HomeMy WebLinkAbout2020 Project Manual (WORD) - Village of Oak Brook - Roof Replacement Project Shinglesv1.1 Project Manual For: 2020 ROOF REPLACEMENT PROJECT AT: VILLAGE OF OAK BROOK BATH & TENNIS CLUB 800 OAK BROOK ROAD OAK BROOK, IL 60523 Project Owner: The Village of Oak Brook 3003 Jorie Blvd Oak Brook, IL 60523 2 VILLAGE OF OAK BROOK BATH & TENNIS CLUB SHINGLE ROOF REPLACEMENT PROPOSAL DUE DATE TBD by End of Business Day Submit Proposals to:dbsbids@garlandind.com (see attached sheet) INTENT The Village of Oak Brook, hereafter known as the “Owner”, is seeking firm pricing for the Bath & Tennis Club Roof Replacement, as described on the plans and in the detailed specifications. These projects will take place at the Bath & Tennis Club , 800 Oak Brook Road, Oak Brook, IL . SCOPE The scope of the improvements involves, but is not limited to (See Section 073110 for roofing specific scope of work): 1. Roofing system by an approved government cooperative with manufacturer’s representative field observation services, quality control, and daily reports. 2. Removal of the existing roof system per specifications 3. Installation of a new shingle roof system as outlined in the attached specifications. 4. Replacement of plywood on the inside walls of mechanical screen wall(west side) and installation of Rmer Wall Pan panels. 5. Protection of all existing low voltage and utility systems to remain. 6. Removal and Re-installation of equipment as required, at low clearances, to remove/replace roof. 7. Replacement of any deteriorated or corroded corrugated steel decking with like kind (allowance will be used for this unknown condition/quantity). 8. Removal of existing and re-installation of existing roof drains as required to properly flash roofing materials beneath the drain pan. 9. Complete cleaning and flushing of existing roof drains. 10. Removal of existing and installation of new flashing to existing HVAC equipment, hangar corrugated metal decking, and other roof openings and penetrations. 11. Existing HVAC and Rooftop equipment scheduling must be coordinated and approved by the Village prior to work starting in any area that may affect building operations 12. Providing assurance that all roof openings (.ie exhaust fans, fresh air intakes, ventilators, etc. are temporarily taken out of service and sealed to prevent any fumes from entering the restaurant area below. Adequate sealing procedures should include taping with duct tape and visqueen before any demo or application of mastic. Remove when operation is completed or as required by the function of the restaurant. Village of Oak Brook must approve all schedules. 13. Protection of existing corrugated metal roofing (and adjacent non-work related areas) during replacement 14. Apply appropriate new flashings around all roof deck penetrations (ie. boots for piping and vent stacks, galvanized sheetmetal flashings, etc.). 15. All scope as indicated in the drawings. SITE REVIEW The Owner requires contractors interested in submitting a proposal, view the project site prior to submitting a bid. Scheduled review date will be determined by the Manufacturer’s representative. Absolutely no drop- in appointments w ill be allowed. 3 QUESTIONS All questions shall be submitted in writing to Scott Goehring according to bid sheets. No questions will be accepted verbally. TIME SCHEDULE The contractor shall commence work upon receipt of Contract and shall complete all work in a diligent and professional manner by the dates as follows. The substantial completion date for the improvements is TBD all work as specified within this contract to be sufficiently complete so that the Owner can utilize the area for its intended use and secure occupancy permits. The final completion date for the improvements is TBD – all work, including punchlist items, must be 100% complete at this time. Contractor is responsible for scheduling construction activities to achieve these dates. Within 7 days of award, contractor must submit a construction schedule including commencement and completion dates of each phase of the work for review and acceptance by the Owner. Unless a time extension has been granted in writing by the Village of Oak Brook; failure to comply with the deadlines for the substantial completion date and final completion date shall result in the enforcement of liquidated damages in the amount of $500.00 per day for each and every calendar day that these improvements remain incomplete. The time schedule for this work is very critical. When submitting a proposal, the Contractor agrees he can meet the completion requirements and has sufficient staff and financial resources to complete the project on time. He further agrees he has included in the bid submittal any premium or overtime wages necessary to have workers on overtime, multiple working shifts, holidays, weekends or any other arrangement to sufficiently man the project to meet the schedule. The Bidder further agrees he will place a Project Superintendent from his staff full time on the project. Full time is forty hours minimum. This person must be thoroughly trained and skilled to manage the project and must be fully capable of communicating with the Owner and Engineer at all times. In addition, the Project Superintendent must be on site at any time his contractors and/or subcontractors are on site. Failure to maintain a full time Project Superintendent on the site from start to final acceptance will be reason for the Owner to deduct from the contract amount all costs of services if the Owner and/or Engineer and/or Architect decide any other services are required to complete the project in an orderly and timely manner. The Contractor agrees by submitting a bid that he has included sufficient safety precautions and protection to insure safe conditions for the building occupants during the entire project. The Village is not responsible for site safety. The Contractor is solely and exclusively responsible for construction means, methods, technologies, and site safety. This project takes place in a public space with an operational business on site. Time schedule, storage, and staging must be approved by the Engineer. Access to the adjacent areas must be maintained at all times and site cleanliness must be maintained at all times to the satisfaction of the Owner. The preparation of the time schedule, storage, staging and site cleanliness is considered incidental to the costs of this contract. GENERAL The Contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work; maintain and remove temporary equipment; maintain site cleanliness; and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied therefrom. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, ready to operate, and delivered to the Owner in new condition. Each Contractor shall coordinate his work with any and all other trades and Contractors on the site, as well as the Owner. His work shall be performed in a timely fashion to meet the project time schedule for all work. If it is the intent of the Bidder to utilize a subcontractor(s) to complete any portion of this contract the Bidder shall advise the company name, contact name, address, phone and fax number, and e-mail address 4 at the time of bid submittal. All subcontractors must be approved by the Engineer and shall be responsible for following the contract, as specified, as if they are the awarded Contractor. Contractor shall include at least (2) historical residential project references with their proposal. Include site address, owner contact, date of installation, and photographs (if available). DELIVERY All materials shall be delivered within the designated area on the project site. Delivery will be allowed Monday through Friday from 7:00 a.m. to 3:00 p.m when approved by the Fire Station. Absolutely no materials shall be stored on the existing roof, or landscape areas. BIDDING DOCUMENTS 1. Specifications 2. Drawings 3. Addenda LIST OF DRAWINGS Roof Plan (2 Sheets) dated 7/19/2019. CONTRACTOR REQUIREMENTS All interested Bidders shall meet the following requirements in order to bid this project: (1) Five (5) years minimum United States experience with building contracts. (2) Contractors bidding the work shall have their own place of business, equipment, staff, manpower, etc. required for the type of work they are licensed to perform. (3) Contractors bidding the work shall provide the necessary financial information to the Owner when requested, including, but not limited to, the financial statements for the three (3) previous years of the apparent successful contractor which shall be submitted