Loading...
R-1997 - 01/25/2022 - ENGINEERING - Resolutions Supporting Documents ITEM 6.C.4 BOARD OF TRUSTEES MEETING VILI Acre C)i SAMUEL E. DEAN BOARD ROOM OAK B R , K . BUTLER GOVERNMENT CENTER 1200 OAK BROOK ROAD OAK BROOK, ILLINOIS 630-368-5000 AGENDA ITEM Regular Board of Trustees Meeting of January 25, 2022 SUBJECT: Award of Contract—A Professional Engineering Services Agreement for the Design of the Harger Road STP Resurfacing Project. FROM: Rick Valent, Director of Public Works W BUDGET SOURCE/BUDGET IMPACT: $57,800 from account#461-76200. RECOMMENDED MOTION: I move that the Village Board award a Professional Engineering Services Agreement to Christopher B. Burke Engineering, Ltd. (CBBEL), Rosemont, Illinois, in the amount of $57,800 for the design of the Harger Road STP Resurfacing Project. Additionally, I move that the Village Board approve Resolution R- 1997. Background/History: In coordination with Village Staff, Christopher B. Burke Engineering, Ltd. prepared and submitted a grant application on behalf of the Village to receive federal Surface Transportation Program (STP) funding in March of 2020. The intent was to obtain funding for the resurfacing of Harger Road after the Harger Multi-Use Path and the Harger Road Water Main Projects were completed. As part of the Five-Year Capital Plan,in year 2023 it is proposed to resurface Harger Road between Spring Road and Yorkshire Woods following the water main replacement project scheduled for 2022.The construction process of the project will be funded by using federal STP and local MFT funds. Therefore, IDOT procedural guidelines will be met and their approval will be required. The estimated construction budget for this project is $600,000, of which a federal grant of up to $420,000 will offset the total construction cost. It is anticipated that the project will be designed in 2022 for the contract to be placed on the November 2022 IDOT letting. The timeline for the project is to have final plan drawings and the final construction engineering BOT AGENDA Page 1 and local agency agreements submitted to MOT by August 8t'to meet that November deadline. Recommendation: That the Village Board award a Professional Engineering Services Agreement to Christopher B. Burke Engineering,Ltd. (CBBEL),Rosemont, Illinois,in the amount of $57,800 for the design of the Harger Road STP Resurfacing Project. Additionally, I move that the Village Board approve Resolution R-1997. BOT AGENDA Page 2