R-1936 - 03/23/2021 - CONTRACTS - Resolutions Supporting Documents (2) Section 00 63 63-CHANGE ORDER NO. 1
Owner: Village of Oak Brook, Illinois Owner's Project No.:
Engineer: Dixon Engineering, Inc. Engineer's Project No.: 13-22-24-03 &04-20
Contractor: Era Valdivia Contractors, Inc. Contractor's Project No.:
Project: 250,000 Gallon Spheroid (East and West Tanks)
Contract Name: Exterior Overcoat,Wet Interior Spot Repaint, Dry Interior Spot Repaint,and
Miscellaneous Repairs
Date Issued: April 15,2021 Effective Date of Change Order: April 15,2021
The Contract is modified as follows upon execution of this Change Order:
Description: Remove antennas and antenna cables from the tank and install one new penetration in
the basebell per the attached Bulletin 1.
Attachments: Bulletin 1
Change in Contract Times
[State Contract Times as either a specific date or a
Change in Contract Price number of days]
Original Contract Price: Original Contract Times:
Substantial Completion: N/A
$ 728,400 Ready for final payment: N/A
[Increase] [Decrease]from previously approved [Increase] [Decrease]from previously approved
Change Orders No. 1 to No. [Number of previous Change Orders No.1 to No. [Number of previous
Change Order]: Change Order]:
Substantial Completion: N/A
$ 0 Ready for final payment: N/A
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: N/A
$ 728,400 Ready for final payment: N/A
Increase this Change Order: [Increase] [Decrease]this Change Order:
Substantial Completion: N/A
$ 9,840 Ready for final payment: N/A
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial Completion: N/A
$ 738,240 Ready for final payment: N/A
Recommended by Engineer(if required) Authorized by Owner
By:
Title: Project Manager
Date: April 15, 2021
Authorized by Contractor Approved by Funding Agency(if applicable)
By:
Title:
Date:
EJCDC®C-941,Change Order.
Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies
and American Society of Civil Engineers.All rights reserved.
Page 1 of 1
Section 00 63 57-Change Order Price Request Form
Village of Oak Brook,Illinois
250,000 Gallon Spheroid
(East and West Tanks)
Exterior Overcoat
Wet Interior Repaint
Dry Interior Spot Repaint
and Miscellaneous Repairs
April 13,2021
Bulletin No. 1
Provide prices for the following:
Remove antennas and antenna cables from the tank, all removed items are to become the
property of the Contractor for proper disposal. Remove cables from the entire tank to the
antenna equipment cabinets. Remove the abandoned electrical raceway on the south side
(exterior). The water meter cable and antenna is to remain. Where applicable remove pipe
extensions on the five openings. Weld `/4 inch steel plate over the openings, overlap a minimum
of/z inch all around and weld using '/ inch full penetration fillet welds on both sides.
Install one new penetration in the basebell in a location directed by the Owner. Cut hole in the
basebell and install a 3 inch Schedule 80 pipe. Extend the pipe a minimum of 4 times the
existing steel thickness(minimum 4 inches) inside and outside the basebell wall. Weld using '/
inch full penetration fillet welds on both sides. Install a fernco flexible pipe cap over the opening
as a temporary cover after the topcoat is applied.
$ �z ,
Con r Signature
Date
Section 00 63 63-CHANGE ORDER NO.2
Owner: Village of Oak Brook,Illinois Owner's Project No.:
Engineer: Dixon Engineering,Inc. Engineer's Project No.: 13-22-24-03&04-20
Contractor: Era Valdivia Contractors,Inc. Contractor's Project No.:
Project: 250,000 Gallon Spheroid(East and West Tanks)
Exterior Overcoat,Wet Interior Spot Repaint,Dry Interior Spot Repaint,and
Contract Name: Miscellaneous Repairs
Date Issued: April 16,2021 Effective Date of Change Order: April 16,2021
The Contract is modified as follows upon execution of this Change Order:
Description: Install a steel plate mounting bracket in the basebell in a location directed by the Owner. All
welds are to be 3/16 in.full fillet welds. Coat all new steel per the specifications.See attachment.
