Engineering Services Agreement York and Harger Intersection Improvement Project CONSTRUCTION ENGINEERING SERVICES AGREEMENT
VILLAGE OF OAK BROOK
THIS AGREEMENT, made and entered into this�t das+y of
2020, by and between Civiltech Engineering, Inc., (hereinafter referred to as "ENGINEER")
and the Village of Oak Brook, a municipal corporation (hereinafter referred to as "VILLAGE")
covers certain professional engineering services in connection with the York Road/Harger
Road Intersection Improvement Project, (hereinafter referred to as "PROJECT").
The VILLAGE wishes to retain ENGINEER for these certain professional engineering
services and ENGINEER is willing to perform such services for the compensation and in
accordance with the terms and conditions described in this Agreement.
NOW,THEREFORE,in consideration of the mutual benefits, covenants and agreements
contained within this Agreement, the parties agree as follows:
1. SCOPE OF SERVICES
ENGINEER agrees to perform engineering consulting services as defined in the Scope
of Services attached as Appendix I and made a part of this Agreement.
2. COMPENSATION AND PAYMENT
ENGINEER shall be paid by VILLAGE for all services stipulated within this Agreement
according to the Compensation Schedule attached as Appendix II and made a part of this
Agreement.
Payment to ENGINEER shall be made by VILLAGE upon receipt of ENGINEER'S
monthly invoice. The invoice shall consist of a summary of direct labor hours by
ENGINEER'S standard job classification times the respective factors as depicted in
Appendix II plus listing of reimbursable costs incurred with copies of appropriate
invoices. The invoice will state the phase of work for which it applies, if a multi-phase
scope is used (e.g., design, construction, etc.). If VILLAGE identifies an item in the
invoice which appears to be in error, VILLAGE may withhold the amount in question,
pay the balance of the invoiced amount, and provide ENGINEER with a statement
concerning the questioned item. Alternatively, VILLAGE may pay the invoiced amount
in full, provide ENGINEER with a statement of the questioned item, and an adjustment,
if appropriate, will be made in the next subsequent invoice submitted by ENGINEER.
Engineer will mark "Invoice number and final" on the invoice which closes
out this contract or a phase of the contract.
If VILLAGE fails to make any payment due ENGINEER for services and expenses,
including amounts wrongly withheld, within thirty (30) days after submittal of
ENGINEER'S billing thereof,the amounts due ENGINEER shall include a charge at the
rate of one percent (1.0) per month from such thirtieth (30th) day; and, in addition, the
ENGINEER may, after giving seven (7) days written notice to VILLAGE, suspend
services under this Agreement until it has been paid in full the amounts due it for services
and expenses. During the period of any such suspension, the parties shall have the same
rights and obligations as are provided by Subsection 5(e) of this Agreement.
3. TIME SCHEDULE
The services required by this Agreement shall be completed in accordance with the Time
Schedule attached as Appendix III and made a part of this Agreement. It is recognized by
the parties that the Time Schedule may be contingent upon factors beyond the control of
either party. Both parties will take all reasonable steps to adhere to the Time Schedule.
4. TERM OF AGREEMENT
Unless extended by amendment, this Agreement shall terminate at the time of receipt of
final payment by the ENGINEER, provided that all warranties and representations shall
survive said final payment.
5. GENERAL TERMS AND CONDITIONS
a. Modification
The nature and the scope of services specified in this Agreement may only be
modified by written amendment to this Agreement approved by both parties.
b. Relationship between ENGINEER and VILLAGE
ENGINEER shall serve as VILLAGE'S professional engineering consultant in
those phases of the PROJECT to which this Agreement applies. The relationship
is that of a buyer and seller of professional services, and it is understood that the
parties have not entered into any joint venture or partnership with the other.
C. Responsibility of the ENGINEER
That all plans and other documents furnished by the ENGINEER pursuant to this
Agreement will be endorsed by him and will show his professional seal where
such is required by law.
