S-1401 - 06/10/2014 - PREVAILING WAGES - Ordinances Supporting Documents ITEM 6.F. 1)
Of OAk
a
0
9ARL son.
.o
o
v
AGENDA ITEM
Regular Board of Trustees Meeting
of
June 10,2014
SUBJECT: Prevailing Wages
FROM. Peter Friedman,Village Attorney
BUDGET SOURCEJBUDGET.IMPACT
RECOMMENDED MOTION I move for passage of Ordinance S-1401, An Ordinance
Adopting the Prevailing Wage Standards for the Village of Oak Brook,Illinois.
Background/History
Pursuant to the provisions of the so-called Prevailing Wage Act, the State requires that each year
the Village pass an ordinance adopting the prevailing rate of wages for various trades employed
in performing construction on public works within the Village. The Illinois Department of Labor
has released statistics relative to such prevailing wage rates for DuPage and Cooly Counties.
Attached is an ordinance which adapts these mandated wage rates.
Recommendation;
I recommend that this Ordinance be passed,
ORDINANCE 2014-PW-WPA-EX2-S-1401
AN ORDINANCE ADOPTING THE PREVAILING WAGE
STANDARDS FOR THE VILLAGE OF OAK BROOK, ILLINOIS
WHEREAS, the State of Illinois has enacted the "Prevailing Wage Act," 820 ILCS 130/1 et seq.
(the"Act"); and
WHEREAS, the Act requires that the Village of Oak Brook investigate and ascertain the
prevailing rate of wages as defined in the Act for laborers, mechanics and other workers in the locality of
the Village employed in performing construction of public works for the Village.
NOW, THEREFORE, be it ordained by the President and Board of Trustees of the Village of Oak
Brook, Cook County and DuPage County, Illinois, as follows:
SECTION 1: To the extent and as required by the Act, the general prevailing rates of wages in
this locality for laborers, mechanics and other workers engaged in construction of public works coming
under the jurisdiction of the Village and being performed in that part of the Village located within Cook
County is hereby ascertained to be the same as the prevailing rates of wages for construction work in the
Cook County area, as determined by the Department of Labor of the State of Illinois as of June of the
current year(See Exhibit"A").
SECTION 2: To the extent and as required by the Act, the general prevailing rates of wages in
this locality for laborers, mechanics and other workers engaged in construction of public works coming
under the jurisdiction of the Village and being performed in that part of the Village located within DuPage
County is hereby ascertained to be the same as the prevailing rates of wages for construction work in the
DuPage County area, as determined by the Department of Labor of the State of Illinois as of June of the
current year(See Exhibit"B").
SECTION 3: As required by the Act, any and all revisions of the prevailing rates of wages by the
Department of Labor of the State of Illinois shall supersede the Department's June construction
undertaken by the Village. The definition of any terms appearing in the ordinance which area also used in
the Act shall be the same as in the Act.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 2 of 22
SECTION 4: Nothing herein contained shall be construed to apply said general prevailing rates
of wages as herein ascertained to any work or employment except public works construction undertaken
by the Village to the extent required by the Act.
SECTION 5: The Village Clerk shall publicly post this determination or any revisions of such
prevailing rates of wages, and keep it available for inspection at the Village Hall by any interested party.
A copy of the determination or of the currently revised determination of the prevailing rates of wages then
in effect shall be attached to all contract specifications.
SECTION 6: The Village Clerk shall mail a copy of this determination to any employer and to any
association of employers and to any person or association of employees who have filed their names and
addresses and have requested copies of any determination stating the particular rates and the particular
class of workers whose wages will be affected by such rates.
SECTION 7: The Village Clerk shall promptly file a certified copy of this ordinance with the
Honorable Jesse White, Secretary of State of Illinois, Index Department, 111 East Monroe Street,
Springfield, IL 62706 and with the Illinois Department of Labor, Fair Labor Standards Division, One West
Old State Capitol Plaza, Room 300, Springfield, IL 62701.
SECTION 8: Within thirty (30) days after the filing with the Secretary of State, the Village Clerk
shall cause a notice to be published in a newspaper of general circulation within the Village stating:
THE VILLAGE OF OAK BROOK, ILLINOIS
PUBLIC NOTICE OF ADOPTION OF
PREVAILING WAGE STANDARDS
PLEASE TAKE NOTICE that on June 10, 2014, the President and Board of Trustees of
the Village of Oak Brook, Illinois, adopted Ordinance 2014-PW-WPA-EX2-S-1401
determining prevailing wages pursuant to 820 ILCS 13/1 et seq., which determination is
now effective.
(Date of Publication)
Published by Order of the President and Board of Trustees of the Village of Oak Brook.
Charlotte K. Pruss
Village Clerk
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 3 of 22
SECTION 9: If any section, paragraph, clause or provision of this ordinance shall be held invalid,
the invalidity thereof shall not affect any of the other provisions of this ordinance.
SECTION 10: All ordinances in conflict herewith are repealed to the extent of such conflict.
SECTION 11: This ordinance shall be in full force and effect from and after its passage, approval
and publication as provided by law.
APPROVED THIS 10th day of June, 2014.
Gopal G. Lalmalani
Village President
PASSED THIS 10th day of June, 2014.
Ayes:
Nays:
Absent:
ATTEST:
Charlotte K. Pruss
Village Clerk
STATE OF ILLINOIS )
) SS
COUNTY OF DUPAGE )
CERTIFICATION
I, Charlotte Pruss, DO HEREBY CERTIFY that I am the duly qualified and elected Clerk of the
Village of Oak Brook, Illinois, and that as such Clerk I do have charge of and custody of the books and
records of the Village of Oak Brook, Illinois.
I DO HEREBY FURTHER CERTIFY that the foregoing is a full, true and correct copy of
Ordinance 2014-PW-WPA-EX2-S-1401, "AN ORDINANCE ADOPTING THE PREVAILING WAGE
STANDARDS IN THE VILLAGE OF OAK BROOK, ILLINOIS," adopted and approved by the President
and Board of Trustees of the Village of Oak Brook, Illinois on June 10, 2014.
IN WITNESS WHEREOF, I have hereunto affixed my hand and the Corporate Seal of the Village
of Oak Brook, Illinois this 10th day of June, 2014.
