Loading...
R-1324 - 01/14/2014 - ENGINEERING - Resolutions RESOLUTION 2014-ENG-AG-NOISE-R-1324 A RESOLUTION APPROVING AND AUTHORIZING THE AWARD AND EXECUTION OF A ENGINEERING SERVICES AGREEMENT WITH CIVILTECH ENGINEERING, INC. FOR A NOISE WALL DESIGN AND COST STUDY WHEREAS, the Village is considering building a noise wall to shield Tuscan Woods from the noise generated by the Tollway("Wall'J; and WHEREAS, the Village received a design and cost estimate for the Wall in 2006 ("Initial Study'; and WHEREAS, since the Initial Study, several of the assumed conditions made in the Initial Study have changed; and WHEREAS, in order to better assess whether it is in the best interests of the Village and its residents to build the Wall, the Village desires to retain an engineer to provide a new design and cost study for the Wall ('New Study"); and WHEREAS, pursuant to the Local Government Professional Services Selection Act ("Act'), 50 ILCS 510/0.01 et seq., and Section 1-7-6 of the Village Code, the Village is not required to follow the notice, evaluation, and selection procedures set forth in the Act for engineering services provided by engineers who have a satisfactory relationship with the Village; and WHEREAS, Civiltech Engineering, Inc. ("Civiltech'� has previously provided satisfactory engineering services to the Village in connection with engineering and infrastructure projects; and WHEREAS, the Village desires to enter into and execute an agreement for Civiltech to provide the New Study for an amount not to exceed $12,644 ("Agreement'); and WHEREAS, the President and Board of Trustees have determined that it is in the best interest of the Village to enter into the Agreement; NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK BROOK, DU PAGE AND COOK COUNTIES, ILLINOIS as follows: Section 1: Recitals. The foregoing recitals are hereby incorporated into, and made a part of, this Resolution as the findings of the President and Board of Trustees of the Village of Oak Brook. Section 2: Approval of the Agreement. The President and Board of Trustees hereby approve the Agreement by and between the Village and Civiltech in an amount not to exceed $12,644 and in a final form approved by the Village Manager and Village Attorney. Section 3: Authorization and Execution of the Agreement. The Village President and Village Clerk shall be, and hereby are, authorized to execute the approved final Agreement on behalf of the Village. Section 4: Effective Date. This Resolution shall be in full force and effect upon passage and approval in the manner provided by law. [SIGNATURE PAGE FOLLOWS] Resolution 2013-ENG-AG-NOISE-R-1324 Eng.Snres.Agmt.w/Civiltech Re:Noise Wall-Tuscan Woods Page 2 of 2 APPROVED THIS 14th day of January, 2014 Gopal G. Lalmalani Village President PASSED THIS 14th day of January, 2014 Ayes: Trustees Adler, Baar, Manzo, Moy, Wolin, Yusuf Nays: None Absent: None ATTEST Charlotte K. Pruss I' Village Clerk +k d „k'-� , 2 Civiltech Engineering,Inc, www,civiltechinc.com Transportation I Civil I Construction I E=nvironmental I Structural I Appraisal December 3, 2013 Mr. Michael Hullihan Village Engineer and Public Works Director Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523 Re: Proposal for Professional Engineering Services Proposed Tuscan Woods Noise Barrier Preliminary Cost Estimate Dear Mr. Hullihan: It is our understanding that the Village of Oak Brook desires a preliminary-level cost estimate for a noise barrier that has been proposed along the Tollway frontage adjacent to the Tuscan Woods residential development. We understand that through coordination with the Illinois Tollway,the Tollway has verbally agreed to participate in the cost of the noise barrier in the amount of$286,000. This is equal to $26,000 times the agreed-upon number of houses (11)that would be benefited by the noise barrier. The remainder of the cost of the barrier would be covered by parties other than the Tollway. It is our understanding that the currently-assumed estimate based on copies of 2005 to 2010 correspondence provided by the Village uses a$25 per square foot of wall unit cost, for a total estimate of between$450,000 and$500,000. As noted in the correspondence,the$25 unit cost is used for the cost- to-benefit calculations for planning purposes, and actual construction costs will likely be different. The constructability, scope and size of overall project and current market conditions affect the cost. The purpose of this Preliminary Cost Estimate is to update and refine the preliminary $25 per square foot estimate. The estimate will be provided to the Village and Tuscan Woods association so that a decision can be made regarding whether or not the construction of the noise barrier should be further pursued, and if pursued,then to provide the information to the Tollway so that the cost sharing agreement can be finalized. It is our understanding that the estimate will be prepared for the noise wall location, length and height as shown in the"Plans for Proposed Noise Abatement Wall—Tuscan Woods Development"plan set provided by the Village dated February 15, 2008, except that an extension will be assumed. We assume that the noise barrier design in that plan set is based upon the April 28, 2006 noise analysis memorandum prepared by Edwards&Kelcey for the Tollway. The assumed noise wall will be extended approximately 280 feet to the southwest along the vacant property to west of Lot 1. At this time, since topographic survey is not available and detailed computerized noise modeling will not be performed, we can only estimate the necessary height and location of the extension based on the 2006 study,the 2008 plan set,topographic contours of the vacant parcel and surrounding area, and roadway profiles from as-built Tollway plans. The noise wall extension would need to be verified and finalized during future design engineering of the noise barrier. 