S-1613 - 12/08/2020 - BUDGET - Ordinances Supporting Documents �GNS�V1�g�
r)o+ cos(?o OC
V0 f p/ on I7 file ITEM 11.13.2
0� )ARD OF TRUSTEES MEETING
VILLAGE OF SAMUEL E. DEAN BOARD ROOM
OAK B R� , K BUTLER GOVERNMENT CENTER
1200 OAK BROOK ROAD
OAK BROOK, ILLINOIS
630-368-5000
AGENDA ITEM
Regular Board of Trustees Meeting
of
December 8, 2020
SUBJECT: 2021 Municipal Budget
FROM: Jason Paprocki, Finance Director
J
BUDGET SOURCE/BUDGET IMPACT: Ordinance establishing the 2021 Budget.
RECOMMENDED MOTION: I move that the Village Board adopt Ordinance 2020-BU-EX-
S-1613 "An Ordinance Adopting the Budget of the Village of Oak Brook for 2021".
Or
I move that the Village Board adopt Ordinance 2020-BU-EX-S-1615 "An Ordinance Adopting
the Budget of the Village of Oak Brook for 2021".
Background/History:
The Village of Oak Brook operates under the Budget Officer Act as outlined in Chapter 24, Section
8-2-9 of the Illinois Compiled Statutes, as revised. The Act requires the Village President and
Board of Trustees to adopt the annual budget prior to the beginning of the fiscal year to which it
applies and provides that the budget shall serve as the Village's annual appropriation ordinance.
The 2021 budget workshops were conducted on November 11 and 17,2020 to review the proposed
budget and receive feedback. The budget was made available for public inspection on the Village's
website on October 30, 2020. Notification is required by State Statute to be given at least ten(10)
days prior to its passage by publication in a newspaper of a public hearing which is held before the
final action of the budget to obtain resident comments. The notification was published in the Daily
Herald newspaper on November 27, 2020.
The 2021 Proposed Budget originally included an assumed $4 million borrowing in the
Infrastructure Fund to fund capital improvements. The Board expressed a desire to delay certain
projects and not borrow money in 2021. The 2021-2025 capital projects schedule has been revised
BOT AGENDA Page I
RG
to delay projects and avoid borrowing money in 2021. In addition, budgeted personnel accounts
were increased by $12,025 in total to account for certain employee evaluation raises that were
mistakenly not in the original document. As a result, the following changes have been made to
the proposed budget:
• Increase $12,025 various General Fund personnel accounts for personnel changes.
• Reduce$75,000 General Fund transfer to Sports Core Fund account 271-80200.
• Reduce $4,000,000 borrowing proceeds from Infrastructure Fund account 41-44700.
• Reduce $25,000 bond issuance costs from Infrastructure Fund account 360-77300.
• Reduce $50,000 debt interest expense from Infrastructure Fund account 360-80100.
• Reduce$265,000 of capital projects from Hotel Tax Fund account 171-90400.
• Reduce$740,000 of capital projects from the Infrastructure Fund account 364-90800.
• Reduce$125,000 of capital projects from the Infrastructure Fund account 366-90100.
• Reduce$2,300,000 of capital projects from the Infrastructure Fund account 461-90700.
• Reduce$75,000 Sports core Fund transfer from General Fund account 812-48150.
• Increase $41,015 of capital projects from the Sports Core Fund account 811-90400. This
relates to OSLAD grant projects projected to occur in 2020,but were delayed to 2021.
The attached Exhibit A reflects a summary of the changes noted above and is reflected in
Ordinance S-1613.
In addition, the Board requested a Proposed Budget that de-authorized cost of living adjustments
for all union and merit increases for non-union staff,and eliminated contracted paramedic services.
Exhibit B reflects a budget summary with all individual salary and benefit accounts updated to
remove union cost of living wage increases for 2021,non-union merit increases, and 10 months of
contacted paramedic services removed. Please note, all union step increases and merit increase
remain in the Exhibit B. In addition, the changes noted above in Exhibit A have been removed
from Exhibit B as well. Exhibit B is reflected in Ordinance S-1615.
As noted above, step movements and merit increases are not removed from the figures above for
union employees. Should the Board want to pursue step and merit freezes for the union members,
this would reflect an additional $71,370 reduction,broken out as:
• Police- $48,140
• Fire- $11,395
• Public Works - $11,835
Under the original Proposed Budget, the General Fund cash reserve ends 2021 at $21,322,862, or
11.1 months of net operating expenses. Under the changes noted in Exhibit A, the General Fund
cash reserve ends 2021 at $21,835,837, or 11.1 months of net operating expenses. Under the
changes noted in Exhibit B, the General Fund cash reserve ends 2021 at $22,276,112, or 12.1
months of net operating expenses. These figures would increase by over $700,000 should the
Board choose to fund the Police and Fire Pension plans at the legally required minimum for 2020.
BOT AGENDA Page 2
Recommendation:
The Village Board adopt Ordinance 2020-BU-EX-S-1613 "An Ordinance Adopting the Budget
of the Village of Oak Brook for fiscal year 2021".
Or
The Village Board adopt Ordinance 2020-BU-EX-S-1615 "An Ordinance Adopting the Budget
of the Village of Oak Brook for fiscal year 2021".
