Minutes - 09/28/2017 - Planned Development Commission2.
9
VILLA6F OF MINUTES OF THE SEPTEMBER 28, 2017
OAK B R92 REGULAR MEETING OF THE PLANNED
DEVELOPMENT COMMISSION OF THE
VILLAGE OF OAK BROOK
APPROVED AS WRITTEN ON NOVEMBER 12, 2018
CALL TO ORDER:
The Regular Meeting of the Planned Development Commission was called to order
by Chairman Champ Davis, Jr. in the Samuel E. Dean Board Room of the Butler
Government Center at 7:02 p.m.
ROLL CALL:
Gail Polanek called the roll with the following persons
PRESENT: Chairman Champ Davis, Jr., Vice Chairman Marcia Tropinski,
Members Jeffrey Bulin, Natalie Cappetta, Raju Iyer and Simon
Sheers
ABSENT: Member Thomas Doyle
IN ATTENDANCE: Trustees John Baar and Edward Tiesenga, Development
Services Director Tony Budzikowski, Public Works Director Doug
Patchin, Deputy Police Chief Jason Cates, Village Planner Rebecca
VonDrasek, and Planning Technician Gail Polanek
APPROVAL OF MINUTES
14rAP (@x* 9T"
ROLLCALL
MINUTES
REGULAR MEETING OF THE PLANNED DEVELOPMENT COMMISSION AUGUST24,2017
OF AUGUST 24, 2017
Motion by Member Bulin, seconded by Member Sheers to approve the minutes of
the August 24, 2017 Regular Planned Development Commission meeting as
amended. VOICE VOTE: Motion Carried.
UNFINISHED BUSINESS
There was no unfinished business.
UNFINISHED
BUSINESS
5. A. CASE NO: 2017-15-ZO-PUD — CARVANA, LLC, CONTRACT PURCHASER CARVANA. LLC.
ON BEHALF OF PROPERTY OWNER ELECMAT HOLDINGS. LLC — 720 DR ENTERPRISE
DR -PLANNED
ENTERPRISE DRIVE — PLANNED DEVELOPMENT DEVELOPMENT
Chairman Davis reviewed the planned development being requested along with the
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 1 of 14 September 28, 2017
1�
Planned Development Commission public hearing procedures. All witnesses were
sworn in. The owner of the property owner, Elecmat Holdings, LLC, 729
Enterprise Drive, Oak Brook, IL 60523, provided written support of the request,
which is in the case file.
Lenny Asaro, Attorney for the applicant with Neal & Leroy, 120 N. LaSalle Street,
Suite 2600, Chicago, IL 60602, introduced the witnesses.
• Vanessa MacDonald, Real Estate Entitlement Manager, Carvana, 1980
West Rio Salado Parkway, Tempe, Arizona, 85281 as applicant and contract
purchaser of the property at 720 Enterprise Drive
• Jim Hodges, WHN + Architects, 330 West 10a' Street, Charlotte, NC 28202.
• William Woodward, KLOA, Traffic Consultant, 9575 W. Higgins Road,
Suite 400, Rosemont, IL 60018
• Sarah Murley, Principal, Applied Economics, LLC, 11209 N. Tatum Blvd.,
Suite 226, Phoenix, AZ 85028
• George Kisiel, AIA, AICP, Okrent Kisiel Associates, Land Planner, 122 S.
Michigan Ave., Suite 1200, Chicago, IL 60603
• Mary Linberger, Linberger & Company, Impact Evaluation Report, 1017
Ridge Ave., Evanston, IL 60202
Waivers and Variations: Mr. Asaro identified the waiver and variations being
sought for this planned development as follows:
• Section 13-10A.1: waiver to permit and allow an automotive sales
establishment as a permitted use for the subject property.
• Section 13-11-1OC: variation to permit and allow more than one sign
per street frontage; and to allow those wall signs to be located on the
center of each building wall.
• Section 13 -11 -IOD: variation to exceed the maximum gross surface area
for signage on the property from 200 square feet to approximately 562
square feet of sign area.
• Section 13-11-1OGA: variation to exceed the maximum permitted
height for a company logo to be taller than the height of the lettering for
the principal wall sign.
Vanessa MacDonald, Carvana Real Estate Entitlement Manager reviewed the
background and history of Carvana, LLC as an online retailer of pre -owned cars
using its robust and interactive website to find a car within their 8,000 plus
inventory with videos provided of each car showing the interior and exterior. They
have a 7 -day test policy in order to decide whether to keep it with no questions
asked.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 2 of 14 September 28, 2017
��j
There are two delivery options either to be delivered directly to the customer's
home or to pick up the car through the vending machine, which has already been
purchased online. A token is mailed to those choosing the vending machine option.
