Loading...
2800 Meyers Rd. Demolition and Site Clearance Project PGS OF oAk 09 Village of Oak Brook 0 2800 Meyers Road Building Demolition `coand Site Clearance 9� 8UN'i`I+ Bid Package August 2019 Table of Contents Section A. Notice to Bidders B. Bid C. Instructions D. Specifications E. General Conditions F. Statement of Contractor's Qualifications G. References H. Bid Certification I. Contract J. Contract Bond K. Figures L. Appendix j:\worddoc\bid packages\2019 bid packages\2800 meyers demolition and site clearance final.docx Section A Notice to Bidders Posted on the Village website on Tuesday, August 20, 2019: The Village of Oak Brook will receive bids for: 2800 Meyers Road Building Demolition and Site Clearance A Pre-Bid meeting and site visit will be held at 10:00 a.m. on Tuesday, August 27 2019. at 2800 Meyers Road, Oak Brook, IL, 60523. Attendance at this meeting is strongly recommended. The purpose of the meeting is to give all prospective bidders the opportunity to inspect the exterior conditions of the building and site. The building will not be open for interior inspection. Any questions or concerns can be addressed at this time. Sealed bids will be received by Rania Serences, Senior Purchasing Assistant, Village of Oak Brook, 1200 Oak Brook Road, Oak Brook, IL 60523 until 11:00 A.M., Tuesday, September 3, 2019, prevailing time, and publicly opened in the Samuel E. Dean Board Room at that time. No bids will be accepted after this time and date. Bids received after this date and time will be returned to the sender unopened. A complete bid package, of which this legal notice is a part, is on file for inspection and may be downloaded from the Village's website www.oak-brook.org or picked up at the Butler Government Center, 1200 Oak Brook Road, Oak Brook, Illinois 60523, between the hours of 8:00 A.M. and 4:30 P.M. Monday through Friday. There is no charge for the package. No bid shall be withdrawn after opening of bids without the consent of the Village of Oak Brook for a period of ninety(90) days after the scheduled time of opening bids. The Village of Oak Brook reserves the right to reject any or all bids and to waive any informalities in bidding and to accept the bid deemed most advantageous to it. Charlotte K. Pruss Village Clerk Section B Bid 2800 Meyers Road Building Demolition and Site Clearance 1. COST OF WORK: I The undersigned, acting for and on behalf of contractor and having familiarized himself with conditions affecting the cost of the work and its performance and having carefully examined and fully understood the entire bid package, hereby affirms and agrees to enter into a contract with the Village of Oak Brook, Oak Brook, IL. To provide all supervision, labor, material, equipment and all other expense items to completely perform the work covered by all specifications for the work. The undersigned submits herewith his bid for the indicated item as follows: { Complete the 2800 Meyers Road Building Demolition and Site Clearance as contained in Section D: Lump Sum Total $$26.500 in Words Twenty-Six Thousand Five Hundred Dollars I VInWords Itemate, the bidder shall s bmit a separate price fo stment of storm st ur�e(s)as needed to et a finish grades of t site. Unit Co t$ /Structure As an alternate, the bidder shall submit a separate price for furnishing and placing additional clean fill as needed to meet the finish grades of the site. Unit Cost$ /Cubic Yard In Words i Page 1 The Village of Oak Brook reserves the right to reject any or all bids and to waive any informalities in bidding and to accept the bid deemed most advantageous to it. 2. COSTS: The undersigned contractor hereby affirms and states the prices quoted herein constitute the total cost to the Village for all work involved in the respective items and that this cost also includes all insurance, royalties, transportation charges, use of all tools and equipment, superintendence, overhead expense, all profits and all other work, services and conditions necessarily involved in the work to be done and materials to be furnished in accordance with the requirements of the contract documents considered severally and collectively. This bid shall be held valid for a period of ninety(90)days after the bid due date. 3. INSTRUCTIONS: The undersigned contractor shall comply with all provisions and requirements of this Bid Package. 4. TIME 4F C MOLETION The undersigned affirms and declares that if awarded the contract for this work he will completely perform said contract in strict accordance with its terms and conditions byNovember 30, 2019„ less additional time shall be granted by the Village in accordance with the provision of the specifications. Should the contractor fail to complete the work by said date or within such extended time as may have been allowed, the contractor shall be liable to the Village in the amount set forth in the specifications. 5. BID GUARANTEE: N/A Page 2 Firm Name: im lee Removal & Trucking Inc Address: P 0 Box 12472 City, State, ZIP: Chicago Illinois 60612 Signature: Name Printed: Shantelle Lee Title President Telephone: 708-714-6808 Date: 11-11-2019 If a Corporation: ATTEST: crery Page 3 Section C Instructions 1. RECEIPT OF BID: Tuesday, September 3, 2019 at 11:00 am. 2. BASIS OF BID: Sealed bids will be received until the above noted time and date. 3. PROJECT DESCRIPTION: 2800 Meyers Road Building Demolition and Site Clearance. 4. PREPARATION AND SUBMISSION OF BID: A. A Pre-Bid meeting and site visit will be held at 10.00 a.m. on Tuesday August 27, 2019, at 2800 Meyers Road, Oak Brook, IL, 60523. . Attendance at this meeting is strongly recommended. The purpose of the meeting is to give all prospective bidders the opportunity to inspect the exterior conditions of the building and site. The building will not be open for interior inspection. Any questions or concerns at this time shall be submitted to the Village of Oak Brook in written form for a response to be distributed to all represented entities. B. The bid must be delivered to the office of the Senior Purchasing Assistant, Village of Oak Brook, 1200 Oak Brook Road, Oak Brook, IL 60523 on or before Tuesday. Seatember 3, 2019, at 11:00 A.M., prevailing time, at which time it will be publicly opened and read in the S. E. Dean Board Room of the Village Hall. Bids received after this time will not be considered and will be returned unopened. C. The bid shall be submitted on the exact form furnished. All blank spaces for bid price, unit cost and alternates must be filled in--in ink--in both words and figures (as stipulated). In case of any discrepancy in the amount proposed, the prices expressed in written words shall govem. D. A complete bid package must be submitted, including the following items: 1. Bid. 2. Statement of Qualifications. 3. References 4. Bid Certification E. The Contract and Contract Bond(Performance and Payment)are provided as information, and will be completed only upon acceptance of the bid by the Village. The surety company issuing the Contract Bond must be listed and approved by the U.S. Department of the Treasury. Letters of Credit will not be accepted in place of the Contract Bond. F. Separate sheets may be attached to the bid for the purpose of explanation, exception, alternate bid and to cover the unit price, if needed. G. In submitting this bid, the contractor further declares that the only person or party interested in the bid as principals are those named herein, and that the bid is made without collusion with any other person, firm or corporation. Page 1 H. The contractor further declares that he has carefully examined this entire Bid Package and he has inspected in detail the site of the proposed work, and that he has familiarized himself with all of the local conditions affecting the contract and the detailed requirements of this work and understands that in making the bid he waives all rights to plead a misunderstanding regarding same. I. The contractor further understands and agrees that if his bid is accepted, he is to furnish and provide all necessary machinery, tools, apparatus, and other means to do all of the work and to furnish all of the materials specified in the contract, except such materials as are to be furnished by the Village of Oak Brook in the manner and at the time therein prescribed, and in accordance with the requirements therein set forth. J. The contractor declares that he understands that the quantities listed on the Bid are approximate only and that they are subject to increase or decrease; and that he will take in full payment thereof the amount and the summation of the actual quantities, as fully determined by the Village. K. The contractor further agrees that the price submitted within the bid is for the purpose of obtaining a gross sum, and for use in computing the value of extras and deductions. If there is a discrepancy between the gross sum bid and that resulting from the summations of the quantities multiplied by the unit price, the latter shall apply. L. The contractor