to the Owner. The financial statements shall have been prepared and certified by a C.P.A. (4) Contractors proposing the work shall be able to submit the necessary insurance as required by these contract documents. The insurance company shall be acceptable to the Owner. (5) It is the General Contractor’s intention to remit payment of approved invoice amounts within forty- five (45) days of General Contractor’s acceptance. Deductions may be made for unapproved amounts invoiced and/or any penalties or damages incurred by the Owner or General Contractor. (6) The final invoice for retention will be paid upon the General Contractor’s receipt of final payment by the Owner. (7) All Invoices must be submitted to General Contractor on AIA G702/G703 invoice forms or approved equal. (8) The contractor shall be prepared to submit a Certificate of Insurance with the Owner and General Contractor identified as the additional insured in accordance with the requirements as outlined in the Supplementary Conditions. (9) The Contractor shall be responsible for any building permits required by the Village of Oak Brook and must comply with all local, State, and Federal requirements. (10) Once the project is awarded and started, the contractor must continue to work, full-time and with a sufficient workforce able to faithfully prosecute the Work until final completion is issued by 5 the General Contractor. Work must be performed in logical sequence and in accordance with the specification documents as provided herein, deviations will only be allowed under direction of the General Contractor or Owner. (11) One Proposal sheet shall be completed in full for all buildings in scope. Unit costs must be provided for additional / optional repair items to be completed on various buildings. Any expected latent or c oncealed site conditions should be identified upfront with unit pricing. (12) Proposers are reminded that the General Contractor is purchasing the Garland roof system materials for this project. Proposers should adjust profit and overhead accordingly as they are not incurring the expense of the materials, but will still need to handle the materials and load the job site once the materials arrive to the site. (13) Proposers are reminded that the freight for the General Contractor supplied materials will be paid for by the General Contractor and will not be an expense to the Proposer. (14) Proposers are reminded that sales or use tax on the General Contractor supplied materials will be paid for by the General Contractor and will not be an expense to the Proposer. (15) Proposers are responsible for all materials not supplied by the General Contractor, as well as, the costs, freight, and sales or use taxes, if applicable. 6 TABLE OF CONTENTS SECTION 011000 - SUMMARY ................................................................................................................... 7 SECTION 012100 - ALLOWANCES .......................................................................................................... 12 SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION .................................................. 14 SECTION 013300 - SUBMITTAL PROCEDURES .................................................................................... 19 SECTION 014000 - QUALITY REQUIREMENTS ...................................................................................... 27 SECTION 016000 - PRODUCT REQUIREMENTS ................................................................................... 32 SECTION 017300 - EXECUTION .............................................................................................................. 36 SECTION 073110– ROOF SHINGLES ..................................................................................................... 41 7 SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 LOCAL CODES A. Each Contractor complies with specified and applicable codes and standards. If conflict between codes or standards and drawings, specifications or addenda requirements, more stringent requirements shall govern. 1.3 ENVIRONMENTAL CONTROL A. The Contractor shall comply with all applicable federal, state, and local laws, regulations, ordinances, codes for standards concerning environmental control. Particular attention shall be given, without limitation, to: 1. Reduction of air pollution by: minimization of dust; containment of chemical vapors; control of engine exhaust gases; and control of smoke from temporary heaters. Refuse burning is not permitted. 2. Reduction of water pollution by control of sanitary facilities, proper storage of fuels and other potential contaminants, and prevention of siltation from land erosion. 3. Minimization of noise levels. 4. Proper and legal disposal, off site of waste and soil resulting from construction activities. 1.4 TEMPORARY SERVICES A. Contractor may extend out from the building any necessary power. B. Water is made available from the building. C. Contractor shall provide temporary toilet facilities. D. Contractor shall provide his own temporary office and phone, if needed or required. E. Contractor shall remove all temporary facilities upon completion of the project. 1.5 USE OF PREMISES A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits. B. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. C. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. 1. There will be an area allotted to a construction staging area. Any damaged areas that are due to construction are to be repaired at no cost to the Owner. 1.6 WORK RESTRICTIONS A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 8 1. Notify Owner not less than 72 hours in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without Owner's written permission. 1.7 CONSTRUCTION SCHEDULE A. The Contractor shall meet the schedule defined in Bid Specifications section “Time Schedule.” B. If the work falls behind the approved Construction Schedule, the Owner shall have the authority to direct the Contractor to perform overtime work and holiday work, with the affected subcontractors, to maintain the schedule. This work shall be performed at no additional cost to the Owner. C. The Contractor and all Subcontractors, suppliers and manufacturers shall schedule materials, deliveries and installations to conform with the Schedule and provisions to this effect shall be included in all subcontracts. D. It is understood and agreed by all the Contractors that the materials, tools, equipment, building or work is entirely at their risk until same is completed. The Owner assumes no responsibility for the loss by theft or damage. 1.8 CONTRACTOR INSPECTION A. The Contractor shall inspect and supervise the work to be assured that the work is performed in accordance with contract requirements. B. The Contractor shall reject or stop portions of the work which are not in accordance with contract requirements. C. By requesting the Final Payment, each prime Contractor certifies that he has provided his work in compliance with the specifications and drawings. 1.9 CLEANING A. The premises and the job site shall be maintained in a neat and orderly condition and kept free from accumulations of waste materials and rubbish during the entire construction period, removing all crates, cartons and other flammable waste materials or trash from the working areas as required. B. The Contractor shall be responsible for the general cleaning and maintenance of the premises and the job and the coordination and direction of the clean- up of all his Subcontractors. If the premises and jobsite are not maintained properly, the Owner may have any accumulations of waste materials or trash removed, and charge the cost to the Contractor. 1.10 ACCIDENTS AND SAFETY RESPONSIBILITY A. The contractor is solely responsible for supervision, monitoring, and maintaining safe working conditions on, in and around the construction site. The Architect, his consultants and the Owner are not responsible for the safety conditions on the construction site. B. The Contractor shall report any and all accidents on the site or related to the project in writing to his insurance company and to the Owner and Architect within 24 hours of occurrence. The report shall contain the following information: 1. Name and address of injured person or persons; 2. Location of occurrence; 9 3. Date and time of occurrence; 4. Narrative description of the accident and how it occurred; 5. Extent of injuries, hospital where treated name or names of physicians in attendance; 6. Names of witnesses and, whenever possible, statements of witnesses and the name of person taking such statement; 7. Signature of Contractor's superintendent. C. In addition, if death or serious injuries or serious damages are caused, the accident shall be reported to the Engineer and the Owner immediately by telephone or messenger. 