Fire Station 93 Shower Rooms Piping and Valve Replacement Pre-Bid Minutes and Attendance SheetMeeting Minutes
Project [18-172-1197] - 1197 -
Village of Oak Brook - Fire
Station 93 Shower Rooms
View Date 9/21/2018
Kluber, Inc.
10 S. Shumway Ave.
Batavia, IL 60510
Phone: (630) 406-1213
Meeting No. 18-172-
1197-002
Meeting Type Pre-Bid
Subject Pre-Bid Meeting
Prepared By Rachel Whelan
Date 9/20/2018
Time 10:00 AM CT
Location Fire Station 93, Oak Brook, IL
Meeting Attendance
Company - Attendee Required Attended Company - Attendee Required Attended
Kluber, Inc. - Charli Johnsos Village of Oak
Brook - Doug Patchin
Kluber, Inc. - Rachel Whelan Village of Oak
Brook - Rania Serences
Village of Oak
Brook - Doug Hroba
Village of Oak
Brook - Rick Valent
Ordered By Item No.
18-172-1197-002-001
Summary Project Team
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. Kluber Architects + Engineers
a. Charli Johnsos, Project Manager
b. Rachel Whelan, Project Coordinator
2. Village of Oak Brook
a. Doug Hroba, Fleet and Facilities Supervisor
b. Doug Patchin, Public Works Director
c. Rania Serences, Senior Purchasing Agent
d. Rick Valent - Public Works Superintendent
3. Project Work Site
Fire Station 93, 725 Enterprise Road, Oak Brook, Illinois 60523
Project Team was reviewed. Charli Johnsos made business cards available to potential bidders.
18-172-1197-002-002
Summary Invitation for Bidder's Proposals
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. Scope of Work: This project consists of the replacement of the galvanized piping for the
showers at Fire Station 93. The existing shower pans and the repair of the tile walls and floors
Page 1 of 5Meeting Minutes
9/21/2018https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=...
will also be included as this piping is replaced. The general contractor shall provide and install all
materials, unless noted otherwise.
2. Bid Package:
a. Invitation for Bidder's Proposals
b. General Instructions to Bidders
c. Addenda, if any
d. Bidder's Proposal
e. Bidder's Sworn Acknowledgement
f. Bidder's Sworn Work History Statement
g. Other information submitted by Bidder, if requested
h. Notice of Award
i. Contract, including all attachments and appendicies, if any
3. Bid Documents:
a. Viewable at no charge online at www.oak-brook.org
b. A paper hard copy may be obtained in person from Owner's Purchasing Division, Butler
Government Center, 1200 Oak Brook Road,Oak Brook, Illinois 60523.
4. Pre-Bid Meeting: Every prospective bidder is required to attend the Pre-Bid Meeting. Failure to
attend will disqualify the bidder.
a. Make sure you have signed in on the Sign-In sheet.
b. Leave business card with all contact information.
5. Bid Opening: Owner will receive sealed Bidder's Proposals for the Work until 10:00 A.M., local
time, Thursday, September 27, 2018, in the Samuel E. Dean Board Room, at the Butler
Government Center located at 1200 Oak Brook Road,Oak Brook, Illinois 60523, at which time,or
as soon thereafter as possible, all Bidder's Proposals will be publicly opened and read aloud.
Bidders or their agents are invited to be present.
Information was reviewed. Bid Opening is 10 AM on 9/27. The Pre-Bid Meeting is mandatory. Potential
bidders signed in and left their business card. It is attached to these minutes.
18-172-1197-002-003
Summary Bidder's Proposal
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. The Bidder's Proposal should consist of the following documents:
a. The Bidder's Proposal Form, as furnished by the Village of Oak Brook
b. A copy of each Addendum issued
c. The Bidder's Sworn Acknowledgement as furnished by the Village of Oak Brook
d. The Bidder's Work History Statement, as furnished by the Village of Oak Brook
e. The Required Bid Security in the form of a Cashier's Check, Certified Check or Bid Bond
(at least 5% of the Bidder's Price Proposal)
f. A letter from Bidder's Insurance Carrier certifying that said insureree has read the
requirements and will issue the required certificates on award of Contract.