further agrees that if the Village decides to extend or shorten the work, or otherwise alter it by extras or deductions, including elimination of one or more of the items, as provided in the specifications, he will perform the work as altered, increased or decreased, at the contract unit price. M. The contractor further agrees that the Village representative may at any time during the progress of the work covered by this Contract, order other work or materials incidental thereto and that all such work and materials as do not appear in the bid or contract as a specific item covered by a lump sum price, and which are not included under the bid price for other items in the Contract, shall be performed as extra work, and compensation shall be as set forth in the specifications. N. The contractor further agrees to execute all documents within this Bid Package, obtain a Certificate of Insurance for this work and present all of these documents within fifteen (15) days after the receipt of the Notice of Award and the Contract by him. O. The contractor further agrees that he and his surety will execute and present within fifteen (1 5) clays iftfter the receipt of the Notice of Award and the Contract, a Contract-bored satisfactory to and in ther form prescribed by the Village, in the penal amount of 100,%, of the Contract amount,,guararrteeing the faithful performance of the work`and payment for tabor, mater at su lies,"and' -sub ntractors in accordance with the terms of the Contract. P. The contractor further agrees to begin worm not later than ten(10)days after receipt of the Notice to Proceed, unless otherwise provided, and to execute the work in such a manner and with sufficient materlals;,equipment and labor as will insure its completion within the time limit specified within the Bid, it being understood andagreedthat the completion within the time limit is an essential part of the contract. Page 2 Q. By submitting a Bid, the contractor understands and agrees that, if his bid is accepted, and he fails to enter into a contract forthwith, he shall be liable to the Village for any damages the Village may thereby suffer. R. No bid will be considered unless the party offering it shall furnish evidence satisfactory to the Village that he has necessary facilities, ability and pecuniary resources to fulfill the conditions of the Contract. S. If the contractor is in doubt as to the true meaning of any part of the plans, specifications or other proposed contract documents, he may submit to the Building Official a written request for an interpretation thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation of the documents will be made only by addendum duly issued by the Village. The Village will not be responsible for any other explanation or interpretation of the Bid Package. 5. SUBSTITUTIONS: A. Certain materials and equipment are specified by a manufacturer or trade name to establish standards of quality and performance and not for the purpose of limiting competition. Bidders are invited to submit bids not only on named items but also on items , which they propose for substitution of named items. Products of other manufacturers'May, be substituted, if, in the opinion of the Village, they are equal to those specified in quality, performance, design and suitability for intended use. Where two or more items are specified, the selection among those specified is the bidder's option, or he may submit his bid on all such items. B. Bids shall be based on materials included in the specifications. Substitutions for the purpose of evaluating bids will be considered only if proposed substitutions are set forth in the sealed bid and will only be accepted prior to the award of the contract. The offer of substitutions shall be an integral part of the bid, appearing immediately after all requested bids and before the signature of the bidder. C. Substitutions of materials other than those specified will not be considered in the base bid price. However, other substitutions may be listed in the specified place in the Bid Form, with the indication of the change in the base bid price for the total cost. D. In addition to the requirements heretofore mentioned, in order for substitutions to qualify for consideration, the following shall accompany each bid: 1. Each proposed substitution shall be itemized showing manufacturer name, catalog number, quantity, unit cost and total cost. The bidder shall prepare the necessary forms to list his substitutions in the manner outlined. 2. Each bid offering substitutions shall be accompanied by descriptive literature, catalog data, complete technical specifications and reports of all pertinent tests concerning the bidder's proposed substitutions Page 3 6. BASIS OF AWARD: The Village of Oak Brook reserves the right to reject any or all bids and to waive any informality or technical error and to accept any bid deemed most favorable to the interests of the Village of Oak Brook. In addition to price, the Village will consider: A. Ability, capacity and skill to fulfill the contract as specified. B. Ability to supply the commodities, provide the services or complete the construction promptly, or within the time specified, without delay or interference. C. Character, integrity, reputation, judgment, experience and efficiency. D. Quality of performance on previous contracts. E. Previous and existing compliance with laws and ordinances relating to the contract. F. Sufficiency of financial resources. G. Quality, availability and adaptability of the commodities, services or construction, in relation to the Village's requirements. H. Ability to provide future maintenance and service under the contract. I. Number and scope of conditions attached to the bid/proposal. J. Record of payments for taxes, licenses or other monies due the Village 7. CONDITIONS: The Village is exempt from Federal excise tax (#36-600-9534) and the Illinois Retailer's Occupation Tax(#E99974381). This bid cannot include any amounts of money for these taxes. 8. WARRANTY: Included in Section D, Specifications. 9. PAYMENT: The Village of Oak Brook authorizes the payment of invoices on the second and fourth Tuesday of the month. For consideration on one of these dates, ppymenf`request must be received no dater than fourteen(14) days prior to the second or fourth Tuesday of the month. 10. INDEMNIFICATION: Page 4 The Contractor shall protect, indemnify, save, defend and hold forever harmless the Village and/or its officers, officials, employees, volunteers and agents from and against all liabilities, obligations,claims,damages, penalties,causes of action, costs and expenses, including without limitation court costs, insurance deductibles and attorney's fees and expenses,which the Village and/or its officers, officials, employees, volunteers and agents may incur, suffer or sustain, or for which the Village and/or its officers, employees and agents may become obligated by reason for any accident, injury to or death of persons or loss of or damage to property, or civil and/or constitutional infringement of rights (specifically including violations of the Federal Civil Right Statutes), arising indirectly or directly in connection with or under, or as a result of, this or any Agreement by virtue of any act or omission of any of the Contractor's officers, employees, subcontractors, and/or agents, provided that the Contractor shall not be liable for claims, obligations, damages, penalties, causes of action, costs and expenses arising solely by any act or omission of the Village's officers, officials, employees, volunteers and/or agents. The contractor shall hold the Village harmless for any and all claims for labor, material, apparatus, equipment, fixtures or machinery furnished to the contractor for the purpose of performing the work under the contract; and the payment of all direct and indirect damages to any person, firm, company or corporation suffered or sustained on account of the performance of such work during the time the contract is in force. 