1.11 SUBSTANTIAL COMPLETION A. The Contractor shall: 1. Submit written certification to the Owner that work is substantially complete and that all major elements of the work are installed and functioning. 2. Submit list of items to be completed or corrected. B. The Architect will make a punchlist inspection within seven (7) working days after receipt of certification, together with Owner's Representative. Items to be completed or corrected will be listed. C. Should Owner consider that work is substantially complete: 1. Contractor will prepare, and submit to the Owner, a list of items to be completed or corrected, as determined by the inspection. 2. Owner will prepare a Certificate of Substantial Completion, containing: a. Proposed Date of Substantial Completion. 3. Contractor: Complete work listed for completion or correction, within designated time. The work listed will include the items listed from the Owner and/or Architect inspection, the contractor’s list and any additional items that occur prior to the completed final completion. D. Should Owner consider that work is not substantially complete: 1. He shall notify the Contractor stating the reasons. 2. Contractor: Complete work, and send second written notice to Owner certifying that designated portion of Project is substantially complete. 3. Architect and/or Owner's Representative will reinspect work. 4. Contractor shall pay the cost of the Architect’s subsequent professional time to reach Substantial Completion. 1.12 WARRANTY PERIOD FOR ALL WORK A. There is a (30) THIRTY YEAR workmanship and material warranty period from the date of Substantial Completion as a minimum for all roofing/flashing work. The warranty period and provisions may be extended in other sections of the contract documents. B. The Contractor agrees to repair and replace all defective work including all labor and materials for the warranty period. The Contractor agrees to perform the corrective work 10 within five (5) days of receiving notice from the Architect or Owner. Emergency conditions shall require the Contractor to perform corrective work within two (2) days. 1.13 PROJECT RECORD DOCUMENTS A. Provide project “Record” Drawings (documents). B. When all revisions showing work as finally installed are made, acceptable Record Drawings shall be delivered to the Engineer before final payment is made. 1.14 OPERATION AND MAINTENANCE INSTRUCTIONS A. The Contractor shall arrange to instruct Owner's operating personnel in proper operation, lubrication and maintenance of equipment. B. The Contractor shall provide three (3) copies of the Maintenance-Operation Manual, reflecting and incorporating the following: 1. Shop Drawings as finally approved. 2. Preventive maintenance and repair procedures. 3. Material lists and source. 1.15 FINAL INSPECTION A. Contractor shall submit written certification that: 1. Contract documents have been reviewed. 2. Portion of project for which he is responsible has been inspected for compliance with contract documents. 3. Work has been completed in accordance with contract documents. 4. Equipment and systems have been tested in presence of Owner's Representative and are operational. 5. Project is completed and ready for final inspection with all punchlist items from the Owner’s and the Contractor’s lists are complete. 6. Punchlist items may be added to the point of final inspection. 7. Architect will make final inspection within ten (10) days after receipt of certification, with Owner's Representative. B. Should Owner consider that work is finally complete in accordance with requirements of contract documents, he will request Contractor to make project closeout submittals. C. Should the Owner consider that work is not finally complete: 1. He shall notify the Contractor and state reasons. 2. Contractor shall take immediate steps to remedy the stated deficiencies, and send second written notice certifying that work is complete. 3. Architect, Engineer and Owner will reinspect work. 1.16 REINSPECTION COSTS A. Should Architect be required to perform additional inspections because of failure of work to comply with original certifications of Contractor, Contractor will compensate Architect at their current hourly rates. 11 1.17 CLOSEOUT SUBMITTALS A. Submit the following: 1. Project Record Documents and Drawings. 2. Maintenance Data. 3. Guarantees and Bonds, if specified. 4. Certificate of Insurance for Products and Completed Operations. 5. Letter from each Contractor and Prime Contractor certifying that no asbestos-containing products were used in this project. 6. Consent of Surety, if applicable. 7. Progress Photos and Site Observation Reports from the Manufacturer’s Representative. 8. Manufacturer Warranties. 1.18 CHANGE ORDERS A. All change orders must be submitted to and reviewed by General contractor and approved by the Village prior to starting any work. 1. Change order mark-up is limited to 10% by the contractor. 2. Sub-Contractor work shall be limited to a 5% mark-up. 3. Allowance balances shall be returned to the owner via change order at the end of the project. 1.19 FINAL APPLICATION FOR PAYMENT A. Contractor shall submit final application in accordance with provisions of the Contract Documents, to include: 1. The application. 2. Final Waivers of Lien from all Subcontractors and suppliers listed in the Final Schedule of Values in the full amounts listed therein. 3. Evidence that project closeout submittals have been received and approved by the Owner. 4. Evidence that project punchlist items have been completed to the Owner’s satisfaction. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 011000 12 SECTION 012100 - ALLOWANCES PART 4 - GENERAL 4.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 4.2 SUMMARY A. This Section includes administrative and procedural requirements governing allowances. 1. Certain items are specified in the Contract Documents by allowances. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. B. Types of allowances include the following: 1. Contingency allowances. 4.3 SUBMITTALS A. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders. B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance. C. Submit time sheets and other documentation to show labor time and cost for installation of allowance items that include installation as part of the allowance. D. Coordinate and process submittals for allowance items in same manner as for other portions of the Work. 4.4 COORDINATION A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation. 4.5 CONTINGENCY ALLOWANCES A. Allowances shall be used ONLY at the discretion of the Owner and must be reviewed by the Owner in advance of work being performed. B. Contractor's overhead, profit, and related costs for products and equipment ordered under the contingency allowance are included in the allowance and are not part of the Contract Sum. These costs include delivery, installation, insurance, equipment rental, and similar costs. C. At Project closeout, credit unused amounts remaining in the allowance to Owner by Change Order. PART 5 - PRODUCTS (Not Used) PART 6 - EXECUTION 6.1 EXAMINATION A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement. 13 6.2 PREPARATION A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work. 6.3 SCHEDULE OF ALLOWANCES A. Allowance No. 1: Include a contingency allowance of $0,000 in the Base Bid for unforeseen conditions. END OF SECTION 012100 14 SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 1.2 SUMMARY A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: 1. Administrative and supervisory personnel. 2. Project meetings. 3. Requests for Interpretation (RFIs). 1.3 DEFINITIONS A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents. 1.4 COORDINATION A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation. B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required. C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures. Such administrative activities include, but are not limited to, the following: 1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values (G702 and G703). 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. 1.5 SUBMITTALS A. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. 15 1.6 ADMINISTRATIVE AND SUPERVISORY PERSONNEL A. General: In addition to Project superintendent, provide other administrative and supervisory personnel as required for proper performance of the Work. 1.7 PROJECT MEETINGS A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated. 