2. One copy of each Bidder's Proposal, properly signed, together with all other required documents
shall be enclosed in a sealed envelope or package.
This was reviewed. Potential bidders were reminded to label the envelope containing their bid
proposal with their name and the project.
18-172-1197-002-004
Summary General Instructions to Bidders
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Page 2 of 5Meeting Minutes
9/21/2018https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=...
Discussion Details
1. Addenda, if required, will be issued prior to bid opening and shall become a part of the Bid
Package. Intent is to issue final addenda no later than Monday, September 24th.
2. Prevailing wages are required.
3. Owner is exempt from state and local sales, use and excise taxes. Tax Exemption Letter will be
furnished by Village of Oak Brook.
4. Contractor shall be responsibl for applying for and obtaining all permits. These costs should be
included in bid price.
5. Award of Contract, if Contract is awarded, will be made within 45 days of Bid Opening.
a. The successful bidder will be required to furnish a Performance and Payment Bond
b. The successful bidder will be required to furnish Certificates of Insurance as required by
Section 4.2 of the Contract.
6. Any questions, clarifications or substitution requests need to occur in writing via email to Charli
Johnsos at cjohnsos@kluberinc.com and Rania Serences at rserences@oak-brook.org. Oral or
other interpretations or clarifications will be without legal effect. The last day to submit
questions, substitution requests for incorporation into addenda will be Friday, September 21st.
This information was reviewed with no furter comments.
18-172-1197-002-005
Summary Contract Terms
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. The Village of Oak Brook's Contract for Fire Station 93 - Piping and Valve Replacement contains
the following:
a. Article I = The Work
b. Article II = Changes and Delays
c. Article III = Contractor's Responsibility for Defective Work
d. Article IV = Financial Assurances
e. Article V = Payment
f. Article VI = Disputes and Remedies
g. Article VII = Legal Relationships and Requirements
h. Attachment A = Supplemental Schedule of Contract Terms
i. Attachment B = Specifications
j. Attachment C = List of Drawings
k. Attachment D = Special Project Requirements
i. Appendix 1 = Prevailing Wage Ordinance
ii. Appendix 2 = Form of Performance Bond
iii. Appendix 3 = Labor and Materials Payment Bond
The Contract is viewable in Oak Brook's front end of the specifications.
18-172-1197-002-006
Summary Preliminary Schedule
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. Award of Contract: October 9, 2018
Page 3 of 5Meeting Minutes
9/21/2018https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=...
2. Commencement of Construction: October 10, 2018
3. Substantial Completion: December 19, 2018
The Work should be substantially complete before the holidays.
18-172-1197-002-007
Summary Work Site
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
1. Work is being performed in bathroom, so other bathroom must remain open and accessible
during construction.
2. Barriers: Provide in bid price cost to provide temporary barrier in bathroom to prevent
unauthorized entry into construction areas, to contain construction dust and to allow Owner's
use of site while Work is being performed.
This information was reviewed with no further comment.
18-172-1197-002-008
Summary Owner Comments
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
None.
18-172-1197-002-009
Summary Contractor Questions
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
Question 1. Will the galvanized piping to the hydrant between the two showers be replaced? It is not
currently shown on the drawings.
Answer: Yes. This will be addressed by addendum.
Question 2. Will the plumber be doing all the demo work?
Answer: It does not matter who does the demo, as long as it is coordinated. The plumber can do all
the demo work. If the plumber plans to do the demo, make sure it is noted to the GC.
Question 3. Is there a shower basin in the specifications?
No, there will not be a new basin. The current terrazzo basin is to be removed, the drain is going to be
relocated and then the floor will be mud base with a ceramic tile top.
Page 4 of 5Meeting Minutes
9/21/2018https://secure.constructware.com/Common/View/Document_Display.asp?DocumentType=...
18-172-1197-002-010
Summary Tour of Space
Desired Outcome
Responsible Parties
Originated
Due
Resolved
Complete
Discussion Details
All information reported on this document is assumed to be accurate and correct. The
information on the document will remain on record unless changes are reported in writing
within seven (7) days of this report to the Kluber, Inc. office.