11. INSURANCE: Certificates of Insurance shall be presented to the Village within fifteen(15)days after the receipt by the contractor of the Notice of Award and the unexecuted contract, it being understood and agreed that the Village will not approve and execute the contract until acceptable insurance certificates are received and approved by the Village. Each contractor performing any work pursuant to a contract with the Village of Oak Brook and each permittee working under a permit as required pursuant to the provisions of Title 1 of Chapter 8 of the Code of Ordinances of the Village of Oak Brook (hereinafter referred to as "Insured") shall be required to carry such insurance as specified herein. Such contractor and permittee shall procure and maintain for the duration of the contract or permit insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work under the contract or permit, either by the contractor, permittee, or their agents, representatives, employees or subcontractors. A contractor or permittee shall maintain insurance with limits no less than: A. General Liability - $2,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage, provided that when the estimated cost of the work in question does not exceed $5,000, the required limit shall be $500,000; B. Automobile Liability (if applicable) - $1,000,000 combined single limit per accident for bodily injury and property damage; C. Worker's Compensation and Employer's Liability "- Worker's Compensation limits as required by the Labor Code of the State of Illinois and Employer's Liability limits of $1,000,000 per accident. Page 5 Any deductibles or self-insured retention must be declared to and approved by the Village. At the option of the Village, either the insurer shall reduce or eliminate such deductible or self- insured retention as respects the Village, its officers, officials, employees and volunteers; or the Insured shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses to the extent of such deductible or self-insured retention. The policies shall contain, or be endorsed to contain, the following provisions: D. General Liability and Automobile Liability Coverage- (1) The Village, its officers, officials, employees and volunteers are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of the Insured; premises owned, occupied or used by the Insured. The coverage shall contain no special limitations on the scope of protection afforded to the Village, its officers, officials, employees, volunteers, or agents. (2) The Insured's insurance coverage shall be primary insurance as respects the Village, its officers, officials, employees, volunteers and agents. Any insurance or self-insurance maintained by the Village, its officers, officials, employees, volunteers or agents shall be in excess of the Insured's insurance and shall not contribute with it. (3) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Village, its officers, officials, employees, volunteers or agents. (4) The Insured's insurance shall apply separately to each covered party against whom claim is made or suit is brought except with respect to the limits of the insurer's liability. E. Worker's Compensation and Employer's Liability Coverage The policy shall waive all rights of subrogation against the Village, its officers, officials, employees, volunteers and agents for losses arising from work performed by the insured for the Village. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail has been given to the Village. Each insurance policy shall name the Village, its officers, officials and employees, volunteers and agents as additional Insureds. Insurance is to be placed with insurers with a Best's rating of no less than A: VII. Each Insured shall furnish the Village with certificates of insurance and with original endorsements effecting coverage required by this provision. The certificate and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be on forms approved by the Village and shall be subject to approval by the Village Attorney before work commences. The Village reserves the right to require complete, certified copies of all required insurance policies, at any time. Page 6 Each insured shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. 12. SAFETY: The contractor and any subcontractors shall comply with all the provisions of the Federal Occupational Safety and Health Act of 1970 (84 Stat. 1590), as amended. 13. EQUAL OPPORTUNITY: The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, ancestry, national origin, place of birth, age or handicap unrelated to bona fide occupational qualifications. 14. PREVAILING RATE OF WAGES: All wages paid by the Contractor and each subcontractor shall be in compliance with The Prevailing Wage Act (820 ILCS 130), as amended, except where a prevailing wage violates a federal law, order, or ruling, the rate conforming to the federal law, order, or ruling shall govern. The Contractor shall be responsible to notify each subcontractor of the wage rates set forth in this contract and any revisions thereto. If the Department of Labor revises the wage rates, the revised rate as provided by the public body shall apply to this contract and the Contractor will not be allowed additional compensation on account of said revisions. Contractor will comply with the Illinois prevailing wage law, as amended from time to time. Not less than the prevailing rate of wages as found by Village of Oak Brook or the Illinois Department of Labor shall be paid to all laborers, workers and mechanics performing work under the Contract. If the Department of Labor revises the prevailing rate of wages to be paid laborers, workers or mechanics under the Contract, Village of Oak Brook will notify Contractor and each Subcontractor of the change in the prevailing rate of wages; provided, however, regardless of whether Village of Oak Brook gives such notice, the revised prevailing rate of wages shall apply to the Contract and Contractor shall have the sole responsibility and duty to pay, and ensure that all Subcontractors pay, the revised prevailing rate of wages to each person to whom a revised rate is applicable. Revision of the prevailing wages shall not result in an increase in the Contract sum or other cost to Village of Oak Brook. Contractor shall indemnify, defend and hold Village of Oak Brook harmless from any loss, including but not limited to Village of Oak Brook's attorney's fees, resulting from Contractor's failure to comply with this prevailing wage clause. All bonds applicable to the Contract shall include a provision as will guarantee the faithful performance of the obligation to pay the prevailing rate of wages. The Contractor and each subcontractor shall make and keep, for a period of not less than 3 years, records of all laborers, mechanics, and other workers employed by them on the project; the records shall include each worker's name, address, telephone number when available, social security number, classification or classifications, the hourly wages paid in each period, the number of hours worked each day, and the starting and ending times of work each day. The Contractor and each subcontractor shall submit monthly, in person, by mail, or electronically a certified payroll to the public body in charge of the project. The Page 7 certified payroll shall consist of a complete copy of the records. The certified payroll shall be accompanied by a statement signed by the contractor or subcontractor which states that: (i) such records are true and accurate; (ii) the hourly rate paid to each worker is not less than the general prevailing rate of hourly wages required; and (iii) the contractor or subcontractor is aware that filing a certified payroll that he or she knows to be false is a Class B misdemeanor. Upon 2 business days' notice, the contractor and each subcontractor shall make available for inspection the records to the public body in charge of the project, its officers and agents, and to the Director of Labor and his deputies and agents at all reasonable hours at a location within this State. The Contractor and each subcontractor shall permit his/her employees to be interviewed on the job, during working hours, by compliance investigators of the Department or the Department of Labor. 15. COPIES OF DOCUMENTS The number of copies of Contract and Bond required to be executed is as follows: a)Two (2) original counterparts of the Contract documents will be required to be executed. 16. EXECUTION OF DOCUMENTS The Contractor, in signing his Bid on the whole or on any portion of the work, shall conform to the following requirements: A Bid signed by an individual other than the individual represented in the Bid documents shall have attached thereto a power of attorney evidencing authority to sign the Bid in the name of the person for whom it is signed. A bid signed for a partnership shall be signed by all of the partners or by an attomey-in-fact. If signed by an attorney-in-fact,there shall be attached to the Bid a power of attorney evidencing authority to sign the bid, executed by the partners. A bid signed for a corporation, shall have the correct corporate name thereof and the signature of the President or other authorized officer of the corporation manually written below the corporate name. If such Bid is manually signed by an official other than the President of the Corporation, a certified copy of a resolution of the board of directors evidencing the authority of such official to sign the Bid should be attached to it. Such Bid shall also bear the attesting signature of the Secretary of the corporation and the impression of the corporate seal. The Contract shall be deemed as have been awarded when formal notice of award shall have been duly served upon the intended awardee. 