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner of scheduled meeting dates and times. B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. Attendees: Authorized representatives of Owner, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Discuss items of significance that could affect progress, including the following: a. Tentative construction schedule. b. Critical work sequencing and long-lead items. c. Designation of key personnel and their duties. d. Procedures for processing field decisions and Change Orders. e. Procedures for RFIs. f. Procedures for testing and inspecting. g. Procedures for processing Applications for Payment. h. Submittal procedures. i. Preparation of Record Documents. j. Use of the premises and existing building. k. Work restrictions. l. Owner's occupancy requirements. m. Responsibility for temporary facilities and controls. n. Construction waste management and recycling. o. Parking availability. p. Office, work, and storage areas. q. Equipment deliveries and priorities. r. Security. s. Progress cleaning. t. Working hours. 16 C. Progress Meetings: Conduct progress meetings at regular intervals. Coordinate dates of meetings with preparation of payment requests. 1. Attendees: In addition to representatives of Owner and Manufacturer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. 1) Review schedule for next period. b. Review present and future needs of each entity present, including the following: 1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Work hours. 10) Hazards and risks. 11) Progress cleaning. 12) Quality and work standards. 13) Status of correction of deficient items. 14) Field observations. 15) RFIs. 16) Status of proposal requests. 17) Pending changes. 18) Status of Change Orders. 19) Pending claims and disputes. 20) Documentation of information for payment requests. 3. Minutes: Record the meeting minutes. 17 4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. 1.8 REQUESTS FOR INTERPRETATION (RFIs) A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified. 1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response. 2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors. B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following: 1. Project name. 2. Date. 3. Name of Contractor. 4. Name of Architect. 5. RFI number, numbered sequentially. 6. Specification Section number and title and related paragraphs, as appropriate. 7. Drawing number and detail references, as appropriate. 8. Field dimensions and conditions, as appropriate. 9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI. 10. Contractor's signature. 11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation. a. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments. C. Software-Generated RFIs: Submit all RFI’s electronically to the Owner in PDF format. D. Owners's Action: Owner representative will review each RFI, determine action required, and return it. Allow up to three working days for Owner's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day. 1. The following RFIs will be returned without action: a. Requests for approval of submittals. b. Requests for approval of substitutions. c. Requests for coordination information already indicated in the Contract Documents. 18 d. Requests for adjustments in the Contract Time or the Contract Sum. e. Requests for interpretation of Owner’s or Architect's actions on submittals. f. Incomplete RFIs or RFIs with numerous errors. 2. Owners's action may include a request for additional information, in which case Owner's time for response will start again. 3. Owner's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to the General Specification Requirements. a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Owner in writing within five days of receipt of the RFI response. E. On receipt of Owner's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Owner within five days if Contractor disagrees with response. F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Include the following: 1. Project name. 2. Name and address of Contractor. 3. Name and address of Architect. 4. RFI number including RFIs that were dropped and not submitted. 5. RFI description. 6. Date the RFI was submitted. 7. Date Owner's response was received. 8. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate. 9. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 013100 19 SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. B. Related Sections include the following: 1. Division 01 Section "Project Management and Coordination" for submitting and distributing meeting and conference minutes and for submitting Coordination Drawings. 2. Division 01 Section "Quality Requirements" for submitting test and inspection reports and for mockup requirements. 3. Divisions 02 through 49 Sections for specific requirements for submittals in those Sections. 1.3 DEFINITIONS A. Action Submittals: Written and graphic information that requires Owner’s or Architect's responsive action. B. Informational Submittals: Written information that does not require Owner’s or Architect's responsive action. Submittals may be rejected for not complying with requirements. 1.4 SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect or Owner reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Owner's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. 1. Initial Review: Allow 7 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Owner will advise Contractor when a submittal being processed must be delayed for coordination. 2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal. 3. Resubmittal Review: Allow 7 days for review of each resubmittal. 20 C. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review, approval markings, and action taken by Owner or Architect. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Architect. d. Name and address of Contractor. e. Name and address of supplier. f. Name of manufacturer. g. Submittal number or other unique identifier, including revision identifier. 1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 061000.01.A). h. Number and title of appropriate Specification Section. i. Drawing number and detail references, as appropriate. j. Other necessary identification. D. Deviations: Encircle or otherwise specifically identify deviations from the Contract Documents on submittals. E. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Owner will discard submittals received from sources other than Contractor. 1. Transmittal Form: Provide locations on form for the following information: a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Specification Section number and title. i. Drawing number and detail references, as appropriate. j. Transmittal number, numbered consecutively. k. Submittal and transmittal distribution record. l. Remarks. 21 m. Signature of transmitter. 2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by the Owner or Architect on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same label information as related submittal. F. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. 1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of revision. 3. Resubmit submittals until they are marked "Reviewed” or “Reviewed as Noted”. G. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. 1.5 CONTRACTOR'S USE OF OWNER AND/OR ARCHITECT'S CAD FILES A. At Contractor's written request, copies of Owner’s and/or Architect's CAD files will be provided to Contractor for Contractor's use in connection with Project, subject to the following conditions: 1. An electronic version of roof plans in the form of AutoCad will be made available for the Contractor’s use upon signing an Agreement Letter. An electronic version of details is not available for the Contractor’s use. B. All contractor requests for electronic data files relating to mechanical, electrical, plumbing and fire protection shall require the contractor to complete/sign the form “Agreement Regarding Electronic Data Files” from the Engineer’s office and submit to the Engineer. Upon receipt of this form, the Engineer shall send the requested electronic data files to the contractor via email PART 2 - PRODUCTS 2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections. B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Standard color charts. e. Manufacturer's catalog cuts. 22 f. Standard product operation and maintenance manuals. g. Compliance with specified referenced standards. h. Testing by recognized testing agency. i. Application of testing agency labels and seals. j. Notation of coordination requirements. 