Charlotte K. Pruss, Village Clerk
SEAL Village of Oak Brook, Illinois
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 4 of 22
EXHIBIT A
Cook County Prevailing Wage for June 2014
(See explanation of column headings at bottom of wages)
Trade Name RG TYP C Base FRMAN M-F>8 OSA OSH H/W Pensn Vac
Trng
ASBESTOS ABT-GEN ALL 37. 100 37. 600 1.5 1.5 2.0 13.38 9.520 0.000
0.500
ASBESTOS ABT-MEC BLD 35.100 37. 600 1.5 1.5 2.0 11.17 10.76 0.000
0.720
BOILERMAKER BLD 44 .240 48.220 2. 0 2.0 2.0 6. 970 17.54 0.000
0.350
BRICK MASON BLD 41.580 45.740 1.5 1.5 2.0 9.700 12.80 0.000
1.040
CARPENTER ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
CEMENT MASON ALL 42.350 44.350 2.0 1.5 2.0 12. 16 12.35 0.000
0.430
CERAMIC TILE FNSHER BLD 34 .810 0.000 2.0 1.5 2.0 10.20 7.830 0.000
0. 640
COMM. ELECT. BLD 38.000 40.800 1.5 1.5 2.0 8.420 11.30 1.100
0.700
ELECTRIC PWR EQMT OP ALL 44 .850 49.850 1.5 1.5 2.0 10. 63 14.23 0.000
0. 450
ELECTRIC PWR GRNDMAN ALL 34. 980 49.850 1.5 1.5 2.0 8.290 11.10 0.000
0.350
ELECTRIC PWR LINEMAN ALL 44.850 49. 850 1.5 1.5 2.0 10. 63 14 .23 0.000
0.450
ELECTRICIAN ALL 43.000 46.000 1.5 1.5 2. 0 12.83 14 .27 0. 000
0.750
ELEVATOR CONSTRUCTOR BLD 49. 900 56.140 2.0 2.0 2.0 12.73 13.46 3. 990
0. 600
FENCE ERECTOR ALL 34 . 840 36.840 1.5 1.5 2.0 12.86 10. 67 0.000
0.300
GLAZIER BLD 40.000 41.500 1.5 2.0 2.0 12.49 15. 99 0.000
0. 940
HT/FROST INSULATOR BLD 46. 950 49.450 1.5 1.5 2.0 11. 17 11. 96 0.000
0.720
IRON WORKER ALL 42.070 44.070 2.0 2.0 2.0 13.45 19.59 0.000
0.350
LABORER ALL 37.000 37.750 1.5 1.5 2.0 13.38 9.520 0.000
0.500
LATHER ALL 42.520 44 .520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
MACHINIST BLD 43. 920 46.420 1.5 1.5 2.0 6.760 8. 950 1.850
0.000
MARBLE FINISHERS ALL 30.520 0.000 1.5 1.5 2.0 9.700 12.55 0.000
0.590
MARBLE MASON BLD 40.780 44.860 1.5 1.5 2.0 9.700 12.71 0.000
0.740
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 5 of 22
MATERIAL TESTER I ALL 27.000 0.000 1.5 1.5 2.0 13.38 9.520 0.000
0.500
MATERIALS TESTER II ALL 32.000 0.000 1.5 1.5 2.0 13.38 9.520 0.000
0.500
MILLWRIGHT ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
OPERATING ENGINEER BLD 1 46.100 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 2 44 .800 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 3 42.250 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 4 40.500 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 5 49.850 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 6 47. 100 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 749. 100 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER FLT 1 51.300 51.300 1.5 1.5 2.0 15.70 10.55 1. 900
1.250
OPERATING ENGINEER FLT 2 49.800 51.300 1.5 1.5 2.0 15.70 10.55 1. 900
1.250
OPERATING ENGINEER FLT 3 44 .350 51.300 1.5 1.5 2.0 15.70 10.55 1. 900
1.250
OPERATING ENGINEER FLT 4 36.850 51.300 1.5 1.5 2.0 15.70 10.55 1. 900
1.250
OPERATING ENGINEER FLT 5 52.800 51.300 1.5 1.5 2.0 15.70 10.55 1. 900
1.250
OPERATING ENGINEER HWY 1 44.300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 2 43.750 48.300 1.5 1.5 2. 0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 3 41.700 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 4 40.300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 5 39.100 48.300 1.5 1.5 2. 0 16. 60 11. 05 1. 900
1.250
OPERATING ENGINEER HWY 6 47.300 48.300 1.5 1.5 2.0 16. 60 11.05 1.900
1.250
OPERATING ENGINEER HWY 7 45.300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
ORNAMNTL IRON WORKER ALL 42. 900 45.400 2. 0 2.0 2.0 13. 11 16.40 0.000
0. 600
PAINTER ALL 40.750 45.500 1.5 1.5 1.5 10.75 11. 10 0.000
0.770
PAINTER SIGNS BLD 33. 920 38.090 1.5 1.5 1.5 2. 600 2.710 0.000
0.000
PILEDRIVER ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
PIPEFITTER BLD 46.000 49.000 1.5 1.5 2.0 9.000 15.85 0.000
1.680
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 6 of 22
PLASTERER BLD 41.250 43.730 1.5 1.5 2.0 11.10 11. 69 0.000
0.550
PLUMBER BLD 46.050 48.050 1.5 1.5 2.0 12.53 10.06 0.000
0.880
ROOFER BLD 39.200 42.200 1.5 1.5 2.0 8.280 9. 690 0.000
0.430
SHEETMETAL WORKER BLD 41.210 44.510 1.5 1.5 2.0 10.48 19.41 0.000
0. 660
SIGN HANGER BLD 30.210 30.710 1.5 1.5 2.0 4.850 3.030 0.000
0.000
SPRINKLER FITTER BLD 49.200 51.200 1.5 1.5 2.0 10.75 8.850 0.000
0.450
STEEL ERECTOR ALL 42.070 44.070 2.0 2.0 2.0 13.45 19.59 0.000
0.350
STONE MASON BLD 41.580 45.740 1.5 1.5 2.0 9.700 12.80 0.000
1.040
SHD ' NOT IN EFFECT 37.000 37.750 1.5 1.5 2.0 12. 97 9. 930 0.000
0.500
TERRAZZO FINISHER BLD 36. 040 0.000 1.5 1.5 2.0 10.20 9. 900 0.000
0.540
TERRAZZO MASON BLD 39.880 42.880 1.5 1.5 2.0 10.20 11.25 0.000
0.700
TILE MASON BLD 41.840 45.840 2.0 1.5 2.0 10.20 9.560 0.000
0.880
TRAFFIC SAFETY WRKR HWY 28.250 29.850 1.5 1.5 2.0 4 .896 4.175 0.000
0.000
TRUCK DRIVER E ALL 1 33.850 34 .500 1.5 1.5 2. 0 8. 150 8.500 0.000
0.150
TRUCK DRIVER E ALL 2 34. 100 34.500 1.5 1.5 2.0 8.150 8.500 0.000
0.150
TRUCK DRIVER E ALL 3 34.300 34 .500 1.5 1.5 2. 0 8.150 8.500 0.000
0.150
TRUCK DRIVER E ALL 4 34 .500 34.500 1.5 1.5 2.0 8.150 8.500 0.000
0.150
TRUCK DRIVER W ALL 1 32.550 33.100 1.5 1.5 2.0 6.500 4 .350 0.000
0.000
TRUCK DRIVER W ALL 2 32.700 33. 100 1.5 1.5 2.0 6.500 4.350 0.000
0.000
TRUCK DRIVER W ALL 3 32. 900 33.100 1.5 1.5 2. 0 6.500 4 .350 0.000
0.000
TRUCK DRIVER W ALL 4 33. 100 33.100 1.5 1.5 2.0 6.500 4.350 0.000
0.000
TUCKPOINTER BLD 41. 950 42. 950 1.5 1.5 2. 0 8. 180 11.78 0.000