Notwithstanding anything to the contrary which may be contained in this
Agreement or any other material incorporated herein by reference, or in any
agreement between VILLAGE and any other party concerning the PROJECT,
ENGINEER shall not have control or be in charge of and shall not be responsible
for the means, methods, techniques, sequences or procedures of construction, or
the safety, safety precautions or programs of VILLAGE, the construction
contractor, other contractors or subcontractors performing any of the work or
providing any of the services on the PROJECT, nor shall ENGINEER be
responsible for the acts or omissions of VILLAGE provided that the ENGINEER
has properly executed his duties. ENGINEER shall not be responsible for the
failure of VILLAGE, any architect, engineer, consultant, contractor or
subcontractor to carry out their respective responsibilities in accordance with the
PROJECT documents, or any other agreement concerning the PROJECT. Any
provision which purports to amend this provision shall be without effect unless it
contains a reference that the content of this Subsection 5(c)is expressly amended
for the purposes described in such amendment and is signed by ENGINEER.
d. Corrections
In the event plans, surveys or construction staking is found to be in error and
revisions of the plans or survey or construction staking are necessary, the
ENGINEER agrees that he will perform such work without expense to the
VILLAGE, even though final payment has been received by him. He shall give
immediate attention to these changes so there will be a minimum delay to the
contractor.
e. Suspension of Services
VILLAGE may, at any time, by written order to ENGINEER (Suspension of
Services Order), require ENGINEER to stop all, or any part of, the services
required by this Agreement. Upon receipt of such an order, ENGINEER shall
immediately comply with its terms and take all reasonable steps to minimize the
occurrence of costs allocable to the services covered by the order.
ENGINEER will not be obligated to provide the same personnel employed prior
to suspension when the services are resumed, in the event the period of any
suspension exceeds thirty(30) days.
f. Termination
1) The VILLAGE shall have the right to terminate this Agreement with or
without cause upon serving thirty(30) days written notice upon the other
ply.
2) Upon such termination,the liabilities of the parties to this Agreement shall
cease,but they shall not be relieved of the duty to perform their obligations
up to the date of termination. All warranties and the provisions of Section
5, Paragraph I shall be in full force and effect after termination.
Upon such termination, ENGINEER shall cause to be delivered to the
VILLAGE all drawings, specifications, partial and completed estimates,
and any and all other data concerning the PROJECT which ENGINEER
is then accomplishing for the VILLAGE. ENGINEER shall be paid for
any services completed and any services partially completed in
accordance with Sections 2 and 3.
g. Warranties
In addition to the covenants herein made,the ENGINEER represents and certifies
that its engineering services shall be performed in accordance with the standards
of professional practice, care, and diligence practiced by recognized engineering
firms in the industry in performing services of a similar nature in existence at the
time of performance. The representations and certifications expressed shall be in
addition to any other representations and certifications expressed in this
Agreement, or expressed or implied by law, which are hereby reserved unto the
VILLAGE.
h. Representations
In addition to the covenants herein made, the ENGINEER represents and agrees:
1) That all plans and special provisions to be furnished by the ENGINEER
pursuant to this Agreement will be in accordance with the current standard
specifications and policies of the VILLAGE, it being understood that all
such plans and drafts shall, before being finally accepted, be subject to
approval by the VILLAGE.
2) That he has not employed or retained any company or person, other than
a bona fide employee working solely for the ENGINEER, to solicit or
secure this Agreement, and that he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for
the ENGINEER, any fee, commission,percentage,brokerage fee, gifts,or
any other consideration, contingent upon or resulting from the award or
making of the Agreement. For breach or violation of this warranty, the
VILLAGE shall have the right to annul this Agreement without liability,
or in its discretion to deduct from the Agreement price or consideration,
or otherwise recover,the full amount of such fee,commission,percentage,
brokerage fee, gift, or contingent fee.