4. Submit Product Data before or concurrent with Samples. 5. Submit all Product Data electronically to Owner using PDF format. Owner and/or Architect will return reviewed submittals electronically. C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. 1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable: a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. f. Shopwork manufacturing instructions. g. Templates and patterns. h. Schedules. i. Design calculations. j. Compliance with specified standards. k. Notation of coordination requirements. l. Notation of dimensions established by field measurement. m. Relationship to adjoining construction clearly indicated. n. Seal and signature of professional engineer if specified. o. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring. 2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches. 3. Submit all Shop Drawings electronically to Owner using PDF format. Owner and/or Architect will return reviewed submittals electronically. D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed. 1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package. 23 2. Identification: Attach label on unexposed side of Samples that includes the following: a. Generic description of Sample. b. Product name and name of manufacturer. c. Sample source. d. Number and title of appropriate Specification Section. 3. Disposition: Maintain sets of approved Samples at Project site, available for quality- control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. 4. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; and components used for independent testing and inspection. a. Number of Samples: Submit three sets of Samples. Owner and Architect will retain two Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project Record Sample. 1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated. 2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations. 2.2 INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. 1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. Owner and Architect will not return copies. 2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. 3. Test and Inspection Reports: Comply with requirements specified in Division 01 Section "Quality Requirements." B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. C. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified. 24 D. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project. E. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required. F. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents. G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents. H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents. I. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. J. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information: 1. Name of evaluation organization. 2. Date of evaluation. 3. Time period when report is in effect. 4. Product and manufacturers' names. 5. Description of product. 6. Test procedures and results. 7. Limitations of use. K. Schedule of Tests and Inspections: Comply with requirements specified in Division 01 Section "Quality Requirements." L. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents. M. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion. N. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents. 25 O. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Division 01 Section "Operation and Maintenance Data." P. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers. Q. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable: 1. Preparation of substrates. 2. Required substrate tolerances. 3. Sequence of installation or erection. 4. Required installation tolerances. 5. Required adjustments. 6. Recommendations for cleaning and protection. R. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable: 1. Name, address, and telephone number of factory-authorized service representative making report. 2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections. 8. Dated or labeled photographs to confirm installation compliance/requirements. S. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. T. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to Architect. 1. Architect will not review submittals that include MSDSs and will return the entire submittal for resubmittal. 26 PART 3 - EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Owner. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 OWNER'S ACTION A. General: Owner and/or Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. Action Submittals: Owner and/or Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Owner and/or Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows: 1. “Reviewed”, “Reviewed as Noted”, “Resubmit” or “Rejected”. a. Final Unrestricted Release: Where submittals are marked ”Reviewed,” that part of the Work covered by the submittal may proceed provided it complies with requirements of the Contract Documents; final acceptance will depend upon that compliance. b. Final-But-Restricted Release: When submittals are marked “Reviewed as Noted,” that part of the Work covered by the submittal may proceed provided it complies with notations or corrections on the submittal and requirements of the Contract Documents; final acceptance will depend on the compliance. c. Returned for Resubmittal: When a submittal is marked “Reviewed as Noted, Resubmit,” or “Rejected,” do not proceed with that part of the Work covered by the submittal, including purchasing, fabrication, delivery, or other activity. Revise or prepare a new submittal in accordance with the notations; resubmit without delay. Repeat if necessary to obtain a different action mark. d. Other Action: Where a submittal is primarily for information or record purposes, special processing or other activity, the submittal will be returned marked “Action not Required.” C. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without review. D. Submittals not required by the Contract Documents may not be reviewed and may be discarded. END OF SECTION 013300 27 SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements. 1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products. 2. Specified tests, inspections, and related actions do not limit Contractor's other quality- assurance and -control procedures that facilitate compliance with the Contract Document requirements. 3. Requirements for Contractor to provide quality-assurance and -control services required by Architect, Owner or authorities having jurisdiction are not limited by provisions of this Section. C. Related Sections include the following: 1. Division 02 Section "Cutting and Patching" for repair and restoration of construction disturbed by testing and inspecting activities. 2. Divisions 02 through 49 Sections for specific test and inspection requirements. 1.3 DEFINITIONS A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements. B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect. C. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria. D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with industry standards. E. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop. F. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work. 28 G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency. H. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations. 1. Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to tradespeople of the corresponding generic name. I. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. 1.4 CONFLICTING REQUIREMENTS A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Owner for a decision before proceeding. B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Owner for a decision before proceeding. 1.5 SUBMITTALS A. Schedule of Tests and Inspections: Prepare in tabular form and include the following: 1. Specification Section number and title. 2. Description of test and inspection. 3. Identification of applicable standards. 4. Identification of test and inspection methods. 5. Number of tests and inspections required. 6. Time schedule or time span for tests and inspections. 7. Entity responsible for performing tests and inspections. 8. Requirements for obtaining samples. 9. Unique characteristics of each quality-control service. B. Reports: Prepare and submit certified written reports that include the following: 1. Date of issue. 2. Project title and number. 3. Name, address, and telephone number of testing agency. 4. Dates and locations of samples and tests or inspections. 