Loading...
R-1990 - 01/25/2022 - ENGINEERING - Resolutions Supporting Documents ITEM 6.C.3 BOARD OF TRUSTEES MEETING VILLAGE 01SAMUEL E. DEAN BOARD ROOM OAK B R� , K, BUTLER GOVERNMENT CENTER 1200 OAK BROOK ROAD OAK BROOK, ILLINOIS 630-368-5000 AGENDA ITEM Regular Board of Trustees Meeting of January 25, 2022 SUBJECT: Award of Contract—Construction Management Contract for Designer-Led Design-Build Project for Resurfacing Improvements to Brook Forest, Regent Drive Bridge,Trinity Lakes Bike Path,and Spring Road Water Main Break Restoration. FROM: Rick Valent, Director of Public Works BUDGET SOURCE/BUDGET IMPACT: $5,123,225 from Accounts 366-90700, Safety Pathway Maintenance and 461-90700,Roadway Improvements. RECOMMENDED MOTION: I move that the Village Board award a Construction Management Contract for Designer-Led Design-Build Project for the Resurfacing Improvements to Brook Forest, Regent Drive Bridge, Trinity Lakes Bike Path and Spring Road Water Main Break Restoration to Burke, LLC, Rosemont, Illinois, in the amount of $5,123,225. Additionally, I move that the Village Board approve Resolution R-1990. Background/History: In 2019, the water main replacement in Brook Forest was approved with a four-year phased approach with the final phase scheduled to be completed in 2022. In addition to the water main replacement was a fifth phase in 2023 for street improvements which would include a significant amount of curb replacement, storm sewer structure repairs and replacement, and asphalt resurfacing. Fast forward to 2021 and all four phases of the water main replacement were completed a year early due to the designer-led design-build process and the awarded contractor providing favorable pricing that brought a generous savings to the Village. The overall savings,both engineering and construction costs, was nearly$2.7M lower than the projected costs identified in the 2018 Water Plan. In addition to street improvements in Brook Forest, the Five-Year Capital Plan identifies BOT AGENDA Page 1 G'-S. asphalt improvements to the Trinity Lakes bike path and Regent Drive Bridge. These projects, as well as the asphalt restoration of a water main break on Spring Road, included with Brook Forest increase the quantities and provide better pricing all around. As part of the competitive bidding process associated with this Project,Burke, LLC received sixteen(16)bids from reliable contractors to ensure favorable pricing. In fact, the engineering design build process and its competitive pricing have offered a savings of nearly$1.2M to what is in the Five-Year Capital Plan. Please note,the budget figures were developed from costs estimates generated by in-house engineering staff dating back to 2016. Staff is requesting the approval of the designer-led design-build process for a few reasons. The State of Illinois will be letting one of its largest project lists in the coming weeks,which will have a large impact on the pricing of material and the availability of contractors. By approving this process,the Village can avoid those issues and better secure the timely completion and savings of its projects. Staff also recognizes that the residents of Brook Forest have endured ongoing construction for multiple years in a row and are confident that the contractors that are awarded this project will complete the work in a professional and expedient manner. Recommendation That the Village Board award a Construction Management Contract for Designer-Led Design-Build Project for the Resurfacing Improvements to Brook Forest, Regent Drive Bridge,Trinity Lakes Bike Path and Spring Road Water Main Break Restoration to Burke, LLC,Rosemont,Illinois,in the amount of$5,123,225. Additionally,that the Village Board approve Resolution R-1990. BOT AGENDA Page 2