Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025 Res A and B Repaint and Misc. Repairs
Oak Brook, Illinois - 3,500,000 Gallon Concrete Reservoir (A) and 4,000,000 Gallon Concrete Reservoir (B) 2025 Water Tower Painting Project -February 26, 2025 - 2:00 p.m. LC United Seven Brothers Era Valdivia Dean Baughman E&L Painting Tecorp Sterling Heights,Shelby Twp.,Chicago,Fort Wayne,Howell,Joliet, MI MI IL IN MI IL Reservoir A Section 05 00 00 Roof Hatch (1)16,000 10,000 18,000 Draw Pipe Silt Stop (2)14,000 1,800 7,500 Roof Vents (3)38,000 7,800 60,000 Section 09 00 00 Wet Interior Piping Repaint (4)82,000 27,380 170,000 Wet Interior Rebar Painting (5)38,000 10,000 12,000 Section 13 00 00 Mixer Installation - 2 Mixers (6)106,000 42,900 58,000 Project Total 294,000 99,880 325,500 Bid Bond 10%10%10% 1 Oak Brook, Illinois - 3,500,000 Gallon Concrete Reservoir (A) and 4,000,000 Gallon Concrete Reservoir (B) 2025 Water Tower Painting Project -February 26, 2025 - 2:00 p.m. A1 Industrial Abhe & Svobada Midwest Tank Stoic Industrial P T & T Youngstown,Jordan,Fremont,Grand Ledge,Henderson, OH MN OH MI KY Reservoir A Section 05 00 00 Roof Hatch (1)12,500 14,000 Draw Pipe Silt Stop (2)2,200 5,000 Roof Vents (3)32,100 18,000 Section 09 00 00 Wet Interior Piping Repaint (4)62,500 52,000 Wet Interior Rebar Painting (5)6,000 100,000 Section 13 00 00 Mixer Installation - 2 Mixers (6)71,200 65,000 Project Total Reservoir A 186,500 254,000 Bid Bond 10%5% 2 Oak Brook, Illinois - 3,500,000 Gallon Concrete Reservoir (A) and 4,000,000 Gallon Concrete Reservoir (B) 2025 Water Tower Painting Project -February 26, 2025 - 2:00 p.m. LC United Seven Brothers Era Valdivia Dean Baughman E&L Painting Tecorp Sterling Heights,Shelby Twp.,Chicago,Fort Wayne,Howell,Joliet, MI MI IL IN MI IL Reservoir B Section 03 00 00 48,000 Roof Hatch Curb Extensions (1)14,000 12,000 Section 09 00 00 Wet Interior Piping Repaint (2)92,000 30,380 170,000 Exterior Appurtenances Repainting w/ Con. (3)69,000 14,000 170,000 Section 13 00 00 Mixer Installation - 2 Mixers (4)106,000 42,900 58,000 Project Total Reservoir B 281,000 99,280 446,000 Project Total Both Tanks 575,000 199,160 771,500 Bid Bond 10%10%10% 3 Oak Brook, Illinois - 3,500,000 Gallon Concrete Reservoir (A) and 4,000,000 Gallon Concrete Reservoir (B) 2025 Water Tower Painting Project -February 26, 2025 - 2:00 p.m. A1 Industrial Abhe Svoboda Midwest Tank Stoic Industrial PT & T Youngstown,Jordan,Fremont,Grand Ledge,Henderson, OH MN OH MI KY Reservoir B Section 03 00 00 Roof Hatch Curb Extensions (1)15,300 24,000 Section 09 00 00 Wet Interior Piping Repaint (2)74,500 52,000 Exterior Appurtenances Repainting w/ Con. (3)38,500 60,000 Section 13 00 00 Mixer Installation - 2 Mixers (4)71,200 65,000 Project Total Reservoir B 199,500 201,000 Project Total Both Tanks 386,500 455,000 Bid Bond 10%5% 4