29 5. Names of individuals making tests and inspections. 6. Description of the Work and test and inspection method. 7. Identification of product and Specification Section. 8. Complete test or inspection data. 9. Test and inspection results and an interpretation of test results. 10. Record of temperature and weather conditions at time of sample taking and testing and inspecting. 11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting and reinspecting. C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work. 1.6 QUALITY ASSURANCE A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements. B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance. C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. D. Manufacturer Inspections: An employee of the manufacturer is required to perform DAILY inspections of the project while work is being conducted. A report showing photos and descriptions of work performed must be completed daily. E. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. F. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent. G. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated. 1. Requirement for specialists shall not supersede building codes and regulations governing the Work. H. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities. 30 1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. 2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory Accreditation Program. I. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project. J. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following: 1. Contractor responsibilities include the following: a. Provide test specimens representative of proposed products and construction. b. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work. c. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to adequately demonstrate capability of products to comply with performance requirements. d. Build site-assembled test assemblies and mockups using installers who will perform same tasks for Project. e. Build laboratory mockups at testing facility using personnel, products, and methods of construction indicated for the completed Work. f. When testing is complete, remove test specimens, assemblies, mockups, and laboratory mockups; do not reuse products on Project. 2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Architect with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents. 1.7 QUALITY CONTROL A. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not. 1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services. a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner. 2. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service. 3. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility. 4. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct. 31 B. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections, on a daily basis. Report results in writing as specified in Division 01 Section "Submittal Procedures." C. Coordination: Coordinate sequence of activities to accommodate required quality- assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. 1. Schedule times for tests, inspections, obtaining samples, and similar activities. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 REPAIR AND PROTECTION A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes. 1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. 2. Comply with the Contract Document requirements for Division 01 Section "Cutting and Patching." B. Protect construction exposed by or for quality-control service activities. C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services. END OF SECTION 014000 32 SECTION 016000 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products. 1.3 DEFINITIONS A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents. 2. Comparable Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product. B. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in- service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers. 1.4 SUBMITTALS A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Include data to indicate compliance with the requirements specified in "Comparable Products" Article. 2. Owner's Action: If necessary, Owner will request additional information or documentation for evaluation within one week of receipt of a comparable product request. Owner will notify Contractor of approval or rejection of proposed comparable product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later. a. Form of Approval: As specified in Division 01 Section "Submittal Procedures." b. Use product specified if Owner and/or Architect does not issue a decision on use of a comparable product request within time allocated. B. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01 Section "Submittal Procedures." Show compliance with requirements. 33 1.5 QUALITY ASSURANCE A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options. 1. Each contractor is responsible for providing products and construction methods compatible with products and construction methods of other contractors. 2. If a dispute arises between contractors over concurrently selectable but incompatible products, Architect will determine which products shall be used. 1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions. B. Delivery and Handling: 1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. 2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. 3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. 4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected. C. Storage: 1. Store products to allow for inspection and measurement of quantity or counting of units. 2. Store materials in a manner that will not endanger Project structure. 3. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. 4. Store cementitious products and materials on elevated platforms. 5. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment. 6. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage. 7. Protect stored products from damage and liquids from freezing. 8. Provide a secure location and enclosure at Project site for storage of materials and equipment by Owner's construction forces. Coordinate location with Owner. 1.7 PRODUCT WARRANTIES A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations 34 on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. 1. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner. 2. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Owner. B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution. 1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed. 2. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly executed. 3. Refer to Divisions 02 through 49 Sections for specific content requirements and particular requirements for submitting special warranties. C. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures." PART 2 - PRODUCTS 2.1 PRODUCT SELECTION PROCEDURES A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise indicated, that are new at time of installation. 1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. 2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects. 3. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents. 4. Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products. 5. Or Equal: Where products are specified by name and accompanied by the term "or equal" or "or approved equal" or "or approved," comply with provisions in Part 2 "Comparable Products" Article to obtain approval for use of an unnamed product. B. Product Selection Procedures: 1. Product: Where Specifications name a single product and manufacturer, provide the named product that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered. 2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered. 35 3. Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered unless otherwise indicated. a. Nonrestricted List: Where Specifications include a list of names of both available manufacturers and products, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product. 4. Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered unless otherwise indicated. a. Nonrestricted List: Where Specifications include a list of availalbe manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed manufacturer’s product. 5. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers. 2.2 COMPARABLE PRODUCTS A. Conditions for “Or Equal” product: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements: 1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work. 2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. 3. Evidence that proposed product provides specified warranty. 4. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners, if requested. 