2017 PD Renovations Addendum 3Shales McNutt Construction Village of Oak Brook Police Dated: October 6, 2017
Addendum #3 Detention Zone Renovation Addition
Shales McNutt Construction ADDENDUM # 3
Page: 1/2
This Construction Manager’s Addendum No. 3 dated October 6, 2017 is being issued stand alone.
The following is a summary of changes to be made to the Construction Manager's Bid Manual for this
project. Please review and incorporate all changes into your bid. This addendum shall be noted on the bid
form verifying inclusion of this work in your bid.
ADDENDUM NO. 3
1. The following change applies to all bid packages:
A. All addenda shall be noted on the front page of the bid form. Bid addenda can be verified on
PROCORE.
B. New bid form attached.
C. Revised alternate sheet attached
2. In the SCOPE OF WORK sections, make all changes as outlined below:
A. Bid Package #06A – General Trades
Item Revision:
8.
Miscellaneous
Furnish and install all carpet and resilient base as shown and indicated on the contract
documents.
3. The following questions have been received and are answered as follows (Any and all work
related to/implied by the response to the RFI’s noted below, shall be included in the bid package
indicated/required to provide this work):
Q. Which bid package is doing the carpet?
A. The walk mat and all resilient base will be provided by Bid Package #06A – General Trades.
Q. Which rooms are getting resilient base?
A. Only L28, as referenced #62
Q. Which rooms are getting epoxy base?
A. all others as referenced #60 except L29D, L29E and L46
Q. What is the height of the resilient base?
A. 4‐inches per specification
Q. Are the concrete benches being covered with epoxy?
A. No. Finish the benches with the specified Resinous Flooring product (Tnemec Series 287)
Q. Cove Base is to be figured with the Double Broadcast Quartz Epoxy according to the spec, is there a
designated height?
A. 6‐inches
Shales McNutt Construction Village of Oak Brook Police Dated: October 6, 2017
Addendum #3 Detention Zone Renovation Addition
Shales McNutt Construction ADDENDUM # 3
Page: 2/2
Q. For the resinous flooring is cove base to be figured into our proposal and what height would we need to
figure?
A. No base is required at these locations (gun range)
Q. IS THIS JOB TAX EXEMPT?
A. Yes. Tax exempt form is included in the Scope of Work Notes.
Q. We were not able to attend the job walk on Sept. 27th for this project. Was it a mandatory job walk? And
is it possible to go to the site and do a field take off?
A. We have arranged with the Village for a second walkthrough to be held at the Village complex on
Monday, October 9, 2017 at 11:30 am. Meet on the upper level at the east doors to the facility.
Q. Where can we stockpile existing material for use of backfill and black dirt reuse?
A. There is no space on the site for stockpiling of existing soils. Material will need to be removed from
site.
END OF CM ADDENDUM NO. 3
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
From:
(Bidders Name)
(Address)
(City, State, Zip Code)
To:
Attn:
of
City State Zip Code
Bid Package: Name & Number:
for the lump sum of:
_____________________________________________Dollars ($_________________)
this amount constituting my/our base bid.
Check here if you are submitting a combined bid on the next page.
(An Individual)
Telephone No.
Detention Area Renovation & Addition
for the renovations and additions, located at 1200 Oak Brook Rd, Oak Brook, IL , and hereby agrees to
execute a Contract, furnish satisfactory Bonds and Certificates, and complete the referenced project in strict
accordance with the Contract Documents. The undersigned Bidder agrees, if this Bid is accepted, to enter
into an Agreement with the Owner in the form identified in the Contract Documents to complete the Work as
specified or indicated in the Bid Documents for the Contract Price and within the Contract time indicated in
this Bid. The Bid reflects the Owner's status as a Tax exempt Agency.