0. 630
Legend: Rc (Region)
TYP (Trade Type - All,Highway,Building,Floating,Oil & Chip,Rivers)
C (Class)
Base (Base Wage Rate)
FRMAN (Foreman Rate)
M-F>8 (OT required for any hour greater than 8 worked each day, Mon through Fri.
OSA (Overtime (OT) is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
Pensn (Pension)
Vac (Vacation)
Trng (Training)
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 7 of 22
Explanations
COOK COUNTY
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial Day,
Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and
Veterans Day in some classifications/counties. Generally, any of
these holidays which fall on a Sunday is celebrated on the following
Monday. This then makes work performed on that Monday payable at the
appropriate overtime rate for holiday pay. Common practice in a given
local may alter certain days of celebration. If in doubt, please
check with IDOL.
TRUCK DRIVERS (WEST) - That part of the county West of Barrington
Road.
EXPLANATION OF CLASSES
ASBESTOS - GENERAL - removal of asbestos material/mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials/mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to remain.
CERAMIC TILE FINISHER
The grouting, cleaning, and polishing of all classes of tile, whether
for interior or exterior purposes, all burned, glazed or unglazed
products; all composition materials, granite tiles, warning detectable
tiles, cement tiles, epoxy composite materials, pavers, glass,
mosaics, fiberglass, and all substitute materials, for tile made in
tile-like units; all mixtures in tile like form of cement, metals, and
other materials that are for and intended for use as a finished floor
surface, stair treads, promenade roofs, walks, walls, ceilings,
swimming pools, and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin-set mortars, epoxies, wall mud, and any other
sand and cement mixtures or adhesives when used in the preparation,
installation, repair, or maintenance of tile and/or similar materials.
The handling and unloading of all sand, cement, lime, tile,
fixtures, equipment, adhesives, or any other materials to be used in
the preparation, installation, repair, or maintenance of tile and/or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work, particularly and
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including, but not be limited to, all soap compounds, paper products,
tapes, and all polyethylene coverings, plywood, masonite, cardboard,
and any new type of products that may be used to protect tile
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 8 of 22
installations, Blastrac equipment, and all floor scarifying equipment
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re-tiled.
COMMUNICATIONS ELECTRICIAN
Installation, operation, inspection, maintenance, repair and service
of radio, television, recording, voice sound vision production and
reproduction, telephone and telephone interconnect, facsimile, data
apparatus, coaxial, fibre optic and wireless equipment, appliances and
systems used for the transmission and reception of signals of any
nature, business, domestic, commercial, education, entertainment, and
residential purposes, including but not limited to, communication and
telephone, electronic and sound equipment, fibre optic and data
communication systems, and the performance of any task directly
related to such installation or service whether at new or existing
sites, such tasks to include the placing of wire and cable and
electrical power conduit or other raceway work within the equipment
room and pulling wire and/or cable through conduit and the
installation of any incidental conduit, such that the employees
covered hereby can complete any job in full.
MARBLE FINISHER
Loading and unloading trucks, distribution of all materials (all
stone, sand, etc. ) , stocking of floors with material, performing all
rigging for heavy work, the handling of all material that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching, waxing of material if
damaged, pointing up, caulking, grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material, drilling of holes for wires that anchor material set by
setters, mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material, mixing up of sand
to cement for the installation of material and such other work as may
be required in helping a Marble Setter in the handling of all
material in the erection or installation of interior marble, slate,
travertine, art marble, serpentine, alberene stone, blue stone,
granite and other stones (meaning as to stone any foreign or domestic
materials as are specified and used in building interiors and
exteriors and customarily known as stone in the trade) , carrara,
sanionyx, vitrolite and similar opaque glass and the laying of all
marble tile, terrazzo tile, slate tile and precast tile, steps, risers
treads, base, or any other materials that may be used as substitutes
for any of the aforementioned materials and which are used on interior
and exterior which are installed in a similar manner.
MATERIAL TESTER I: Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 9 of 22
MATERIAL TESTER II: Field inspection of welds, structural steel,
fireproofing, masonry, soil, facade, reinforcing steel, formwork,
cured concrete, and concrete and asphalt batch plants; adjusting
proportions of bituminous mixtures.