Appointments are set for the vending machine site in order to pick up the cars. A
video was shown of the vending machine operation.
They have been very successful since their launch in Atlanta, Georgia, in early
2013 and they are now the second largest pre -owned auto retailer in the state of
Georgia. They are currently in 33 different cities across the country with seven (7)
vending machines operational. Four are located in Texas, Florida, North Carolina
and Tennessee. They in various stages of construction and development with two
more in Florida, Charlotte, North Carolina, Gaithersburg, Maryland and
Indianapolis, Indiana and hopefully in Oak Brook, which would be the first one in
the Chicago metro area.
She described the differences between Carvana and a traditional car dealership.
Their dealership requires less than two acres with a building square footage of 7700
square feet using only 50-60 parking spaces. All vehicles are presold waiting for
customer pick up by appointment only. Customers are not invited to the site to
view inventory or test drive that would occur at a typical car dealership. They use
smaller impervious surfaces, no fuel pumps, service bays, parts departments or
other ancillary uses. It enables them to use vacant or underutilized space. They
will be demolishing the existing building and constructing a new building. They
will be applying a modern technology to the traditional car industry.
There will be 10-20 customer advocates, which will work in shifts Monday —
Saturday between the hours of 9 am — 7 pm. They interface with customers on the
phone and online, setting appointments, and load the vehicles into the tower.
The tower component of the site was placed as close to the interstate as possible.
The building conforms to the required 50 -foot setback along Enterprise Drive.
Parking will be located around the perimeter of the lot. Deliveries will be made to
the site approximately once a day and they will drive around to the back of the
building, closest to the highway where the vehicles will be unloaded. The trucks
will not need to back up on site. They will proceed forward around the building to
exit onto Enterprise Drive. Forward motion is important allowing safe navigation
of the site and without the annoying back up beeps required of the trucks in order to
exit onto the street.
There will be dense landscape buffers meeting the five-foot high minimum
requirement of the Village, which will provide adequate buffering between the
neighbors. Trees will be added to the front yard with additional landscaping
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 3 of 14 September 28, 2017
provided around the tower.
Variations were sought for a single blade sign at ground level so that visitors will
know where to tum in. The Carvana logo signage takes advantage of the building
design, which is symmetrical and square. The Carvana logo is around each face of
the building. The lettering will be placed on the parapet along the long side of the
building with the logo on the short side as depicted in the signage plans provided in
the case file. At the suggestion of staff the signage was modified from the original
submittal, which sought the lettering to be mounted on the glass with raceways,
which resulted in the building height to be increased by three (3) feet.
As a young growing company they like to be involved and engaged and intend to
be strong partners within the community.
Mr. Asaro asked the following questions of Ms. MacDonald regarding her
testimony to which she responded yes.
• Will the site have adequate landscape and buffering features to protect the
uses on site and surrounding properties.
• Will the proposed signage conform to the Villages Sign Regulations, except
for those variations being sought.
• Will the proposed development be under Carvana's control and ownership
following the closing on the property.
• Will the proposed development comply with all standards and regulations
of the Villages Subdivision Regulations.
• Will the proposed development include plans for appropriate property and
building security and site measures.
• Will the proposed development provide a reasonable visual and acoustical
privacy.
Jim Hodges, Principal, WHN + Architects the master architect for Carvana since it
was founded and they were involved with the vending machine concept itself.
There is a 3000 square foot conditioned space, which houses the office uses and
customer center. There are three (3) vehicle delivery bays. The vehicle tower is an
8 -tier steel structure vehicle display rack that is clad with aluminum and white
opaque glass. The only modification to their standard building is the raised parapet
in order to raise the signage onto the parapet and off the glass. There are LED
accent bands over the top of the tower and over the delivery bays and customer
center that will be seen at night. Shown was a similar sized office building across
the interstate. At night the tower and signage is lighted, which is similar to other
lighted office buildings across the interstate. Views were shown from the interstate
and Enterprise Drive along with a description of the materials to be used.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 4 of 14 September 28, 2017
—r6
Mr. Asaro asked the following questions of Mr. Hodges regarding his testimony to
which he responded yes.