3) The ENGINEER represents and certifies that the ENGINEER is not
barred from contracting with a unit of state or local government as a result
of: (1)a delinquency in the payment of any tax administered by the Illinois
Department of Revenue, unless the ENGINEER is contesting, in
accordance with the procedures established by the appropriate revenue
act, its liability for the tax or the amount of the tax, as set forth in Section
11-42.1-1 et seq. of the Illinois Municipal Code, 65 ILCS 5/11-42.1-1 et
seq.; or(2)a violation of either Section 33E-3 or Section 33E-4 of Article
33E of the Criminal Code of 1961, 720 ILCS 5/33E-1 et seq. ENGINEER
represents that the only persons, firms, or corporations interested in this
Agreement as principals are those disclosed to the VILLAGE prior to the
execution of this Agreement, and that this Agreement is made without
collusion with any other person,firm,or corporation. If at any time it shall
be found that the ENGINEER has, in procuring this Agreement, colluded
with any other person, firm, or corporation, then the ENGINEER shall be
liable to the Village for all loss or damage that the VILLAGE may suffer,
and this Agreement shall, at the VILLAGE's option,be null and void.
4) That he is qualified technically and is conversant with the policies
applicable to the PROJECT; and that he has and will furnish sufficient,
properly trained and experienced personnel to perform the services
enumerated herein.
5) That he will not employ, for the duration of this Agreement, any person
presently employed by the VILLAGE without the written consent of the
VILLAGE.
6) ENGINEER represents and certifies that,to the best of its knowledge: (1)
no elected or appointed VILLAGE official, employee or agent has a
personal financial interest in the business of ENGINEER or in this
Agreement,or has personally received payment or other consideration for
this Agreement; (2)as of the date of this Agreement,neither ENGINEER
nor any person employed or associated with ENGINEER has any interest
that would conflict in any manner or degree with the performance of the
obligations under this Agreement; and (3) neither ENGINEER nor any
person employed by or associated with ENGINEER shall at any time
during the term of this Agreement obtain or acquire any interest that would
conflict in any manner or degree with the performance of the obligations
under this Agreement.
i. Documents Property of VILLAGE
Drawings, specifications, reports, and any other documents prepared by
ENGINEER in connection with any or all of the services furnished hereunder
shall be the property of VILLAGE and the VILLAGE shall obtain any and all
intellectual property rights in the drawings,specifications,reports,and documents
prepared by ENGINEER in connection with any and all of the services furnished
hereunder. ENGINEER shall have the right to retain copies of all documents and
drawings for its files. All construction drawings shall be prepared electronically
using MICROSTATION software. Paper copies will be provided to the
VILLAGE in full-size (24" x 36") or quarter-size (11" x 17") as requested.
Electronic design files will also be transferred to the VILLAGE.
If construction services are a part of the ENGINEER'S work, he will create
electronic "As-Built" conditions and will deliver them to the VILLAGE within
thirty(30) days after completion of construction and before final payment to the
ENGINEER. ENGINEER will title these files "Record Drawings".
If construction services are not part of the ENGINEER'S work, he will deliver
electronic MICROSTATION files to the VILLAGE upon request and before final
payment to the ENGINEER.
j. Access to Records
The ENGINEER shall maintain all books,documents,papers, accounting records
and other evidence pertaining to his costs incurred by reason of this Agreement
and agrees to make such material available, at his office at the address indicated
in Section 5,Paragraph u of this Agreement, at all reasonable times during the life
of this Agreement and for a period of three (3) years from the date of final
payment of the obligations of this Agreement by the VILLAGE or such longer
time as requested by the VILLAGE,for inspection by personnel of the VILLAGE,
or any authorized representative of the VILLAGE, and copies thereof shall be
furnished if requested. The cost of any copies shall be paid by the VILLAGE.
k. Reuse of Documents
All documents, including drawings and specifications furnished by ENGINEER
pursuant to this Agreement, are intended for use on the PROJECT only. They
should not be used or modified by VILLAGE or others on extensions of the
PROJECT or any other project without specific written verification or adaptation
by ENGINEER. Any reuse or modification without written verification or
adaptation by ENGINEER shall be at VILLAGE'S sole risk.