OPERATING ENGINEER - BUILDING
Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with
Caisson Attachment; Batch Plant; Benoto (requires Two Engineers) ;
Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant;
Combination Back Hoe Front End-loader Machine; Compressor and Throttle
Valve; Concrete Breaker (Truck Mounted) ; Concrete Conveyor; Concrete
Conveyor (Truck Mounted) ; Concrete Paver Over 27E cu. ft; Concrete
Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom;
Concrete Pump (Truck Mounted) ; Concrete Tower; Cranes, All; Cranes,
Hammerhead; Cranes, (GCI and similar Type) ; Creter Crane; Spider
Crane; Crusher, Stone, etc. ; Derricks, All; Derricks, Traveling;
Formless Curb and Gutter Machine; Grader, Elevating; Grouting
Machines; Heavy Duty Self-Propelled Transporter or Prime Mover;
Highlift Shovels or Front Endloader 2-1/4 yd. and over; Hoists,
Elevators, outside type rack and pinion and similar machines; Hoists,
One, Two and Three Drum; Hoists, Two Tugger One Floor; Hydraulic
Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment) ;
Locomotives, All; Motor Patrol; Lubrication Technician; Manipulators;
Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump
Cretes Dual Ram; Pump Cretes: Squeeze Cretes-Screw Type Pumps; Gypsum
Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;
Scoops - Tractor Drawn; Slip-Form Paver; Straddle Buggies; Operation
of Tie Back Machine; Tournapull; Tractor with Boom and Side Boom;
Trenching Machines.
Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete
Mixer (Two Bag and Over) ; Conveyor, Portable; Forklift Trucks;
Highlift Shovels or Front Endloaders under 2-1/4 yd. ; Hoists,
Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;
Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled) ;
Rock Drill (Truck Mounted) ; Rollers, All; Steam Generators; Tractors,
All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.
Class 3. Air Compressor; Combination Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators (remodeling
or renovation work) ; Hydraulic Power Units (Pile Driving, Extracting,
and Drilling) ; Pumps, over 3" (1 to 3 not to exceed a total of 300
ft. ) ; Low Boys; Pumps, Well Points; Welding Machines (2 through 5) ;
Winches, 4 Small Electric Drill Winches.
Class 4. Bobcats and/or other Skid Steer Loaders; Oilers; and Brick
Forklift.
Class 5. Assistant Craft Foreman.
Class 6. Gradall.
Class 7. Mechanics; Welders.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 10 of 22
OPERATING ENGINEERS - HIGHWAY CONSTRUCTION
Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt
Heater Scarfire; Asphalt Spreader; Autograder/GOMACO or other similar
type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast
Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi-Mix
Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe
Bucket or over or with attachments) ; Concrete Breaker (Truck
Mounted) ; Concrete Conveyor; Concrete Paver over 27E cu. ft. ; Concrete
Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower
Cranes of all types: Creter Crane: Spider Crane; Crusher, Stone, etc. ;
Derricks, All; Derrick Boats; Derricks, Traveling; Dredges;
Elevators, Outside type Rack & Pinion and Similar Machines; Formless
Curb and Gutter Machine; Grader, Elevating; Grader, Motor Grader,
Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard
Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Heavy
Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes;
Backhoes with shear attachments up to 40' of boom reach; Lubrication
Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig;
Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid
Rig; Rock Drill - Truck Mounted; Rock/Track Tamper; Roto Mill
Grinder; Slip-Form Paver; Snow Melters; Soil Test Drill Rig (Truck
Mounted) ; Straddle Buggies; Hydraulic Telescoping Form (Tunnel) ;
Operation of Tieback Machine; Tractor Drawn Belt Loader; Tractor
Drawn Belt Loader (with attached pusher - two engineers) ; Tractor with
Boom; Tractaire with Attachments; Traffic Barrier Transfer Machine;
Trenching; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole
Drills (Tunnel Shaft) ; Underground Boring and/or Mining Machines 5
ft. in diameter and over tunnel, etc; Underground Boring and/or Mining
Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO) .
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with
attachments) ; Compressor and Throttle Valve; Compressor, Common
Receiver (3) ; Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft. ; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck
Cars (Haglund or Similar Type) ; Drills, All; Finishing Machine -
Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging
Machine; Hydraulic Boom Trucks (All Attachments) ; Hydro-Blaster; Hydro
Excavating (excluding hose work) ; Laser Screed; All Locomotives,
Dinky; Off-Road Hauling Units (including articulating) Non
Self-Loading Ejection Dump; Pump Cretes: Squeeze Cretes - Screw Type
Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow Plows;
Rototiller, Seaman, etc. , self-propelled; Self-Propelled Compactor;
Spreader - Chip - Stone, etc. ; Scraper - Single/Twin Engine/Push and
Pull; Scraper - Prime Mover in Tandem (Regardless of Size) ; Tractors
pulling attachments, Sheeps Foot, Disc, Compactor, etc. ; Tug Boats.
Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2) ; Concrete Mixer (Two Bag and Over) ;
Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding, etc. ;
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 11 of 22
Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All
Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; Pipe
Jacking Machines; Post-Hole Digger; Power Saw, Concrete Power Driven;
Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam
Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats;
Tamper-Form-Motor Driven.
Class 4 . Air Compressor; Combination - Small Equipment Operator;
Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or Drilling) ; Light Plants, All
(1 through 5) ; Pumps, over 3" (1 to 3 not to exceed a total of 300
ft. ) ; Pumps, Well Points; Vacuum Trucks (excluding hose work) ; Welding
Machines (2 through 5) ; Winches, 4 Small Electric Drill Winches.
Class 5. SkidSteer Loader (all) ; Brick Forklifts; Oilers.
Class 6. Field Mechanics and Field Welders
Class 7. Dowell Machine with Air Compressor; Gradall and machines of
like nature.
OPERATING ENGINEER - FLOATING
Class 1. Craft Foreman; Master Mechanic; Diver/Wet Tender; Engineer;
Engineer (Hydraulic Dredge) .
Class 2. Crane/Backhoe Operator; Boat Operator with towing
endorsement; Mechanic/Welder; Assistant Engineer (Hydraulic Dredge) ;
Leverman (Hydraulic Dredge) ; Diver Tender.
Class 3. Deck Equipment Operator, Machineryman, Maintenance of Crane
(over 50 ton capacity) or Backhoe (115, 000 lbs. or more) ; Tug/Launch
Operator; Loader/Dozer and like equipment on Barge, Breakwater Wall,
Slip/Dock, or Scow, Deck Machinery, etc.