Oak Brook, Illinois 60523
Rania Serences - Purchasing Clerk
The undersigned, having inspected the site and familiarized ourselves/myself with the local conditions
affecting the cost of the work and all the Contract Documents including Construction Manager’s Scope of
Work Plan Notes dated September 19, 2017, as well as the Architect’s Plans, and Specifications as
scheduled on the title sheet all dated February 15, 2017, and Addenda No.___, dated __________, No.___,
dated ___________ and No.___, dated ___________ as prepared by : Williams Architects, 500 Park
Boulevard, Suite 800, Itasca, IL 60143, and on file in the office of: Shales McNutt Construction, LLC, 425
Renner Drive Elgin, IL 60123
(A Partnership)
This Bid is submitted to the Board of Trustees of the Village of Oak Brook, IL :
BID FORM
Include but not limited to the following: Scope of Work Notes, Project Specifications, Construction Documents
Village of Oak Brook Police
ALL BID PACKAGES ARE COVERED BY THIS FORM
Street Address
Board of Trustees - Village of Oak Brook
(A Corporation) ( A Joint-Venture)
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
Bid Packages: Names & Numbers:
for the lump sum of:
_____________________________________________Dollars ($_________________)
this amount constituting my/our base bid.
2. BID BREAKDOWN (Required - Failure to complete may result in disqualification of bid):
Quantity Units Unit Price Total
Estimated Insurance Costs for your firms typical base insurance coverage
Total Base Bid (Shall match lump sum bid amount from page 1)
$
Bond $
Overhead & Profit $
$
Adder for specified insurance coverage
$
$
Allowance:
$
*** Project Payment will be based on Lump Sum Bid Amount ***
Allowance: $
Allowance:
Sub - Total
1. COMBINED BID:
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
3. ALTERNATE BIDS:
Alternate
No.
1
Alternate
No.
2
N/A
Alternate
No.
3
N/A
Alternate
No.
4
N/A
Alternate
No.
5
N/A
Voluntary
Alternate
4. BONDING CERTIFICATION:
5. CONSTRUCTION TIME:
6. RIGHT TO REJECT BIDS AND SIGNING CONTRACT:
Alternate Bid Price add/deduct:
Voluntary Alternate Bid Price add/deduct:
All work will be performed per the attached Construction Manager’s Schedule. Each trade contractor will
work in sequence within the limits described. Adjustments to the sequence MUST BE SUBMITTED TO THE
OWNER AND CONSTRUCTION MANAGER IN WRITING AND must be approved by the Construction
Manager. Under no circumstances will the final completion date of the TRADE PACKAGE AS LISTED ON
THE SCHEDULE be changed without written approval from the Construction Manager and Owner.
Bidder to describe Voluntary Alternate
Alternate Bid Price add/deduct:
Alternate Bid Price add/deduct:
The undersigned agrees and hereby certifies that his company is 100 percent bondable for performance as
well as material and labor payment bonds for said project. The cost of the Bond are included in Base Bid.
If awarded a Contract, the undersigned agrees to begin construction per construction manager’s schedule.
In submitting this Bid, it is understood that the right is reserved by the Owner to reject any and all bids. If
written notice of the acceptance of the bid mailed, telegraphed, or delivered to the undersigned within 90
days after the opening thereof, or at anytime thereafter before this Bid is withdrawn by written notifications,
the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required
bonds within 10 days after the Contract is presented to him for signature.
Alternate Bid Price add/deduct:
Furnish and install temporary construction entrance (Contractor to install presto
geosystems "geoterra" structural mat system using manufacturing specifcations) as
shown and indicated on drawing C5.0. Base bid is not to include this work.
Alternate Bid Price add/deduct:
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
1.
2.
8. FREEDOM OF INFORMATION ACT REQUIREMENTS:
1
2
3
a.
7. PREVAILING WAGE PROJECT:
The general prevailing rate of wages in the locality for each craft or type of worker or mechanic
needed to execute the contract or perform such work and the general prevailing rate for legal
holiday and overtime work, shall be not less that the prevailing rate of wages as found by the
Board, the Illinois Department of Labor, or the court on review, and be paid for each craft or type
of worker needed to execute the contract or to perform such work;
It shall be mandatory upon the contractor to whom the contract is awarded and upon any
subcontractor, to pay not less than the specified rates to all laborers, workmen, and mechanics
employed in the execution on the contract of such work.
All Contractors' bonds shall include such provision as will guarantee the faithful performance of such
prevailing wage clause as provided by contract (820 ILCS 130/0.01 et seq)
It is contesting its liability for the tax or the amount of tax in accordance with
procedures established by the appropriate Revenue Act; or
9. CERTIFICATION FOR CONTRACT:
The Contractor is not currently delinquent in the payment of any tax administered by or owed to
Illinois Department of Revenue or otherwise in default upon any such tax as defined by the Illinois
The Contractor is fully aware of and able to comply with all Local, State and federal Safety and
other Laws, Codes and regulations applicable for the construction of the Project.