5. Samples, if requested. PART 3 - EXECUTION (Not Used) END OF SECTION 016000 36 SECTION 017300 - EXECUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Specification Requirements Section, apply to this Section. 1.2 SUMMARY A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following: 1. General installation of products. 2. Progress cleaning. 3. Starting and adjusting. 4. Protection of installed construction. 5. Correction of the Work. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 EXAMINATION A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work. B. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations. 1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following: a. Description of the Work. b. List of detrimental conditions, including substrates. c. List of unacceptable installation tolerances. d. Recommended corrections. 2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. 3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation. 4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed. 5. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. 37 3.2 PREPARATION A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. 3.3 INSTALLATION A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. 1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated. 4. Maintain minimum headroom clearance of 8 feet in spaces without a suspended ceiling. B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion. D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy. E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements. G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work. 1. Allow for building movement, including thermal expansion and contraction. 2. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. 38 I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous. 3.4 PROGRESS CLEANING A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully. 1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. 2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F. 3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations. B. Site: Maintain Project site free of waste materials and debris. C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work. 1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate. D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces. E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted. H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion. I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects. J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. 3.5 STARTING AND ADJUSTING A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest. B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation. C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. D. Manufacturer's Field Service: If a factory-authorized service representative is required to 39 inspect field-assembled components and equipment installation, comply with qualification requirements in Division 01 Section "Quality Requirements." 3.6 PROTECTION OF INSTALLED CONSTRUCTION A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion. B. Comply with manufacturer's written instructions for temperature and relative humidity. 3.7 CORRECTION OF THE WORK A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with requirements in Division 02 Section "Cutting and Patching." 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. B. Restore permanent facilities used during construction to their specified condition. C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair. D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired. E. Remove and replace chipped, scratched, and broken glass or reflective surfaces. END OF SECTION 017300 40 SECTION 07311 ASPHALT SHINGLES - GENERAL RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY This Section includes the following: 1. Asphalt shingles. 2. Manufacturer’s recommended underlayment. 3. Self-adhering sheet underlayment. 4. Ridge vents. Related Sections include the following: 5. Section 01010 – Summary of Work DEFINITIONS Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section. SUBMITTALS Product Data: For each type of product indicated. Samples for Initial Selection: For each type of asphalt shingle, ridge and hip cap shingles ridge vent and exposed valley lining indicated. 6. Include similar Samples of trim and accessories involving color selection. Samples for Verification: For the following products, of sizes indicated, to verify color selected. 7. Asphalt Shingle: Full-size asphalt shingle strip. 8. Ridge and Hip Cap Shingles: Full-size ridge and hip cap asphalt shingle. 9. Ridge Vent: 12-inch- (300-mm-) long Sample. 10. Exposed Valley Lining: 12 inches (300 mm) square. 11. Self-Adhering Underlayment: 12 inches (300 mm) square 12. Contractor needs to provide sample boards for final approval 13. Color: Customer to choose 41 Qualification Data: For Installer, including certificate signed by asphalt shingle manufacturer stating that Installer is approved, authorized, or licensed to install roofing system indicated. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency or by manufacturer and witnessed by a qualified testing agency, for asphalt shingles. Maintenance Data: For asphalt shingles to include in maintenance manuals. Warranties: Special warranties specified in this Section. QUALITY ASSURANCE Source Limitations: Obtain specified products as required from warranting manufacturer as outlined in the specifications. Fire-Test-Response Characteristics: Provide asphalt shingle and related roofing materials with the fire- test-response characteristics indicated, as determined by testing identical products per test method below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency. 14. Exterior Fire-Test Exposure: Class A; ASTM E 108 or UL 790, for application and roof slopes indicated. Pre-installation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." MANUFACTURER’S INSPECTIONS A. When the project is in progress, the base sheet system manufacturer will provide the following: 1. Keep the Owner informed as to the progress and quality of the work as observed. 2. Provide job site inspections everyday that work is performed. 3. Report to the Owner in writing any failure or refusal of the Contractor to correct unacceptable practices called to the Contractor’s attention. 4. Confirm after completion that manufacturer has observed no applications procedures in conflict with the specifications other than those that may have been previously reported and corrected. DELIVERY, STORAGE, AND HANDLING Store roofing materials in a dry, well-ventilated, weathertight location according to asphalt shingle manufacturer's written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double-stack rolls. 42 15. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members. Protect unused under-layment from weather, sunlight, and moisture when left overnight or when roofing work is not in progress. PROJECT CONDITIONS Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manufacturer's written instructions and warranty requirements. 16. Install self-adhering sheet under-layment within the range of ambient and substrate temperatures recommended by manufacturer. WARRANTY Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace asphalt shingles that fail in materials or workmanship within specified warranty period. Materials failures include manufacturing defects and failure of asphalt shingles to self-seal after a reasonable time. 17. Material Warranty Period: Lifetime Ltd. Transferable manufacturers warranty. 18. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds up to 110 mph for 10 years from date of Substantial Completion. 19. Algae-Discoloration Warranty Period: Asphalt shingles will not discolor 10 years from date of Substantial Completion. Special Project Warranty: Roofing Installer's warranty, on warranty form at end of this Section, signed by roofing Installer, covering Work of this Section, in which roofing Installer agrees to repair or replace components of asphalt shingle roofing that fail in materials or workmanship within the following warranty period: 20. Warranty Period: two years from date of Substantial Completion. EXTRA MATERIALS Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 21. Asphalt Shingles: 100 sq. ft of each type, in unbroken bundles. - PRODUCTS MANUFACTURERS In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: 43 22. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified. GLASS-FIBER-REINFORCED ASPHALT SHINGLES Laminated-Strip Asphalt Shingles: ASTM D 3462, laminated, multi-ply overlay construction, glass-fiber reinforced, mineral-granule surfaced, and self-sealing. 