Loading...
Proposal for Supplemental Prof. Eng. Srvs. for Harger Road STP Resurfacing Project CHRISTOPHER B. BURKE ENGINEERING,LTD. 9575 West Higgins Road Suite 600 Rosemont, Illinois 60018 TEL(847)823-0500 FAX(847)823-0520 "ATTACHMENT A" June 6, 2022 Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523 Attention: Mr. Rick Valent, Public Works Director Subject: Proposal for Supplemental Professional Engineering Services Design of Harger Road Bridge Repairs Dear Mr. Valent: Christopher B. Burke Engineering, Ltd. (CBBEL) is providing this proposal to supplement our professional engineering services agreement for the Harger Road STP Resurfacing Project. Included below you will find our Understanding of the Assignment, Scope of Services and Determination of Fee. UNDERSTANDING OF THE ASSIGNMENT Christopher B. Burke Engineering, Ltd. (CBBEL) is currently under contract for design plan preparation (Phase I and Phase II Engineering) related to the preparation of the bidding documents and plans for the Village's Harger Road STP Resurfacing Project. Upon approval of the design contract, CBBEL and Village Staff participated in a kick-off meeting with the Illinois Department of Transportation (IDOT). During the kick-off meeting, IDOT concluded that the Village was required to coordinate with the Illinois State Toll Highway Authority (Tollway) regarding the proposed resurfacing project and omission of the Harger Road bridge over Salt Creek which is under Tollway jurisdiction. Per the email correspondence received on March 18th, the Tollway requested that the Village address some of the suggested bridge repairs that were noted in their latest Bridge Defect Summary Report dated May 10, 2021, as part of the Harger Road STP Resurfacing Project. If the Village is agreeable to expanding the project limits to include these bridge repairs, the Village and Tollway would enter into an intergovernmental agreement that details the Tollway's obligation for reimbursing the Village for all design engineering, construction, and construction engineering costs related to the bridge repairs. A summary of the additional design engineering tasks and associated fees required to accommodate this request are as follows: SCOPE OF SERVICES AND FEES CBBEL will perform an initial site visit to verify the Tollway's recommended repairs. CBBEL will measure the approximate limits of repair at accessible areas. The required repair areas at top of piers and abutments will be estimated. There will be no concrete sounding, hands-on inspection or chain dragging of the deck during this visit. CBBEL will prepare the plans, specs, and cost estimate to complete the requested repairs. The followings are sheet lists and fees for each task: 1. Field Visit $3,080.00 2. General Plan and Elevation, General Notes and Bill of Materials $3,780.00 3. Parapet Repair Plan, Elevation and Details $2,240.00 4. Deck Joint Replacement Details $2,310.00 5. Substructure Repair Plans $4,900.00 6. Quantities, Estimates, and Specifications $2,670.00 7. Incorporating Tollway Review Comments $2,940.00 8. Coordination $2,450.00 Total Fee =$24,370.00 We would like to establish our contract in accordance with the Village of Oak Brook's approved Engineering Services Agreement, Rider No. 1, General Terms and Conditions and Standard Charges. It is understood that this agreement may be terminated by either party upon 60 days written notice. Please sign both copies of the agreement and return one to us as an indication of acceptance and notice to proceed. Sincerely, —�� Michael E. Kerr, PE President THIS PROPOSAL ACCEPTED FOR THE VILLAGE OF OAK BROOK: BY: TITLE: DATE: OCG N'\PRO POSALS\ADM I N\2022\Oak Brook-Harger Road STP\Oak Brook Harger Rd STP Bridge Repairs Supplement.06062022.doc Page 2 of 2