1. Indemnification
ENGINEER agrees to indemnify, hold harmless, and defend (or pay the
VILLAGE for the costs of defense if the Village so desires in its sole discretion)
the VILLAGE and any of its officers, employees, or agents from and against all
liability, claims, demands, and causes of action arising out of or related to any
loss, damage, injury, death, or loss or damage to property resulting from any
negligence, errors or omissions by the ENGINEER in the performance of this
Agreement.
In the event of joint or concurrent negligence of ENGINEER and VILLAGE,each
shall bear that portion of the loss or expense that its share of the joint or concurrent
negligence bears to the total negligence (including that of third parties) which
caused the personal injury or property damage.
M. Entire Agreement
This Agreement sets forth all the covenants, conditions and promises between the
parties. There are no covenants, promises, agreements, conditions or
understandings between the parties, either oral or written, other than those
contained in this Agreement.
n. Governing Law
This Agreement shall be governed by the laws of the State of Illinois both as to
interpretation and performance.
o. Successors and Assigns
The terms of this Agreement shall be binding upon and inure to the benefit of the
parties and their respective successors and assigns; provided, however, that
neither party shall assign this Agreement in whole or in part without the proper
written approval of the other.
p. Waiver of Contract Breach
The waiver of one party of any breach of this Agreement or the failure of one
party to enforce at any time, or for any period of time, any of the provisions
hereof, shall be limited to the particular instance, shall not operate or be deemed
to waive any future breaches of this Agreement, and shall not be construed to be
a waiver of any provision, except for the particular instance.
q. Severability of Invalid Provisions
If any provisions of this Agreement shall be held to contravene or be invalid under
the laws of any particular State, County or jurisdiction where used, such
contravention shall not invalidate the entire Agreement,but it shall be construed
as if not containing the particular provision or provisions held to be invalid in the
particular State, County or jurisdiction and the rights or obligations of the parties
hereto shall be construed and enforced accordingly.
r. Force Majeure
Neither VILLAGE nor ENGINEER shall be liable for any fault or delay caused
by any contingency beyond their control, including, but not limited to, acts of
God, wars, strikes, walkouts, fires, or natural calamities.
S. Access and Permits
VILLAGE shall arrange for ENGINEER to enter upon public and private property
and shall obtain all necessary approvals and permits required from all
governmental authorities having jurisdiction over the PROJECT.
t. Designation of Authorized Representatives
Each party shall designate one or more persons to act with authority in its behalf
in respect to appropriate aspects of the PROJECT. The persons designated shall
review and respond promptly to all communications received from the other
ply.
U. Address for Notices
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to ENGINEER, such notices or communications shall be
delivered or sent to:
CIVILTECH ENGINEERING, INC.
Two Pierce Place
Suite 1400
Itasca, Illinois 60143
Attn: James D. Ewers, P.E.
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to the VILLAGE, such notices or communications shall be
delivered or sent to:
VILLAGE OF OAK BROOK
1200 Oak Brook Road
Oak Brook, Illinois 60523
Attn: Doug Patchin
Director of Public Works
Notices personally delivered or sent via U.S. Mail, postage prepaid, shall be
deemed, for all purposes, proper notice.
V. Insurance
ENGINEER agrees to obtain and maintain, for the term of this Agreement, and
for a period of twelve(12)months after the services contracted for hereunder have
been completed, insurance hereinafter provided, furnishing a certificate or
certificates of insurance to the VILLAGE prior to commencing work under this
Agreement. The certificate or certificates of insurance shall be in a form
satisfactory to the VILLAGE from companies authorized to do business in Illinois
and shall provide that the policies referred to shall not be canceled or changed
without first giving thirty(30) days written notice thereof to the VILLAGE. Said
insurance requirements are attached as Appendix IV and made a part of this
Agreement ("REQUIRED INSURANCE POLICIES").
