Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2023 Harger Road Water MainBid Tabulation
Item No. Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total1WATER MAIN PVC C900 CERTA-LOK, 10"2,803 LF $240.00 $672,720.00 $242.00 $678,326.00 $205.00 $574,615.00 $301.70 $845,665.10 $217.00 $608,251.00 $308.00 $863,324.00 $299.00 $838,097.00 $340.00 $953,020.00 $360.00 $1,009,080.002WATER MAIN PVC C900 CERTA-LOK, 8"515 LF $175.00 $90,125.00 $234.00 $120,510.00 $180.00 $92,700.00 $278.35 $143,350.25 $224.00 $115,360.00 $333.00 $171,495.00 $269.00 $138,535.00 $315.00 $162,225.00 $300.00 $154,500.003WATER MAIN DIP CL 52, 8"42 LF $200.00 $8,400.00 $175.00 $7,350.00 $180.00 $7,560.00 $245.73 $10,320.66 $602.00 $25,284.00 $288.00 $12,096.00 $195.00 $8,190.00 $320.00 $13,440.00 $200.00 $8,400.004WATER MAIN DIP CL 52, 6"475 LF $180.00 $85,500.00 $180.00 $85,500.00 $156.00 $74,100.00 $245.45 $116,588.75 $384.00 $182,400.00 $281.00 $133,475.00 $204.00 $96,900.00$310.00 $147,250.00 $150.00 $71,250.005FIRE HYDRANT REMOVAL5 EA $1,000.00 $5,000.00 $1,500.00 $7,500.00 $240.00 $1,200.00 $396.00 $1,980.00 $6,474.00 $32,370.00 $950.00 $4,750.00 $250.00 $1,250.00 $1,500.00 $7,500.00 $500.00 $2,500.006FIRE HYDRANT ASSEMBLY10 EA $12,000.00 $120,000.00 $12,000.00 $120,000.00 $14,500.00 $145,000.00 $9,637.90 $96,379.00 $14,094.00 $140,940.00 $9,320.00 $93,200.00 $11,000.00 $110,000.00 $10,000.00 $100,000.00 $15,500.00 $155,000.007VALVE VAULT REMOVAL11 EA $1,200.00 $13,200.00 $1,600.00 $17,600.00 $616.00 $6,776.00 $247.50 $2,722.50 $2,647.00 $29,117.00 $450.00 $4,950.00 $200.00 $2,200.00 $900.00 $9,900.00 $300.00 $3,300.008VALVE BOX REMOVAL4 EA $500.00 $2,000.00 $300.00 $1,200.00 $200.00 $800.00 $99.00 $396.00 $1,219.00 $4,876.00 $260.00 $1,040.00 $100.00 $400.00 $400.00 $1,600.00 $250.00 $1,000.009TAPPING VALVE, 10", W/ 5' DIA. VALVE VAULT1 EA $15,000.00 $15,000.00 $13,800.00 $13,800.00 $20,000.00 $20,000.00 $13,181.25 $13,181.25 $18,412.00 $18,412.00 $12,680.00 $12,680.00 $19,805.00 $19,805.00 $17,000.00 $17,000.00 $12,000.00 $12,000.0010GATE VALVE, 10", W/ 5' DIA. VALVE VAULT1 EA $10,000.00 $10,000.00 $9,500.00 $9,500.00 $13,750.00 $13,750.00 $10,462.80 $10,462.80 $16,929.00 $16,929.00 $8,820.00 $8,820.00 $9,000.00 $9,000.00 $10,500.00 $10,500.00 $11,000.00 $11,000.0011GATE VALVE, 8", W/ 5' DIA. VALVE VAULT2 EA $9,000.00 $18,000.00 $8,500.00 $17,000.00 $9,150.00 $18,300.00 $9,250.30 $18,500.60 $11,115.00 $22,230.00 $7,980.00 $15,960.00 $8,000.00$16,000.00 $9,200.00 $18,400.00 $10,500.00 $21,000.0012GATE VALVE, 6", W/ 5' DIA. VALVE VAULT10 EA $7,000.00 $70,000.00 $8,000.00 $80,000.00 $8,325.00 $83,250.00 $8,489.95 $84,899.50 $12,696.00 $126,960.00 $7,550.00 $75,500.00 $7,000.00 $70,000.00 $8,500.00 $85,000.00 $10,000.00 $100,000.0013WATER MAIN PROTECTION, 20"45 LF $350.00 $15,750.00 $210.00 $9,450.00 $340.00 $15,300.00 $107.10 $4,819.50 $639.00 $28,755.00 $226.00 $10,170.00 $350.00 $15,750.00 $200.00 $9,000.00 $95.00 $4,275.0014WATER MAIN PROTECTION, 12"113 LF $200.00 $22,600.00 $145.00 $16,385.00 $250.00 $28,250.00 $78.35 $8,853.55 $309.00 $34,917.00 $180.00 $20,340.00 $260.00 $29,380.00 $200.00 $22,600.00 $65.00 $7,345.0015WATER SERVICE, 1" TYPE K COPPER21 LF $70.00 $1,470.00 $90.00 $1,890.00 $50.00 $1,050.00 $65.95 $1,384.95 $330.00 $6,930.00 $104.00 $2,184.00 $90.00 $1,890.00 $160.00 $3,360.00$7.00 $147.0016WATER SERVICE CONNECTION W/ B-BOX1 EA $1,500.00 $1,500.00 $1,600.00 $1,600.00 $4,500.00 $4,500.00 $2,586.30 $2,586.30 $2,940.00 $2,940.00 $3,860.00 $3,860.