450 E Devon Ave.Suite 3001 Itasca,IL 60143 30 N LaSalle St,Suite 26241 Chicago,IL 60602 500 Coventry Ln,Suite 2901 Crystal Lake,It 60014 Tel:630.773.39001 Fax:630,773.3975 Tel:312.726,59101 Fax:312,725.5911 Tel:815.477.19151 Fax:815.477.1958 Mr. Michael Hullihan December 3,2013 Page 2 of 4 Following is our anticipated scope of services, a schedule and a fee estimate. I. Scope of Work Task I—Data Collection and Early Coordination a. Obtain GIS files from Village, including topography, aerial photography and other layers. b. Obtain as-built plans from the Illinois Tollway for 1-88 and ramps adjacent to Tuscan Woods. c. Obtain recent construction bid tabs from IDOT and the Tollway. d. Perform a field visit and photo log. Task 2—Conceptual Noise Barrier Design a. Estimate the height of the extension of the noise barrier to the west of the location shown in the 2008 plan set based upon existing topographic contour information and adjacent roadway profile information. b. Using CAD and an image of sheet 5 of 5 in the 2008 plan set as a base layer, draw the approximated extension of the noise barrier in plan and profile view to the west on top of the sheet. c. Investigate the constructability of the proposed noise barrier and extension, as this could have a significant effect on the cost given its proposed location. d. Investigate other wall-type options(to the extent possible without soil boring information)to determine if options exist for a less-costly noise barrier than the standard Tollway design. e. To the extent possible with the background information provided, identify other work items which would be necessary for the construction of the noise barrier, e.g. utilities, landscaping removal and replacement,temporary construction access paths, maintenance of traffic on the Tollway ramp, additional noise wall easements, etc. Task 3—Cost Estimate a. Research recent construction bid tabs from IDOT and the Illinois Tollway. b. Prepare a preliminary-level cost estimate for the construction of the noise barrier and submit for Village review. c. Revise the estimate based on Village comments and submit a final estimate. Task 4—Meetings and Coordination a. Project setup and administration. b. Internal meetings. c. One Village Staff meeting to review cost estimate. 11. Project Schedule We propose to submit a draft exhibit and cost estimate for client review within six weeks of the date of authorization to proceed and receipt of all items in Task 1. This estimate is based upon current workload and staffing availability. Should authorization to proceed occur more than two weeks from the date of this proposal/agreement,the proposed project schedule may need to be re-evaluated. m:\proposal\municip\oakbrook\tuscan woods noise wall\2013-11-27-proposal-letter.docx Mr. Michael Hullihan December 3,2013 Page 4 of 4 We thank you for the opportunity to submit this proposal, and look forward to working with you toward the successful completion of this project. If this proposal is acceptable, please endorse one copy and return it to our office. If you have any questions or require additional information, please contact me at our Itasca office. Very truly yours, James R. Woods,P.E., PTOE Project Manager Civiltech Engineering, Inc. Approved By: �� YryY'� Title: V 1 j ( n�Z Y r 1QMG Cl�� Date: m:\proposal\municip\oakbrook\tuscan woods noise wall\2013-11-27-proposal-letter.docx Mr. Michael Hullihan December 3,2013 Page 3 of 4 III. Compensation We propose to perform the work on the basis of cost plus a fixed fee, with a not-to-exceed maximum. The fee will include reimbursement of direct labor costs, overhead and indirect costs, fringe benefit and salary burden costs,plus a net fee for profit. We will use a billing factor of 2.8. Direct expenses will be reimbursed at their actual cost. The upper limit of compensation is based on the workhour estimates and fee calculations shown below: Task Task Name __ -- Workhours 1. Data Collection and Early Coordination 16 2. Conceptual Noise Barrier Design 60 3. Cost Estimate 24 4. ` Meetings and Coordination 12 Total 112 Fee Estimate: 112 hrs. x$40/hour x 2.80= $ 12,544 Direct Costs(mileage estimate)_ $ 100 Fee Estimate= $ 12,644 Additional Work During the course of the first part of this project, it may become necessary to perform additional services beyond the scope of this contract including but not limited to attendance at additional or extended-length meetings, additional geometric analyses/plans, or additional plan,exhibit, and report revisions. Should some of this work become necessary,the additional fee for extra work would be billed on a time-and- material basis. Billing rates are as follows: Principal-in-Charge-QC/QA $70/hour x 2.8 =$196/hour Director $63/hour x 2.8 =$176.40/hour Project Manager: $42/hour x 2.8 =$117.60/hour Project Engineer: $35/hour x 2.8=$98/hour m:\proposal\municip\oakbrook\tuscan woods noise wall\2013-11-27-proposal-letter.docx