BOT AGENDA Page 3
THE VILLAGE OF OAK BROOK
COOK AND DUPAGE COUNTIES, ILLINOIS
ORDINANCE
2020-BU-EX-S-1613
AN ORDINANCE
ADOPTING THE BUDGET OF THE
VILLAGE OF OAK BROOK FOR 2021
GOPAL G. LALMALANI, Village President
CHARLOTTE K. PRUSS, Village Clerk
JOHN BAAR
PHILIP CUEVAS
MICHAEL MANZO
MOIN SAWED
EDWARD TIESENGA
ASIF YUSUF
Village Board
Published in pamphlet form by authority of the
President and the Board of Trustees of the Village of Oak Brook
on this the 8th day of December, 2020
Ordinance 2020-BU-EX-S-1613
An Ordinance Adopting The Budget of
The Village of Oak Brook For 2021
Page 2 of 3
ORDINANCE 2020-BU-EX-S-1613
AN ORDINANCE ADOPTING THE BUDGET OF THE
VILLAGE OF OAK BROOK FOR 2021
BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF OAK
BROOK,DU PAGE AND COOK COUNTIES,ILLINOIS as follows:
Section 1: Findings:
The President and Board of Trustees find that the tentative annual budget of the Village of Oak
Brook for 2021 has been conveniently available to public inspection for at least ten(10)days prior to its
passage in pamphlet form as prescribed by the corporate authorities. A public hearing has been held prior
to final action on the budget,notice of which hearing was given by publication in a newspaper having
general circulation in the Village of Oak Brook,said notice having been published at least one week prior
to the time of hearing. The hearing on the budget was held not less than one week after the tentative
annual budget was published,by placing it on file with the Village Clerk for public inspection.
Section 2:The sums set forth for the purposes indicated in the 2021 Municipal Budget of the Village
of Oak Brook attached hereto and made a part hereof are hereby budgeted to pay all necessary expenses
and liabilities of the Village of Oak Brook for the fiscal period beginning January 1, 2021 and ending
December 31,2021.
Section 3: The Village of Oak Brook hereby approves and adopts the 2021 Municipal Budget as
attached hereto as Exhibit A.
Section 4: In case of a vacancy in any office specified in this Ordinance,the Appointing Authority
shall not be required to fill such office,if,in his or herjudgment or discretion,there is no necessity therefore.
Section 5: The 2021 Municipal Budget may be amended as provided by law.
Section 6: This ordinance shall be in full force and effect from and after passage and approval
pursuant to law.
[SIGNATURE PAGE FOLLOWS]
Ordinance 2020-BU-EX-S-1613
An Ordinance Adopting The Budget of
The Village of Oak Brook For 2021
Page 3 of 3
APPROVED THIS 81h day of December,2020.
Gopal G.Lalmalani
Village President
PASSED THIS 811 day of December,2020.
Ayes:
Nays:
Absent:
ATTEST:
Charlotte K.Pruss
Village Clerk
VILLAGE OF OAK BROOK,ILLINOIS Exhibit A
Budget Summaries
Cash and Investments Analysis
Fiscal Year 2021
Projected Budgeted Budgeted 2021 Projected
Cash Balance Revenues Expenditures Change in Cash Balance
12/31/2020 2021 2021 Cash 12/31/2021
General Fund $ 21,322,557 $ 24,412,060 $ 24,348,780 $ 63,280 $ 21,385,837
Special Revenue Funds
Hotel/Motel Tax 4,729,483 462,000 628,030 (166,030) 4,563,453
Motor Fuel Tax 852,462 467,175 1,300,000 (832,825) 19,637
Capital Project Funds
Infrastructure Fund 5,578,310 7,106,340 12,682,615 (5,576,275) 2,035
Promenade TIF 251,019 476,000 470,350 5,650 256,669
Enterprise Funds
Water Works System 6,402,692 10,905,000 14,868,375 (3,963,375) 2,439,317
Sports Core 291,481 3,808,800 4,064,055 (255,255) 36,226
Golf Surcharge 97,044 116,000 200,000 (84,000) 13,044
Internal Service Funds
Self-Insurance 297,145 3,700,650 3,681,250 19,400 316,545
Garage 299,603 611,055 765,025 (153,970) 145,633
Capital Replacement 983,742 352,635 803,905 (451,270) 532,472
TOTAL ALL FUNDS $ 41,105,538 $ 52,417,715 $ 63,812,385 $ (11,394,670) $ 29,710,868
Exhibit A
2021 Proposed 2021 Updated
Budget Budget Change
Personnel $ 23,298,520 $ 23,310,545 $ 12,025 a
Materials&Supplies 1,651,840 1,651,840 -
Operational&Contractual 16,520,700 16,495,700 (25,000)b
Other Expenditures 3,228,025 3,103,025 (125,000)c
Capital 22,640,260 19,251,275 (3,388,985)d
$ 67,339,345 $ 63,812,385 $ (3,526,960)
a-Miscellaneous adjustments to 2020 salaries not reflected in original document.
b-Removal of Infrastructure Fund bond issuance costs.
c-Removal of Infrastructure Fund debt interest expense,reduce General Fund transfer to Sports Core.
d-Delay/reduce or(add)the following capital projects:
Hotel Tax-16th St.&Spring Rd.Pedestration Crossing Design(2) $ 80,000
Hotel Tax-Jorie Blvd.Pedestrian Crossing Design(4) 160,000
Hotel Tax-TBD Pedestrian Access Additional Projects 25,000
Infrastructure-B&T Drive Drainage 75,000
Infrastructure-B&T Tennis Area Drainage 125,000
Infrastructure-B&T Parking Lot Expansion 490,000
Infrastructure-B&T Wedding Area Walkway Drainage 50,000
Infrastructure-Safety Pathway Misc.Resurfacing (5,000)••
Infrastructure-Trinity Lakes Resurfacing 130,000
Infrastructure-Brook Forest Phase 15treet Improvements 825,000
Infrastructure-Brook Forest Phase 2 Street Improvements 1,475,000
Sports Core-OSLAD Jogging Track (41,015)***
$ 3,388,985
*Reduced from$500,000 to$10,000.
**Misc.patching added due to the delay of Trinity Lakes project.
***Jogging Track project was projected to be completed in 2020,but remainder moved to 2021.