17. NON-DISCRIMINATING: Page 8 The Vendor, its employees and subcontractors, agrees not to commit unlawful discrimination and agrees to comply with applicable provisions of the Illinois Human Rights Act, the U.S. Civil Rights Act and Section 504 of the Federal Rehabilitation Act, and rules applicable to each. 18. INDEPENDENT CONTRACTOR: There is no employee/employer relationship between the CONTRACTOR and the VILLAGE. CONTRACTOR is an independent contractor and not the VILLAGE'S employee for all purposes, including, but not limited to, the application of the Fair Labors Standards Act minimum wage and overtime payments, Federal Insurance Contribution Act, the Social Security Act, the Federal Unemployment Tax Act, the Worker's Compensation Act (820 ILCS 305/1, et seq.). The VILLAGE will not (i) provide any form of insurance coverage, including but not limited to health, worker's compensation, professional liability insurance, or other employee benefits, or(ii) deduct any taxes or related items from the monies paid to CONTRACTOR. The performance of the services described herein shall not be construed as creating any joint employment relationship between the CONTRACTOR and the VILLAGE, and the VILLAGE is not and will not be liable for any obligations incurred by the CONTRACTOR, including but not limited to unpaid minimum wages and/or overtime premiums, nor does there exist an agency relationship or partnership between the VILLAGE and the CONTRACTOR. 19. ASSIGNMENT Neither the VILLAGE nor the CONTRACTOR shall assign or transfer any rights or obligations under this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld. 20. GOVERNING LAW This Agreement shall be governed by the laws of the State of Illinois as to interpretation, performance and enforcement. The forum for resolving any disputes concerning the parties' respective performance or failure to perform under this Agreement shall be the Circuit Court for the Eighteenth Judicial Circuit, DuPage County, Illinois. Page 9 Section D Specifications 2800 Meyers Road, Building Demolition and Site Clearance PART 1 - GENERAL 1.1 SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial Village of Oak Brook occupancy during the work, coordination with other work and the phasing of the work. In the event the Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Village of Oak Brook for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. 1.1.2 EXTENT OF WORK' A. In general the work shall indtude! a. The court-ordered removal and disposal of the building located at 2800 Meyers Road, Oak Brook, Illinois along with the grading and seeding of the site. b. The court-ordered removal of allmaterials-and vehicles on the premises located at 2800 Meyers Road, Oak Brook, Illinois. c: Removal of the existing damaged acid'deteriorated driveway, with restoration, including;grading and seeding of the site. 1.1.3 RELATED WORK A. Section not used. 1.1.4 TASKS The work tasks for the demolition of 2800 Meyers Road, Oak Brook, Illinois are summarized briefly as follows: A. Comply with all environmental requirements as applicable. B. Remove existing utility service lines in accordance with the Village code and the requirements of the individual utilities. If the individual utility requires that the removal of its service line must be done by the utilities personnel, the Contractor shall coordinate the removal work with the utility. C. Remove and dispose of the buildings (including the primary structure and all sheds/outbuildings) and contents of 2800 Meyers Road, Oak Brook, Illinois including the foundation(s). Page 1 D. Remove of the existing damaged and deteriorated driveway, with restoration, including grading and seeding of the site. E. Weeds and Grass: Weeds and grass shall conform to international property maintenance code section 302.4 as adopted and amended within this title. F. Grade the site as shown on the plans. Provide additional clean fill if required. G. Provide 4 inches of top soil for the disturbed portion of the site and seed in accordance with the specifications. 1.1.5 CONTRACTOR USE OF PREMISES A. The Contractor and Contractor's personnel shall cooperate fully with the Village of Oak Brook's representative/consultant to facilitate efficient use of buildings and areas within building. The Contractor shall perform the work in accordance with the Village of Oak Brook's specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local regulations and requirements. B. The Contractor shall minimize the disruption of access to the adjacent office buildings with trucks and equipment needed for completion of this project. 1.2 APPLICABLE CODES AND REGULATIONS 1.2.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS A. All work under this contract shall be done in strict accordance with all applicable Federal, State, and local regulations. All applicable codes, regulations and standards are adopted into this specification and will have the same force and effect as this specification. B. The most recent edition of any relevant regulation, standard, document or code shall be in effect. Where conflict among the requirements or with these specifications exists, the most stringent requirement(s) shall be utilized. C. Asbestos removal and disposal shall be in accordance with the latest NESHAP and IEPA regulations for building demolition. 1.2.2 PERMITS/LICENSES A. The Contractor shall obtain and pay for all required permits and licenses to perform the work as required by Federal, State, and Local regulations. Village of Oak Brook permits shall be required. B. The Contractor shall notify NESHAP at least 10 working days prior to the start of demolition. 1,,2,3 POSTING AND FILING OF REGULATIONS A. Maintain twp (2)copies of applicable federal, PP state, and local regulations. Post one copy of each at tha regulated area where workers will have daily access to the regulations and keep another copy in-the Contractor's office. 1.3 VILLAGE OF OAK BROOK'S RESPONSIBILITIES Prior to commencement of work: A. The Village of Oak Brook shall provide the Contractor with Village of Oak Brook permit application forms and addresses of adjacent properties for owner notification. Page 2 1.4 PRE-CONSTRUCTION MEETING Prior to commencing the work, the Contractor shall meet with the Village of Oak Brook's representative to present and review, as appropriate, the project schedule, safety requirements submittals and access to the work area. 1.5 PROJECT COORDINATION The Contractor shall coordinate with the Village of Oak Brook's representative, utility representatives and Federal, State and Local regulators regarding the project schedule, safety requirements and submittals. PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT 2.1 MATERIALS AND EQUIPMENT 2.1.1 GENERAL REQUIREMENTS Prior to the start of work, the contractor shall provide and maintain a sufficient quantity of materials and equipment to assure continuous and efficient work throughout the duration of the project. Work shall not start unless the following items have been delivered to the site and verification has been submitted to the Village of Oak Brook's representative. A. All materials shall be delivered in their original package, container or bundle bearing the name of the manufacturer and the brand name (where applicable). B. Store all materials subject to damage off the ground, away from wet or damp surfaces and under cover sufficient enough to prevent damage or contamination. Flammable and combustible materials cannot be stored inside buildings. C. The Contractor shall not block or hinder use of buildings by staff, and visitors to the Village of Oak Brook's building by placing materials/equipment in any unauthorized location. D. The Village of Oak Brook's representative shall inspect for damaged, deteriorating or previously used materials. Such materials shall not be used and shall be removed from the worksite and disposed of properly. E. Adequate and appropriate PPE for the project and number of personnel/shifts shall be provided. All personal protective equipment issued must be based on a written hazard assessment in accordance with OHSA requirements. 2.2 SUBMITTALS 2.2.1 PRE-CONSTRUCTION MEETING SUBMITTALS Submit to the Village of Oak Brook a minimum of 14 days prior to the pre-start meeting the following for review and approval. Meeting this requirement is a prerequisite for the pre-construction meeting for this project: A. Submit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. B. Submit a staff organization chart showing all personnel who will be working on the project and their capacity/function. Page 3 PART 3 - EXECUTION 3.1 BUILDING REMOVAL AND DISPOSAL 3.1.1 REMOVAL OF EXISTING HAZARDOUS MATERIALS There are no known hazardous materials in regulated quantities on this site. Should any hazardous materials be identified, the Contractor shall comply with all applicable hazardous material removal/remediation requirements, including- but not limited to- asbestos and lead. The Contractor is solely responsible for determining, verifying, and complying with all applicable requirements. 