Loading...
R-1997 - 06/14/2022 - AGREEMENTS - Resolutions Exhibits ITEM 6.A.5 VILLAGOF BOARD OF TRUSTEES MEETING DAEK B R SAMUEL E. DEAN BOARD ROOM KBUTLER GOVERNMENT CENTER 1200 OAK BROOK ROAD OAK BROOK, ILLINOIS 630-368-5000 AGENDA ITEM Regular Board of Trustees Meeting of June 14, 2022 SUBJECT: Proposal Approval — A Proposal Supplementing the Design Engineering Services Agreement for the Harger Road STP Resurfacing Project. FROM: Rick Valent, Director of Public Works BUDGET SOURCE/BUDGET IMPACT: $24,370 from account#461-76200. RECOMMENDED MOTION: I move that the Village Board approve the proposal supplementing the Design Engineering Services Agreement for the Harger Road STP Resurfacing Project submitted by Christopher B. Burke Engineering, Ltd. (CBBEL), Rosemont, Illinois, in the amount of$24,370 for additional design services related to the rehabilitation of the Harger Road Bridge over Salt Creek. Background/History: On January 25, 2022, the Village Board awarded Christopher B. Burke Engineering, Ltd. (CBBEL) a Professional Engineering Services Agreement for the design plan preparation of the Harger Road STP Resurfacing Project scheduled for 2023 which postdates the water main replacement scheduled to be completed in 2022. Upon approval of the design contract, CBBEL and Village Staff participated in a kick-off meeting with the Illinois Department of Transportation (IDOT). During that meeting, IDOT concluded that the Village was required to coordinate with the Illinois State Toll Highway Authority(Tollway) regarding the proposed resurfacing project and omission of the Harger Road Bridge over Salt Creek which is under Tollway jurisdiction. Per email correspondence received on March 18, 2022, the Tollway requested that the Village address some of the suggested bridge repairs that were noted in their latest Bridge Defect Summary Report dated May 10, 2021, as part of the Harger Road STP Resurfacing Project. If the Village is agreeable to expanding the project limits to include these bridge repairs, the Village and Tollway would enter into an intergovernmental agreement (IGA) that details the Tollway's obligation for reimbursing the Village for all design engineering, construction, and construction engineering costs related to the bridge repairs. BOT AGENDA Page 1 SCOPE OF SERVICES AND FEES CBBEL will perform an initial site visit to verify the Tollway's recommended repairs. CBBEL will measure the approximate limits of repair at accessible areas. The required repair areas at top of piers and abutments will be estimated. There will be no concrete sounding, hands-on inspection or chain dragging of the deck during this visit. CBBEL will prepare the plans, specs, and cost estimate to complete the requested repairs. The followings are sheet lists and fees for each task: 1. Field Visit $3,080.00 2. General Plan and Elevation, General Notes and Bill of Materials $3,780.00 3. Parapet Repair Plan, Elevation and Details $2,240.00 4. Deck Joint Replacement Details $2,310.00 5. Substructure Repair Plans $4,900.00 6. Quantities, Estimates, and Specifications $2,670.00 7. Incorporating Tollway Review Comments $2,940.00 8. Coordination $2,450.00 Total Fee = $24,370.00 We would like to establish our contract in accordance with the Village of Oak Brook's approved Engineering Services Agreement, Rider No. 1, General Terms and Conditions and Standard Charges. It is understood that this agreement may be terminated by either party upon 60 days written notice. Please sign both copies of the agreement and return one to us as an indication of acceptance and notice to proceed. Sincerely, Michael E. Kerr, PE President THIS PROPOSAL ACCEPTED FOR THE VILLAGE OF OAK BROOK: BY: TITLE: k7i I t jQ -).n DATE: Oce Page 2 of 2 N'.\PROPOSALSVADMIN\2022\Oak Brook-Harger Road STP\Oak Brook Harger Rd STP Bridge Repairs Supplement.06062022.doc CHRISTOPHER B. BURKE ENGINEERING,LTD. 9575 West Higgins Road Suite 600 Rosemont, Illinois 60018 TEL(847)823-0500 FAX(847)823-0520 "ATTACHMENT A" June 6, 2022 Village of Oak Brook 1200 Oak Brook Road Oak Brook, IL 60523 Attention: Mr. Rick Valent, Public Works Director Subject: Proposal for Supplemental Professional Engineering Services Design of Harger Road Bridge Repairs Dear Mr. Valent: Christopher B. Burke Engineering, Ltd. (CBBEL) is providing this proposal to supplement our professional engineering services agreement for the Harger Road STP Resurfacing Project. Included below you will find our Understanding of the Assignment, Scope of Services and Determination of Fee. UNDERSTANDING OF THE ASSIGNMENT Christopher B. Burke Engineering, Ltd. (CBBEL) is currently under contract for design plan preparation (Phase I and Phase II Engineering) related to the preparation of the bidding documents and plans for the Village's Harger Road STP Resurfacing Project. Upon approval of the design contract, CBBEL and Village Staff participated in a kick-off meeting with the Illinois Department of Transportation (IDOT). During the kick-off meeting, IDOT concluded that the Village was required to coordinate with the Illinois State Toll Highway Authority (Tollway) regarding the proposed resurfacing project and omission of the Harger Road bridge over Salt Creek which is under Tollway jurisdiction. Per the email correspondence received on March 18th, the Tollway requested that the Village address some of the suggested bridge repairs that were noted in their latest Bridge Defect Summary Report dated May 10, 2021, as part of the Harger Road STP Resurfacing Project. If the Village is agreeable to expanding the project limits to include these bridge repairs, the Village and Tollway would enter into an intergovernmental agreement that details the Tollway's obligation for reimbursing the Village for all design engineering, construction, and construction engineering costs related to the bridge repairs. A summary of the additional design engineering tasks and associated fees required to accommodate this request are as follows: Since the Harger Road STP Resurfacing Project is a Village coordinated project already in its engineering phase, a supplemental proposal from CBBEL for additional design engineering tasks and associated fees required to accommodate this request has been submitted for approval. Again, through the IGA with the Tollway that will be presented to the Village Board for approval at an upcoming meeting, 100% of these engineering costs is to be paid for by the Tollway. Also of note is the fact that federal grant dollars were awarded for this project based on a commitment from the Village that the project would be awarded during the 2022 State fiscal year. As such, prefinal plans must be submitted to IDOT by August 12, 2022, so time is of the essence. A final item of importance worth mentioning is the inconvenience that both the water main replacement in 2022 and resurfacing in 2023 will have on our residents, business owners, and commuters. The recently completed York/Harger Intersection Improvements is a good example of this. Should the Village Board choose to not approve this supplemental proposal, as well as the upcoming IGA, repairs to the Harger Road Bridge will not occur during this construction process, but rather at a later date when the Tollway makes the decision to perform the bridge repairs on their own schedule. This would introduce yet another inconvenience to the community. Recommendation: That the Village Board approve the proposal supplementing the Design Engineering Services Agreement for the Harger Road STP Resurfacing Project submitted by Christopher B. Burke Engineering,Ltd. (CBBEL),Rosemont, Illinois, in the amount of$24,370. BOT AGENDA Page 2