Loading...
Projects Update 9.15.23 Project Updates for the Week of September 18th, 2023 Updated September 15th, 2023 • The resurfacing of Harger Road from Spring Road to the westbound I-88 entrance ramp is underway. Please be advised that a temporary road closure between Spring Road and Yorkshire Woods is scheduled to begin on September 25th, 2023. This closure is required to complete repair work to the bridge over Salt Creek. Local access to residences and businesses will remain open from either side of the bridge, however thru traffic will be closed. Electronic message boards will be updated and signage will be in place to alert drivers of the upcoming closure. Signage for the detour route will also be in place prior to the road closure. The closure is anticipated to last up to 21 calendar days. All work is weather dependent. For more information or answers to your questions, please feel free to call the Resident Engineer, Raz Calin, at 224-240-2998 or the Project Manager, Orion Galey, at 847-833-0210. You may also contact Public Works at 630-368-5270. • The Illinois Tollway has notified the Village that beginning the week of September 18th, traffic on westbound 22nd Street/Cermak Road will be reduced to a single lane at I-294 and the right auxiliary lane on eastbound 22nd Street/Cermak Road. Two lanes will remain open for traffic. The lane closures are scheduled to remain in place through the fall. Electronic message boards and signage will be in place in advance to alert drivers. All work is weather dependent. For more information, please visit www.illinoistollway.com/media-center/construction-alerts. • The condition of the York Road bridge deck over the I-88 / I-294 connector ramp continues to be monitored and patched as needed. The Village is in the process of coordinating the deck and superstructure replacement with the Illinois Tollway Authority. • Flagg Creek Water Reclamation District is in the process of installing a lift station at Harger Road east of Spring Road. For more information, please contact Flagg Creek at 630-323-3299. • The DuPage County Division of Transportation has notified the Village that Midwest Road/Summit Ave, which is a County roadway, is to be improved/resurfaced this construction season. For more information, please contact DuPage County at 630-407-6900. • The Illinois Department of Transportation has notified the Village that it is initiating a crack and joint sealing project along Route 38, which is a State roadway, from East of Edson Avenue to East of I-294 this construction season. For more information, please contact IDOT at 847-705-4250 • ComEd has notified the Village that it is initiating vegetation maintenance activities along Meyers Road, 35th Street, and White Oak Lane in the next few months. Affected residents will be notified via mailed postcard. For more information, please contact ComEd at 800-Edison-1 (800-334-7661).