The VILLAGE shall be named as an additional insured and a cancellation notice
recipient on all Required Insurance Policies.
W. Additional Services
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECT.
Separate proposals shall be submitted by ENGINEER for furnishing these
additional services. Compensation for such additional services shall be negotiated
by the parties and included in this Agreement by a written amendment.
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECT.
Separate proposals shall be submitted by ENGINEER for furnishing these
additional services. Compensation for such additional services shall be negotiated
by the parties and included in this Agreement by a written amendment.
X. Time
Time is of the essence in the performance of all terms and provisions of this
Agreement.
Y. Third Party Beneficiary
No claim as a third party beneficiary under this Agreement by any person,firm,
or corporation shall be made or be valid against the Village.
Z. Conflicts
If any provisions of this Agreement conflict with any provisions of the attached
appendices I through IV,the provisions of this Agreement shall control.
IN WITNESS WHEREOF, the parties set their hands and seals on the date first written
above.
VILLAGE OF OAK 1100K ATTEST:
Vf1laje Manager Village Clerk
CIVILTECH ENGINEERING, INC. ATTEST:
President Vice President
APPENDIX 1
SCOPE OF SERVICES
Realignment and reconstruction of Harger Rd and widening and resurfacing of
North York Rd, including underpass structure for realigned Salt Creek Trail
Village of Oak Brook
Route: FAU 2678 York Rd and FAU 1446 Harger Rd
Local Agency. Village of Oak Brook
Section No.: 17-00049-00-PV
Proj. No.: BFN9(911)
Job No.: C-91-007-17
County: DuPage
Contract No.: 61 G 16
SCOPE OF SERVICES
Civiltech will provide the following Scope of Services in conformance with the Illinois
Department of Transportation's Standard Construction Engineering Agreement.
• Provide contract management including but not limited to contractor
communications, utility coordination, and preparation/processing of pay
requests and change orders.
• Act as resident construction supervisor and coordinate with the Village of Oak
Brook and IDOT.
• Provide construction inspection service to ensure that the project is being
constructed according to specifications.
• Provide material testing for the project to ensure compliance with the contract
specifications in accordance with the STATE BMPR "Project Procedures Guide"
and the STATE BMPR "Manual of Test Procedures for Materials" STATE
BMPR Inspection reports can include:
o Concrete
o Hot-Mix Asphalt
o Soils
o Aggregates
• Provide Quality Assurance services required by/DOT. Personnel shall have
completed the appropriate STATE BMPR QC/QA trained technician classes.
• Provide verification of construction layout(to be completed by the contractor).
• Prepare daily and weekly work reports per IDOT Standards.
• Keep construction documentation per IDOT requirements.
• Provide measurement and computation of pay items.
• Inspect and document the adequacy of the establishment and maintenance of
the traffic control.
• Complete all necessary shop drawing reviews.
• Provide plan revisions to reflect as built conditions.
