Loading...
2017 PD Renovations Addendum 2Shales McNutt Construction Village of Oak Brook Police Dated: October 3, 2017 Addendum #2 Detention Zone Renovation Addition Shales McNutt Construction ADDENDUM # 2 Page: 1/1 This Construction Manager’s Addendum No. 2 dated October 3, 2017 is being issued stand alone. The following is a summary of changes to be made to the Construction Manager's Bid Manual for this project. Please review and incorporate all changes into your bid. This addendum shall be noted on the bid form verifying inclusion of this work in your bid. ADDENDUM NO. 2 1. The following change applies to all bid packages: A. All addenda shall be noted on the front page of the bid form. Bid addenda can be verified on PROCORE. B. All bidder questions shall be received not later than 5:00 PM, Wednesday, October 4, 2017 2. The following questions have been received and are answered as follows (Any and all work related to/implied by the response to the RFI’s noted below, shall be included in the bid package indicated/required to provide this work): Q.  There is no HVAC spec section for BAS Controls.  Who is the “existing” BAS contractor for the Village?  A. The building automation system is Trane,  Dillon Drayer is the rep, 630 734‐3200.  END OF CM ADDENDUM NO. 2