The contractor ensures that they operate a drug-free environment and that drugs are not allowed
in the workplace or satellite locations as well as the project site in accordance with the Drug Free
Workplace Act of January 1992.
This project is subject to the State of Illinois Prevailing Wage requirements for DuPage County, IL, and as
such the provisions of the Prevailing Wage Act shall be complied with in all applicable work to be performed
at the Village of Oak Brook Police (820 ILCS 130/0.01 et seq.).
The Bidder acknowledges that the Freedom of Information Act, 5 ILCS 140/1 et seq. (the “Act”) places an
obligation on Village of Oak Brook, (the, “Owner”), to produce certain records that may be in the possession
of Bidder. Bidder shall comply with the record retention and documentation requirements of the Local
Records Retention Act 5 ILCS 160/1 et seq. and the Act and shall maintain all records relating to any work
being done for the Owner in compliance with the Local Records Retention Act and the Act (complying in all
respects as if the Bidder was, in fact, the Owner). Bidder shall review its records promptly and produce to the
Owner within two business days of request by the Owner the required documents responsive to a request
under the Act. If additional time is necessary to comply with the request, the Bidder may request the Owner
to extend the time do so, and the Owner will, if time and a basis for extension under the Act permits,
consider such extensions. Bidder further acknowledges that the Act, as amended and effective January 1,
2010, provides for severe criminal and civil penalties for willful failure to comply with its terms. Accordingly,
Bidder does hereby agree, as an additional condition of being awarded a bid or the Construction Manager
agreeing to contract with Bidder to provide labor, services or materials to the Owner, that it will hold harmless
and indemnify, including costs and reasonable attorneys fees, the Construction Manager, the Owner and its
Trustees, officers, agents and employees, against all damages incurred or penalties or fees assessed
against it or them because of non-compliance with this agreement or the Act or the production requirements
imposed under the Act.
The undersigned, as duly authorized representative of the Contractor, hereby certifies to the Board of
Trustees of Village of Oak Brook, that regarding this project known as the Village of Oak Brook Police -
Detention Area Renovation & Addition located at 1200 Oak Brook Rd, Oak Brook, IL 60523:
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
b.
4
5
ATTACHMENTS (These documents shall be attached to the bid form):
Bid Form
Bid Bond
Qualification form
Contractor Wage breakdown for 2017/2018 and 2018/2019
OTHER
Secretary
It has entered into agreement with the department of revenue for payment of all taxes
due and is currently in compliance with that agreement.
The Contractor is not barred from bidding on the Project, or entering into this Contract as a result
of a violation of either Section 33E-3 or 33E-4 of the Illinois Criminal Code of 1961, or any similar
offense of "bid rigging" or 'bid rotating" of any state of the United States.
Firm Name
Title
Telephone Number
By
Certificate of Insurance or letter from Insurance Agent verifying coverage as required
by the Project Documents
The Contractor has a written Sexual Harassment Policy in place in full compliance with all
applicable state and local laws and policies.
(NOTE: If Bidder is a corporation, the corporate seal must be affixed)
The undersigned further agrees and guarantees the amount set down hereinbefore to be firm for the same
90 days. If the undersigned is not one of the three lowest bidders, the bid deposit may be retained for five
days from the date of opening of the bids.
IN WITNESS WHEREOF the undersigned Bidder has caused his/its signature and seal to be affixed hereto
Attest:
Official Address
Shales McNutt Construction
Scope of Work Notes
Village of Oak Brook Police
Detention Zone Renovation Addition
Dated: September 19, 2017
Add #3: October 6, 2017
Alternate No. 1
Alternate No. 2
Alternate No. 3
Alternate No. 4
Alternate No. 5
Voluntary
Alternate
End of Alternates
ALTERNATES
Include but not limited to the following: Bid Packet Notes, Project Specifications, Construction Documents
Bidder to describe Voluntary Alternate
Furnish and install temporary construction entrance (Contractor to install presto geosystems "geoterra" structural
mat system using manufacturing specifcations) as shown and indicated on drawing C5.0. Base bid is not to
include this work.