R-1952 - 07/13/2021 - ENGINEERING - Resolutions Supporting Documents 0 REVIEW OF CONTRACTS
Awarding Agency: Ty e of Contract:
!/0� ✓�. Ca-/srn veno-✓S2Vi
Department: Pkl/ Program/Account Number:
Awarded Contract Price: Budgeted Amount:
1,-91" rod . o� 03gtS-0o . 00
CONTRACT AMOUNT
F-1 Under$20,000 $500,001 - $1,000,000
$20,000-$500,000 Over$1,000,000
NOTES
�,/�j(„�c,ce(�/r Cd.�S-,cv�no„� �L�✓ICCs �Dl�
-S?40e r s Go,tE D s�A .�.ti��a✓�Nt c—,.i-rS.
DEPA EE SIGNATURE
Name: --
Date: -//-7 /Z
INITIENG A ORNEY SIGNATURE
Name
Date:
APPROVED BY VILLAGE'MANA ER
Name: IS? Date:
FINAL 7�,IEIWWS F A
ATTORNEY SIGNATURE
Name: %'"� ��i� Date:
Three (3)Originals signed by other party Date/Initials lam/
Original provided to staff member for other party Date/Initials DC
Original provided to Official Files Date/Initials^ � �1
'� �y
ENGINEERING CONSTRUCTION SERVICES AGREEMENT
VILLAGE OF OAK BROOK
SPORTS CORE OSLAD IMPROVEMENTS PROJECT
THIS AGREEMENT, made and entered into this day of 2021,
by and between Christopher B. Burke Engineering, LTD., (hereinafter re ed to as
"ENGINEER") and the Village of Oak Brook, a municipal corporation(hereinafter referred to as
"VILLAGE")covers certain professional engineering services in connection with the Sports Core
OSLAD Improvements Project(hereinafter referred to as"PROJECT").
The VILLAGE wishes to retain ENGINEER for these certain professional engineering
services and ENGINEER is willing to perform such services for the compensation and in
accordance with the terms and conditions described in this Agreement.
NOW, THEREFORE, in consideration of the mutual benefits, covenants and agreements
contained within this Agreement, the parties agree as follows:
1. SCOPE OF SERVICES
ENGINEER agrees to perform engineering consulting services as defined in the Scope of
Services attached as Appendix I and made a part of this Agreement.
2. COMPENSATION AND PAYMENT
ENGINEER shall be paid by VILLAGE for all services stipulated within this Agreement
according to the Compensation Schedule attached as Appendix II and made a part of this
Agreement.
Payment to ENGINEER shall be made by VILLAGE upon receipt of ENGINEER'S
monthly invoice. The invoice shall consist of a summary of direct labor hours by
ENGINEER'S standard job classification times the respective factors as depicted in
Appendix II plus listing of reimbursable costs incurred with copies of appropriate invoices.
The invoice will state the phase of work for which it applies,if a multi-phase scope is used
(e.g., design, construction, etc.). If VILLAGE identifies an item in the invoice, which
appears to be in error,VILLAGE may withhold the amount in question,pay the balance of
the invoiced amount, and provide ENGINEER with a statement concerning the questioned
item. Alternatively, VILLAGE may pay the invoiced amount in full,provide ENGINEER
with a statement of the questioned item, and an adjustment, if appropriate, will be made in
the next subsequent invoice submitted by ENGINEER.
Engineer will mark"Invoice number and final"on the invoice which closes out
this contract or a phase of the contract.
Page 1
If VILLAGE fails to make any payment due ENGINEER for services and expenses,
including amounts wrongly withheld, within thirty (30) days after submittal of
ENGINEER'S billing thereof,the amounts due ENGINEER shall include a charge at the
rate of one percent(1.0)per month from such thirtieth(30th)day; and,in addition,the
ENGINEER may,after giving seven(7)days written notice to VILLAGE,suspend services
under this Agreement until it has been paid in full the amounts due it for services and
expenses.During the period of any such suspension,the parties shall have the same rights
and obligations as are provided by Subsection 5(e)of this Agreement.