Class 4 . Deck Equipment Operator, Machineryman/Fireman (4 Equipment
Units or More) ; Off Road Trucks; Deck Hand, Tug Engineer, Crane
Maintenance (50 Ton Capacity and Under) or Backhoe Weighing (115, 000
pounds or less) ; Assistant Tug Operator.
Class 5. Friction or Lattice Boom Cranes.
SURVEY WORKER - Operated survey equipment including data collectors,
G.P.S. and robotic instruments, as well as conventional levels and
transits.
TERRAZZO FINISHER
The handling of sand, cement, marble chips, and all other materials
that may be used by the Mosaic Terrazzo Mechanic, and the mixing,
grinding, grouting, cleaning and sealing of all Marble, Mosaic, and
Terrazzo work, floors, base, stairs, and wainscoting by hand or
machine, and in addition, assisting and aiding Marble, Masonic, and
Terrazzo Mechanics.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 12 of 22
TRAFFIC SAFETY
Work associated with barricades, horses and drums used to reduce lane
usage on highway work, the installation and removal of temporary lane
markings, and the installation and removal of temporary road signs.
TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION - EAST & WEST
Class 1. Two or three Axle Trucks. A-frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by cars, pick-up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics
Helpers and Greasers; Oil Distributors 2-man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man operation;
Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters; Unskilled
Dumpman; and Truck Drivers hauling warning lights, barricades, and
portable toilets on the job site.
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self-loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yards;
Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self-loading equipment or similar
equipment over 16 cubic yards; Explosives and/or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1-man operation; Winch trucks, 3 axles or more;
Mechanic--Truck Welder and Truck Painter.
Class 4 . Six axle trucks; Dual-purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front.
Other Classifications of Work:
For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are
available. If a task to be performed is not subject to one of the
classifications of pay set out, the Department will upon being
contacted state which neighboring county has such a classification and
provide such rate, such rate being deemed to exist by reference in
this document. If no neighboring county rate applies to the task,
the Department shall undertake a special determination, such special
determination being then deemed to have existed under this
determination. If a project requires these, or any classification not
listed, please contact IDOL at 217-782-1710 for wage rates or
clarifications.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 13 of 22
LANDSCAPING
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by
landscape plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the classifications of truck driver.
MATERIAL TESTER & MATERIAL TESTER/INSPECTOR I AND II
Notwithstanding the difference in the classification title, the
classification entitled "Material Tester I" involves the same job
duties as the classification entitled "Material Tester/Inspector I".
Likewise, the classification entitled "Material Tester II" involves
the same job duties as the classification entitled "Material
Tester/Inspector II".
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 14 of 22
EXHIBIT B
Du Page County Prevailing Wage for June 2014
(See explanation of column headings at bottom of wages)
Trade Name RG TYP C Base FRMAN M-F>8 OSA OSH H/W Pensn Vac
Trng
ASBESTOS ABT-GEN ALL 37.100 37. 600 1.5 1.5 2.0 13.38 9.520 0.000
0.500
ASBESTOS ABT-MEC BLD 35. 100 37. 600 1.5 1.5 2.0 11. 17 10.76 0.000
0.720
BOILERMAKER BLD 44.240 48.220 2.0 2.0 2.0 6. 970 17.54 0.000
0.350
BRICK MASON BLD 41.580 45.740 1.5 1.5 2.0 9.700 12.80 0.000
1.040
CARPENTER ALL 42.520 44 .520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
CEMENT MASON ALL 38.500 40.500 2.0 1.5 2.0 12.16 16.25 0.000
0.430
CERAMIC TILE FNSHER BLD 34.810 0.000 2.0 1.5 2.0 10.20 7.830 0.000
0. 640
COMMUNICATION TECH BLD 32. 650 34 .750 1.5 1.5 2.0 9.550 15. 16 1.250
0. 610
ELECTRIC PWR EQMT OP ALL 37. 890 51. 480 1.5 1.5 2.0 5.000 11.75 0.000
0.380
ELECTRIC PWR GRNDMAN ALL 29.300 51.480 1.5 1.5 2.0 5.000 9.090 0.000
0.290
ELECTRIC PWR LINEMAN ALL 45.360 51.480 1.5 1.5 2.0 5.000 14 .06 0.000
0.450
ELECTRIC PWR TRK DRV ALL 30.340 51.480 1.5 1.5 2.0 5.000 9.400 0.000
0.300
ELECTRICIAN BLD 37. 160 40.880 1.5 1.5 2.0 9.550 17.39 4.480
0. 680
ELEVATOR CONSTRUCTOR BLD 49. 900 56.140 2.0 2.0 2.0 12.73 13.46 3. 990
0. 600
FENCE ERECTOR NE ALL 34.840 36.840 1.5 1.5 2.0 12.86 10. 67 0.000
0.300
FENCE ERECTOR W ALL 45.060 48. 660 2.0 2.0 2.0 9.390 17. 69 0.000
0.400
GLAZIER BLD 40.000 41.500 1.5 2.0 2.0 12.49 15. 99 0.000
0. 940
HT/FROST INSULATOR BLD 46. 950 49.450 1.5 1.5 2.0 11.17 11. 96 0.000
0.720
IRON WORKER E ALL 42. 070 44.070 2.0 2.0 2.0 13.45 19.59 0.000
0.350
IRON WORKER W ALL 45.060 48. 660 2.0 2.0 2.0 9.390 17. 69 0.000
0.400
LABORER ALL 37.000 37.750 1.5 1.5 2.0 13.38 9.520 0.000
0.500
LATHER ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 15 of 22
MACHINIST BLD 43. 920 46.420 1.5 1.5 2.0 6.760 8. 950 1.850
0.000
MARBLE FINISHERS ALL 30.520 0.000 1.5 1.5 2.0 9.700 12.55 0.000
0.590
MARBLE MASON BLD 40.780 44 .860 1.5 1.5 2.0 9.700 12.71 0.000
0.740
MATERIAL TESTER I ALL 27.000 0.000 1.5 1.5 2.0 13.38 9.520 0.000
0.500
MATERIALS TESTER II ALL 32.000 0.000 1.5 1.5 2.0 13.38 9.520 0.000
0.500
MILLWRIGHT ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
OPERATING ENGINEER BLD 1 46. 100 50. 100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 2 44 .800 50.100 2.0 2.0 2.0 16. 60 11. 05 1. 900
1.250