• Is the proposed development designed to be operated and maintained so that
it will not impair an adequate supply of light to adjacent properties and not
substantially increase the danger of fire or otherwise endanger the public
health, safety and welfare.
• Is the proposed development designed so as to provide adequate landscape
and other buffering features to protect the uses within the development and
outside surrounding properties.
• Is the proposed development laid out as a unit in accordance with an
integrated overall design provided for a safe, efficient, convenient grouping
of structures and uses on site.
• Does the proposed development design account for exposed storage areas,
trash, etc.
• Is the proposed development designed to provide reasonable visual and
acoustical privacy.
• Is the proposed development designed for the removal of surface waters
onsite so as to not adversely affect neighboring properties and the storm
water system.
William Woodward, KLOA, Senior Traffic Consultant, provided the traffic impact
study for the development. He noted that he was very familiar with the area and
had also conducted the traffic impact study for the Rush project and the parcel
north of Hub. They studied the traffic impact at the intersection of Jorie and 22"d
Street. The intersection has been improved over the last several years, providing
dual turns onto 22"d Street and onto Jorie Blvd. They reviewed peak hours and
Saturday with AM peak hours 7:30 to 8:30 and PM peak hours 4:30 pm to 5:30 pm.
Opening at 9 am their traffic is at the end of the AM peak time and will create a
low traffic impact with less than a one percent increase. They anticipate most of the
traffic to come from the east with access from I-294 as well as the exit ramp from I-
88 on York. Some traffic will come from Route 83. Future traffic is projected to
be lower than a traditional automobile dealership and the projected growth
provided also factored in the increase of pass through driving conditions. The dual
access drives will adequately serve the development with stop sign control. The site
provides sufficient onsite circulation with two-way drive aisles. The proposal is for
64 off-street parking spaces, which is more than adequate and exceeds the Village
Code requirements.
Mr. Asaro noted that the KLOA traffic study was at Tab 4 of the case file.
Sarah Morley, Principal, Applied Economics, which connects economic and fiscal
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 5 of 14 September 28, 2017
_r13
impact assessments for local governments, corporations and developers. An
economic and revenue impact was prepared for Carvana. Sales were based on data
from Atlanta; however the facility does not have a vending machine. Carvana
already has existing sales in the Chicago metro area, but delivery and point of sale
is at their place of residence. The vending machine would make Oak Brook the
point of sale, if the customer chose to take delivery from the vending machine
instead of their residence. Oak Brook would capture the sales tax if the customer
picked up the vehicle.
Sales tax assumptions have estimated taxable sales of $12.8 million in the first year
estimated to increase to $65.3 million by the fourth year. A new car dealership
sells $40-70 million per year, so it is comparable but on a much smaller efficient
space. There is the assumption that only 50 percent of the sales will be at the
vending machine site. They assume a 1 percent sales tax rate for Oak Brook, which
would translate into about $128,000 in the first year, increasing to a stabilized level
of $653,000 by the fourth year for about $5.7 million in revenue. Based on the
general sales tax to Oak Brook, this one facility would account for approximately 5
percent of the sales tax generated when levels are stabilized.
The benefit to Oak Brook is that this one acre site increases the sales capture and
maximizes the site potential with the high visibility compared to no sales tax being
generated from its current use.
Mr. Asaro noted that the economic impact study was located at Tab 3 of the case
file and asked the following questions of Ms. Murley regarding her professional
opinion and testimony to which she responded yes.
• In regards to the Economic Impact study prepared at Tab 3 is the proposed
development economically beneficial for both Carvana and the Village.
George Kisiel, AIA, AICP, Okrent Kisiel Associates, Certified Land Planner with
more than 35 years experience. He reviewed the planned development standards.
He noted that although the use is identified as auto sales, it does not fit that mold in
that it is markedly different in that it is not a site where customers come in and
shop. These purchases are made online; an appointment is made to retrieve the
vehicle from the automated vending machine. It is more similar to a doctor or
dentist's office or an accountant or architect where appointments are made for
specific times and managed by the facility. It is a much smaller site with much
lower impact and more efficient use of land with the economic benefit to the
Village. The use in the area is office use with other permitted uses of which
Carvana is more like those uses than it is to an auto dealership.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes
Page 6 of 14 September 28, 2017
The Commercial Areas Revitalization Plan described the area as Class B office use
and the proposed use fits well along with hours of operation and traffic generation.