3.1.2 REMOVAL OF EXISTING UTILITY SERVICE LINES A. All existing utility service lines including water, sewer, electric, natural gas, telephone and storm sewer shall be removed in accordance with the individual utility's requirements and in accordance with all Federal, State and Local requirements. Disposal of all materials shall be in accordance with all governmental agency requirements. The Contractor shall be responsible for the notification to each of the utilities regarding the disconnection and removal of the service line. 3.1.3 REMOVAL AND DISPOSAL OF THE BUILDING MATERIAL AND OTHER ITEMS A. The Contractor shall remove and properly dispose of all foundation, building material, and building contents material and other debris. During the demolition and disposal process, water shall be constantly sprayed on the building to reduce the dust from the process. Water shall be obtained from the nearest hydrant or by water truck.Water trucks may be filled at the Village of Oak Brook Public Works hydrant, 3003 Jorie Boulevard. There shall be no charge for this water by the Village but the approximate quantity used shall be provided to the Village. B. Abandoned motor vehicles shall be removed from site and disposed of in a legal manner. 3.1.4 ADJUSTMENT OF STORM SEWER STRUCTURES No storm sewer structures are anticipated to require adjustment in the performance of this project. Should any adjustment be required, the Village of Oak Brook shall provide specifications for additional work- to be bid as an alternate. The Contractor is to immediately notify the Village of Oak Brook for authorization. Implementation of this alternate must have prior written approval from the Village of Oak Brook. 3.1.5 SITE GRADING After the demolition and removal of the building,the site shall be graded to slope as shown on the plans. The Contractor shall provide any additional fill necessary beyond the material that is available on the site. The cost for this additional fill shall be paid for at the unit price for additional fill. 3.7.3 SITE RESTORATION After the rough grading is complete, the disturbed area shall receive a 4-inch layer of top soil to meet the final grade elevations. The site shall be seeded with the Prairie Moon Nursery Wet Prairie mix. This seed mix contains a variety of native grasses, forbs Page 4 and wild flowers that adapt to both wet and dry conditions. The seed mix is shown in Appendix B. 3.7.3 WORK HOURS All work shall be done during the work hours detailed in Appendix D. Any change in the work schedule must have prior written approval from the Village of Oak Brook. 3.7.4 WARRANTY All material and workmanship shall be warranted against defects in material and labor for 1 year after acceptance of the project by the Village of Oak Brook Page 5 Section E General Conditions 1. Contractor shall have five (5) years of experience which is comparable in type and scope to this project. 2. All work shall be done during the work hours detailed in Appendix D. Any change in the work schedule must have prior written approval from the Village of Oak Brook. 3. The project will be done on consecutive work days until completed, delays only to inclement weather or act of God. 4. Contractor is required to obtain all necessary permits from the Village of Oak Brook, and schedule required inspections through Community Development. 5. The contractor shall supply to the Village, phone numbers where he/she can be reached after normal working hours. 6. The contractor shall post a Village of Oak Brook supplied sign- in a prominent and readily visible location- that provides 24-hour contact information. 7. The contractor must submit with the bid proposal five (5) references, names and phone numbers of similar projects completed within the last two (2) years. 8. The contractor must submit all manufacturers' literature on all materials that will be used on this project, including M.S.D.S. (Material Safety Data Sheets) prior to any work beginning. 9. A storage location for supplies, ladders and scaffolding shall be mutually agreed upon between the Village and the contractor before any material is stored on site. Deliver material with manufacturers labels intact and legible, store material on raised platforms and cover material with protective covering. 10.Before work is started, deliver to the job site sufficient material to complete the project. 11.If a dumpster is required, the location of the dumpster placement shall be mutually agreed upon between the Village and the contractor. 12.All ladders and scaffolding shall be maintained during the course of this project and shall be secured at the end of each workday. 13.Provide barricades to ensure that falling debris will not injure anyone, and to prevent public access to the work area at all times. Yellow "CAUTION" tape will be placed below the immediate work areas of laborers and scaffolds to warn the public of men working overhead. 14.At all times the work and storage areas shall be kept in a clean, orderly, and a picked up manner, to prevent debris from blowing. Clean adjoining streets and immediate vicinity at the end of each work day. Sidewalks, windowsills, roofs and other work areas will be broom swept to remove all debris. Daily material and debris not placed into dumpster will be removed from the site. Page 6 15.Upon completion of the project the work area shall be cleaned. All debris and remaining material and supplies shall be removed from the jobsite, including the dumpster within 72 hours of completion. 16.Upon completion the Contractor shall supply a one year warranty covering material and workmanship; contractor shall submit sample warranty with bid. Page 7 Section F Statement of Contractor's Qualifications All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets.The Contractor may submit any additional information he or she desires. 1. Name of Contractor: Simplee Removal &Trucking Inc. 2. Permanent main office address: 1603 St. Charles Rd. Maywood IL 60153 3. When organized:October 2011 4. If a corporation,where incorporated: Illinois 5. How many years have you been engaged in the contracting business under your present firm or trade name: 7 6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion) 7. General character of work performed by your company: Wnrk ;s nprfnr Pci in a substantial workmanlike performance to the client's satisfactr n. 8. Have you ever defaulted on a contract: No 9. List, on an attached sheet, the more important projects recently completed by your company, stating the approximate cost for each, and the month and year completed. Include a contact person and phone#for each. 10. List your majorquipm�nt available for this contract: CAT Excavator 320, Peterbil Tractor and �ump railer 11, eri nce in wont s'tnilar in imp jt nce to this rojec# 1Nrec�Cing and hawing residen�ra�and commercial buildings for over fifteen year 12. Background and experience of the principal members of your organization, including the officers. Union qualified workers in wrecking and excavation field. 13. Credit available: 11� 95100 o 14. Bank reference: Bank Of America I l Page 1 15. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the Village of Oak Brook: _ yes 16. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Village of Oak Brook in verification of the recitals comprising this Statement of Contractor's Qualifications, DATED atIllinois this "day of 2019. By: � Title STATE OF ILLINOIS ) )SS. COUNTY OF ) � and that the answers to the foregoing questions and all statements therein contained are true and correct. SUBSCRIBED and sworn to before me this I day of� �P c� ,2019. i i NotaryPublic OFFICIAL SEAL C Hamlin j Notary Public State of Illinois My Commission Exp,Sept, 19,2021 I { I I 1 i i Page 2 i Section G References Bidder shall supply the following information listing at least five customers for which the bidder has supplied a similar type of commodities, service, or construction. 1. Company Name: Real Restoration Address: 1322 W. Walton CHICAGO IL 60642 Phone#: 847-502-5496 Contact: Mike Kellikidis 2. Company Name: MPI Contracting, Inc Address: 2918 S. Wentworth Ave. Chicago, IL 60616 Phone#: 312.949.9962 Contact: Dan Mark 3. Company Name: MBR Wrecking Inc. Address: 4107 S. Oakton St. Skokie IL Phone#: 888.585.DEMO Contact: Joel Reifer 4. Company Name: City of Chicago D.O. B. Address: 2045 W. Washington blvd Chicago, IL 60612 Phone#: 312-743-3556 Contact: Jorge Herrera 5. Company Name: Address: Phone#: Contact: I Paqe 1 Simplee Removal Projects Add ress Price Date Contact 734 N. Milwaukee $228,000 07/2018 Kevin 224-478-4224 217 E. 13411 St. $17,500 05/2019 Rafiq Yasin 708-612-9296 4111 Joliet Ave. $18,000 08/2017 Mike 847-502-5496 City of Chicago Contract Demolish Residential &Commercial building Jorge Herrera 312-743-3556 Section H Bid Certification The undersigned, being first duly swom an oath, deposes and states that he has the authority to make this certification on behalf of the bidder for the construction, product, commodity,or service briefly described as follows: "2800 Meyers Road Building Demolition and Site Clearance" (A) The undersigned certifies that, pursuant to Chapter 720, Section 5/33E of the Illinois Compiled Statutes, 1993, the bidder is not barred from bidding on this contract as a result of a conviction for the violation of State of Illinois laws prohibiting bid-rigging or bid-rotating. (B) The undersigned states under oath that, pursuant to Chapter 65, Section 5/11-42.1- 1 of the Illinois Compiled Statutes, 1993, the bidder is not delinquent in the payment of any tax administered by the Illinois Department of Revenue. I (C) The undersigned certifies that, pursuant to Chapter 775, Section 5/2-105. of the Illinois Compiled Statutes, 1993, the bidder has a written sexual harassment policy. in place including the following information: 1. An acknowledgment of the illegality of sexual harassment. 