APPENDIX II
COMPENSATION SCHEDULE
Per attached submitted by
Civiltech Engineering, Inc.,hereto attached
Exhibit A-Construction Engineering
COST ESTIMATE OF CONSTRUCTION SERVICES
PHASE III ENGINEERING SERVICES
York-Harger Intersection&Underpass Improvement
Village of Oak Brook
Route: FAU 2678&1446;York-Harger Intersection&Underpass Improvement
Local Agency: Village of Oak Brook *Includes annual increase(3%)for work in 2020
Contract No.: 17-00049-00-PV **Firm's approved Over Head rate on file with 1DOT%
Project No.: BFN9(911) Bureau of Accounting and Auditing is 117.73%
Job No.: C-91-007-18 ***Labor x 0.145 x 2.1773=Fixed Fee
County: DuPage Complexity factor(R=0.00)
Consultant:Civiltech En Ineerin ,Inc. Prepared: 11/14/2019
P*00,Burden a `
PayroN Aayrdt Fringe Cost* F1xad
• . Rate*: Gaeta OiAdu sd&Expenses F"** TOTAL
X t.197 x .315
Construction Engineering: Res.Engr.V 2,663 54.10% $ 55.62 $ 148,116 $ 174,377 $ 46,760 $ 369,253
Asst.RE(Res.Engr.III) 1,975 40.13% $ 39.57 $ 78,151 $ 92,007 $ 24,672 $ 194,830
Inspector(Res.Engr.1) 0 0.00% $ 30.39 $ - $ - $ - $ _
Intern(Field Tech.l) 0 0.00% $ 36.86 $ - $ - $ - $ _
Chief Layout Specialist 184 3.74% $ 35.02 $ 6,444 $ 7,587 $ 2,034 $ 16,065
Structural Engr.IV 48 0.98% $ 42.23 $ 2,027 $ 2,386 $ 640 $ 5,053
Sr.Proj.Mngr. 52 1.06% $ 70.00 $ 3,640 $ 4,285 $ 1,149 $ 9,074
SUBTOTAL
Direct Expenses: $ 594,275
1.)Vehicle Expense $ 29,150
2.)Material Testing
$ 57,000
3.)Soils Monitoring $
4.)Printing Expense $ 500
5. Phot r h
$ 150
TOTALS ..00 :0
1.)530 Days @$55.00/Day
2.)Material Testing(Midland Standard Engineering&Testing,Inc.)
3.)Soils Monitoring
4.)Estimated printing expense for Record Drawings
5.)Estimated photography expense
APPENDIX III
TIME SCHEDULE
Per attached submitted by Civiltech Engineering,Inc.
York-Harger Intersection&Underpass Improvement
Village of Oak Brook
Antic l ated Contractor's Schedule
T'
;M
l0
�tym_ IMI 0
t
Tae a ...0 0 0 0 1--0 0•0i 0�.a 0�_. - t -_ qt �.. .t0a�t0o�lo0 112 IZB 2 Ilo'tA IIO i ittT Ilo 12 ��mi.? _
0 0 0 0 0'.0@ b bl BB IM BT ICB 82 2 T'.. T � -.
APPENDIX IV
Insurance
Engineer shall maintain for the term of this Agreement, and for a period of twelve months
after the services is contracted for hereunder have been completed, insurance policies covering:
1. Workers Compensation: Statutory.
2. Employers Liability Insurance:
$1,000,000 injury-per occurrence
$500,000 disease-per employee
$1,000,000 disease-policy limit
Such insurance shall evidence that coverage applies in the State of Illinois.
3. Comprehensive General Liability Insurance:
$2,000,000 per occurrence combined single limit. Coverages shall include Broad
Form Property Damage Endorsements and Blanket Contractual Liability(must
expressly cover the indemnity provisions of the Agreement).
4. Comprehensive Automobile Liability Insurance:
$1,000,000 combined single limit, any auto.
5. Professional Liability Insurance(errors and omissions):
$1,000,000 per claim and $2,000,000 in aggregate.
6. Umbrella or excess liability:
The required coverages may be in any combination of primary, excess, and
umbrella policies. Any excess or umbrella policy must provide excess coverage
over underlying insurance on a following-form basis such that when any loss
covered by the primary policy exceeds the limits under the primary policy, the
excess or umbrella policy becomes effective to cover such loss.
7. Engineer will provide the Village with a certificate of insurance and additional
insured endorsement showing the Village added to the General Liability Insurance
as an additional insured.
8. Coverage shall not be suspended, voided, canceled, or reduced except after thirty
(30) days prior written notice by certified mail has been given to the Village. If a
standard Certificate of Insurance form is used with a cancellation clause,the words
"endeavor to" and "but failure to mail such notice shall impose no obligation or
liability of any kind upon the company, its agents or representatives" will be
stricken or crossed out.
Page 23