There will be no negative impacts on the uses of the surrounding properties or
property values. With respect to future uses in the specific Subarea Plan, as Class
B office, with the suggestion that development take greater advantage of tollway
visibility and this development replaces a nondescript office building. The
distinctive tower will take full advantage of the tollway frontage and visibility. The
Plan also talks about redevelopment of the frontage of Enterprise Drive, which may
include mixed use redevelopment, such as multi -family. The proposed use fits in
with the Class B office and low traffic generation due to its land use characteristics
and there would be no negative impacts on mixed use redevelopment.
He believed the proposal is consistent with the Commercial Area Revitalization
Plan and meets the criteria for Planned Development approval. It fits well within
its context from a physical esthetic land use perspective with no discernible
negative impact on nearby development. It also provides the Village with the
positive economic benefits of an auto dealership without the potentially negative
land use attributes of a typical automobile facility.
Mr. Asaro requested the admission of the Report prepared by Okrent Kisiel
Associates to following the existing tabs and be numbered 19. He asked the
following questions of Mr. Kisiel regarding his testimony and professional opinion
to which he responded yes.
• The proposed development would not necessarily be injurious to the use or
enjoyment of other property in the neighborhood for the purposes permitted
and not prevent the normal and orderly development and improvement of
surrounding properties for permitted uses and will not be inconsistent with
the character of the community and will not alter the essential character of
the neighborhood and will not be incompatible with other property in the
immediate vicinity.
• The proposed development is needed with respect to land utilization.
• The proposed development includes measures that prevent adverse impacts
on neighboring properties with respect to security and site control.
• The proposed development that will be laid out and developed as a unit in
accordance with the integrated overall design and uses on site.
• The functional and mechanical features of the proposed development are
not incongruous with the existing contemplated environment and
surrounding properties.
• The proposed development with respect to drives, parking and circulation
does not detract from the design of the proposed building structures or the
neighboring properties.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 7 of 14 September 28, 2017
Mary Linberger, Linberger & Company, Commercial Real Estate Appraiser for the
past 10-15 years has focused on environmental impact. She noted that the impacts
have been addressed by other speakers. Issues that she thought could be a potential
concern to adjoining properties would have been truck deliveries, signage, lighting,
hours of operation and traffic generation. She did not see anything negative in any
of those areas.
Mr. Asaro requested the admission of the Real Estate Appraisal — Linberger &
Company report dated September 27, 2017 to following the existing tabs and be
numbered 20 in the case file. He asked Ms. Linberger the following questions in
regards to her testimony and professional opinion to which she responded yes.
• The proposed development would not be injurious to the use or enjoyment
of surrounding properties nor diminish their property values.
• The proposed development could draw a new category of buyers to the
office park, who could capitalize on the parks potential for more intense
development.
Mr. Asaro submitted a written proposed Findings of Fact for the record.
Larry Herman, property owner of two parcels directly across the street 715-721
Enterprise Drive did not have any objections and realized the benefit to the Village
if the revenue materializes. He has owned one of the parcels for over 20 years and
the redevelopment of Enterprise Drive has been a topic of conversation for many
years. Development appears to be riper now than ever before. He noted that there
are many parcels without any assemblage that could create a unified concept for
future development, which is difficult to accomplish with many different property
owners. Most are owner occupied properties and most appear to be happy to utilize
the parcels as they are. However, times are changing. This is not the use he would
have imagined for the area and although he is not 100 percent certain it would work
to the benefit of everyone on the street. After sitting through the presentation he
was impressed by what he had seen. He agrees that there is relatively low traffic on
the street and if the presentation is correct the development should not have a
material change or intensity on the traffic. This use may be the catalyst for future
development. As redevelopment occurs in the future it may mean that Enterprise
may eventually need a center turn lane. He would like to see the unloading of the
truck in the back be made a condition. It did not appear to have 64 parking spaces.
Baxter Phillip, Phillips Flowers property owner of the building at 700 Enterprise
Drive noted that he was also impressed with the presentation. He questioned the
height of the proposed tower in comparison as to what would be allowed by Code.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes
Page 8 of 14 September 28, 2017
�Q
Director Budzikowski responded that the maximum structure height allowed in the
ORA -1 District is 75 feet and the proposed structure is 74 feet 10 inches.
Mr. Baxter questioned whether the additional parking spaces were provided for
excess inventory before they are moved to the tower. The front facade was a
concern as to what it would look like. He noted that the buildings along the street
may be outdated, but the street itself has a nice local ambiarice. In general he
believed it was a well thought out plan and was supportive, but wanted to be sure to
maintain the integrity and ambiance of Enterprise Drive.