3. TIME SCHEDULE
The services required by this Agreement shall be completed in accordance with the Time
Schedule attached as Appendix III and made a part of this Agreement.It is recognized by
the parties that the Time Schedule may be contingent upon factors beyond the control of
either party.Both parties will take all reasonable steps to adhere to the Time Schedule.
4. TERM OF AGREEMENT
Unless extended by amendment,this Agreement shall terminate at the time of receipt of
final payment by the ENGINEER,provided that all warranties and representations shall
survive said final payment.
5. GENERAL TERMS AND CONDITIONS
a. Modification
The nature and the scope of services specified in this Agreement may only be
modified by written amendment to this Agreement approved by both parties.
b. Relationship between ENGINEER and VILLAGE
ENGINEER shall serve as VILLAGE'S professional engineering consultant in
those phases of the PROJECTS to which this Agreement applies.The relationship
is that of a buyer and seller of professional services,and it is understood that the
parties have not entered into any joint venture or partnership with the other.
C. Responsibility of the ENGINEER
That all plans and other documents furnished by the ENGINEER pursuant to this
Agreement will be endorsed by him and will show his professional seal where such
is required by law.
Notwithstanding anything to the contrary which may be contained in this
Agreement or any other material incorporated herein by reference, or in any
agreement between VILLAGE and any other party concerning the PROJECTS,
ENGINEER shall not have control or be in charge of and shall not be responsible
for the means,methods,techniques,sequences or procedures of construction,or the
safety,safety precautions or programs of VILLAGE,the construction contractor,
Page 2
#11850987 v1
other contractors or subcontractors performing any of the work or providing any of
the services on the PROJECTS, nor shall ENGINEER be responsible for the acts
or omissions of VILLAGE provided that the ENGINEER has properly executed his
duties. ENGINEER shall not be responsible for the failure of VILLAGE, any
architect, engineer, consultant, contractor or subcontractor to carry out their
respective responsibilities in accordance with the PROJECTS documents, or any
other agreement concerning the PROJECTS. Any provision, which purports to
amend this provision, shall be without effect unless it contains a reference that the
content of this Subsection 5(c) is expressly amended for the purposes described in
such amendment and is signed by ENGINEER.
d. Corrections
In the event plans, surveys or construction staking is found to be in error and
revisions of the plans or survey or construction staking are necessary, the
ENGINEER agrees that he will perform such work without expense to the
VILLAGE, even though final payment has been received by him. He shall give
immediate attention to these changes so there will be a minimum delay to the
contractor.
e. Suspension of Services
VILLAGE may, at any time, by written order to ENGINEER (Suspension of
Services Order),require ENGINEER to stop all,or any part of,the services required
by this Agreement. Upon receipt of such an order, ENGINEER shall immediately
comply with its terms and take all reasonable steps to minimize the occurrence of
costs allocable to the services covered by the order.
ENGINEER will not be obligated to provide the same personnel employed prior to
suspension when the services are resumed,in the event the period of any suspension
exceeds thirty(30) days.
f. Termination
1) The VILLAGE shall have the right to terminate this Agreement with or
without cause upon serving thirty (30) days written notice upon the other
Ply
2) Upon such termination, the liabilities of the parties to this Agreement shall
cease,but they shall not be relieved of the duty to perform their obligations
up to the date of termination. All warranties and the provisions of Section
5, Paragraph I shall be in full force and effect after termination.
Upon such termination, ENGINEER shall cause to be delivered to the
VILLAGE all drawings, specifications, partial and completed estimates,
and any and all other data concerning the PROJECTS which ENGINEER
is then accomplishing for the VILLAGE. ENGINEER shall be paid for any
Page 3
#11850987_vl
services completed and any services partially completed in accordance with
Sections 2 and 3.
g. Warranties
In addition to the covenants herein made,the ENGINEER represents and certifies
that its engineering services shall be performed in accordance with the standards of
professional practice,care,and diligence practiced by recognized engineering firms
in the industry in performing services of a similar nature in existence at the time of
performance. The representations and certifications expressed shall be in addition
to any other representations and certifications expressed in this Agreement, or
expressed or implied by law,which are hereby reserved unto the VILLAGE.
h. Representations
In addition to the covenants herein made,the ENGINEER represents and agrees:
1) That all plans and special provisions to be furnished by the ENGINEER
pursuant to this Agreement will be in accordance with the current standard
specifications and policies of the VILLAGE,it being understood that all
such plans and drafts shall, before being finally accepted, be subject to
approval by the VILLAGE.