OPERATING ENGINEER BLD 3 42.250 50. 100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 4 40.500 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 5 49.850 50. 100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 6 47. 100 50. 100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER BLD 7 49.100 50.100 2.0 2.0 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 1 44 .300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 2 43.750 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 3 41.700 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 4 40.300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 5 39.100 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
OPERATING ENGINEER HWY 6 47.300 48.300 1.5 1.5 2.0 16. 60 11. 05 1. 900
1.250
OPERATING ENGINEER HWY 7 45.300 48.300 1.5 1.5 2.0 16. 60 11.05 1. 900
1.250
ORNAMNTL IRON WORKER E ALL 42. 900 45.400 2.0 2.0 2.0 13. 11 16.40 0.000
0. 600
ORNAMNTL IRON WORKER W ALL 45.060 48. 660 2.0 2.0 2.0 9.390 17. 69 0.000
0.400
PAINTER ALL 40. 980 42. 980 1.5 1.5 1.5 10.00 8.200 0.000
1.350
PAINTER SIGNS BLD 33. 920 38.090 1.5 1.5 1.5 2. 600 2.710 0.000
0.000
PILEDRIVER ALL 42.520 44.520 1.5 1.5 2.0 13.29 12.75 0.000
0. 630
PIPEFITTER BLD 41.200 43.200 1.5 1.5 2.0 9.750 17.59 0.000
1.710
PLASTERER BLD 41.250 43.760 1.5 1.5 2.0 9.700 13.08 0.000
0. 980
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 16 of 22
PLUMBER BLD 41.200 43.200 1.5 1.5 2.0 9.750 17.59 0.000
1.710
ROOFER BLD 39.200 42.200 1.5 1.5 2.0 8.280 9. 690 0.000
0. 430
SHEETMETAL WORKER BLD 43.250 45.250 1.5 1.5 2.0 10. 65 12. 90 0.000
0.820
SPRINKLER FITTER BLD 49.200 51.200 1.5 1.5 2.0 10.75 8.850 0.000
0.450
STEEL ERECTOR E ALL 42.070 44 .070 2. 0 2.0 2.0 13.45 19.59 0.000
0.350
STEEL ERECTOR W ALL 45.060 48. 660 2.0 2.0 2.0 9.390 17. 69 0.000
0.400
STONE MASON BLD 41.580 45.740 1.5 1.5 2.0 9.700 12.80 0.000
1.040
SURVEY .r,� n�D_) NOT IN EFFECT 37.000 37.750 1.5 1.5 2.0 12. 97 9. 930 0.000
0.500
TERRAZZO FINISHER BLD 36.040 0.000 1.5 1.5 2.0 10.20 9. 900 0.000
0.540
TERRAZZO MASON BLD 39.880 42.880 1.5 1.5 2.0 10.20 11.25 0.000
0.700
TILE MASON BLD 41.840 45.840 2.0 1.5 2.0 10.20 9.560 0.000
0.880
TRAFFIC SAFETY WRKR HWY 28.250 29.850 1.5 1.5 2.0 4.896 4 .175 0.000
0.000
TRUCK DRIVER ALL 1 32.550 33.100 1.5 1.5 2.0 6.500 4.350 0.000
0.150
TRUCK DRIVER ALL 2 32.700 33.100 1.5 1.5 2.0 6.500 4 .350 0.000
0.150
TRUCK DRIVER ALL 3 32. 900 33. 100 1.5 1.5 2.0 6.500 4.350 0.000
0.150
TRUCK DRIVER ALL 4 33.100 33.100 1.5 1.5 2.0 6.500 4 .350 0.000
0.150
TUCKPOINTER BLD 40. 950 41. 950 1.5 1.5 2.0 9.700 11. 93 0.000
0. 630
Legend: Rc (Region)
TYP (Trade Type - All,Highway,Building,Floating,Oil & Chip,Rivers)
C (Class)
Base (Base Wage Rate)
FRMAN (Foreman Rate)
M-F>8 (OT required for any hour greater than 8 worked each day, Mon through Fri.
OSA (Overtime (OT) is required for every hour worked on Saturday)
OSH (Overtime is required for every hour worked on Sunday and Holidays)
H/W (Health & Welfare Insurance)
Pensn (Pension)
Vac (Vacation)
Trng (Training)
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 17 of 22
Explanations
DUPAGE COUNTY
IRON WORKERS AND FENCE ERECTOR (WEST) - West of Route 53.
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial Day,
Fourth of July, Labor Day, Thanksgiving Day, Christmas Day and
Veterans Day in some classifications/counties. Generally, any of
these holidays which fall on a Sunday is celebrated on the following
Monday. This then makes work performed on that Monday payable at the
appropriate overtime rate for holiday pay. Common practice in a given
local may alter certain days of celebration. If in doubt, please
check with IDOL.
EXPLANATION OF CLASSES
ASBESTOS - GENERAL - removal of asbestos material/mold and hazardous
materials from any place in a building, including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials/mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS - MECHANICAL - removal of asbestos material from mechanical
systems, such as pipes, ducts, and boilers, where the mechanical
systems are to remain.
TRAFFIC SAFETY - work associated with barricades, horses and drums
used to reduce lane usage on highway work, the installation and
removal of temporary lane markings, and the installation and removal
of temporary road signs.
CERAMIC TILE FINISHER
The grouting, cleaning, and polishing of all classes of tile, whether
for interior or exterior purposes, all burned, glazed or unglazed
products; all composition materials, granite tiles, warning detectable
tiles, cement tiles, epoxy composite materials, pavers, glass,
mosaics, fiberglass, and all substitute materials, for tile made in
tile-like units; all mixtures in tile like form of cement, metals, and
other materials that are for and intended for use as a finished floor
surface, stair treads, promenade roofs, walks, walls, ceilings,
swimming pools, and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin-set mortars, epoxies, wall mud, and any other
sand and cement mixtures or adhesives when used in the preparation,
installation, repair, or maintenance of tile and/or similar materials.
The handling and unloading of all sand, cement, lime, tile,
fixtures, equipment, adhesives, or any other materials to be used in
the preparation, installation, repair, or maintenance of tile and/or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work, particularly and
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 18 of 22
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including, but not be limited to, all soap compounds, paper products,
tapes, and all polyethylene coverings, plywood, masonite, cardboard,
and any new type of products that may be used to protect tile
installations, Blastrac equipment, and all floor scarifying equipment
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re-tiled.