Ms. MacDonald responded that they will be using the delivery logistics hub
locations and when purchased they are sent from the hub to the vending machine
for pick up or for at home delivery.
Ms. MacDonald responded that the parking calculation includes the parking spots
within the tower, which are utilized by the cars while awaiting pick up. There are
32 surface parking spaces, which are along the north and south perimeter of the
building. She reviewed the slide showing the frontage of the building,
understanding that it is not the typical frontage. The entrance faces the parking lot,
but there is glass and they will be adding trees to soften the building itself with
landscape buffers running the length of the building frontage. The landscape is
taller than what is depicted in the rendering plans.
Director Budzikowski asked for clarification how the home deliveries were
initiated; as to whether they are made from the logistics hub or from the Oak Brook
vending location.
Ms. MacDonald responded that there were three types of facilities. The vending
machines with customer access, the small logistics hub and in larger facilities they
have hundreds of parking spots at their inspection centers, which is where the cars
are inspected and photographed. She explained that the cars make their way from
the inspection centers to the logistics hubs. When an order is filled the car is either
taken from the hub to the vending machine or to a home for delivery.
Member Sheers questioned the taxes being paid in that it was his understanding that
if you lived in Glen Ellyn the taxes would be paid to Glen Ellyn.
Ms. MacDonald responded that if the car is delivered to your home that once the
car gets to the vending machine facility that is where the point of sale would
become Oak Brook. If the car is purchased online and you live in Glen Ellyn and it
never comes to the vending machine, then the sales tax would go to the point of
residence. Once it comes to the vending machine and the transaction takes place in
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 9 of 14 September 28, 2017
113
Oak Brook the Village would get that sales tax.
Member Bulin asked where the cars are serviced and fueled. He noted that there
would not be any flat bed deliveries coming from the vending machine in Oak
Brook.
Ms. MacDonald responded that it takes place at the logistics center. The vehicles
delivered to the Vending machine have a minimal amount of fuel. Those that are
being delivered directly to homes come from the hub not the Oak Brook site.
They are currently selling cars in the Chicagoland area that come from the hub in
Hickory Hills.
Member Iyer asked several questions regarding whether there would be any service
bays or parts at the location. How many cars will be stored on site in Oak Brook
and how many deliveries of cars per day and at what time.
Ms. MacDonald agreed and noted that the customer picks up the vehicle and they
have seven days to check out and return the vehicle if there is an issue or they
change their mind. The cars are certified at the inspection centers. There will be a
maximum of 32 cars, which will be located in the tower. There may be one or two
car haulers per day, which carry 9 cars; some may take place during the day. The
business park appears to be empty around 6 pm and on Saturdays. They can try to
accommodate deliveries in the evening or on Saturdays.
Member Iyer questioned if the trucks would go down Jorie Blvd. He questioned the
number of trips referenced in the traffic study. He questioned if there were enough
spaces for the customers.
Mr. Woodward responded that they would not go down Jorie Blvd.; they would
utilize 22"d Street to go to 294 or Route 83. The numbers in the traffic study were
based on a typical auto dealership where people shop around. This facility is
accessed by appointment only. There were 32 spaces to be used by employees and
customers that come in, which arrive for appointments.
Member Iyer questioned the sales tax number of $128,000 provided and questioned
the number of cars sold per month and at what value. He did not seem to think the
math worked out as shown.
Ms. Murley responded that they estimate a cars value at approximately $20,000.
Member Bulin questioned the landscaping plan with additional screening in the
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 10 of 14 September 28, 2017
front parkway. He did not think the landscaping provided was on par with the rest
of what was going on with the project. He thought the vegetation along the I-88
fence line should be removed and replaced.
Planner VonDrasek noted that the trees in the front were not in the parkway, but in
the front yard and could be evergreen trees.
Ms. MacDonald noted they would provide whatever the Village required and they
were adding a couple of trees along Enterprise Drive. They would work with staff
in regards to the landscaping plan. They would be happy to give it the attention it
deserves as it goes through the process and is on their property.
Chairman Davis questioned how it could be remedied so that an appropriate
landscaping plan is submitted at a later date or a condition that would be approved
by the Village staff.
Director Budzikowski agreed that it should be a condition and that staff would
work with the applicant regarding approval of a revised landscape plan.
Chairman Davis also noted that a condition would be included to require the
unloading of the vehicles would be on the property that is adjacent to the tollway.