2. The definition of sexual harassment under State law. 3. A description of sexual harassment, utilizing examples. 4. The contractor's internal complaint process including penalties. 5. The legal recourse, investigative and complaint process available through the Illinois Department of Human Rights and the Human Rights Commission, 6. Directions on how to contact the Department or the Commission_ This byKiness firm is: (check one) Corporation Partnership Individual Firm Name: Simplee Removal & Trucking Inc. Address: 1603 St. Charles Rd_ City, State, ZIP: Maywood, IL 60153 Signature: Name Printed: ShanteliP i Pe Title: President Telephone: 708-714-6808 Date: 09/09/2019 Page 1 OFFICIAL SEAL C Hamlin Notary Public State of Illinois ATTES My Commission Exp.Sept.19,2021 -SEAL- SUBSCRIBEDSWORN TO before me this day of r , 208. Notary Public I 1 { I 1 1 , , 1 i f i I r i 1 , , f I , I 1 i Paqe 2 Section I Contract 2800 Meyers Building Demolition and Site Clearance 1. THIS AGREEMENT, made and concluded this day of L&�, 2019, between the Village of Oak Brook, a municipal corporation, actin by nd through its President and Board of Trustees, known as VILLAGE, and 1 f 1 I-we� his executors, administrators, successors or assigns, k own as CON CTOR. ` 2. WITNESSETH: That for and in consideration of the payments and agreements mentioned in the Bid hereto attached, to be made and performed by the VILLAGE, and according to the terms expressed in the Bond (if applicable) referring to these presents, the CONTRACTOR agrees, at their own proper cost and expense,to do all work,furnish all materials and all labor necessary to complete the work in accordance with the plans and specifications hereinafter described, and in full compliance with all of the terms of this Contract. 3. And it is also understood and a r that the e Bid Package hereto attached, approved by the VILLAGE this day e day of 2019, are all essential documents of this contract and are a part hereof. 4. IN WITNESS WHEREOF, the said parties have executed these presents on the above mentioned date. ATTEST: ILLAGE OF AK BROOK 9LXt � -�� B Village Clerk illage Manager ATTEST: S t v i Cor orate Name By Secretary Contr ctor Page 1 Partners doing Business under (If a Co-Partnership) the firm name of Party of the Second Part (If an Individual) Party of the Second Part Page 2 SEXUAL HARASSMENT CERTIFICATE -7s-txvio—'7 -f) er ' after referred to as "Contractor" having submitted a bid/proposal for to the Village of Oak Brook, DuPage/Cook Counties, Illinois, hereby certifies that said Contractor has a written sexual harassment policy in place in full compliance with 775 ILCS 5/2-105(A)(4) including the following information: 1. An acknowledgment of the illegality of sexual harassment. 2. The definition of sexual harassment under State law. 3. A description of sexual harassment, utilizing examples. 4. The contractor's internal complaint process including penalties. 5. The legal recourse, investigative and complaint process available through the Illinois Department of Human Rights and the Human Rights Commission. 6. Directions on how to contact the Department or the Commission. 7. An acknowledgment of protection of a complaint against retaliation as provided in Section 6-101 of the Human Rights Act. Each contractor must provide a copy of such written policy to the Illinois Department of Human Rights upon request. By: Authorized Agent of Contractor Subscribed and sworn to before me this day of N O-e , 20 j • Notary Public Page 3 CONTRACTOR'S CERTIFICATIONS (CONTRACT EXECUTION) executed a contract for"Y) Iat- •h the VILLAGE, hereby'certifies at said contractor is not barred from exec ting said contract as a result of a violation of either section 5/33E-3 or 5/33E-4 of Chapter 720 of the I llinois Compiled Statutes. (DRUG-FREE 'WORKPLACE) Contractor deposes, states and certifies it will provide a drug free workplace by complying with Section 3 of the Illinois Drug Free Workplace Act, being 301LCS 580/3. Attest/Witness: Contractor By: Capri Hamlin By. Shantelle Lee Name of Contractor's Executing Officer Title: Chief Admin Officer Title: President Title of Contractor's Executing Officer Subscribed and Swom to before me this 11th day of November 2019 . ---- My Commission Expires: 09-19-21 Notary Public =SEAL- OFFICIAL SEAL C Hamlin Notary Publlo State of Illinois My Commission Exp.Sept.19,2021 Page 4 CERTIFICATION OF PAYROLL RECORDS 1, Shantelle Lee (name of person executing this certificate),do hereby certify that I am the duly qualified and acting President (title) for , (name of contractor) and, as such, am authorized to certify payroll records,as true and accurate for such company in accordance with the requirements of Section 5 of the Prevailing Wage Act(820 iLCS 130/5) (the "Act"). I do hereby further certify that the following document is a true and accurate copy of the records of all laborers, mechanics, and other workers employed by Simplee Removal & Trucking Inc._(name of contractor)on the 2800 Meyers Rd Demo Site earance Project (the"Project")for the Village of Oak Brook(the"Village"), including each such worker's name, address, telephone number, social security number, classification or class cations; and the hourly wages paid in each pay period, hours worked each day, and the starting and ending times of work each day for each such worker on such Project. I do hereby further certify that the hourly rate paid to each worker is not less then the general prevailing rate of hourly wages required by the Act, and that Simplee Removal Trucking Inc. (name of contractor), and I on behalf of such contractor, are full aware that filing a certified payroll that we know to be false is a Class B misdemeanor. 1 further certify that upon two(2)business days'notice, if requested,we and any subcontractor hired by us shall make available for inspection the records required in the Act totheDistrict, its officers and agents, and to the Director of Labor, his deputies and agents, at reasonable hours at a location within the State of Illinois. Date: November 11th , 2019 Simplee Removal & Trucking Inc. (Name of ontractor) (Signature) Shantelle Lee (Printed Name) President (Title) Subscribed and sworn to before me this 11th day of November 2019. ' OFFICIAL SEAL C Hamlin Notary Public Notary Public State of Illinois My Commission Exp.Sept. 19,202 Paqe 6 PERFORMANCE BOND BOND NUMBER: ASUR 002459 CONTRACTOR: SURETY: (Name, legal status and address) (Name,legal status and principal place of business) SIMPLEE REMOVAL&TRUCKING INC AXIS Insurance Company 1603 ST CHARLES RD 303 West Madison Street,Suite 500 MAYWOOD, IL 60153 Chicago,Illinois,60606 OWNER: (Name,legal status and address) VILLAGE OF OAKBROOK 1200 OAK BROOK RD OAK BROOK,IL 60523 CONSTRUCTION CONTRACT Date: Amount:$ 26,500.00 Description: WRECK&REMOVE A 1 STORY FRAME RESIDENTIAL BUILDING (Project name and location) A'"°' 2800 Meyers Road Demolition and Site Clearance-Oakbrook,IL BOND Date:NOVEMBER 8,2019 (Not earlier than Construction Contract Date) Amount:$ 26,500.00 Modifications to this Bond: l=_J None See Section 16 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) SIMPLEE REMOVAL& TRUCKING INC AXIS Name and ATTO E -IN-FACT (Any additional signatures appear on the last page of this Performance Bond.) (FOR INFORMATION ONLY—Name, address and telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE: BISA INC (Architect, Engineer or other party:) 13841 SOUTHWEST HWY ORLAND PARK,IL 60462 The Company executing this bond vouches that this document conforms to American Institute of Architects Document A312,2010 edition. 