Loading...
HomeMy WebLinkAbout2023 Heritage Center Facade Restoration Project Tabulation 2023 Heritage Center Facade Restoration Project (Tuckpointing) Proposal Tabulation Work Item Quantity Units of Work Description US-CES Design Developers Berglund Soumar Masonry Bully & Andrews Fortune Number Measure Section A (Parapet - North)& Rehub, Inc.Construction Co.Restoration, Inc. Masonry Restoration, LLC. Restoration 1 1 Lump Sum Performance and Payment Bond $4,426.00 $3,000.00 $1,111.00 $3,800.00 $2,377.00 $12,000.00 2 1 Lump Sum Mobilization and General Provisions $15,250.00 $6,000.00 $36,230.00 $2,500.00 $59,071.00 $116,000.00 3 1 Lump Sum Site Protection $18,625.00 $3,000.00 $5,859.00 $2,500.00 $44,000.00 $12,000.00 4 1 Lump Sum Tuckpointing $50,214.00 $77,000.00 $96,800.00 $144,000.00 $166,265.00 $277,000.00 TOTAL PRICE $88,515.00 $89,000.00 $140,000.00 $152,800.00 $271,713.00 $417,000.00 Work Item Quantity Units of Work Description US-CES Design Developers Berglund Soumar Masonry Bully & Andrews Fortune Number Measure Section A (Parapet - North)& Rehub, Inc.Construction Co.Restoration, Inc. Masonry Restoration, LLC. Restoration 1 1 SF Tuckpointing $18.00 $18.00 $26.19 $25.00 $55.00 $125.00 2 1 LF Waterproofing Existing Lintel $160.00 $40.00 $300.00 $280.00 $450.00 $885.00 3 1 LF Lintel Replacement $205.00 $230.00 $400.00 $185.00 $450.00 $890.00 4 1 SF Brick Replacement $23.00 $65.00 $125.00 $120.00 $140.00 $50.00 5 1 LF Sealant Replacement (Including Door, Window, & Louvers Frames)$8.15 N/A $20.00 $12.00 $28.00 $25.00 6 Paint Door and Window Frames a)1 Each a) Door Frames $325.00 N/A $1,000.00 $450.00 $1,500.00 $350.00 b)1 Each b) Window Frames $1,225.00 N/A $1,000.00 $440.00 $1,850.00 $350.00 c)1 Each c) Louvers $225.00 N/A $1,000.00 $110.00 $1,850.00 $400.00