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.0017CONNECT TO EXISTING WATER MAIN, 8"3 EA $4,000.00 $12,000.00 $2,800.00 $8,400.00 $10,500.00 $31,500.00 $4,950.00 $14,850.00 $7,657.00 $22,971.00 $3,860.00 $11,580.00 $17,200.00$51,600.00 $7,800.00 $23,400.00 $15,000.00 $45,000.0018CONNECT TO EXISTING WATER MAIN, 6"10 EA $3,800.00 $38,000.00 $2,500.00 $25,000.00 $10,000.00 $100,000.00 $4,950.00 $49,500.00 $4,749.00 $47,490.00 $3,680.00 $36,800.00 $17,100.00 $171,000.00 $7,500.00 $75,000.00 $12,000.00 $120,000.0019ABANDON EXISTING WATER MAIN1 LS $20,000.00 $20,000.00 $5,000.00 $5,000.00 $50,000.00 $50,000.00 $15,000.00 $15,000.00 $13,130.00 $13,130.00 $60,000.00 $60,000.00 $2,676.50 $2,676.50 $15,000.00 $15,000.00 $13,000.00 $13,000.0020TRACER WIRE ACCESS BOX8 EA $500.00 $4,000.00 $200.00 $1,600.00 $400.00 $3,200.00 $558.25 $4,466.00 $1,622.00 $12,976.00 $140.00 $1,120.00 $1,500.00 $12,000.00 $500.00 $4,000.00 $500.00 $4,000.0021CONCRETE ENTRANCE, REMOVE AND REPLACE 50 SY $125.00 $6,250.00 $145.00 $7,250.00 $160.50 $8,025.00 $138.00 $6,900.00 $159.00 $7,950.00 $118.00 $5,900.00 $245.00 $12,250.00 $200.00 $10,000.00 $180.00 $9,000.0022CURB & GUTTER TYPE B-6.12, REMOVE & REPLACE95 LF $75.00 $7,125.00 $65.00 $6,175.00 $88.00 $8,360.00 $97.75 $9,286.25 $97.00 $9,215.00 $48.00 $4,560.00 $150.00 $14,250.00 $75.00 $7,125.00 $115.00 $10,925.0023HMA BIKE BATH, REMOVE AND REPLACE235 SY $75.00 $17,625.00 $98.00 $23,030.00 $58.00 $13,630.00 $94.30 $22,160.50 $65.00 $15,275.00 $118.00 $27,730.00 $38.00 $8,930.00 $90.00 $21,150.00 $44.22 $10,391.7024CLASS D PATCH, 9"820 SY $125.00 $102,500.00 $68.00 $55,760.00 $125.00 $102,500.00 $51.75 $42,435.00 $117.50 $96,350.00 $80.00 $65,600.00 $68.00 $55,760.00 $120.00 $98,400.00 $93.43 $76,612.6025CLASS D PATCH, 4"46 SY $90.00 $4,140.00 $65.00 $2,990.00 $71.00 $3,266.00 $51.75 $2,380.50 $75.00 $3,450.00 $79.00 $3,634.00 $35.00 $1,610.00 $90.00 $4,140.00 $56.48 $2,598.0826PAVEMENT REMOVAL866 SY $12.00 $10,392.00 $34.00 $29,444.00 $7.50 $6,495.00 $14.95 $12,946.70 $12.00 $10,392.00 $22.00 $19,052.00 $18.00 $15,588.00 $10.00 $8,660.00 $10.00 $8,660.0027AGGREGATE SHOULDER, TYPE B, 4"73 SY $30.00 $2,190.00 $8.00 $584.00 $26.25 $1,916.25 $28.75 $2,098.75 $91.00 $6,643.00 $46.00 $3,358.00 $37.00 $2,701.00 $20.00 $1,460.00 $10.00$730.0028INLET PROTECTION15 EA $250.00 $3,750.00 $250.00 $3,750.00 $180.00 $2,700.00 $173.35 $2,600.25 $326.00 $4,890.00 $260.00 $3,900.00 $200.00 $3,000.00 $50.00 $750.00 $25.00 $375.0029TOPSOIL, SEEDING AND EROSION CONTROL BLANKET1,139 SY $20.00 $22,780.00 $16.00 $18,224.00 $15.00 $17,085.00 $12.65 $14,408.35 $16.00 $18,224.00 $16.00 $18,224.00 $12.50 $14,237.50 $14.00 $15,946.00 $18.00 $20,502.00Village of Oak BrookHarger Road Water Main ReplacementFebruary 1, 2023Bid Tabulation$1,695,302.00Engineer's Estimate John Neri Construction Swallow Construction Corp.Martam ConstructionGRAND TOTAL BID $1,402,017.00 $1,374,818.00 $1,435,828.25J. Congdon$1,892,591.38PERCENT ABOVE LOW BID - -37.7%4.4%34.6%13.6%25.5%21.2%Bolder ConstructionTrine ConstructionAqua Contractors Corp.IHC Construction$1,850,826.00$1,561,123.01$1,725,000.00$1,665,627.0023.3%