23. Available Products: GAF- Timberline-Weathered Wood Color Owens Corning- TruDefinition Duration shingles CertainTeed-Landmark Solaris 24. Butt Edge: Straight cut. 25. Strip Size: Manufacturer's standard. 26. Algae Resistance: Granules treated to resist algae discoloration. 27. Color and Blends: Match Architect’s samples. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles. UNDERLAYMENT MATERIALS Self-Adhering Sheet Underlayment, Granular Surfaced: ASTM D 1970, minimum of 85-mil-thick sheet; glass-fiber-mat-reinforced, SBS-modified asphalt; mineral-granule surfaced; with release paper backing; cold applied. Provide primer for adjoining concrete or masonry surfaces to receive underlayment. 28. As recommended by: The Garland Company, Inc. – Rmer Seal Granular-Surfaced Valley Lining: ASTM D 3909, mineral-granular-surfaced, glass-felt-based, asphalt roll roofing; 39 inches wide. 29. As recommended by: The Garland Company, Inc. – Rmer Seal ACCESSORIES Asphalt Roofing Cement: ASTM D 4586, Type II, asbestos free. Roofing Nails: ASTM F 1667; aluminum, stainless-steel, copper, or hot-dip galvanized steel wire shingle nails, minimum 0.120-inch- (3-mm-) diameter, barbed shank, sharp-pointed, with a minimum 3/8-inch- (9.5-mm-) diameter flat head and of sufficient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 1/8 inch (3 mm) through OSB or plywood sheathing. 30. Where nails are in contact with metal flashing, use nails made from same metal as flashing. Felt Underlayment Nails: Aluminum, stainless-steel, or hot-dip galvanized steel wire with low profile capped heads or disc caps, 1-inch (25-mm) minimum diameter. 44 METAL FLASHING AND TRIM Sheet Metal Flashing and Trim: Comply with requirements in Division 7 Section "Sheet Metal Flashing and Trim." 31. Sheet Metal: Copper or Anodized aluminum. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item. 32. Step Flashings: Fabricate with a headlap of 2 inches (50 mm) and a minimum extension of 5 inches (125 mm) over the underlying asphalt shingle and up the vertical surface. 33. Cricket Flashings: Fabricate with concealed flange extending a minimum 24 inches (600 mm) beneath upslope asphalt shingles and 6 inches (150 mm) above the roof plane. 34. Open Valley Flashings: Fabricate in lengths not exceeding [10 feet (3 m)] with 1-inch- (25-mm-) high inverted-V profile at center of valley and equal flange widths of 10 inches (250 mm). 35. Drip Edges: Fabricate in lengths not exceeding [10 feet (3 m)] with 2-inch (50-mm) roof deck flange and 1-1/2-inch (38-mm) fascia flange with 3/8-inch (9.6-mm) drip at lower edge. Vent Pipe Flashings: ASTM B 749, Type L51121, at least 1/16 inch (1.6 mm) thick. Provide lead sleeve sized to slip over and turn down into pipe, soldered to skirt at slope of roof and extending at least 4 inches (100 mm) from pipe onto roof. - EXECUTION EXAMINATION Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work. 36. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances. 37. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored; and that provision has been made for flashings and penetrations through asphalt shingles. Proceed with installation only after unsatisfactory conditions have been corrected. UNDERLAYMENT INSTALLATION Single-Layer Felt Underlayment: Install single layer of felt underlayment on roof deck perpendicular to roof slope in parallel courses. Lap sides a minimum of 2 inches (50 mm) over underlying course. Lap ends a minimum of 4 inches (100 mm). Stagger end laps between succeeding courses at least 72 inches (1830 mm). Fasten with roofing nails. 38. Install felt underlayment on roof deck not covered by self-adhering sheet underlayment. Lap sides of felt over self-adhering sheet underlayment not less than 3 inches (75 mm) in 45 direction to shed water. Lap ends of felt not less than 6 inches (150 mm) over self- adhering sheet underlayment. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of underlayment manufacturer if applicable. Install at locations indicated on Drawings, lapped in direction to shed water. Lap sides not less than 3-1/2 inches (89 mm). Lap ends not less than 6 inches (150 mm) staggered 24 inches (600 mm) between courses. Roll laps with roller. Cover underlayment within seven days. 39. Prime concrete and masonry surfaces to receive self-adhering sheet underlayment. 40. Eaves: Extend from edges of eaves 36 inches beyond interior face of exterior wall. 41. Rakes: Extend from edges of rake 36 inches beyond interior face of exterior wall. 42. Valleys: Extend from lowest to highest point 18 inches on each side. 43. Hips: Extend 18 inches on each side. 44. Ridges: Extend 36 inches on each side. 45. Sidewalls: Extend beyond sidewall 18 inches and return vertically against sidewall not less than 4 inches 46. Dormers, Chimneys, Skylights, and other Roof-Penetrating Elements: Extend beyond penetrating element 18 inches and return vertically against penetrating element not less than 4 inches. 47. Roof Slope Transitions: Extend 18 inches on each roof slope. Metal-Flashed Open Valley Underlayment: Install two layers of 36-inchwide felt underlayment centered in valley. Stagger end laps between layers at least 72 inches. Lap ends of each layer at least 12 inches in direction to shed water, and seal with asphalt roofing cement. Fasten each layer to roof deck with roofing nails. 48. Lap roof deck felt underlayment over first layer of valley felt underlayment at least 6 inches. METAL FLASHING INSTALLATION General: Install metal flashings and other sheet metal to comply with requirements in Division 7 Section "Sheet Metal Flashing and Trim." 49. Install metal flashings according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." Apron Flashings: Extend lower flange over and beyond each side of downslope asphalt shingles and up the vertical surface. Step Flashings: Install with a headlap of 2 inches and extend over the underlying asphalt shingle and up the vertical surface. Fasten to roof deck only. Cricket Flashings: Install against the roof-penetrating element extending concealed flange beneath upslope asphalt shingles and beyond each side. Open Valley Flashings: Install centrally in valleys, lapping ends at least 8 inches in direction to shed water. Fasten upper end of each length to roof deck beneath overlap. 50. Secure hemmed flange edges into metal cleats spaced 2 inches apart and fastened to roof deck. 46 Rake Drip Edges: Install rake drip edge flashings over underlayment and fasten to roof deck. Eave Drip Edges: Install eave drip edge flashings below underlayment and fasten to roof sheathing. Pipe Flashings: Form flashing around pipe penetrations and asphalt shingles. Fasten and seal to asphalt shingles as recommended by manufacturer. ASPHALT SHINGLE INSTALLATION Install asphalt shingles according to manufacturer's written instructions, recommendations in ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with tabs removed with self-sealing strip face up at roof edge. 51. Extend asphalt shingles 1/2 inch over fascia at eaves and rakes. 52. Install starter strip along rake edge. Install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure. Fasten asphalt shingle strips with a minimum of six (6) roofing nails located according to manufacturer's written instructions. 1. When ambient temperature during installation is below 50 deg F, seal asphalt shingles with asphalt roofing cement spots. Closed-Cut Valleys: Extend asphalt shingle strips from one side of valley 12 inches beyond center of valley. Use one-piece shingle strips without joints in the valley. Fasten with extra nail in upper end of shingle. Install asphalt shingle courses from other side of valley and cut back to a straight line 2 inches short of valley centerline. Trim upper concealed corners of cut-back shingle strips. 53. Do not nail asphalt shingles within 6 inches of valley center. 54. Set trimmed, concealed-corner asphalt shingles in a 3-inch-wide bed of asphalt roofing cement. Ridge Vents: Install continuous ridge vents over asphalt shingles according to manufacturer's written instructions. Fasten with roofing nails of sufficient length to penetrate sheathing. Ridge and Hip Cap Shingles: Maintain same exposure of cap shingles as roofing shingle exposure. Lap cap shingles at ridges to shed water away from direction of prevailing winds. Fasten with roofing nails of sufficient length to penetrate sheathing. 55. Fasten ridge cap asphalt shingles to cover ridge vent without obstructing airflow. END OF SECTION