEAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 539WATER SERVICE, NEAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 1040WATER SERVICE, FAR SIDE, 1 1/2" EACH 4241WATER SERVICE, FAR SIDE, 1 1/2" (SPECIAL) EACH 442WATER SERVICE, FAR SIDE, 1 1/2" (OPEN CUT) EACH 243WATER SERVICE, FAR SIDE, 1 1/2" (5-FOOT BEYOND BACK-OF-CURB) EACH 744WATER SERVICE, FAR SIDE, 1 1/2" (25-FOOT BEYOND RIGHT-OF-WAY) EACH 845WATER SERVICE, NEAR SIDE, 2" EACH 946WATER SERVICE, FAR SIDE, 2" EACH 847DRAINAGE STRUCTURE TO BE ADJUSTED EACH 1048WATER SERVICE ADJUSTMENT EACH 1049TRACER WIRE IN CONDUITFOOT 948650TRACER WIRE ACCESS BOXEACH 2951VALVE BOXES TO BE FILLEDEACH 1552VALVE VAULTS TO BE FILLED EACH 553VALVE BOXES TO BE REMOVED EACH 454FIRE HYDRANTSEACH 2955TEMPORARY FIRE HYDRANTEACH 156FIRE HYDRANTS TO BE REMOVED EACH 1957SELECT GRANULAR BACKFILL CU YD 588258CLSM BACKFILL (FLOWABLE FILL) CU YD 7059SANITARY SERVICE REPAIRFOOT 33560SUMP LINE REPAIREACH 561STREET SWEEPINGHOUR 20062TEST HOLESEACH 3363THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 6064THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 12065THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 5666TRAFFIC CONTROL & PROTECTION L SUM 1UNITTOTALUNITTOTALPRICECOSTPRICECOSTSWALLOW CONSTRUCTIONA LAMP CONCRETE CONTRACTORS$1,650.00$64,350.00$1,800.00$70,200.00$1,700.00$8,500.00$1,600.00$8,000.00$2,500.00$25,000.00$4,300.00$43,000.00$1,950.00$81,900.00$2,800.00$117,600.00$1,950.00$7,800.00$1,500.00$6,000.00$1,950.00$3,900.00$2,800.00$5,600.00$2,200.00$15,400.00$2,450.00$17,150.00$2,750.00$22,000.00$4,200.00$33,600.00$1,850.00$16,650.00$2,500.00$22,500.00$2,500.00$20,000.00$4,500.00$36,000.00$325.00$3,250.00$250.00$2,500.00$150.00$1,500.00$50.00$500.00$1.00$9,486.00$1.50$14,229.00$350.00$10,150.00$45.00$1,305.00$300.00$4,500.00$125.00$1,875.00$300.00$1,500.00$285.00$1,425.00$125.00$500.00$95.00$380.00$4,000.00$116,000.00$7,500.00$217,500.00$2,000.00$2,000.00$6,500.00$6,500.00$600.00$11,400.00$600.00$11,400.00$36.00$211,752.00$26.00$152,932.00$200.00$14,000.00$25.00$1,750.00$85.00$28,475.00$125.00$41,875.00$500.00$2,500.00$350.00$1,750.00$125.00$25,000.00$135.00$27,000.00$150.00$4,950.00$300.00$9,900.00$10.00$600.00$3.50$210.00$20.00$2,400.00$10.50$1,260.00$35.00$1,960.00$28.50$1,596.00$100,000.00$100,000.00$75,000.00$75,000.00TOTAL = $2,163,299.00 TOTAL = $2,331,934.25