COMMUNICATIONS TECHNICIAN
Low voltage installation, maintenance and removal of telecommunication
facilities (voice, sound, data and video) including telephone and
data inside wire, interconnect, terminal equipment, central offices,
PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass,
CATV, WAN (wide area networks) , LAN (local area networks) , and ISDN
(integrated system digital network) , pulling of wire in raceways, but
not the installation of raceways.
MARBLE FINISHER
Loading and unloading trucks, distribution of all materials (all
stone, sand, etc. ) , stocking of floors with material, performing all
rigging for heavy work, the handling of all material that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching, waxing of material if
damaged, pointing up, caulking, grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material, drilling of holes for wires that anchor material set by
setters, mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material, mixing up of sand
to cement for the installation of material and such other work as may
be required in helping a Marble Setter in the handling of all
material in the erection or installation of interior marble, slate,
travertine, art marble, serpentine, alberene stone, blue stone,
granite and other stones (meaning as to stone any foreign or domestic
materials as are specified and used in building interiors and
exteriors and customarily known as stone in the trade) , carrara,
sanionyx, vitrolite and similar opaque glass and the laying of all
marble tile, terrazzo tile, slate tile and precast tile, steps, risers
treads, base, or any other materials that may be used as substitutes
for any of the aforementioned materials and which are used on interior
and exterior which are installed in a similar manner.
MATERIAL TESTER I: Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.
MATERIAL TESTER II: Field inspection of welds, structural steel,
fireproofing, masonry, soil, facade, reinforcing steel, formwork,
cured concrete, and concrete and asphalt batch plants; adjusting
proportions of bituminous mixtures.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 19 of 22
OPERATING ENGINEER - BUILDING
Class 1. Asphalt Plant; Asphalt Spreader; Autograde; Backhoes with
Caisson Attachment; Batch Plant; Benoto (requires Two Engineers) ;
Boiler and Throttle Valve; Caisson Rigs; Central Redi-Mix Plant;
Combination Back Hoe Front End-loader Machine; Compressor and Throttle
Valve; Concrete Breaker (Truck Mounted) ; Concrete Conveyor; Concrete
Conveyor (Truck Mounted) ; Concrete Paver Over 27E cu. ft; Concrete
Paver 27E cu. ft. and Under: Concrete Placer; Concrete Placing Boom;
Concrete Pump (Truck Mounted) ; Concrete Tower; Cranes, All; Cranes,
Hammerhead; Cranes, (GCI and similar Type) ; Creter Crane; Spider
Crane; Crusher, Stone, etc. ; Derricks, All; Derricks, Traveling;
Formless Curb and Gutter Machine; Grader, Elevating; Grouting
Machines; Heavy Duty Self-Propelled Transporter or Prime Mover;
Highlift Shovels or Front Endloader 2-1/4 yd. and over; Hoists,
Elevators, outside type rack and pinion and similar machines; Hoists,
One, Two and Three Drum; Hoists, Two Tugger One Floor; Hydraulic
Backhoes; Hydraulic Boom Trucks; Hydro Vac (and similar equipment) ;
Locomotives, All; Motor Patrol; Lubrication Technician; Manipulators;
Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump
Cretes Dual Ram; Pump Cretes: Squeeze Cretes-Screw Type Pumps; Gypsum
Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;
Scoops - Tractor Drawn; Slip-Form Paver; Straddle Buggies; Operation
of Tie Back Machine; Tournapull; Tractor with Boom and Side Boom;
Trenching Machines.
Class 2. Boilers; Broom, All Power Propelled; Bulldozers; Concrete
Mixer (Two Bag and Over) ; Conveyor, Portable; Forklift Trucks;
Highlift Shovels or Front Endloaders under 2-1/4 yd. ; Hoists,
Automatic; Hoists, Inside Elevators; Hoists, Sewer Dragging Machine;
Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled) ;
Rock Drill (Truck Mounted) ; Rollers, All; Steam Generators; Tractors,
All; Tractor Drawn Vibratory Roller; Winch Trucks with "A" Frame.
Class 3. Air Compressor; Combination Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators (remodeling
or renovation work); Hydraulic Power Units (Pile Driving, Extracting,
and Drilling) ; Pumps, over 3" (1 to 3 not to exceed a total of 300
ft. ) ; Low Boys; Pumps, Well Points; Welding Machines (2 through 5) ;
Winches, 4 Small Electric Drill Winches.
Class 4 . Bobcats and/or other Skid Steer Loaders; Oilers; and Brick
Forklift.
Class 5. Assistant Craft Foreman.
Class 6. Gradall.
Class 7. Mechanics; Welders.
OPERATING ENGINEERS - HIGHWAY CONSTRUCTION
Class 1. Asphalt Plant; Asphalt Heater and Planer Combination; Asphalt
Heater Scarfire; Asphalt Spreader; Autograder/GOMACO or other similar
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 20 of 22
type machines: ABG Paver; Backhoes with Caisson Attachment; Ballast
Regulator; Belt Loader; Caisson Rigs; Car Dumper; Central Redi-Mix
Plant; Combination Backhoe Front Endloader Machine, (1 cu. yd. Backhoe
Bucket or over or with attachments) ; Concrete Breaker (Truck
Mounted) ; Concrete Conveyor; Concrete Paver over 27E cu. ft. ; Concrete
Placer; Concrete Tube Float; Cranes, all attachments; Cranes, Tower
Cranes of all types: Creter Crane: Spider Crane; Crusher, Stone, etc. ;
Derricks, All; Derrick Boats; Derricks, Traveling; Dredges;
Elevators, Outside type Rack & Pinion and Similar Machines; Formless
Curb and Gutter Machine; Grader, Elevating; Grader, Motor Grader,
Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard
Rail Post Driver Truck Mounted; Hoists, One, Two and Three Drum; Heavy
Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes;
Backhoes with shear attachments up to 40' of boom reach; Lubrication
Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig;
Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill - Crawler or Skid
Rig; Rock Drill - Truck Mounted; Rock/Track Tamper; Roto Mill
Grinder; Slip-Form Paver; Snow Melters; Soil Test Drill Rig (Truck
Mounted) ; Straddle Buggies; Hydraulic Telescoping Form (Tunnel) ;
Operation of Tieback Machine; Tractor Drawn Belt Loader; Tractor
Drawn Belt Loader (with attached pusher - two engineers) ; Tractor with
Boom; Tractaire with Attachments; Traffic Barrier Transfer Machine;
Trenching; Truck Mounted Concrete Pump with Boom; Raised or Blind Hole
Drills (Tunnel Shaft) ; Underground Boring and/or Mining Machines 5
ft. in diameter and over tunnel, etc; Underground Boring and/or Mining
Machines under 5 ft. in diameter; Wheel Excavator; Widener (APSCO) .