2) That he has not employed or retained any company or person,other than a
bona fide employee working solely for the ENGINEER,to solicit or secure
this Agreement,and that he has not paid or agreed to pay any company or
person,other than a bona fide employee working solely for the ENGINEER,
any fee, commission, percentage, brokerage fee, gifts, or any other
consideration,contingent upon or resulting from the award or making of the
Agreement.For breach or violation of this warranty,the VILLAGE shall
have the right to annul this Agreement without liability or in its discretion
to deduct from the Agreement price or consideration,or otherwise recover,
the full amount of such fee,commission,percentage,brokerage fee,gift,or
contingent fee.
3) The ENGINEER represents and certifies that the ENGINEER is not bared
from contracting with a unit of state or local government as a result of:(1)
a delinquency in the payment of any tax administered by the Illinois
Department of Revenue, unless the ENGINEER is contesting, in
accordance with the procedures established by the appropriate revenue act,
its liability for the tax or the amount of the tax,as set forth in Section 11-
42.1-1 et seq.of the Illinois Municipal Code,65 ILCS 5/11-42.1-1 et seq.;
or(2)a violation of either Section 33E-3 or Section 33E-4 of Article 33E
of the Criminal Code of 1961, 720 ILCS 5/33E-1 et seq. ENGINEER
represents that the only persons, firms,or corporations interested in this
Agreement,as principals are those disclosed to the VILLAGE prior to the
execution of this Agreement, and that this Agreement is made without
Page 4
#11850987 v1
collusion with any other person, firm, or corporation. If at any time it shall
be found that the ENGINEER has, in procuring this Agreement, colluded
with any other person, firm, or corporation, then the ENGINEER shall be
liable to the Village for all loss or damage that the VILLAGE may suffer,
and this Agreement shall, at the VILLAGE's option,be null and void.
4) That he is qualified technically and is conversant with the policies
applicable to the PROJECTS; and that he has and will furnish sufficient,
properly trained and experienced personnel to perform the services
enumerated herein.
5) That he will not employ, for the duration of this Agreement, any person
presently employed by the VILLAGE without the written consent of the
VILLAGE.
6) ENGINEER represents and certifies that, to the best of its knowledge: (1)
no elected or appointed VILLAGE official, employee or agent has a
personal financial interest in the business of ENGINEER or in this
Agreement, or has personally received payment or other consideration for
this Agreement; (2) as of the date of this Agreement, neither ENGINEER
nor any person employed or associated with ENGINEER has any interest
that would conflict in any manner or degree with the performance of the
obligations under this Agreement; and (3) neither ENGINEER nor any
person employed by or associated with ENGINEER shall at any time during
the term of this Agreement obtain or acquire any interest that would conflict
in any manner or degree with the performance of the obligations under this
Agreement.
i. Documents Property of VILLAGE
Drawings, specifications, reports, and any other documents prepared by
ENGINEER in connection with any or all of the services furnished hereunder shall
be the property of VILLAGE and the VILLAGE shall obtain any and all intellectual
property rights in the drawings, specifications,reports, and documents prepared by
ENGINEER in connection with any and all of the services furnished hereunder.
ENGINEER shall have the right to retain copies of all documents and drawings for
its files. All construction drawings shall be prepared electronically using
MICROSTATION software. Paper copies will be provided to the VILLAGE in
full-size(24"x 36")or quarter-size(11"x 17")as requested. Electronic design files
will also be transferred to the VILLAGE.
If construction services are a part of the ENGINEER'S work, he will create
electronic "As-Built" conditions and will deliver them to the VILLAGE within
thirty (30) days after completion of construction and before final payment to the
ENGINEER. ENGINEER will title these files "Record Drawings".