Attachments:Cathodic Protection Attachment Plate
Change in Contract Times
[State Contract Times as either a specific date or a
Change in Contract Price number of days]
Original Contract Price: Original Contract Times:
Substantial Completion: N/A
$ 728,400 Ready for final payment: N/A
Increase from previously approved Change Order No.1: [Increase][Decrease]from previously approved
Change Orders No.1 to No.[Number of previous
Change Order]:
Substantial Completion: N/A
$ 9,840 Ready for final payment: N/A
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: N/A
$ 738,240 Ready for final payment: N/A
Increase this Change Order: [increase][Decrease]this Change Order:
Substantial Completion: N/A
$ 1,800 Ready for final payment: N/A
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial Completion: N/A
$ 740,040 Ready for final payment: N/A
Recommended by Engineer(if required) Auth d by Owner
By. �.
rrJ'Gt ,7�ArG
Title: Project Manager
Date: April 16,2021
Authorized by Contractor Approved by Funding Agency(if applicable)
By:
Title:
Date:
EJCDC•C-941,Change Order.
Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies
and American society of Civil Engineers.All rights reserved.
Page 1 of 1
54"
24"
1
3"x3"x1/4" steel angle legs(typ of 4)
3/16"tk steel plate
III
Section 00 63 63-CHANGE ORDER NO.3
Owner: Village of Oak Brook,Illinois Owner's Project No.:
Engineer: Dixon Engineering,Inc. Engineer's Project No.: 13-22-24-03&04-20
Contractor: Era Valdivia Contractors,Inc. Contractor's Project No.:
Project: 250,000 Gallon Spheroid(East and West Tanks)
Exterior Overcoat,Wet Interior Spot Repaint,Dry Interior Spot Repaint,and
Contract Name: Miscellaneous Repairs
Date Issued: September 14,2021 Effective Date of Change Order: September 14,2021
The Contract is modified as follows upon execution of this Change Order:
Description: Replace access tube alignment lugs on the West Tank per Bulletin 2
Attachments:Bulletin No.2 and pictures of broken access tube lugs
Change in Contract Times
(State Contract Times as either a specific date or a
Chane in Contract Price number of daysl
Original Contract Price: Original Contract Times:
Substantial Completion: N/A
$
728,400 Ready for final payment: N/A
Increase from previously approved Change Order No.1 llncrease][Decrease]from previously approved
&No.2: Change Orders No.1 to No.[Number of previous
Change Order]:
Substantial Completion: N/A
$ 11,640 Ready for final payment: N/A
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: N/A
$ 740,040 Ready for final payment: N/A
Increase this Change Order: (Increase](Decrease]this Change Order:
Substantial Completion: N/A
$ 19,800 Ready for final payment: N/A
Contract Price incorporating this Change Order: ContractTimes with all approved Change Orders:
Substantial Completion: N/A
$ 759,840 Ready for final payment: N/A
Recommended by Engineer(if required) Auth ized b Owner
By: �rrJlf � C
Title: Project Manager
Date: September 14,2021
Authorized by Contractor Approved by Funding Agency(if applicable)
By:
Title:
Date:
E1CDC'C-941,Change Order.
Copyrightc 2018 National Society of Professional Engineers,American Council of Engineering Companies
and American Society of Civil Engineers.All rights reserved.
Page 1 of 1
i
i
I
Section 00 63 57-Change Order Price Request Form !
i
Village of Oak Brook,Illinois
250,000 Gallon Spheroid
(East and West Tanks)
Exterior Overcoat
Wel Interior Repaint
Dry Interior Spot Repaint
and Miscellaneous Repairs
September 13,2021
Bulletin No.2
Provide prices for the following:
Remove the existing access tube alignment lugs on the west tank.Grind the existing lugs and
welds flush with the surrounding steel. Reinstall new 4x4x3/8 inch steel plate,field verify length
needed. Weld using 114 inch full fillet welds.
Nineteen Thousand Eight Hundred Dollars $ 19,800.00
Era-Valdivia Contractors,Inc.
L1_L
tra ignalure
/ 9/14/2021
Date
Access tube lugs have broken away making the access tube sway
i
t<;