1 §1 The Contractor and Surety,jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract,which is incorporated herein by reference. §2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond,except when applicable to participate in a conference as provided in Section 3. §3 If there is no Owner Default under the Construction Contract,the Surety's obligation under this Bond shall arise after .1 the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Section 3.1 shall be held within ten (10)business days of the Surety's receipt of the Owner's notice. If the Owner,the Contractor and the Surety agree,the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right,if any,subsequently to declare a Contractor Default; .2 the Owner declares a Contractor Default,terminates the Construction Contract and notifies the Surety;and .3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. §4 Failure on the part of the Owner to comply with the notice requirement in Section 3.1 shall not constitute a failure to comply with a condition precedent to the Surety's obligations,or release the Surety from its obligations,except to the extent the Surety demonstrates actual prejudice. §5 When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense take one of the following actions: §5.1 Arrange for the Contractor,with the consent of the Owner,to perform and complete the Construction Contract; §5.2 Undertake to perform and complete the Construction Contract Itself,through its agents or independent contractors,- S.3 ontractors;5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Section 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default;or §5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner;or .2 Deny liability in whole or in part and notify the Owner,citing the reasons for denial. §6 If the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Section 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part,without further notice the Owner shall be entitled to enforce any remedy available to the Owner. §7 If the Surety elects to act under Section 5.1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract..Subject to the commitment by the Owner to pay the Balance of the Contract Price,the Surety is obligated,without duplication,for .1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; The Company executing this bond vouches that this document conforms to American Institute of Architects Document A312,2010 edition. 2 .2 additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Section 5;and .3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. §8 if the Surety elects to act under Section 5.1,5.3 or 5.4,the Surety's liability is limited to the amount of this Bond. §4 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract,and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators,successors and assigns. §10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. § 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein, When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a !0-0' common law bond. §14 Definitions § 14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract. § 14.2 Construction Contract.The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents. §14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract. § 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. §14.5 Contract Documents.All the documents that comprise the agreement between the Owner and Contractor. §15 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. The Company executing this bond vouches that this document conforms to American Institute of Architects Document A312,2010 edition. 3 §16 Modifications to this bond are as follows: (Space is provided below for additional signatures of added parties,other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) AXIS Insurance Company Signature: Signature: Name and Title: Name and Title: Address: Address: The Company executing this bond vouches that this document conforms to American Institute of Architects Document A312,2010 edition. 4 -A, --,X el PAYMENT BOND BOND NUMBER: ASUR 002459 CONTRACTOR: SURETY: (Name, legal status and address) (Name,legal status and principal place of business) SIMPLEE REMOVAL&TRUCKING INC Axis Insurance Company 1603 ST CHARLES RD 303 West Madison Street MAYWOOD, IL 60153 Chicago, Illinois 60606 OWNER: (Name, legal status and address) VILLAGE OF OAKBROOK 1200 OAK BROOK RD OAK BROOK,IL 60523 CONSTRUCTION CONTRACT Date: Amount:$ 26,500.00 Description:WRECK&REMOVE A 1 STORY FRAME RESIDENTIAL BUILDING (Project name and location) 2800 Meyers Road Demolition and Site Clearance-Oakbrook,IL 000, BOND ASUR 002459 Date:NOVEMBER 8,2019 (Not earlier than Construction Contract Date) Amount:$ 26,500.00 Modifications to this Bond: None See Section 18 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: ( SIMPLEE REMOVAL&TRUCKING INC AXIS Insuran ojnVSignature: Signature: Name and Title: SName and Title: MIICH (Any odditional sig off/f�s bVIA�sn the lat page of this Payment Bond.) ATTORNEY- -FACT (FOR INFORMATION ONLY— Name, address and telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE: (Architect, Engineer or other party.) The Company executing this bond vouches that this Document conforms to American Institute of Architects Document A312,2010 edition. 1 § 1 The Contractor and Surety,jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract,which is incorporated herein by reference,subject to the following terms. §2 If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond. §3 If there is no Owner Default under the Construction Contract, the Surety's obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety(at the address described in Section 13)of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract and tendered defense of such claims,demands,liens or suits to the Contractor and the Surety. §4 When the Owner has satisfied the conditions in Section 3, the Surety shall promptly and at the Surety's expense defend, indemnify and hold harmless the Owner against a duly tendered claim, demand, lien or suit. §5 The Surety's obligations to a Claimant under this Bond shall arise after the following: §5.1 Claimants,who do not have a direct contract with the Contractor, .2 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the Claim;and .2 have sent a Claim to the Surety(at the address described in Section 13). §5.2 Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety (at the address described in Section 13). §6 If a notice of non-payment required by Section 5.1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant's obligation to furnish a written notice of non-payment under Section 5.1.1. §7 When a Claimant has satisfied the conditions of Sections 5.1 or 5.2,whichever is applicable,the Surety shall promptly and at the Surety's expense take the following actions: §7.1 Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed;and §7.2 Pay or arrange for payment of any undisputed amounts. §7.3 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement. If, however,the Surety fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant. §8 The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's fees provided under Section 7.3, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. §9 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. The Company executing this bond vouches that this Document conforms to American Institute of Architects Document A312,2010 edition. 2 § 10 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract.The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to, or give notice on behalf of, Claimants or otherwise have any obligations to Claimants under this Bond. § 11 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts,purchase orders and other obligations. §12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the expiration of one year from the date(1)on which the Claimant sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2, or(2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 13 Notice and Claims to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received. § 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 115 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. 16 Definitions § 16.1 Claim.A written statement by the Claimant including at a minimum: .1 The name of the Claimant; .2 The name of the person for whom the labor was done,or materials or equipment furnished; .3 A copy of the agreement or purchase order pursuant to which labor, materials or equipment was furnished for use in the performance of the Construction Contract; .4 A brief description of the labor,materials or equipment furnished; .5 The date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract; .6 The total amount earned by the Claimant for labor, materials or equipment furnished as of the date of the Claim; .7 The total amount of previous payments received by the Claimant;and .8 The total amount due and unpaid to the Claimant for labor, materials or equipment furnished as of the date of the Claim. § 16.2 Claimant.An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located. The intent of this Bond shall be to include without limitation in the terms"labor,materials or equipment"that part of water,gas, power, light,heat, oil,gasoline,telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. § 16.3 Construction Contract.The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and all changes made to the agreement and the Contract Documents. The Company executing this bond vouches that this Document conforms to American Institute of Architects Document A312,2010 edition. § 16.4,Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. 