Page 5
#11850987_vl
If construction services are not part of the ENGINEER'S work, he will deliver
electronic MICROSTATION files to the VILLAGE upon request and before final
payment to the ENGINEER.
j. Access to Records
The ENGINEER shall maintain all books, documents, papers, accounting records
and other evidence pertaining to his costs incurred by reason of this Agreement and
agrees to make such material available, at his office at the address indicated in
Section 5, Paragraph u of this Agreement, at all reasonable times during the life of
this Agreement and for a period of three(3)years from the date of final payment of
the obligations of this Agreement by the VILLAGE or such longer time as
requested by the VILLAGE, for inspection by personnel of the VILLAGE, or any
authorized representative of the VILLAGE, and copies thereof shall be furnished if
requested. The cost of any copies shall be paid by the VILLAGE.
k. Reuse of Documents
All documents, including drawings and specifications furnished by ENGINEER
pursuant to this Agreement, are intended for use on the PROJECTS only. They
should not be used or modified by VILLAGE or others on extensions of the
PROJECTS or any other project without specific written verification or adaptation
by ENGINEER. Any reuse or modification without written verification or
adaptation by ENGINEER shall be at VILLAGE'S sole risk.
1. Indemnification
ENGINEER agrees to indemnify,hold harmless, and defend(or pay the VILLAGE
for the costs of defense if the Village so desires in its sole discretion)the VILLAGE
and any of its officers, employees, or agents from and against all liability, claims,
demands, and causes of action arising out of or related to any loss, damage, injury,
death, or loss or damage to property resulting from any negligence, errors or
omissions by the ENGINEER in the performance of this Agreement.
In the event of joint or concurrent negligence of ENGINEER and VILLAGE, each
shall bear that portion of the loss or expense that its share of the joint or concurrent
negligence bears to the total negligence (including that of third parties) which
caused the personal injury or property damage.
M. Entire Agreement
This Agreement sets forth all the covenants, conditions and promises between the
parties. There are no covenants, promises, agreements, conditions or
understandings between the parties, either oral or written, other than those
contained in this Agreement.
Page 6
#11850987_vl
n. Governing Law
The laws of the State of Illinois as to both interpretation and performance shall
govern this Agreement.
o. Successors and Assigns
The terms of this Agreement shall be binding upon and inure to the benefit of the
parties and their respective successors and assigns;provided,however,that neither
party shall assign this Agreement in whole or in part without the proper written
approval of the other.
P. Waiver of Contract Breach
The waiver of one party of any breach of this Agreement or the failure of one party
to enforce at any time, or for any period of time, any of the provisions hereof, shall
be limited to the particular instance, shall not operate or be deemed to waive any
future breaches of this Agreement, and shall not be construed to be a waiver of any
provision, except for the particular instance.
q. Severability of Invalid Provisions
If any provisions of this Agreement shall be held to contravene or be invalid under
the laws of any particular State, County or jurisdiction where used, such
contravention shall not invalidate the entire Agreement,but it shall be construed as
if not containing the particular provision or provisions held to be invalid in the
particular State, County or jurisdiction and the rights or obligations of the parties
hereto shall be construed and enforced accordingly.
r. Force Majeure
Neither VILLAGE nor ENGINEER shall be liable for any fault or delay caused by
any contingency beyond their control, including, but not limited to, acts of God,
wars, strikes, walkouts, fires, or natural calamities.
S. Access and Permits
VILLAGE shall arrange for ENGINEER to enter upon public and private property
and shall obtain all necessary approvals and permits required from all governmental
authorities having jurisdiction over the PROJECTS.
t. Designation of Authorized Representatives
Each party shall designate one or more persons to act with authority in its behalf in
respect to appropriate aspects of the PROJECTS. The persons designated shall
review and respond promptly to all communications received from the other party.
Page 7
#11850987_vl
U. Address for Notices
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to ENGINEER, such notices or communications shall be
delivered or sent to:
Christopher B. Burke Engineering, LTD.