Mr. Asaro, on behalf of Carvana agreed to these proposed conditions.
Chairman Davis questioned Mr. Kisiel that the proposed planned development
satisfies the Planned Development Standards. Mr. Kisiel responded that it satisfied
those standards.
Director Budzikowski questioned whether any vehicle assistance was provided at
the site, such as a flat tire on site?
Ms. MacDonald responded that they would probably put on the temporary tire,
drive it to a facility to purchase or repair the tire and bring it back to the facility.
Chairman Davis questioned the time of completion should the Board approve it.
Ms MacDonald responded that they would proceed to closing on the property and
then proceed to permit drawings and if possible, upon approval would proceed to
construction starting in the first quarter of next year with completion in 2018.
Typically it takes 7-8 months.
George Evangelopoulos, property owner of 714 Enterprise Drive questioned where
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page I I of 14 September 28, 2017
the cars would be returned and he questioned the material use of EFIS of the
building. However, he believed it was a good looking building.
Ms. MacDonald said that their return rate is less than 3 percent. The 7 -day return
policy gets the buyer over the large online purchase. If a car is to be returned they
will pick up the car and return it to the logistics hub so that it does not go back to
the facility.
Mr. Hodges responded that the EFIS used on their buildings and is a fine sand
finish which is a white smooth surface. Although there are other finishes, this
finish is part of their prototype.
Member Bulin noted the signage variations requested is dispersed over the building
and he questioned the logo being taller than the letters.
Mr. Budzikowski responded that the logo were taller than the lettering on the top of
the building. He noted that it is not uncommon for car dealerships to seek more
signage and in his experience it has been for exposure and is corporate generated.
In return, car dealerships generate significant sales tax revenue.
Chairman Davis questioned the exposure of the vending machine to the large
daytime population in and through Oak Brook.
Ms. MacDonald responded that it has been their experience nationally as they have
opened other markets that they start with a 50/50 distribution of home delivery and
vending machine pick up. As the marketing efforts are increased they generate a
lot of excitement and see it tipping toward the vending machine pick up.
Member Cappetta said that she thought it was a great opportunity for the Village
bringing something that we do have in an area that needs revitalization. It's nice to
be the first out there.
Member Iyer said that it was a positive development especially given that
Enterprise Drive has not had any major development in many years.
Chairman Davis noted that it was a very good presentation and was satisfied with
the exhibits and that the standards were addressed very thoroughly and supported
the request.
Vice Chair Tropinski agreed that it was an excellent presentation.
There were no other comments from the public.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 12 of 14 September 28, 2017
Ms. MacDonald noted that she had contacted all of the surrounding neighbors and
held an informational meeting with those that had attended.
Chairman Davis also commented that it appears to be consistent with the Village's
Commercial Revitalization Plan.
Motion by Member Bulin, seconded by Member Iyer to recommend approval of the
proposed planned development for the Carvana automobile sales establishment as
presented, subject to the following conditions:
1. Development is to be in substantial conformance with the approved plans
including all requested waivers and variations from the Village Code for
the Carvana project including:
A. To permit and allow an automotive sales establishment on the
property;
B. To permit and allow wall sign(s) to be installed at the center of each
building facade;
C. To permit and allow an increase in the maximum gross surface area
for signage on the property; and
D. To permit and allow the maximum permitted height for a company
logo to be taller than the height of the lettering of the principal wall
sign.
2. Automobiles are to be unloaded on the interstate side of the property.
The landscape plan is to be approved by Village Staff at time of building
permit.
4. Comply with all other Village Ordinance requirements at time of building
permit application except as specifically varied or waived.
ROLL CALL VOTE
Ayes: 6 — Members Bulin, Cappetta, Iyer, Sheers, Vice Chair Tropinski and
Chairman Davis
Nays: 0 —
Absent: 1 — Member Doyle. Motion Carried.
4. OTHER BUSINESS
There was no other business to discuss.
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 13 of 14 September 28, 2017
1�
OTHER
BUSINESS
5. ADJOURNMENT:
Motion by Member Iyer, seconded by Member Bulin to adjourn the meeting at
8:52 p.m. VOICE VOTE: Motion carried
ATTEST:
/s/ Tony Budzikowski
Tony Budzikowski
Development Services Director
Secretary
VILLAGE OF OAK BROOK
Regular Planned Development Commission Minutes Page 14 of 14 September 28, 2017
ADJOURNMENT