0008k §16.5 Contract Documents.All the documents that comprise the agreement between the Owner and Contractor. §17 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. §18 Modifications to this bond are as follows: (Space Is provided below for additional signatures of added parties,other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) AXIS Insurance Company Signature: Signature: Name and Title: Name and Title: Address: Address: The Company executing this bond vouches that this Document conforms to American Institute of Architects Document A312,2010 edition. 4 Bond Verification Should you wish to verify the authenticity of this bond, please send your request, including a copy of the bond, via email to: rich. zarandona@axiscapital . com OR Contact: Richard Zarandona Executive Vice President- DCE&S AXIS Insurance 300 Connell Dr., Suite 8000 PO Box 357 Berkeley Heights, NJ 07922 Office: (908) 508-4324 Bond Claims or Notices Should you wish to file any notices to the Surety for the attached AXIS Insurance Company bond(s) they should be sent t0: AXIS Insurance Company 300 Connell Dr,, Suite 8000 PO Box 357 Berkeley Heights, NJ 07922 Attn: Surety Claims know fAll Dien by These Pi went§: ?bat AIfTS Tnsnrapce6�pitny,anliio�s ,atrcl east�'. Pat►Y;tf►e `�piaipany� iibes herby aPPbri�t; n 1ay,.Ili,MvbetleelI±rri � tiinaaeyrit33i4LSaibeee , { as its true and lawful Attorney f s)TFas fo�malCe, ecute seal aid tlelrver for anc�an�tsbeha} as surety;bons,andader�gk , ch dccttrnenTs xo be va tick as, ted by the9yovtl al£-Thee au a ' ts f]lis psztati EX C�7t7�1 NO A I3 It)RTT�t as granted t6.riake,exeiiute�s al and deliver Tionds or updt'kal�uigs tha£guarantee the p t6 t of 11' 'Ono of any promissory note, check,.cYtfift otlefter of credif tt ►n sealE a � 1 uttrand ec tyr�soluzrasdtd : XrtP a1}+ ;L0� ." ttltrts s � f the M ar l of 7�rtor bf w 3t C3LX D thinan Viee suieht;Sures acting ngly>shall have the I owdr and:a�tho !ton Z i'It ands oke Attoi�eys In�Tapt to m 6,execufe; rtntedtme AWerssert: �'atie �enuirV�ee�re§t�dertt , It sir l�c OO W Be re true �ttally cal lafltgy` t 1'p , 3enio descnb tee s� t Insurarte Cortrpany 3o sats ttt vn to bet Jdiv%w rid" fta et�l��eit� o ackrtoevledged that t iey beitng iltily authorized signed;sealed the corporate seal and del Vered'tlie errt lsy"thc att#hortty'artd din etton of aid Company:; ��� I E�� 1t�#1<,lav hexeurtto set my ha aaceti a 6i :sea1 r ��`gti tic ; Nhtary#'ultlic �, „� � r CERTIFICATION °rorxrriereao������ I. Ribhatd Laranaona Vice Presitfe i 5uteiv&Ass stdnt Seeeretary of AXIS InsuranCe.�Cop parry,dts her&Y eertify that•the attached Power of Attorney dated January 2019.4n behalf ofthe person{s)as listed above rs,a frac and correct"copy andthe same has been m,fu11,[brce and effectgirice fihe date thereof and is in full force and effect on the date p this certificate,and id o fgrthez ceirtlfy that the said AdreZv Ili.Weasserh.vslut executed tete I�owez df Attprney,"was a duly elected. SraePresitttt;Surety of A Irtsuti Cornpany ori thodate of tlge eCtmbu+Ithe attacltidtiwiii otiry.I INTESTIMONY WHEREOF,I e hereunto set my hand and affixed the corporate seal of AXIS Insurance Company on tiirth6„„ of , BY. Ill Prlrited*T� Richard Zara lona Title: Y,,.%president.Sarah Section K Figures Figure 1 Location Plan Figure 2 Utility Removal and Adjustment and Grading Plan Page 10 tope Comcast I 1 t���� 1 1��� 280 'Meyers Rd .s; t, Page 12 1 2 3 4 5 a T B 9 10 IT 12 13 14 LEGAL I ........ ft. by d—fp1W in. .a Subs~In the S�M,etee d Sec a. T—hip M NOM,Re,,ge 11—Bf ft TNN Pd.*W MAAdIm.— ,q to ft F100 OemlremNeu August 10.IN?ee DavmeN 527420,In p Pepe Cordy 1111-le. II A im.-Envv)US AREA TABLE 7-7 j Nei New Imperybus Area 7.633 SF NSiMB MAW SHED TO BE—EB THC MWALT DPoVEWAT TO BE REVO6ED 7� C r—S�F.FGENIHMARK ---------- 0 .1 IT LOT 4 `a Belt CWCBETE BATesMuas NORTH JBE 7 Ir VUSR M &SN NELL E—LE V1eN­bj1M BE\R- -- doe led T. J.PATTERSON J.PATTERSON TORE ALL Be—AXIS NOTES: SID AMl EROCIDH CDIIRDL BUNRi OAK B 1. TREES SMALL NOT BE REMOVED.CONTACT REBECCA VONORASISKATB3o-356SIMF LEGEND ANY TREES MUST BE REMOVED. 2. SBE WAS HEAVILYOVERGROWNWTM PROJECT DENrHMARK BRUSH AND OTHER VEGETATION.WW GROUND IMPROVEMENTS MAY HOT HAVE 7 MMDUrI"IOH AND BEEN VISIBLE&SURVEYED AT THE ME OF SROSIONCONTRMPLAN THE SURVEY. cool ehee'e Section L Appendix Appendix A Seed Mixture Appendix B Work Hours Page 11 APPENDIX A IDOT Class 1 Lawn Mbdure Kentucky Bluegrass 100 lbs. / acre Perennial Ryegrass 60 lbs. / acre Creeping Red Fescue 40 lbs. / acre Total 200 lbs. / acre Page 13 APPENDIX A Hours of Construction: No person or entity shall perform construction activities, perform any activity requiring a building permit, or operate heavy equipment,except as follows: Location Day of the Week Permitted Time Residential Zone Districts- Heavy Equipment-Between Interior or Exterior 7:OOam and 6:0 m Hand Tools: Hand Tools may be used at Monday-Friday 7: Y Other Tools- Between 7:OOam and any time within the interior of a fully 8:OOpm enclosed structure provided that there is Heavy Equipment- Between no construction related sound heard at the Saturday 9:OOam and 5:OOpm property line. Other Tools Between 8:OOam and For the purposes of this section"hand 7:OOpm tools" shall mean tubing cutters, volt- ohm meters,manual pipe benders,pliers, wrenches, screwdrivers,paint brushes, Heavy Equipment-Not Permitted rollers, torches,brooms, and similar tools Sunday Other Tools- Between 9:OOam and that are substantially silent in 6:OOpm operation. "Hand tools"shall not include hammers or any other item used as a striking implement. All other Zone Districts- Heavy Equipment-Between Exterior* Any 6:OOam and 6:OOpm Other Tools- Between 6:OOam and *Exception: Any property that shares 8:0m a lot line with a Residential Zone Heavy Equipment- District,within five hundred feet(5001) Any Same as Residential Zone of the Residential Zone District. Districts See attached map, below. All other Zone Districts- Any Other Tools-Any Interior Hand Tools-An Heavy Equipment*For purposes of this section, "heavy equipment" shall mean gasoline or diesel powered air compressors, gasoline or diesel powered saws,bulldozers,jackhammers, pile drivers, power hammers, graders, riveters, earthmovers, tree and stump grinders, trenchers, cement mixers, tractors, power hoists or derricks, demolition balls,power shovels,dump trucks, and power equipment on wheels or traction chains,or other similar equipment, but shall not include garbage trucks, which are governed by separate agreement within the village., non-construction delivery vehicles,trucks operating on designated truck routes, or snow removal equipment. Residential Zone District ***For the purposes of this section"Residential Zone District" shall include all zone districts R1, R2, R3, R4 and R5 with the additional inclusion of any contiguous street, right-of-way, or public owned property. Other Tools" For the purposes of this section "Other Tools" shall mean any construction tool that is neither defined herein as "Hand Tools" or"Heavy Equipment". Other tools shall include-but not be limited to: electric compressors, nailers, hammers, cord-connected electric saws, drills, or similar equipment. It is anticipated that "Other Tools"will create a sound level that can be heard at the property line. Exceptions: 1. Emergencies: The limitations stated in this section shall not apply in any situation which requires heavy equipment or other tools in emergencies to assist or avoid a problem related to health or to safety of persons or property, or to sewer, water,power, utility, or telephone interruptions. 2. Work by Public Agencies: The limitations stated in this section may be waived by the board of trustees by resolution for work undertaken by any public body or agency for the benefit of the public. The board of trustees may attach to any such waiver all conditions it deems necessary to protect the public health, safety or welfare. 3. Waiver: The limitations stated in this section may be waived by the building official in areas of the village zoned for nonresidential uses pursuant to the village zoning ordinance; provided, however, that no such waiver shall be granted unless the building official finds that: a. The party seeking the waiver will suffer a unique or unusual hardship unless the waiver is granted; and b. The granting of a waiver will not cause a substantial or undue adverse impact upon adjacent property or upon the public health, safety and welfare. c. The village manager may attach to such waiver all conditions he deems necessary to protect the public health, safety or welfare. 4. Building Permits: Work undertaken pursuant to any permit issued by the village shall be subject to the provisions of this section. Village of Oak Brook 2016 500 Ft Residential Buffer ws f A j N • °J l M • z � t , e J .� - dee R '. • � - �+ FT�; 71 -7 �3 H _ a �) ,..�a Oak er-C Pok u— BWtliny take.aM Cotka --- - -' -' - P.bk R— S*.P.h D Gout Dam �" .......,.+...,-...-. •••�•••.'••a�...:+. Pmaw Rwtl 4 V&Mng Skm I Om Oak BNK*Dam