9575 West Higgins Road
Suite 600
Rosemont, Illinois 60018
Attn: Orion C. Galey, PE
Whenever it is provided in this Agreement that notice shall be given or other
communication sent to the VILLAGE, such notices or communications shall be
delivered or sent to:
VILLAGE OF OAK BROOK
1200 Oak Brook Road
Oak Brook, Illinois 60523
Attn: Rick Valent
Interim Director of Public Works
Notices personally delivered or sent via U.S. Mail, postage prepaid, shall be
deemed, for all purposes, proper notice.
V. Insurance
ENGINEER agrees to obtain and maintain, for the term of this Agreement, and for
a period of twelve(12)months after the services contracted for hereunder have been
completed,insurance hereinafter provided, furnishing a certificate or certificates of
insurance to the VILLAGE prior to commencing work under this Agreement. The
certificate or certificates of insurance shall be in a form satisfactory to the
VILLAGE from companies authorized to do business in Illinois and shall provide
that the policies referred to shall not be canceled or changed without first giving
thirty (30) days written notice thereof to the VILLAGE. Said insurance
requirements are attached as Appendix IV and made a part of this Agreement
("REQUIRED INSURANCE POLICIES").
The VILLAGE shall be named as an additional insured and a cancellation notice
recipient on all Required Insurance Policies.
W. Additional Services
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECTS.
ENGINEER shall submit separate proposals for furnishing these additional
services. Compensation for such additional services shall be negotiated by the
parties and included in this Agreement by a written amendment.
Page 8
#11850987_vl
services. Compensation for such additional services shall be negotiated by the
parties and included in this Agreement by a written amendment.
ENGINEER shall supply such additional services as requested in writing by
VILLAGE and agreed to by ENGINEER in connection with the PROJECTS.
ENGINEER shall submit separate proposals for furnishing these additional
services. Compensation for such additional services shall be negotiated by the
parties and included in this Agreement by a written amendment.
X. Time
Time is of the essence in the performance of all terms and provisions of this
Agreement.
Y. Third Party Beneficiary
No claim as a third party beneficiary under this Agreement by any person,firm,or
corporation shall be made or be valid against the Village.
Z. Conflicts
If any provisions of this Agreement conflict with any provisions of the attached
appendices I through IV,the provisions of this Agreement shall control.
IN WITNESS WHEREOF,the parties set their hands and seals on the date first written
above.
VILLAGE OF OAK BROOK ATTEST:
A Municipal Corporation
6geana Village Clerk
CHRISTOPHER B.BURKE ATTEST:
ENGINEERING,LTD.
Duly Authorized Officer
Michael Kerr,President
"OFFICIAL SEAL"
Page 9 SHERRY SPORINA
4I 1850987v I NOTARY PUBLIC,STATE OF ILLINOIS
Commission Ex irea0lll13/2t)23
APPENDIX 1
SCOPE OF SERVICES
Per Proposal for Professional Engineering Construction Services submitted by
Christopher B. Burke Engineering, LTD., dated July 1, 2021
Page 10
#11850987_vl
APPENDIX 11
COMPENSATION SCHEDULE
Per Proposal for Professional Engineering Construction Services submitted by
Christopher B. Burke Engineering, LTD., dated July 1, 2021
Page 11
#11850987_vl
APPENDIX III
TIME SCHEDULE
Per Proposal for Professional Engineering Construction Services submitted by
Christopher B. Burke Engineering, LTD., dated July 1, 2021
Page 12
#11850987_vl
M3
CHRISTOPHER B. BURKE ENGINEERING,LTD.
9575 W Higgins Road,Suite 600 Rosemont,Illinois 60018-4920 Tel(847)823-0500 Fax(847)823-0520
July 1,2021
Village of Oak Brook
1200 Oak Brook Road
Oak Brook,IL 60523
Attention: Mr.Rick Valent,Public Works Superintendent
Subject: Proposal for Professional Construction Engineering Services
Sports Core OSLAD Improvements and Bath&Tennis Shoreline Stabilization
Project
Dear Mr.Valent:
Christopher B. Burke Engineering, Ltd. (CBBEL) is providing this proposal to provide
professional engineering services related to the construction observation for the Village of Oak
Brook's (Village) OSLAD improvements located at the Bath & Tennis Property. We
understand that the Village will fund the project utilizing grant funds from the IDNR's Open
Space Land Acquisition and Development (OSLAD) grant program. Therefore, procedural
guidelines must be met per the associated intergovernmental agreements and said agencies
review and approval will be required. Included below you will find our Understanding of the
Assignment,Scope of Services and Determination of Fee.