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers; Car Loader Trailing Conveyors; Combination Backhoe Front
Endloader Machine (Less than 1 cu. yd. Backhoe Bucket or over or with
attachments) ; Compressor and Throttle Valve; Compressor, Common
Receiver (3) ; Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S Series to and including 27 cu.
ft. ; Concrete Spreader; Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck
Cars (Haglund or Similar Type) ; Drills, All; Finishing Machine -
Concrete; Highlift Shovels or Front Endloader; Hoist - Sewer Dragging
Machine; Hydraulic Boom Trucks (All Attachments) ; Hydro-Blaster; Hydro
Excavating (excluding hose work) ; Laser Screed; All Locomotives,
Dinky; Off-Road Hauling Units (including articulating) Non
Self-Loading Ejection Dump; Pump Cretes: Squeeze Cretes - Screw Type
Pumps, Gypsum Bulker and Pump; Roller, Asphalt; Rotary Snow Plows;
Rototiller, Seaman, etc. , self-propelled; Self-Propelled Compactor;
Spreader - Chip - Stone, etc. ; Scraper - Single/Twin Engine/Push and
Pull; Scraper - Prime Mover in Tandem (Regardless of Size) ; Tractors
pulling attachments, Sheeps Foot, Disc, Compactor, etc. ; Tug Boats.
Class 3. Boilers; Brooms, All Power Propelled; Cement Supply Tender;
Compressor, Common Receiver (2) ; Concrete Mixer (Two Bag and Over) ;
Conveyor, Portable; Farm-Type Tractors Used for Mowing, Seeding, etc. ;
Forklift Trucks; Grouting Machine; Hoists, Automatic; Hoists, All
Elevators; Hoists, Tugger Single Drum; Jeep Diggers; Low Boys; Pipe
Jacking Machines; Post-Hole Digger; Power Saw, Concrete Power Driven;
Pug Mills; Rollers, other than Asphalt; Seed and Straw Blower; Steam
Generators; Stump Machine; Winch Trucks with "A" Frame; Work Boats;
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 21 of 22
Tamper-Form-Motor Driven.
Class 4 . Air Compressor; Combination - Small Equipment Operator;
Directional Boring Machine; Generators; Heaters, Mechanical; Hydraulic
Power Unit (Pile Driving, Extracting, or Drilling) ; Light Plants, All
(1 through 5) ; Pumps, over 3" (1 to 3 not to exceed a total of 300
ft. ) ; Pumps, Well Points; Vacuum Trucks (excluding hose work) ; Welding
Machines (2 through 5) ; Winches, 4 Small Electric Drill Winches.
Class 5. SkidSteer Loader (all) ; Brick Forklifts; Oilers.
Class 6. Field Mechanics and Field Welders
Class 7. Dowell Machine with Air Compressor; Gradall and machines of
like nature.
SURVEY WORKER - Operated survey equipment including data collectors,
G.P.S. and robotic instruments, as well as conventional levels and
transits.
TRUCK DRIVER - BUILDING, HEAVY AND HIGHWAY CONSTRUCTION
Class 1. Two or three Axle Trucks. A-frame Truck when used for
transportation purposes; Air Compressors and Welding Machines,
including those pulled by cars, pick-up trucks and tractors;
Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck
Washers; Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics
Helpers and Greasers; Oil Distributors 2-man operation; Pavement
Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;
Self-propelled Chip Spreader; Skipman; Slurry Trucks, 2-man
operation; Slurry Truck Conveyor Operation, 2 or 3 man; Teamsters;
Unskilled Dumpman; and Truck Drivers hauling warning lights,
barricades, and portable toilets on the job site.
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self-loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards;
Ready-mix Plant Hopper Operator, and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self-loading equipment or similar
equipment over 16 cubic yards; Explosives and/or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1-man operation; Pole Trailer, over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long; Slurry
trucks, 1-man operation; Winch trucks, 3 axles or more;
Mechanic--Truck Welder and Truck Painter.
Class 4. Six axle trucks; Dual-purpose vehicles, such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front.
ORDINANCE 2014-PW-WPA-EX2-S-1401
Prevailing Wages
Page 22 of 22
TERRAZZO FINISHER
The handling of sand, cement, marble chips, and all other materials
that may be used by the Mosaic Terrazzo Mechanic, and the mixing,
grinding, grouting, cleaning and sealing of all Marble, Mosaic, and
Terrazzo work, floors, base, stairs, and wainscoting by hand or
machine, and in addition, assisting and aiding Marble, Masonic, and
Terrazzo Mechanics.
Other Classifications of Work:
For definitions of classifications not otherwise set out, the
Department generally has on file such definitions which are available,
If a task to be performed is not subject to one of the
classifications of pay set out, the Department will upon being
contacted state which neighboring county has such a classification and
provide such rate, such rate being deemed to exist by reference in
this document. If no neighboring county rate applies to the task,
the Department shall undertake a special determination, such special
determination being then deemed to have existed under this
determination. If a project requires these, or any classification not
listed, please contact IDOL at 217-782-1710 for wage rates or
clarifications.
LANDSCAPING
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by landscape
plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers (regardless of size of truck driven) is
covered by the classifications of truck driver.
MATERIAL TESTER & MATERIAL TESTER/INSPECTOR I AND II
Notwithstanding the difference in the classification title, the
classification entitled "Material Tester I" involves the same job
duties as the classification entitled "Material Tester/Inspector I".
Likewise, the classification entitled "Material Tester II" involves
the same job duties as the classification entitled "Material
Tester/Inspector II".