UNDERSTANDING OF THE ASSIGNMENT
CBBEL understands that the Village would like to construct a new jogging track,soccer fields,
and walking paths connecting these new elements within the Sports Core.
SCOPE OF SERVICES
Task 1—Pre-Construction
• Management of the pre-construction meeting.
Complete Quarterly Reports for submittal to IDNR.
• Review Contractor's proposed construction schedule.
• Review all Contractors'shop drawings.
Task 2—Construction Observation
CBBEL will provide one resident engineer and one part-time project engineer(as necessary)
for the duration of the project.
Construction observation will include the following tasks:
• Serve as the Village's liaison with the Contractor working principally through the
Contractor's field superintendent.
• Observe the progress and quality of the executed work and to determine if the work is
proceeding in accordance with the Contract Documents. The Engineer will keep the
Village informed of the progress of the work, guard the Village against defects and
deficiencies in the work,advise the Village of all observed deficiencies of the work,
and will disapprove or reject all work failing to conform to the Contract Documents.
• Maintain a daily record of the Contractor's activities throughout construction including
sufficient information to permit verification of the nature and cost of changes in plans
and authorized extra work.
• Measurement and computation of pay items.
• Preparation and submission of all partial and final payment estimates,change orders,
records,documentation and reports.
• Except upon written instructions of the Village, the Resident Engineer or Inspector
shall not authorize any deviation from the Contract Documents.
• Assist Contractors in dealing with any outside agencies.
• Attend all construction conferences. Arrange a schedule of progress meetings and
other job conferences as required. Maintain and circulate copies of records of the
meetings.
• Attend meetings at any reasonable time when requested to do so by representatives
of the Village.
• Review the Contractor's schedule on a weekly basis. Compare actual progress to
Contractor's approved schedule. If the project falls behind schedule, work with the
Contractor to determine the appropriate course of action to get back on schedule.
• Maintain orderly files for correspondence, reports of job conferences,shop drawings
and other submissions, reproductions or original contract documents including all
addenda,change orders and additional drawings issued subsequent to the award of
the contract.
• Prepare payment requisitions and change orders for the Village's approval, review
applications for payment with the Contractor for compliance with established
procedures for their submission and forward them with recommendations to the
Village.
• Prior to final inspection, submit to the Contractor a list of observed items requiring
correction and verify that each correction has been made.
• Coordinate and conduct the final inspection with the Village,prepare a final punchlist.
• Verify that all the items on the final punchlist have been corrected and make
recommendations to the Village concerning acceptance.
• Determine if the project has been completed in accordance with the Contract
Documents and that the Contractor has fulfilled all of his obligations.
Please note that for any of the observation tasks that CBBEL may be performing, the
Contractor(s) shall be informed that neither the presence of CBBEL field staff nor the
observation and testing (if any) by our firm or subconsultant of our firm shall excuse the
Contractor in any way for defects discovered in the work. It should be understood that CBBEL
will not be responsible for any job and site safety on this project;job and site safety shall be
the sole responsibility of the Contractor(s). CBBEL does not have the right to stop work and
will not advise nor supervise the Contractor(s)means and methods of their work.
Task 3—Project Close Out
• All final paperwork will be submitted to the Village and IDNR.
• Material Inspection close out will be submitted to the Village in accordance with the
Construction Manual and Bureau of Materials standards.
OCG
N�ROPOSALSWDMIN2021\0ak B,oklOSLADConstn on Engineenng.070121 dw
DETERMINATION OF FEE
CBBEL proposes the following not to exceed fees for each of the tasks described above for
each Area:
Construction Engineering Services
Task 1 — Pre-Construction $ 2,500
Task 2—Construction Observation $ 32,500
Task 3— Project Close Out $ 4,500
Sub Total $ 39,500
Our contract will be in accordance with the Village of Oak Brook's approved Engineering
Services Agreement, Rider No. 1, General Terms and Conditions and Standard Charges.
It is understood that this agreement may be terminated by either party upon 60 days written
notice.
Please sign both copies of the agreement and return one to us as an indication of acceptance
and notice to proceed.
Sincerely,
W
Michael . Kerr, PE
President
THIS PROPOSA ACCEPTED FOR T VILLAGE OF OAK BROOK:
BY:
TITLE:
DATE:
OCG
N\PROPOSALS\ADM INQ02 1\Oak Brook\OSLAD Construction Engineering.070121.doc
APPENDIX IV
Insurance
Engineer shall maintain for the term of this Agreement, and for a period of twelve months
after the services is contracted for hereunder have been completed, insurance policies covering:
1. Workers Compensation: Statutory.
2. Employers Liability Insurance:
$1,000,000 injury-per occurrence
$500,000 disease-per employee
$1,000,000 disease-policy limit
Such insurance shall evidence that coverage applies in the State of Illinois.
3. Comprehensive General Liability Insurance:
$2,000,000 per occurrence combined single limit. Coverages shall include Broad
Form Property Damage Endorsements and Blanket Contractual Liability(must
expressly cover the indemnity provisions of the Agreement).
4. Comprehensive Automobile Liability Insurance:
$1,000,000 combined single limit, any auto.
5. Professional Liability Insurance (errors and omissions):
$1,000,000 per claim and $2,000,000 in aggregate.
6. Umbrella or excess liability:
The required coverages may be in any combination of primary, excess, and
umbrella policies. Any excess or umbrella policy must provide excess coverage
over underlying insurance on a following-form basis such that when any loss
covered by the primary policy exceeds the limits under the primary policy,the
excess or umbrella policy becomes effective to cover such loss.
7. Engineer will provide the Village with a certificate of insurance and additional
insured endorsement showing the Village added to the General Liability Insurance
as an additional insured.
8. Coverage shall not be suspended, voided, canceled, or reduced except after thirty
(30) days prior written notice by certified mail has been given to the Village. If a
standard Certificate of Insurance form is used with a cancellation clause,the words
"endeavor to" and "but failure to mail such notice shall impose no obligation or
liability of any kind upon the company, its agents or representatives" will be
stricken or crossed out.
Page 13
#11850987_v1
Insurance
Engineer shall maintain for the term of this Agreement,and for a period of twelve months
after the services is contracted for hereunder have been completed,insurance policies covering:
1. Workers Compensation:Statutory.
2. Employers Liability Insurance:
$1,000,000 injury-per occurrence
$500,000 disease-per employee
$1,000,000 disease-policy limit
Such insurance shall evidence that coverage applies in the State of Illinois.
3. Comprehensive General Liability Insurance:
$2,000,000 per occurrence combined single limit. Coverages shall include Broad
Form Property Damage Endorsements and Blanket Contractual Liability(must
expressly cover the indemnity provisions of the Agreement).
4. Comprehensive Automobile Liability Insurance:
$1,000,000 combined single limit,any auto.
5. Professional Liability Insurance(errors and omissions):
$1,000,000 per claim and$2,000,000 in aggregate.
6. Umbrella or excess liability:
The required coverages may be in any combination of primary,excess,and
umbrella policies. Any excess or umbrella policy must provide excess coverage
over underlying insurance on a following-form basis such that when any loss
covered by the primary policy exceeds the limits under the primary policy,the
excess or umbrella policy becomes effective to cover such loss.
7. Engineer will provide the Village with a certificate of insurance and additional
insured endorsement showing the Village added to the General Liability Insurance
as an additional insured.
8. Coverage shall not be suspended,voided,canceled,or reduced except after thirty
(30)days prior written notice by certified mail has been given to the Village.If a
standard Certificate of Insurance form is used with a cancellation clause,the words
"endeavor to"and"but failure to mail such notice shall impose no obligation or
liability of any kind upon the company, its agents or representatives" will be
stricken or crossed out.
Page 13
#11850987 v1